Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
13-749-006
"ABBREVIATIONS - ABV. --- ABOVE INT. --- INTERIOR A.G. --- AIR CONDITIONING INV. --- INVERT ACOUS. --- ACOUSTICAL JT. --- JOINT A.C.T. --- ACOUSTICAL CEILING TILE KIT. --- KITCHEN ADMIN. --- ADMINISTRATION LAV. --- LAVATORY A.DRN --- AREA DRAIN L.F. --- LINEAR FEET ADJ. --- ADJACENT / ADJUSTABLE L.P. --- LOW POINT A.F.F. --- ABOVE FINISH FLOOR MAX. --- MAXIMUM AFP --- ACOUSTICAL FINISH PLASTER MECH. --- MECHANICAL A.H.U. --- AIR HANDLING UNIT MFR. --- MANUFACTURER ALUM. --- ALUMINUM MGR. --- MANAGER ANOD. --- ANODIZED MH --- MANHOLE ARCH. --- ARCHITECTURAL MIN. --- MINIMUM A.S.B. --- ASBESTOS MISC. --- MISCELLANEOUS ASPH. --- ASPHALT M.O. --- MASONRY OPENING ASST. --- ASSISTANT MTL. --- METAL BATT. --- BATT INSULATION NA --- NOT APPLICABLE BB. --- BACKER BOARD NC --- NON-COMBUSTIBLE BD. --- BOARD N.I.C. --- NOT IN CONTRACT BLIDG. --- BUILDING No. / NUM. - -- NUMBER BLK. --- BLOCK / BLOCKING NOM. --- NOMINAL BM, - BEAM N.T.S. --- NOT TO SCALE - B.O. --- BOTTOM OF O.C. --- ON CENTER CAB, --- CABINET 0. D. --- OUTSIDE DIAMETER CB --- CATCH BASIN O.F.I.C. --- OWNER FURNISHED, CEM. --- CEMENT C.PLAS. --- CEMENT PLASTER CONTRACTOR INSTALLED C.G. --- CORNER GUARD O.H. --- OVERHANG C.HGT. --- CEILING HEIGHT OFF. --- OFFICE C.JNT, --- CONTROL JOINT OPNG. --- OPENING CLR. --- CLEAR (FINISH TO FINISH) P.L. ___ PROPERTY LINE - COLM, --- COLUMN P.LAM. ___ PLASTIC LAMINATE COMP. --- COMPUTER PLAS, --- PLASTER CPT. --- CARPET PLUM. --- PLUMBING CT. --- CERAMIC TILE PLYWD. --- PLYWOOD CLG. --- CEILING P.O.B. --_ POINT OF BEGINNING CLO. - - CLOSET PR. --- PAIR C.O. --- CLEAN OUT PTD, --- PAINTED CLM, --- COLUMN R --- RISER CONC. --- CONCRETE RAD. --- RADIUS CONT, --- CONTINUOUS R.D. --- ROOF DRAIN C.M.U. --- CONCRETE MASONRY UNIT REF. --- REFERENCE DETL. --- DETAIL REEL. --- REFLECTED DIA. --- DIAMETER REINF. --- REINFORCED DIR.� --- DIRECTOR REQ. --- REQUIRED DN. --- DOWN RM. --- ROOM D.O. --- DOOR OPENING R.O. --- ROUGH OPENING DR. --- DOOR RT --- RESILIENT TILE DWR. --- DRAWER SC --- SOLID CORE DWG. --- DRAWING SCHD. --- SCHEDULE EA. EACH SERV. --- SERVICE -ELEC. --- ELECTRICAL SHR. --- SHOWER ELEV. --- ELEVATION SHT. --- SHEET © PROJECT NUMBLER SIM. --- SIMILAR EL --- ELEVATOR E.N.C. --- EXISTING, NO CHANGE SPECS. --- SPECIFICATIONS - E.O.S. --- EDGE OF SLAB SQ. -_: SQUARE . 170.1 --- EQUAL SL. --- SLOPE EQUIP. --- EQUIPMENT SLD. --- SLIDING E.W.-C, --- ELECTRIC WATER COOLER SREF --- STATE REQUIREMENTS » EXH. --- EXHAUST FOR EDUCATIONAL EXIST. --- EXISTING FACILITIES (1999 ED.) EXT. --- EXTERIOR S.S. --- SERVICE SINK EXP.JT. --- EXPANSION JOINT S.STL. --- STAINLESS STEEL FBC 2004 --- FLORIDA BUILDING CODE STL --- STEEL ST - - STORAGE F.D. --- FIRE DAMPER FIRE D STRUCT. STRUCTURAL F.F.E. --- FINISH FLOOR ELEVATION SUSP. ---- SUSPENDED F.F.@E, --- FIXTURES, FURNITURE, SYM. --- SYMMETRICAL T -- TREAD AND EQUIPMENT TEL. TELEPHONE F.F.P.C, --- FLORIDA FIRE PROTECTION CODE TEMP ___ TEMPERED FIXT. ---- FIXTURE THK. --- THICKNESS FLASH. --- PUSHING FL. D. --- FLOOR BRAIN T.O. __ _ --- TOP OF ____ F.O.F. --- FACE OF FINISH Np. _-_ TYPICAL F.R. --- FIRE RATED UA --- UNLIMITED AREA GA. --- GAUGE U.C. ___ .UNDER COUNTER GALV. -�- GALVANIZED U.L. --- UNDERWRITERS LABORATORY GEN. --- GENERATOR U.N.O. --- UNLESS OTHERWISE NOTED GL J --- VERT. --- VERTICAL G.W.B. -LL- .CUSS GYPSUM WALL BOARD VEST. --- VESTIBULE H/C --- HANDICAP V.I.F.--- VERIFY IN FIELD HG --- HOLLOW CORE VWC --- VINYL WALL COVERING HDWD. --- HARDWOOD VT - - VINYL TILE W/ --- WITH HM --- HOLLOW METAL W.C. _ _ WATER CLOSET HORIZ. --- HORIZONTAL HGT. --- HEIGHT WD ___ WOOD W/0 --_ WITHOUT H.P. --- LDIA. - HIGH POINT - INSIDE DIAMETER Wp. ___ WATERPROOF INSULATION WT. _-_ WEIGHT MATERIAL LEGEND GENERAL NOTES 1. CONTRACTOR SHALL COMPLY WITH THE FLORIDA BUILDING CODE 2010 (WITH ALL APPLICABLE REVISIONS), FLA. FIRE PREVENTION CODE 2010, ALL STATE AND LOCAL ZONING CODES AND THE CITY OF SOUTH MIAMI CRITERIA. PERMITS SHALL BE POSTED IN A VISIBLE PLACE AT ALL TIMES. ALL PERMITS, UTILITY AND METER CONNECTION FEES SHALL BE OBTAINED AND PAID FOR BY THE CONTRACTOR. 2. ALL WORK, MATERIALS AND EQUIPMENT UTILIZED IN THIS PROJECT SHALL BE NEW AND INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURERS RECOMMENDATIONS AND SPECIFICATIONS. 3. ALL WORK FOR THIS PROJECT SHALL CONFORM TO STANDARDS PUBLISHED BY RECOGNIZED PROFESSIONAL AND INDUSTRY ORGANIZATIONS. 4. CONTRACTOR SHALL BE RESPONSIBLE FOR VISITING THE SITE PRIOR TO BIDDING AND FAMILIARIZING HIMSELF WITH ALL EXISTING CONDITIONS AFFECTING THE WORK, INCLUDING BUT NOT LIMITED . TO PRIVATE AND PUBLIC UTILITIES, ON AND OFF SITE, ACCESS ROADS AND OTHER SUPPORT FACILITIES. 5. CONTRACTOR TO REMOVE, RELOCATE OR RE-ROUTE, AS NECESSARY, ELECTRICAL, TELEPHONE, WATER, SEWER, GAS OR ANY OTHER UTILITY LINES ENCOUNTERED AND SHALL COORDINATE THIS WORK WITH ALL LOCAL UTILITY COMPANIES. 6. CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ARCHITECT OF ANY UNEXPECTED OR UNKNOWN FIELD CONDITIONS, ERRORS, OMISSIONS, OR DISCREPANCIES IN THE DRAWINGS, PROJECT MANUAL, OR CONTRACT DOCUMENTS PRIOR TO PROCEEDING WITH THE WORK OR SHOP FABRICATIONS. 7. CONTRACTOR SHALL PREPARE AND MAINTAIN ALL CONSTRUCTION AREAS, AS WELL AS SURROUNDING AREAS FREE OF DEBRIS OR HAZARDOUS EQUIPMENT AT ALL TIMES. 8. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR AND/OR THE REPLACEMENT OF ANY ITEMS DAMAGED DURING CONSTRUCTION OR CLEAN-UP. CONSTRUCTION PERSONNEL SHALL BE CONFINED TO THE LIMITS OF THE CONSTRUCTION AREA. ALL OSHA REGULATIONS FOR CONSTRUCTION AREAS SHALL BE STRICTLY FOLLOWED. 9. DRAWINGS ARE NOT TO BE SCALED. WRITTEN DIMENSIONS SHALL BE FOLLOWED. 10. ALL DIMENSIONS ARE BASED ON NOMINAL SIZES OF MEMBERS AND ARE GIVEN TO THE OUTER FACE OF SUCH MEMBERS, NOT TO FACE OF FINISH MATERIALS UNLESS OTHERWISE NOTED ON DRAWINGS. WHERE A DIMENSION IS LABELED "CLEAR" IT IS TAKEN FROM THE FACE OF FINISH MATERIALS TO FACE OF FINISH MATERIALS. AS PER F.B.C. 2010 SECTION 423.6.1. 11. CONTRACTOR TO SUBMIT SHOP DRAWINGS FOR APPROVAL BEFORE COMMENCING FABRICATION AND/OR INSTALLATION OF ALL APPLICABLE ITEMS FOR CONSTRUCTION. ALL SHOP DRAWINGS DIMENSIONS SHALL BE FIELD VERIFIED, REVIEWED AND APPROVED BY CONTRACTOR BEFORE SUBMITTAL. SHOP DRAWINGS WHICH ARE INCOMPLETE OR LACKING SUFFICIENT INFORMATION WILL BE RETURNED WITHOUT REVIEW. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. 12. THE CONTRACTOR SHALL BE AWARE THAT SPECIFIC FIRE -RATED SEPARATION WITHIN THE BUILDING'S CONSTRUCTION ARE REQUIRED BY CODE. THE USE OF SPECIFIC MATERIALS AND COMBINATIONS OF MATERIALS WITHIN FIRE RATED ASSEMBLIES, AS CALLED FOR ON THE DRAWINGS AND SPECIFICATIONS, ARE FOR THE PURPOSE OF ACHIEVING THOSE REQUIRED FIRE SEPARATIONS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THAT ANY CHANGE IN MATERIAL THAT IS REQUESTED BY OR MADE BY THE CONTRACTOR AND/OR IT'S SUBCONTRACTORS, FROM THOSE MATERIALS DRAWN OR SPECIFIED, DOES NOT IN ANY WAY AFFECT OR LESSEN THE REQUIRED CONSTRUCTION ASSEMBLY. SPECIFIC SEQUENCES OR METHODS OF ACHIEVING FIRE RATED ASSEMBLIES REQUIRED BY A "U.L. No." LISTING SHALL BE FOLLOWED WITHOUT DEVIATION, UNLESS OTHERWISE NOTED OR DETAILED. 13. WHERE CMU WALLS ARE INDICATED TO HAVE A SPECIFIC HOURLY FIRE RATING, THIS SHALL BE TAKEN AS THE MINIMUM ALLOWED. 14. THE USE OF FIRE RETARDANT TREATED WOOD IS PROHIBITED. PRESSURE TREATED WOOD SHALL BE USED WHERE WOOD IS IN CONTACT WITH CONCRETE OR MASONRY OR IN CONTACT WITH THE ELEMENTS (EXTERIOR). 15. CONTRACTOR TO FURNISH AND INSTALL ALL METAL AND WOOD BLOCKING REQUIRED FOR WALL MOUNTED OR BRACED FIXTURES, MILLWORK, SHELVES, BATHROOM FIXTURES AND ACCESSORIES OR BY OTHER ITEMS DESCRIBED IN INTERIOR DESIGN AND ARCHITECTURAL DRAWINGS. 16. IN ADDITION TO WALL TYPES SHOWN ON PLANS THE CONTRACTOR SHALL REFER TO THE ROOM FINISH SCHEDULE, INTERIOR ELEVATIONS AND DETAILS FOR ADDITIONAL INFORMATION REGARDING FINISHES. 17. CONTRACTOR SHALL COORDINATE WITH MECHANICAL AND ELECTRICAL CONTRACTORS THE LOCATION OF ALL ACCESS PANELS SO AS TO ALLOW FOR PROPER EQUIPMENT ACCESSIBILITY, MAINTENANCE AND/OR OPERATION OF THE BUILDING SYSTEMS PRIOR TO THE START OF WORK. THE OMISSIONS OF ANY OR ALL ACCESS PANELS DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY FROM PROVIDING AND INSTALLING SUCH PANELS OR DOORS. ACCESS PANELS IN RATED ELEMENTS SHALL HAVE THE SAME FIRE RATING. 18. CONTRACTOR TO PROVIDE ACCESS PANELS FOR ALL A/C FIRE DAMPERS WHERE APPLICABLE. 19. CONTRACTOR SHALL PAINT ALL VISIBLE SURFACES OF FACTORY PRIMED OR FACTORY PAINT FINISHED EQUIPMENT, A.C. GRILLS OR REGISTERS, COVERS, ETC. UNLESS SPECIFICALLY NOTED OTHERWISE VERIFY AND COORDINATE COLORS WITH INTERIOR DESIGN AND ARCHITECT. 20. BEFORE INSTALLATION, THE CONTRACTOR SHALL COORDINATE WITH THE ARCHITECT THE EXACT MOUNTING LOCATION AND HEIGHTS OF ALL SWITCHES, WALL RECEPTACLES, PLUGS, THERMOSTATS AND OTHER WALL MOUNTED FIXTURES. 21. ALL INTERIOR AND EXTERIOR JOINTS BETWEEN DIFFERENT MATERIALS OR FINISHES SHALL RECEIVE A BEAD OF CAULKING OR FORM A REVEAL TO MATCH COLOR OF ADJACENT SURFACE. COORDINATE COLORS WITH ARCHITECT. 22. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING ALL DEBRIS AND CONSTRUCTION MATERIAL FROM THE SITE (REFER TO NOTE # 7). CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR PROPERLY CLEANING ALL AREAS PRIOR TO FINAL ACCEPTANCE BY THE OWNER INCLUDING BUT NOT LIMITED TO WINDOWS, FLOORS, CARPETS, WALLS, DOORS, EQUIPMENT, ETC, 23. UPON COMPLETION OF THIS PROJECT, THE CONTRACTOR SHALL GIVE TO THE OWNER A COMPLETE SET OF AS -BUILT CIVIL, LANDSCAPE, ARCHITECTURAL, MECHANICAL, PLUMBING, ELECTRICAL AND FIRE PROTECTION DRAWINGS ALONG WITH THE WRITTEN GUARANTIES, OPERATION AND MAINTENANCE MANUALS OF ALL EQUIPMENT AND FINISHES INSTALLED. THE CONTRACTOR SHALL MAINTAIN A CURRENT SET OF AS -BUILT DRAWINGS AND SPECIFICATIONS. INFORMATION SHALL BE RECORDED BY CONTRACTOR AS CONSTRUCTION PROGRESSES AND REVIEWED FOR COMPLETENESS AT EACH REQUISITION REQUEST. REFER TO PROJECT MANUAL. 24. CONTRACTOR SHALL PROVIDE PROPER SAFEGUARDS IN COMPLIANCE WITH THE LIFE SAFETY PLANS DURING ALL PHASES OF CONSTRUCTION, IN ACCORDANCE WITH F.B.C. 2010 SECTION 423.6,1 AND W/ 2010 FFPC. 25. CONTRACTOR TO INSTALL BARRIERS AS NECESSARY AND REQUIRED AROUND PERIMETER OF CONSTRUCTION LIMITS TO PROTECT THE PUBLIC. REFER TO FBC' 26. ALL PIPING SHALL BE SLEEVED THROUGH SLAB. CONTRACTOR SHALL FULLY SEAL SPACE AROUND PIPES WITH A 2 -HOUR U.L. FIRE STOPPING MATERIAL. REFER TO SPECIFICATIONS. 27. CONTRACTOR TO FURNISH AND INSTALL ALL METAL AND WOOD BLOCKING REQUIRED FOR WALL MOUNTED OR BRACED FIXTURES, CHALKBOARDS, MARKER BOARDS, TACKBOARDS, MILLWORK, SHELVES, TOILET FIXTURES, AND ACCESSORIES OR 'BY OTHER' ITEMS DESCRIBED IN INTERIOR DESIGN AND ARCHITECTURAL DRAWINGS. BLOCKING SHALL BE CONSTRUCTED TO SUPPORT THE IMPOSED LOAD. 28. CONTRACTOR TO PROVIDE A SAFETY PLAN PRIOR TO START OF CONSTRUCTION TO CLEARLY DELINEATE AREAS FOR CONSTRUCTION, SAFETY BARRIERS, EXITS, CONSTRUCTION TRAFFIC DURING THE VARIOUS PHASES AND WHEN CONDITIONS CHANGE. INDEX OF DRAWINGS ORIGINAL LATEST REV. DATE BLDG. DEPT, DATE REV. NO. APPROVED CONCRETE MASONRY UNITS 02. PLYWOOD 7. .13 - CONCRETE C-3 FINISHED PLYWOOD C-4 DRYWALL / STUD PARTITION C-6 WOOD BLOCKING 0". CONCRETE IN SECTION SG.O WOOD - RIGID INSULATION INDICATED C-10 METAL C-11 IN ENLARGED DETAILS / SECTIONS C-12 PAVING, GRADING is DRAINAGE DETAILS C-13 PAVEMENT MARKING is SIGNAGE PLAN C-14 M ETAL LATH - EARTH C-16 POOL DECK JOINT PLAN " u, t 2 GRAVEL/POROUS FILL a u S BATT INSULATION N N LU GENERAL NOTES 1. CONTRACTOR SHALL COMPLY WITH THE FLORIDA BUILDING CODE 2010 (WITH ALL APPLICABLE REVISIONS), FLA. FIRE PREVENTION CODE 2010, ALL STATE AND LOCAL ZONING CODES AND THE CITY OF SOUTH MIAMI CRITERIA. PERMITS SHALL BE POSTED IN A VISIBLE PLACE AT ALL TIMES. ALL PERMITS, UTILITY AND METER CONNECTION FEES SHALL BE OBTAINED AND PAID FOR BY THE CONTRACTOR. 2. ALL WORK, MATERIALS AND EQUIPMENT UTILIZED IN THIS PROJECT SHALL BE NEW AND INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURERS RECOMMENDATIONS AND SPECIFICATIONS. 3. ALL WORK FOR THIS PROJECT SHALL CONFORM TO STANDARDS PUBLISHED BY RECOGNIZED PROFESSIONAL AND INDUSTRY ORGANIZATIONS. 4. CONTRACTOR SHALL BE RESPONSIBLE FOR VISITING THE SITE PRIOR TO BIDDING AND FAMILIARIZING HIMSELF WITH ALL EXISTING CONDITIONS AFFECTING THE WORK, INCLUDING BUT NOT LIMITED . TO PRIVATE AND PUBLIC UTILITIES, ON AND OFF SITE, ACCESS ROADS AND OTHER SUPPORT FACILITIES. 5. CONTRACTOR TO REMOVE, RELOCATE OR RE-ROUTE, AS NECESSARY, ELECTRICAL, TELEPHONE, WATER, SEWER, GAS OR ANY OTHER UTILITY LINES ENCOUNTERED AND SHALL COORDINATE THIS WORK WITH ALL LOCAL UTILITY COMPANIES. 6. CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ARCHITECT OF ANY UNEXPECTED OR UNKNOWN FIELD CONDITIONS, ERRORS, OMISSIONS, OR DISCREPANCIES IN THE DRAWINGS, PROJECT MANUAL, OR CONTRACT DOCUMENTS PRIOR TO PROCEEDING WITH THE WORK OR SHOP FABRICATIONS. 7. CONTRACTOR SHALL PREPARE AND MAINTAIN ALL CONSTRUCTION AREAS, AS WELL AS SURROUNDING AREAS FREE OF DEBRIS OR HAZARDOUS EQUIPMENT AT ALL TIMES. 8. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR AND/OR THE REPLACEMENT OF ANY ITEMS DAMAGED DURING CONSTRUCTION OR CLEAN-UP. CONSTRUCTION PERSONNEL SHALL BE CONFINED TO THE LIMITS OF THE CONSTRUCTION AREA. ALL OSHA REGULATIONS FOR CONSTRUCTION AREAS SHALL BE STRICTLY FOLLOWED. 9. DRAWINGS ARE NOT TO BE SCALED. WRITTEN DIMENSIONS SHALL BE FOLLOWED. 10. ALL DIMENSIONS ARE BASED ON NOMINAL SIZES OF MEMBERS AND ARE GIVEN TO THE OUTER FACE OF SUCH MEMBERS, NOT TO FACE OF FINISH MATERIALS UNLESS OTHERWISE NOTED ON DRAWINGS. WHERE A DIMENSION IS LABELED "CLEAR" IT IS TAKEN FROM THE FACE OF FINISH MATERIALS TO FACE OF FINISH MATERIALS. AS PER F.B.C. 2010 SECTION 423.6.1. 11. CONTRACTOR TO SUBMIT SHOP DRAWINGS FOR APPROVAL BEFORE COMMENCING FABRICATION AND/OR INSTALLATION OF ALL APPLICABLE ITEMS FOR CONSTRUCTION. ALL SHOP DRAWINGS DIMENSIONS SHALL BE FIELD VERIFIED, REVIEWED AND APPROVED BY CONTRACTOR BEFORE SUBMITTAL. SHOP DRAWINGS WHICH ARE INCOMPLETE OR LACKING SUFFICIENT INFORMATION WILL BE RETURNED WITHOUT REVIEW. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. 12. THE CONTRACTOR SHALL BE AWARE THAT SPECIFIC FIRE -RATED SEPARATION WITHIN THE BUILDING'S CONSTRUCTION ARE REQUIRED BY CODE. THE USE OF SPECIFIC MATERIALS AND COMBINATIONS OF MATERIALS WITHIN FIRE RATED ASSEMBLIES, AS CALLED FOR ON THE DRAWINGS AND SPECIFICATIONS, ARE FOR THE PURPOSE OF ACHIEVING THOSE REQUIRED FIRE SEPARATIONS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THAT ANY CHANGE IN MATERIAL THAT IS REQUESTED BY OR MADE BY THE CONTRACTOR AND/OR IT'S SUBCONTRACTORS, FROM THOSE MATERIALS DRAWN OR SPECIFIED, DOES NOT IN ANY WAY AFFECT OR LESSEN THE REQUIRED CONSTRUCTION ASSEMBLY. SPECIFIC SEQUENCES OR METHODS OF ACHIEVING FIRE RATED ASSEMBLIES REQUIRED BY A "U.L. No." LISTING SHALL BE FOLLOWED WITHOUT DEVIATION, UNLESS OTHERWISE NOTED OR DETAILED. 13. WHERE CMU WALLS ARE INDICATED TO HAVE A SPECIFIC HOURLY FIRE RATING, THIS SHALL BE TAKEN AS THE MINIMUM ALLOWED. 14. THE USE OF FIRE RETARDANT TREATED WOOD IS PROHIBITED. PRESSURE TREATED WOOD SHALL BE USED WHERE WOOD IS IN CONTACT WITH CONCRETE OR MASONRY OR IN CONTACT WITH THE ELEMENTS (EXTERIOR). 15. CONTRACTOR TO FURNISH AND INSTALL ALL METAL AND WOOD BLOCKING REQUIRED FOR WALL MOUNTED OR BRACED FIXTURES, MILLWORK, SHELVES, BATHROOM FIXTURES AND ACCESSORIES OR BY OTHER ITEMS DESCRIBED IN INTERIOR DESIGN AND ARCHITECTURAL DRAWINGS. 16. IN ADDITION TO WALL TYPES SHOWN ON PLANS THE CONTRACTOR SHALL REFER TO THE ROOM FINISH SCHEDULE, INTERIOR ELEVATIONS AND DETAILS FOR ADDITIONAL INFORMATION REGARDING FINISHES. 17. CONTRACTOR SHALL COORDINATE WITH MECHANICAL AND ELECTRICAL CONTRACTORS THE LOCATION OF ALL ACCESS PANELS SO AS TO ALLOW FOR PROPER EQUIPMENT ACCESSIBILITY, MAINTENANCE AND/OR OPERATION OF THE BUILDING SYSTEMS PRIOR TO THE START OF WORK. THE OMISSIONS OF ANY OR ALL ACCESS PANELS DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY FROM PROVIDING AND INSTALLING SUCH PANELS OR DOORS. ACCESS PANELS IN RATED ELEMENTS SHALL HAVE THE SAME FIRE RATING. 18. CONTRACTOR TO PROVIDE ACCESS PANELS FOR ALL A/C FIRE DAMPERS WHERE APPLICABLE. 19. CONTRACTOR SHALL PAINT ALL VISIBLE SURFACES OF FACTORY PRIMED OR FACTORY PAINT FINISHED EQUIPMENT, A.C. GRILLS OR REGISTERS, COVERS, ETC. UNLESS SPECIFICALLY NOTED OTHERWISE VERIFY AND COORDINATE COLORS WITH INTERIOR DESIGN AND ARCHITECT. 20. BEFORE INSTALLATION, THE CONTRACTOR SHALL COORDINATE WITH THE ARCHITECT THE EXACT MOUNTING LOCATION AND HEIGHTS OF ALL SWITCHES, WALL RECEPTACLES, PLUGS, THERMOSTATS AND OTHER WALL MOUNTED FIXTURES. 21. ALL INTERIOR AND EXTERIOR JOINTS BETWEEN DIFFERENT MATERIALS OR FINISHES SHALL RECEIVE A BEAD OF CAULKING OR FORM A REVEAL TO MATCH COLOR OF ADJACENT SURFACE. COORDINATE COLORS WITH ARCHITECT. 22. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING ALL DEBRIS AND CONSTRUCTION MATERIAL FROM THE SITE (REFER TO NOTE # 7). CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR PROPERLY CLEANING ALL AREAS PRIOR TO FINAL ACCEPTANCE BY THE OWNER INCLUDING BUT NOT LIMITED TO WINDOWS, FLOORS, CARPETS, WALLS, DOORS, EQUIPMENT, ETC, 23. UPON COMPLETION OF THIS PROJECT, THE CONTRACTOR SHALL GIVE TO THE OWNER A COMPLETE SET OF AS -BUILT CIVIL, LANDSCAPE, ARCHITECTURAL, MECHANICAL, PLUMBING, ELECTRICAL AND FIRE PROTECTION DRAWINGS ALONG WITH THE WRITTEN GUARANTIES, OPERATION AND MAINTENANCE MANUALS OF ALL EQUIPMENT AND FINISHES INSTALLED. THE CONTRACTOR SHALL MAINTAIN A CURRENT SET OF AS -BUILT DRAWINGS AND SPECIFICATIONS. INFORMATION SHALL BE RECORDED BY CONTRACTOR AS CONSTRUCTION PROGRESSES AND REVIEWED FOR COMPLETENESS AT EACH REQUISITION REQUEST. REFER TO PROJECT MANUAL. 24. CONTRACTOR SHALL PROVIDE PROPER SAFEGUARDS IN COMPLIANCE WITH THE LIFE SAFETY PLANS DURING ALL PHASES OF CONSTRUCTION, IN ACCORDANCE WITH F.B.C. 2010 SECTION 423.6,1 AND W/ 2010 FFPC. 25. CONTRACTOR TO INSTALL BARRIERS AS NECESSARY AND REQUIRED AROUND PERIMETER OF CONSTRUCTION LIMITS TO PROTECT THE PUBLIC. REFER TO FBC' 26. ALL PIPING SHALL BE SLEEVED THROUGH SLAB. CONTRACTOR SHALL FULLY SEAL SPACE AROUND PIPES WITH A 2 -HOUR U.L. FIRE STOPPING MATERIAL. REFER TO SPECIFICATIONS. 27. CONTRACTOR TO FURNISH AND INSTALL ALL METAL AND WOOD BLOCKING REQUIRED FOR WALL MOUNTED OR BRACED FIXTURES, CHALKBOARDS, MARKER BOARDS, TACKBOARDS, MILLWORK, SHELVES, TOILET FIXTURES, AND ACCESSORIES OR 'BY OTHER' ITEMS DESCRIBED IN INTERIOR DESIGN AND ARCHITECTURAL DRAWINGS. BLOCKING SHALL BE CONSTRUCTED TO SUPPORT THE IMPOSED LOAD. 28. CONTRACTOR TO PROVIDE A SAFETY PLAN PRIOR TO START OF CONSTRUCTION TO CLEARLY DELINEATE AREAS FOR CONSTRUCTION, SAFETY BARRIERS, EXITS, CONSTRUCTION TRAFFIC DURING THE VARIOUS PHASES AND WHEN CONDITIONS CHANGE. INDEX OF DRAWINGS ORIGINAL LATEST REV. DATE BLDG. DEPT, DATE REV. NO. APPROVED INDEX _ffl� C11 I J1 ING INDEX /ABBREVIATIONS %GENERAL NOTES n GN-001!RNA G -0 N 2 vz� 02. 7.oz,13 2 8.14.13 7. .13 - I I N T N N SURVEY 7.02.13 - - SU -1 SURVEY V M.1.0 a Oro 0 L-0 TREE DISPOSITION L-1 PLANTING PLAN & NOTES L-2 PLANTING DETAILS I -1 R A 0 P N T IR -2 IRRIGATION DETAILS 7.02.13 1 8.05.13 - LS -100 LIFE SAFETY SITE PLAN 7.02.13 1 8.05.13 LS -200 LfFE SAFETY FLOOR PLAN Q 7,02.13 2 8`14`13A-310 REFLECTED CEILING PLAN ttn 2 8.14.13 ROOFING DETAILS 2 7.02.13 2 8.14.13 - 7.02.13 2 8.14.13 - 7.02.13 2 8.14.13 A-500 BUILDING ELEVATIONS A-600 BUILDING SECTIONS A-610 WALL SECTIONS 0 A- 5 R T S FIRE STOPPING 7.02.13 - - A-675 FIRE STOPPING PENETRATION CHART 7.02`13 A-6876 FIRE STOPPING DETAILS 7.02.13 - A-677 FIRE STOPPING DETAILS �.T 1 �.. 9 �IIM A-700 MOUNTING HEIGHTS Q -7 1NLA I INTERIOR ELEVATIONS A-750 FURNITURE PLAN A-751 MILLWORK DETAILS DOORS & WINDOWS A-810 DOOR JAMBS is THRESHOLD DETAILS n 8.14.13 - A-900 SIGNAGE FLOOR PLAN 8.14.13 ID -200 FINISH FLOOR PLAN FLOOR PLAN LEGEND Section XX A -XXX Sheet XX A -XXX GINAL ATE LATEST REV. NO. Ic-1 CIVIL FACILITIES COVER SHEET S2,1 I I N T N N C-3 WATER & SEWER PLAN & PROFILE C-4 WATER & SEWER PROFILES C-6 8.12.13 - 0". NOW SG.O C-9 CROSS-SECTIONS C-10 PAVING, GRADING & DRAINAGE DETAILS C-11 PAVING, GRADING is DRAINAGE DETAILS C-12 PAVING, GRADING is DRAINAGE DETAILS C-13 PAVEMENT MARKING is SIGNAGE PLAN C-14 EROSION & SEDIMENT CONTROL PLAN - S NTRQL DETAILS C-16 POOL DECK JOINT PLAN " u, t 2 a u N N LU �y1 i U U 'i C 3 u 3 0 M.1.0 a Oro 0 L-0 TREE DISPOSITION L-1 PLANTING PLAN & NOTES L-2 PLANTING DETAILS I -1 R A 0 P N T IR -2 IRRIGATION DETAILS 7.02.13 1 8.05.13 - LS -100 LIFE SAFETY SITE PLAN 7.02.13 1 8.05.13 LS -200 LfFE SAFETY FLOOR PLAN Q 7,02.13 2 8`14`13A-310 REFLECTED CEILING PLAN ttn 2 8.14.13 ROOFING DETAILS 2 7.02.13 2 8.14.13 - 7.02.13 2 8.14.13 - 7.02.13 2 8.14.13 A-500 BUILDING ELEVATIONS A-600 BUILDING SECTIONS A-610 WALL SECTIONS 0 A- 5 R T S FIRE STOPPING 7.02.13 - - A-675 FIRE STOPPING PENETRATION CHART 7.02`13 A-6876 FIRE STOPPING DETAILS 7.02.13 - A-677 FIRE STOPPING DETAILS �.T 1 �.. 9 �IIM A-700 MOUNTING HEIGHTS Q -7 1NLA I INTERIOR ELEVATIONS A-750 FURNITURE PLAN A-751 MILLWORK DETAILS DOORS & WINDOWS A-810 DOOR JAMBS is THRESHOLD DETAILS n 8.14.13 - A-900 SIGNAGE FLOOR PLAN 8.14.13 ID -200 FINISH FLOOR PLAN FLOOR PLAN LEGEND Section XX A -XXX Sheet XX A -XXX GINAL ATE LATEST REV. NO. Ic-1 CIVIL FACILITIES COVER SHEET S2,1 I I N T N N C-3 WATER & SEWER PLAN & PROFILE C-4 WATER & SEWER PROFILES C-6 8.12.13 - C-7 =GRADING SG.O C-9 CROSS-SECTIONS C-10 PAVING, GRADING & DRAINAGE DETAILS C-11 PAVING, GRADING is DRAINAGE DETAILS C-12 PAVING, GRADING is DRAINAGE DETAILS C-13 PAVEMENT MARKING is SIGNAGE PLAN C-14 EROSION & SEDIMENT CONTROL PLAN - S NTRQL DETAILS C-16 POOL DECK JOINT PLAN " M.1.0 a Oro 0 L-0 TREE DISPOSITION L-1 PLANTING PLAN & NOTES L-2 PLANTING DETAILS I -1 R A 0 P N T IR -2 IRRIGATION DETAILS 7.02.13 1 8.05.13 - LS -100 LIFE SAFETY SITE PLAN 7.02.13 1 8.05.13 LS -200 LfFE SAFETY FLOOR PLAN Q 7,02.13 2 8`14`13A-310 REFLECTED CEILING PLAN ttn 2 8.14.13 ROOFING DETAILS 2 7.02.13 2 8.14.13 - 7.02.13 2 8.14.13 - 7.02.13 2 8.14.13 A-500 BUILDING ELEVATIONS A-600 BUILDING SECTIONS A-610 WALL SECTIONS 0 A- 5 R T S FIRE STOPPING 7.02.13 - - A-675 FIRE STOPPING PENETRATION CHART 7.02`13 A-6876 FIRE STOPPING DETAILS 7.02.13 - A-677 FIRE STOPPING DETAILS �.T 1 �.. 9 �IIM A-700 MOUNTING HEIGHTS Q -7 1NLA I INTERIOR ELEVATIONS A-750 FURNITURE PLAN A-751 MILLWORK DETAILS DOORS & WINDOWS A-810 DOOR JAMBS is THRESHOLD DETAILS n 8.14.13 - A-900 SIGNAGE FLOOR PLAN 8.14.13 ID -200 FINISH FLOOR PLAN FLOOR PLAN LEGEND Section XX A -XXX Sheet XX A -XXX GINAL ATE LATEST REV. NO. REV.DATE BLDG.DEPT. APPROVED 2.32.13 F S2,1 ROOF FRAMING PLAN S3.1 1 1.12.13 7.02.13 1 8.12.13 - .02. SYMBOL LEGEND, GENERAL NOTES AND CALCULATIONS - HVAC SG.O 7.02.13 1 8.12.13 7.02.13 1 8.12.13 7.02.13 1 8,12.13 PLUMBING INTERACTIVE WATER FEATURE DETAILS SP -2.05 7.02.13 SP -3.01 - STRUCTURAL 1 C S S2.0 FLOOR PLAN S2,1 ROOF FRAMING PLAN S3.1 STRUCTURAL SECTIONS S4.0 TYPICAL STRUCTURAL DETAILS S4.1 STRUCTURAL DETAILS AND SCHEDULES - M0,00 SYMBOL LEGEND, GENERAL NOTES AND CALCULATIONS - HVAC SG.O ENTRANCE SIGN 7.02.13 1 8.09.13 - E-01 SITE ELECTRIC PLAN 7.02.13 1 8.09.13 - E-1.01 BUILDING ELECTRIC PLAN 7.02.13 1 8.09.13 E-1.02 ELECTRIC NOTES, SCHEDULES AND RISERS 0 RECREATIONAL POOL SECTIONS MECHANICAL 7,02,13 - - M0,00 SYMBOL LEGEND, GENERAL NOTES AND CALCULATIONS - HVAC 7.02.13 - - M3.00 FLOOR PLANS - HVAC 7.02.13 - M3.01 ROOF PLAN - HVAC 7.02.13 - M7.00 DETAILS AND SCHEDULES - HVAC INTERACTIVE WATER FEATURE SECTION & DETAILS PLUMBING INTERACTIVE WATER FEATURE DETAILS PO -00 SYMBOL LEGEND AND GENERAL NOTES - PLUMBING P1.00 FLOOR PLAN - PLUMBING P3.00 FLOOR PLAN - SANITARY - PLUMBING P3.01 FLOOR PLAN - DOMESTIC WATER - PLUMBING I P3.02 ROOF PLAN - PLUMBING P5.00 ISOMETRIC RISER DIAGRAM - PLUMBING x P5.01 ISOMETRIC RISER DIAGRAM - PLUMBING P7.00 DETAILS - PLUMBING P7.01 DETAILS - PLUMBING POOL 0 w O :SP -1.02 . POOL AREA PLAN REVIEWED: A O L 0 LAYOUT PLAN SP -1.04 RECREATIONAL POOL PIPING PLAN SP -1.05 RECREATIONAL POOL SECTIONS SP -1.06 RECREATIONAL POOL DETAILS SP -1.07 RECREATIONAL POOL DETAILS SP -1.08 RECREATIONAL POOL EQUIPMENT DETAILS SPA .09 RECREATIONAL POOL DETAILS SP -2.01 INTERACTIVE WATER FEATURE LAYOUT PLAN SP -2.02 INTERACTIVE WATER FEATURE PIPING PLAN SP -2.03 INTERACTIVE WATER FEATURE SECTION & DETAILS SP -2.04 INTERACTIVE WATER FEATURE DETAILS SP -2.05 INTERACTIVE WATER FEATURE EQUIPMENT DETAILS i SP -3.01 POOL EQUIPMENT LAYOUT & PIPING PLAN SP -3.02 RECREATIONAL POOL is INTERACTIVE WATER FEATURE SCHEDULE OF EQUIPMENT I: /- FIRST FLOOR Floor Location IC BUILDING SECTION TAG OIL . T.O. SUB ELEVATION ELEVATION TAG - K- ._._-..- K- 0 -0 = 15.00 N.G.V.D, Elevation - Elevation - 303A WALL SECTION TAG ddftb EXTERIOR ELEVATION X/A-XXX I N TAG XX \-. Sheet 1 XX PARTITION TYPE 4 2 INTERIOR ELEVATION TAG COLUMN GRID PROPERTY LINE FENCE LINE DOOR NUMBER TAG WINDOW TYPE TAG LOUVER TYPE TAG SLAB DEPRESSION FILE No.-----�� RECREATIONAL DRAWN X.X.X. REVIEWED: X,X,X. CHECKED DESIGN AND DATE I� CONSTRUCTION, INC. a 4 x 3990 North Powerline Rwc' I Ft. Lauderdale, FL 33309 Voice: 954.566.3885 I Fax: 954.566,3335 E FQI V) E E u, t 2 a u N N LU �y1 i U U 'i C 3 u 3 0 W N JLU N n � lQ v � ry n M P J v1 11 M M U x` w nnrr J LL -.- LU L N V J ti n � LL � J R ii LU 1 � 0 1¢ zfvg q LL z 8 M CV LUCL w 0071 -. �- C, y e I .. U a o IL LU LLI co a0 Io Z R= i z Seal ` O CL Cn z �•- �,. U $ I LU rgui _'Jose'M e 10670 © PROJECT NUMBLER LU 1320MPCP ei_._. FILE No.-----�� SHEET TITLE ;11 DEX/ABR '°". Fx G E N E R A L IN!x t f 55 SHEET NUMBER DRAWN X.X.X. REVIEWED: X,X,X. CHECKED X,X.X. DATE 07-02-13 ISSUE / REVISIOINS SHEET TITLE ;11 DEX/ABR '°". Fx G E N E R A L IN!x t f 55 SHEET NUMBER Cc