05-794-003GENERAL N07E5 I I I I I I I I I I I LOCATION PLAN -FOURTH F=LOOR I. All work shall be in accordance with the requirements of the Florida Building Code, zoning requirements and other applicable municipal requirements, and the base building specifications 2. Before performing any work or ordering any materials, the contractor shall verify all dimensions and conditions of any existing and new work and shall be responsible for their accuracy. Any differences Found shall be submitted to the architect or engineer for verification before proceeding with work. 3. The architect shall not be responsible for any deviations from these drawings as dated on this sheet. 4. The 414 General Conditions, the Supplementary General Condditipn5, and General Requirements shall be considered an inclusive part of these speciFications and or drawings. All subcontractors, as well as the general contractor, shall be governed by all applicable sections of these documents with reference to their respective areas of work It shall be the responsibility of the general contractor to advise his subcontractors and suppliers of these requirements. 5. The general contractor shall be held to have examined the site with respect to all existing field conditions and to have fully examined the complete set of architectural drawings as prepared by others, and shall be responsible For the coordination and insertion of this drawing set, as is included as part of the original drawings package. ro,The general contractor shall locate all general reference points and take ordinary precautions to prevent their disruption. Each prime subcontractor shall be responsible For all lines, elevations, measurements and others as may be required of and for his work He shall be responsible For verifying all figures and details shown on the drawings which relate to his work, prior to laying out the work He shall be held responsible For anu error resulting From his Failure to take such precautions. `I. Divisions of the work for subcontracting purposes shall be as per the general contractor's direction. 8. It shall be the responsiblity of all the subcontractors to 1E-;. The general contractor or subcontractor shall be have examined and reviewed the c omi)lete set of work ing helot responsible for the removal and disposal of all "debris" drawings and/or specifications and tc provide all labor materials and items commonly refered to as or determined by the architect as refuse, and material For their res ective arep, to work for a p 1�. The eereral contractor shall have had ma ore all complete and Finished installation in c;moliance with the requirsd provisions for the removal of debris from the intent of the drawing and/or specifications, whether it is site± having charges, dumping fees, etc.., in his original indicated or not. All work or not, shall bid Submission_ be in compliance with all building cores and ordinances 1-1. Remove any other item or construction as required which are applicable to the project. to accomplish all new work and/or revision Mork to A104 existing areas as shown or Described elsewhere in the 9. Subcontractors shall cooperate with each other and contract documents. with the general contractor to provicae material and labor 18. The enera I contractor shallrovide and 'install signag , barricades, fencing, lighting, etc, as required that are necessary in each others wore at the proper times for the prevention of persona I injuries to the owners, its so that the construction schedule is n)t affected. his employees, representatives, clientele, or others within interfacing shall be the resPon5lbiity of the the areas of construction. subcontractors whose work is affect, � 65 such. 19. Protective devices to be installed shall comply uaith the requirements of all local, state and national 10. All work Shall be performed governing codes, the bulldire owner guidelines, and in strict acccerdance withmanufdct�'r's soecifioctiors. other governin farms of authority. The general contractor shalltake oridinary precautions to prevent 11. Product manufacturers indicated in ,schedu':e and cr their disruption during the course of work. plans were selected based on gualit, style, size, 20. General contractor shall take ordinary precautions to color,etr_,and are not intended to restrict co~"0e1.it've secure and protect materials to be relocated or bidding. Products "equal to, interoe:l to be used as warehoused. substitutes are subject to the Gpc•cva' in writting prior to product installatic�. 21. Prior to the start of any work, the contractor shall secure all permits, hsense5, utility connection confirmations, 12. This drawino package is based c- documert5, governmental approvals, etc., necessary For full completion specifications and related info -natio, provided i--;: y of the project, owner/tenant and/or owner/tenart'5 acent. 22. All work to be performed to comply with specifications 13. The de5lon information rdlCatco Crl plans I5 '�senoed for General contractors performing construction at First to be a comolets and wcrkable s: sten in accord fee with union Financial Center. all product maruFacturer'5 arJ�-r proposed, building de5i�n, fie'd conditions, es . ,"': �'l �-%-+prials �ts d�="��� dimen�i�-r= • ��-r�� ■ V V • • ` •. y� rr Y •iY � • • .,. V Y V • • i V u Y u V• r ` = �, � i• u y yY•• Y • V i � ` V r i • Y u` • • V r y•• V r f y • V Y Y i • • ,• V • • V V V V • •• � Y V Y V Y • :••ii ...•. LIST OF DRAWINGS, .i• rY•� • • r ryyr Y i • " Y • Y • • • V • 4 Y... • •"" ' • A100 V• i r V V y r • LOCATION PLAN AND GENERAL NOTES A101 1 LOOR PLAN A102 REFLECTED CEILING PLAN A103 FLOORING PLAN AND SCHEDULES A104 WALL TYPES AND DETAILS A105 INTERIOR ELEVATIONS M-1 MECHANICAL PLAN M-2 MECHANICAL PLAN P-1 PLUMBING PLAN E-1 ELECTRICAL PLAN FS -1 FIRE SPRINKLER PLAN INTRU510N AND BURGLARY 5ECURITY NOTE All door and window construction and lockin comply with the provisions of T�41= Florida B including, but not limited to. the Following cr I. All locks on exterior doors shall be capa force of 300 lbs, applied in any movable d accordance with resistance standards set fc ac. 2. All single exterior swing doors shall have operated from exterior with a minimum of 60 changes or locking auxiliary dead bolt with 3. The active leaf of pairs of exterior swine same locks as required for single exterior 5 inactive leaf of these pairs shall have multi 518" minimum throw bolts with inserts. 4. Tinges on exterior out -swinging doors s4 non -removable pins. 5. Jambs of all exterior offset type in -swing doors shall be rabetted or of a similar fabrication to prevent defeating the purpose of the strike and the integrity of the locks and latches. 6. Single, swinging, exterior doors, iF wood, shall be of solid core not less than 1 3/8' thickness. 7, ela55 and exterior doors shall comply with the American National 5tandard5 Institute's 5tandard 29T.1. a. Vision panels in exterior doors other than glazing within 40" of the inside locking device of loose and swinging doors shall comply with American National Standards institute's 5tandard 237.1. 9. Door and window locks by Yale Ceron Products (or approved equal), mise, aneou ... r- _� - - indicated or, o'ans or not, shall by "ncluded as cs�: cf this Pl- ASS NOTA: dra�`ng pack Vie. No drawing in this set may be considered on its own. Any information 14, A­&-tect small be not "ed c`0' startup c. within this set must be understood as part of the whole set. It is the responsiblity of the contractor and const•ucticn , should exist'ng Fe'd conditicr- vim•. F,om his sub contractors to be Familar with all aspects OF the work described within this drawing set. If any draw n -s b� --eater than 2" r conflicts arise as within the description of work in this drawing set the contractor must notify the architect prior to the beginning of any work In addition, the work described within this drawing sat must be coordinated with the drawings of the building shell. If any conflicts arise between this drawing set and the drawing set for the building shell the architect must be notified prior to the beginning of any work RISK BASED SOLU�IONS OFFICE CONDO BUILDOUT SUITE 450, FOUTH FLOOR, PLAZA 57 7301 S.W. 57TH COURT CITY OF SOUTH MIAMI SOUTH MIAMI, FLORIDA 33143 CHANDLER AND ASSOCIATES No. DATE ARCHITECTLME, P.A. AA 0003050 _.,. JASON 11 CHANDLE ' A.LA. _ AX NO.16055 SOUTH 33143 2 FAi x(3.66 7593j� W W W.CHAI� ERARCHITECTURE.COM cw�'Vtrofff J?D rr_A_CR.c44 �5 '?o 't LOCATION PLAN-- S.W. 57TH COURT BETWEEN S.W. 73RD AND 74TH STRESS N CITY OF SOUTH MIAMI, FLORIDA N.T.S. LEGAL DESCRIPTION LOT 70. LESS THE WEST 5.00 FEET, AND LOTS 71, 72, 73, AND 74, LESS THE WEST 5.00 FEET, "W.A. LARKIN'S SUB -DIVISION„, ACCORDING TO THE PLAT THEREOF, AS RECORDED IN PLAT BOOK 3 AT PAGE 108, OF THE PUBLIC RECORDS OF MIAMI-DADE COUNTY, FLORIDA. SECTION 36, TOWNSHIP 54 SOUTH, RANGE 40 EAST REVISION DRAWING TITLE NO. DATE REVISION LOCATION PLAN AND NOTES' SCALE: SEE •HEFT DATE: PROJECT NO: 2005.1 � DRAWING NO: A 100 l I