09-97-02110
CONTROL JOINT
WHITE ALUMINUM FLASHING
3 COAT PORTLAND CEMENT PLASTER
OVERY2" "CDX" PLYWOOD
SHEATHING BOARD
METAL FRAME AWNING BY SCANCOWERSINC.NET
OR EQUAL APPROVED. ENGINEERED AND INSTALLED
BY AWNING FABRICATOR SUBMIT SHOP DWG'S
FOR ARCHITECTS APPROVAL
TOP OF NEW PARAPET
ELEV. =1T-8"
TOP OF EXISTING PARAPET
ELEV. =12'-1 112"
BOTTOM OF EXISTING TRUSS
ELEV. = 9'-71/2"
FINISH FLOOR
ELEV. = 0'-0"
EXISTING WAL
ELEV. VARIES
I'
U
CU
Q
-4 =
O
E�
C M
X
fa 'Cr
L
a L
t�0
M
00 a
0000 O
CD CD
O M
fV Y
TEXISTING
TO REMAIN
cD TCV
AC
1
07
ELEVATION
TO BE
RENOVATED
1
AC4
iV
y
CONTROL JOINT
WHITE ALUMINUM FLASHING
3 COAT PORTLAND CEMENT PLASTER
OVERY2" "CDX" PLYWOOD
SHEATHING BOARD
RELOCATED DRIVE THRU WINDOW—
OUTDOOR WALL SCONCE
SEE LIGHT FIXT. SCHD.
CONTROL JOINT
WHITE ALUMINUM FLASHING
3 COAT PORTLAND CEMENT
OVER Y2" "CDX" PLYWOOD
SHEATHING BOARD
a
a a
I
i
co
I
EXISTING CONC. SILL TO BE REPLASTERED & PAINTED
LEDGE STONE VENEER BY CULTURED STONE
CVS -20008 ASPEN
a
1 -- -- F= -
EXISTING
— - - - - - - ---- - -
EXISTING CONC. SILL TO BE REPLASTERED & PAINTED
LEDGE STONE VENEER BY CULTURED STONE
CVS -20008 ASPEN
CONTROL JOINT
3 COAT PORTLAND CEMENT PLASTER
OVER Y2" "CDX" PLYWOOD
SHEATHING BOARD ----\
OUTDOOR WALL SCONCE
EL DORADO SERIES BY
BK LIGHTING BRONZE COLOR
9-d
L
a ! o
METAL FRAME AWNING BY SCANCOWERSINC.NET
OR EQUAL APPROVED. ENGINEERED AND INSTALLED
BY AWNING FABRICATOR SUBMIT SHOP DWG'S
FOR ARCHITECTS APPROVAL
TOP OF NEW PARAPET
EXISTING -
TO REMAIN
ELEVATION
TO BE
RENOVATED
SOUTH ELEVATION
SCALE: 1/4"= 1'-0"
NORTH ELEVATION
SCALE: 1/4"= 1'-0"
ELEV. =17'-8"
TOP OF EXISTING PARAPET
ELEV. =12'-1 112"
BOTTOM OF EXISTING TRUSS
ELEV. = T-71/2"
FINISH FLOOR
ELEV. = 0'-0"
XISTING WALK
ELEV. VARIES
-K4
1 Ln
TOP OF NEW PARAPET
ELEV. =1T-8"
TOP OF EXISTING PARAPET
EXISTING ELEV. =12'-1 1/2"
TO REMAIN.
CV
BOTTOM OF EXISTING TRUSS
ELEV. = 9'-71/2"
ELEVATION
TO BE
RENOVATED
-IN
"
FINISH FLOOR
ELEV. = 0'-0"
EXISTING WALK
ELEV. VARIES
..r q
STRUG1U�cAL SECTION
p�PPROVED
r•.r -.
ALL IDEAS, DESIGNS, ARRANGEMENTS, AND PLANS INDICATED OR
REPRESENTED BY THIS DRAWING ARE OWNED BY, AND THE PROPERTY OF
TECTONICS ASSOCIATES, INC. AND WERE CREATED, EVOLVED AND
DEVELOPED FOR USE ON, AND IN CONNECTION WITH THE SPECIFIED
PROJECT. NONE OF SUCH IDEAS, DESIGNS, ARRANGEMENTS OR PLANS
SHALL BE USED BYOR DISCLOSED TO ANY PERSON, FIRM OR CORPORATION
FOR ANY PURPOSE WHATSOEVER WITHOUT THE WRITTEN PERMISSION OF
TECTONICS ASSOCIATES, INC.
WRITTEN DIMENSIONS OF THESE DRAWINGS SHALL HAVE PRECEDENCE
OVER SCALED DIMENSIONS. CONTRACTORS SHALL VERIFY, AND BE
RESPONSIBLE FOR ALL DIMENSIONS AND CONDITIONS ON THE JOB AND THIS
OFFICE MUST BE NOTIFIED OF ANY VARIATIONS FROM THE DIMENSIONS AND
CONDITIONS SHOWN BY THESE DRAWINGS. SHOP DETAILS MUST BE
SUBMITTED TO THIS OFFICE FOR APPROVAL BEFORE PROCEEDING WITH
FABRICATION.
705020
ULO
w
�C/)�
U 2 0)
< wv"
H w w U
w0�¢
0
CIf LL
d.
Q
'O
LL-
date - 12-10-08
REVISED BY: ONE D+B
4 03/23/09 FIRE
project number
08146
sheet
A-4
of
Q
H
07
O
u -
O
U�
Q
O
Zp
w
Q
D
(
N
�
O
�
w
W
O
aw-
o
(coo
i
date - 12-10-08
REVISED BY: ONE D+B
4 03/23/09 FIRE
project number
08146
sheet
A-4
of