Loading...
09-97R-002F c ti F REPLACE 4' x 8 CDx PLYW SHEATHING; MIN. 19/32" TH MAXSPAN 24" r REPAIR 4 SEE DETAIL 4/S-2 t 1 1 1 1 1 / 1 1 � / 1 � 1 1 g ✓ 1 REPAIR 1 ( P) SEE DETAIL 1/-2 REPAIR 2 SEE DETAIL 2/S-2 - REPAIR 2 SCALE: N.T.S. PLYWOOD ROOF DIAPHRAGM NAILING ATTACHMENT 1. ROOF DIAPHRAGM SHALL COMPLYDESIGN RECOMMENDATIONS• r CONSTRUCTION GUIDE r .. .• . r THE LOCALrCODE. 2. PLYWOOD ROOF r AND SHALL BE CONTINUOUSOVER TWO OR RE SPANS, WITH FACE GRAIN PERPENDICULAR TO THE SUPPORTS. 3. • T PLYWOOD DIAPHRAGM T• STRUCTURE WITH 10d GALVANIZED NAILS, SPACED AT 6"o.c. MAX. AT SUPPORTED EDGES AND A6"o.c. ALONG - INTERMEDIATE SUPPORTS. IV, 111 113-31 SCALE N.T.S. .9O . so • a • ADD 5/8" PLYWOOD W/ 10D NAIL • EACH SIDE WMINkreirlysTelm • r r • i •� J 0 TOP VIEW DETAIL SCALE N.T.S. mmiffimm 24" MIN. G 24" MIN. A2X4 WOOD EACH SIDE p \ll " Qi THR 6 1/2U BOLT FRONT VIEW DETAIL 2/S-2 SCALE N.T.S. W. CONT.rr 1 SIDE.EACH - PLYWOOD SHEATHING FOR METHOD OF EXTEND ROOF SHEATHINGUNDER SET .. ANCHOR VALLEY TRUSSES PAST THE ROOF SHEATHING AS SHOWN ♦ 7 O r NVSNP3 BY W/(6)8 d x LS AT EACH END UPLIFT G=1 156 # + r NOA 04-0510.03 2) NVSNP3 BY NU-VUE •'t 1• 1 1 ! •�11 ii• +. ,*]:1 F S 0 Y MIA USE(5) (2} NVSNP3 BY NU-VUE STC`Cl SStC W/(6}8 d x1 1/2 MAILS AT EACH END UPLIFT G=1156 # & UPLIFT=1188# 4PhROVED NOA 04-0510.03 ` „17� _,—USEE USE(5)— PREFAB. ENGINEERED WD. TRUSSES24" O.C. SE (AS PER MANF. SPECS.) USE NVRT-24 BY NU-VUE W/(7}-16 d NAILS AT EACH MEMBER UP IFT 1059 # NOA 03-0327.14 TYPICAL AT 2'-0" O.C. TOP OF CONC. BEAM (REFER TO RUCT PUMT 5'-011 MAX. ---f* DETAIL /S-2 SCALE N.T.S. DATE M' 7P DRAITTIii illi Now SHEET ■I# OF J DATE 07-01-09 - SCALE AS SHOWN - DESIGNED DRAWN DRAITTIii illi Now SHEET ■I# OF J