08-40-148CONCRETE SLAB ON FILL 1. SELECTED FILL MATERIALS SHALL BE CLEAN CRUSHED LIMESTONE (3" MAXIMUM PARTICLE) OR CLEAN FINE SAND, THE FILL PLACEMENT SHOULD OCCUR IN THE DRY AND COMPACTED TO A MINIMUM OF 98 PERCENT OF THE MODIFIED PROCTOR MAXIMUM DRY DENSITY (ASTM D-1557). FOLLOW SOIL LAB RECOMMENDATIONS FOR THE METHODS AND PROCEDURES, ALL FILL WORK SHALL BE SUPERVISED BY A SOIL LAB REPRESENTATIVE. ALL TOP SOIL SHALL BE REMOVED BEFORE STARTING FILLING OPERATIONS. 2, SLABS ON GRADE SHALL BE PLACED OVER 10 MIL VISQUEEN OR ENGINEER -APPROVED EQUIVALENT, 3. WELDED WIRE FABRIC SHALL CONFORM WITH ASTM A 185-79 "STANDARD SPECIFICATIONS FOR WELDED WIRE FABRIC FOR CONCRETE REINFORCEMENT" 4. WELDED WIRE. FABRIC SHALL BE SUPPORTED ON SLAB BOLSTERS OR CONCRETE BLOCKS SPACED NO FURTHER THAN 3'-0" O.C. 5. SAW -CUT CONTROL JOINTS SHALL BE SAWED AS SOON AS THE CONCRETE IS HARD ENOUGH NOT TO BE WORN OR DAMAGED BYTHE BLADE. 6. COLUMNS, BEAMS AND WALLS OR ANY OTHER STRUCTURAL MEMBER PENETRATING SLABS ON FILL SHALL BE ISOLATED BY PREMOLDED JOINT FILLER (1/2" THICK) COMPLYING WITH ASTM 01752, TYPE1, DRAWINGS AND FILLER AND SEALANT MATERIALS SHALL FOLLOW SPECIFICATIONS. 7. JOINTS SHALL BE SEALED WHERE INDICATED BY THE ARCHITECTURAL FOUNDATIONS 1, FOUNDATIONS WERE DESIGNED FOLLOWING THE RECOMMENDATIONS OF GFA AS STATED ON THEIR SOIL REPORT DATED JULY 10, 2006 THE ALLOLWABLE SOIL BEARING PRESSURE IN ACCORDING TO THE MENTIONED REPORT IS 2500 PSF, FOUNDATION NOTES 1 ALL FOUNDATION CONCRETE SHALL BE CAST IN THE DRY, DEWATERING OPERATION SHALL BE DONE IN SUCH AWAY THAT GROUND WATER LEVELS OUTSIDE THE SITE WILL BE MAINTAINED TO AVOID SETTLEMENT AND DAMAGE TO NEARBY BUILDINGS AND STRUCTURES. 2. THE ARCHITECT/ENGINEER ASSUMES NO RESPONSIBILITY FOR ANY INTERPRETATION THAT THE SUBSURFACE CONDITIONS DESCRIBED IN THE TEST BORING LOGS OCCUR CONSISTENTLY THROUGHOUT THE JOB SITE, TEST BORINGS ARE INCLUDED ONLY TO ASSIST THE CONTRACTOR DURING BIDDING AND SUBSEQUENT CONSTRUCTION AND REPRESENT SOIL CONDITIONS ONLY AT THE SPECIFIC LOCATIONS AND AT THE PARTICULAR TIMES THEY WERE TAKEN. 3, GENERAL CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR SHORING, SHEETHING AND BRACING OF EXCAVATIONS, 4. EXCAVATION FOR FOOTINGS AND GRADE BEAMS SHALL BE FINISHED BY HAND SHOVEL, 5. IN NO CASE SHALL TRUCKS; BULLDOZERS OR OTHER HEAVY EQUIPMENT BE PERMITTED CLOSER THAN 8'-0" FROM ANY FOUNDATION WALL UNLESS APPROVED BY THE ENGINEER. 6. GENERAL CONTRACTOR SHALL INSTALL ALL PIPE SLEEVES; BOXED OPENINGS, ANCHOR BOLTS, ETC., AS REQUIRED FOR THE VARIOUS TRADES, WALL POCKETS TO RECEIVE BEAMS AND SLABS SHALL BE PROVIDED AS REQUIRED FOR THE SUPER- STRUCTURE, SHOP DRAWINGS SHOWING THE POSITION OF OPENINGS SHALL BE SUBMITTED TO THE STRUCTURAL ENGINEER PRIOR TO PLACEMENT OF CONCRETE. 7 CONCRETE COMPRESSIVE STRENGTH, fc, FOR FOUNDATION WORK SHALL BE 4000 PSI AT 28 DAYS, WITH A WATER -CEMENT RATIO OF 0.45. (MAT FOUNDATION 5000 PSI) 8. ALL REINFORCING STEEL USED IN FOUNDATION WORK SHALL COMPLY WITH ASTM A625-83 (S1), GRADE 60. SEE "REINFORCING STEEL" UNDER "GENERAL NOTES" 9, THE SOIL ENGINEER OR HIS REPRESENTATIVE OR THE OWNER'S QUALIFIED REPRESENTATIVE SHALL INSPECT ALL SUBGRADE PREPARATION WORK PRIOR TO THE PLACEMENT OF ANY REINFORCING STEEL OR CONCRETE AND SHALL PERFORM TESTS AS NECESSARY TO VERIFY THAT SUCH WORK IS IN CONFORMANCE WITH THE RECOMMENDATION GIVEN IN THE SOIL REPORT. 10. THE DESIGN ENGINEER OR HIS QUALIFIED REPRESENTATIVE OR THE OWNER'S QUALIFIED REPRESENTATIVE SHALL CHECK PLACEMENT OF ALL REINFORCING STEEL PRIOR TO CASTING OF ANY CONCRETE. 11. THE BUILDING RETAINING WALLS SHALL BE WATERPROOFED, SEE DRAWINGS AND SPECIFICATIONS, 12. PROVIDE CONTROL OR CONSTRUCTION JOINTS AS SHOWN IN PLAN. IF SAW -CUT OPTION IS USED, SLABS SHALL BE CUT NOT MORE THAN 24 HOURS AFTER POURING. SPECIALTY ENGINEERING NOTES 1. SPECIALTY ENGINEER: A) DEFINITION -A FLORIDA REGISTERED PROFESSIONAL ENGINEER, NOT THE STRUCTURAL ENGINEER OF RECORD, WHO SPECIALIZES IN AND WHO UNDERTAKES THE DESIGN OF STRUCTURAL COMPONENTS OR STRUCTURAL SYSTEMS INCLUDED IN A SPECIFIC SUBMITTAL PREPARED FOR THIS PROJECT. B) SHALL BE' 1) AN EMPLOYEE OR OFFICER OF A FABRICATOR, 2) AN EMPLOYEE OR OFFICER OF AN ENTITY SUPPLYING COMPONENTS TO A FABRICATOR. 3) AN INDEPENDENT CONSULTANT RETAINED BY THE FABRICATOR OR HIS SUPPLIER, 2. SUBMISSIONS AND RE -SUBMISSIONS FOR CUSTOM DESIGNED, MANUFACTURED OR FABRICATED LOAD -CARRYING ITEMS AND CUSTOM FABRICATED ITEMS WHICH ARE REQUIRED BY CODES OR STANDARDS TO RESIST FORCES AND STRESSES, INCLUDING THEIR CONNECTIONS, ANCHORAGES AND ATTACHMENTS REQUIRE A SPECIALTY ENGINEER. 3. THE FOLLOWING SYSTEMS AND COMPONENTS, AS A MINIMUM, REQUIRE FABRICATION AND ERECTION DRAWINGS WITH INPUT BYA SPECIALTY ENGINEER: RAILINGS, EXTERIOR DOORS AND WINDOWS, SHORING AND RESHORING, STEEL STAIRS, PRECAST CONC, STAIRS, PRECAST CONCRETE JOIST, SOFFIT BEAMS AND EXTERIOR WALL METAL STUD SYSTEM. 4. FOR EACH CATEGORY OF SHOP DRAWINGS REQUIRING INPUT FROM A SPECIALTY ENGINEER, THE CONTRACTOR SHALL ATTACH TO THE FIRST SHOP DRAWING SUBMITTAL A SIGNED AND SEALED LETTER FROM THE RESPONSIBLE SPECIALTY ENGINEER STATING, "I CERTIFY THAT THE DESIGN AND DRAFTING OF THE SHOP DRAWINGS WHICH ARE SIGNED AND SEALED BY ME WERE PREPARED UNDER MY DIRECT SUPERVISION AND CONTROL AND TO THE BEST OF MY KNOWLEDGE THE SHOP DRAWINGS COMPLY WITH THE APPLICABLE MINIMUM BUILDING CODES AND THE CONTRACT DOCUMENTS." 5, SUBMITTALS SHALL CLEARLY IDENTIFY THE SPECIFIC PROJECTAND APPLICABLE CODES, LIST THE DESIGN CRITERIA, AND SHOW ALL DETAILS AND PLANS NECESSARY FOR PROPER FABRICATION AND INSTALLATION, CALCULATIONS AND SHOP DRAWINGS SHALL IDENTIFY SPECIFIC PRODUCTS UTILIZED. GENERIC PRODUCTS WILL NOT BE ACCEPTED. 6. SHOP DRAWINGS AND CALCULATIONS REQUIRE THE IMPRESSED SEAL, DATE AND SIGNATURE OF THE SPECIALTY ENGINEER. COMPUTER PRINTOUTS ARE AN ACCEPTABLE SUBSTITUTE FOR MANUAL COMPUTATIONS PROVIDED THEY ARE ACCOMPANIED BY SUFFICIENT DESCRIPTIVE INFORMATION TO PERMIT THEIR PROPER EVALUATION. SUCH DESCRIPTIVE INFORMATION SHALL BEAR THE IMPRESSED SEAL AND SIGNATURE OF THE SPECIALTY ENGINEER AS AN INDICATION THAT HE HAS ACCEPTED RESPONSIBILITY FOR THE RESULTS, SEPIAS DO NOT REQUIRE SIGNATURE AND SEAL. THE STRUCTURAL ENGINEER WILL RETAIN ONE SIGNED AND SEALED BLUELINE PRINT FOR RECORD. 7. DRAWINGS PREPARED SOLELY TO SERVE AS A GUIDE FOR FABRICATION AND INSTALLATION (SUCH AS REINFORCING STEEL SHOP DRAWINGS OR STRUCTURAL STEEL ERECTION DRAWINGS) AND REQUIRING NO ENGINEERING INPUT DO NOT REQUIRE THE SEAL OF A SPECIALTY ENGINEER. 8. CATALOG INFORMATION ON STANDARD PRODUCTS DOES NOT REQUIRE THE SEAL OF A SPECIALTY ENGINEER. 9. REVIEW BYTHE STRUCTURAL ENGINEER OF RECORD OF SUBMITTALS IS LIMITED TO VERIFYING THE FOLLOWING: A) THAT THE SPECIFIED STRUCTURAL SUBMITTALS HAVE BEEN FURNISHED. B) THAT THE STRUCTURAL SUBMITTALS HAVE BEEN SIGNED AND SEALED BYTHE SPECIALTY ENGINEER. C) THAT THE SPECIALTY ENGINEER HAS UNDERSTOOD THE DESIGN INTENT AND HAS USED THE SPECIFIED STRUCTURAL CRITERIA. (NO DETAILED CHECK OF CALCULATIONS WILL BE MADE.) D) THAT THE CONFIGURATION SET FORTH IN THE STRUCTURAL SUBMITTALS IS CONSISTENT WITH THE CONTRACT DOCUMENTS. (NO DETAILED CHECK OF DIMENSIONS OR QUANTITIES WILL BE MADE.) 10. SUBMITTALS NOT MEETING THE ABOVE CRITERIA WILL NOT BE REVIEWED. SHOP DRAWING AND OTHER SUBMITTALS 1 REVIEW OF SUBMITTALS BY THE STRUCTURAL ENGINEER IS FOR GENERAL CONFORMANCE WITH THE DESIGN CONCEPT AS PRESENTED BYTHE CONTRACT DOCUMENTS. NO DETAILED CHECK OF QUANTITIES OR DIMENSIONS WILL BE MADE. ONLY THOSE SUBMITTALS REQUIRED BY THE CONTRACT DOCUMENTS TO BE SUBMITTED WILL BE REVIEWED. ALL OTHERS WILL BE RETURNED WITHOUT COMMENT. 2. BEFORE SUBMITTING THE FIRST SHOP DRAWING, SUBMIT THE SHOP DRAWING SUBMITTAL SCHEDULE, PREPARED BY THE CONTRACTOR TO THE STRUCTURAL ENGINEER CONSISTENT WITH THE FOLLOWING CRITERIA' A) ALLOW ADEQUATE TIME FOR TRANSIT AND PROCESSING BEFORE FABRICATION, THE STRUCTURAL ENGINEER WILL REVIEW AN AVERAGF SUBMITTAL WITHIN 14 CALENDAR DAYS OF RECEIPT BY THEM. B) SCHEDULE AND SUBMIT SHOP DRAWINGS FOR SPECIFIC COMPONENTS, SUCH AS COLUMNS, FOOTINGS, ETC., IN THEIR ENTIRETY, SHOP DRAWINGS FOR SIMILAR FLOORS SHALL BE SUBMITTED IN THE SAME PACKAGE SUBMIT SHOP DRAWINGS IN A TIMELY MANNER, CONSISTENT WITH THE ABOVE. 3. REVIEW OF SHOP DRAWINGS IS LIMITED TO TWO (2) REVIEWS PER SUBMITTAL WITHIN THE SCOPE OF BASIC SERVICES (I.E., INITIAL SUBMITTAL REVIEW AND ONE RESUBMITTAL IF NECESSARY). REVIEW OF ADDITIONAL RESUBMITTALS WILL BE CONSIDERED ADDITIONAL SERVICES; FOR WHICH THE GENERAL CONTRACTOR MAY BE HELD RESPONSIBLE. ADDITIONAL SERVICES COMPENSATION TO THE ENGINEER WILL BE IN ACCORDANCE WITH THE TERMS OF THE ARCHITECT -ENGINEER AGREEMENT FOR THIS PROJECT. 4, ALL SUBMITTALS SHALL BE ACCOMPANIED BY A LETTER OF TRANSMITTAL. DO NOT COMBINE DIFFERENT SUBMITTALS ON THE SAME TRANSMITTAL. 5. ALL SHOP DRAWINGS MUST BEAR EVIDENCE OF THE CONTRACTOR'S APPROVAL PRIOR TO SUBMITTING TO THE A/E. 6. SUBMIT ONE REPRODUCIBLE AND TWO BLUELINE PRINTS TO THE ARCHITECT/ENGINEER FOR REVIEW. THE ARCHITECT/ENGINEER WILL RETURN THE REPRODUCIBLE AND RETAIN BLUELINES AFTER REVIEW. 7. ALL CHANGES AND ADDITIONS MADE ON RE -SUBMITTALS MUST BE CLEARLY FLAGGED AND NOTED. THE PURPOSE OF THE RE -SUBMITTALS MUST BE CLEARLY NOTED ON THE LETTER OF TRANSMITTAL. ARCHITECT/ENGINEER REVIEW WILL BE LIMITED TO THOSE ITEMS CAUSING THE RE -SUBMITTAL. 8. DO NOT REPRODUCE THE STRUCTURAL CONTRACT DOCUMENTS FOR USE AS SHOP DRAWINGS. 9. SHOP DRAWINGS NOT MEETING THE ABOVE CRITERIA OR SUBMITTED AFTER FABRICATION WILL NOT BE REVIEWED. 10. FOR ADDITIONAL CRITERIA APPLICABLE TO SHOP DRAWINGS REQUIRING ENGINEERING INPUT BY A SPECIALTY ENGINEER, SEE SPECIALTY ENGINEER NOTES. r n flTl I1 h I%'��'S1/ CONTRACTOR SHALL DEWATER SITE AS NECESSARY, SO THAT ALL CONCRETE CAN BE PLACED IN THE DRY. ALL BACKFILL SHALL BE ACCOMPLISHED USING MATERIAL CONSISTING OF CRUSHED STONE AND/OR MATERIAL APPROVED BYTHE GEOTECHNICAL ENGINEER. THE BACKFILL SHALL BE COMPACTED TO 95% OF MAXIMUM DENSITY AS DETERMINED BY ASTM D-1557, NO BACKFILL MATERIAL SHALL BE PLACED AGAINST WALLS WHICH DQ NOT HAVE PERMANENT FLOORS AT THE TOP AND BOTTOM WITHOUT PROVISIONS FOR ADEQUATE TEMPORARY BRACING OF THOSE WALLS. PROVIDE ADEQUATE EXCAVATION BRACING IN ACCORD WITH GEOTECHNICAL ENGINEER RECOMMENDATIONS TO MAINTAIN EXISTING FOOTINGS, UTILITIES, AND OTHER IMPROVEMENTS IN A SAFE CONDITION. FORMWORK, SHORING & RESHORING 1, PROVIDE, AS A PACKAGE, SHORING AND RESHORING DRAWINGS PREPARED BY OR UNDER THE DIRECT SUPERVISION OF A SPECIALTY ENGINEER AND CONFORMING TO THE REQUIREMENTS OF SPECIFICATION SECTION 03100 "CONCRETE FOHMWORK 2. DESIGN FORMS AND SHORES FOR HORIZONTAL CONCRETE MEMBERS FOR NOT LESS THAN DEAD LOAD PLUS 50 PSF CONSTRUCTION LOAD AND FOR THE CUMULATIVE LOADS OF SUPPORTED FLOOR. DESIGN WOOD SHORES WITH A SAFETY FACTOR OF 3 AND METAL SHORES WITH A SAFETY FACTOR OF 2. 3. THE MAXIMUM SUPERIMPOSED CONSTRUCTION LOAD APPLIED TO FLOORS SUPPORTING SHORES OR RESHORES SHALL NOT EXCEED 75% OF THE LIVE LOAD SPECIFIED FOR SLABS AND JOISTS AND 60% OF THE LIVE LOAD SPECIFIED FOR BEAMS, NO CONSTRUCTION LOAD SHALL BE APPLIED TO ANY MEMBER UNTIL THE CONCRETE IS A MINIMUM OF 14 DAYS OLD AND THE 7 DAY STRENGTH IS 70% OF THE SPECIFIED 28 DAY STRENGTH, 4 REMOVAL OF FORMWORK IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. REMOVE FORMS IN SUCH A MANNER TO INSURE JOB SAFETY AND TO PREVENT DAMAGE TO AND CREEP DEFLECTION OF THE STRUCTURE. THE FOLLOWING ARE MINIMUM GUIDELINES FOR THE REMOVAL OF HORIZONTAL FORMWORK: A) FOR SLAB SPANS LESS THAN 5'-0", FORMS MAY BE REMOVED 24 HOURS AFTER COMPLETING CONCRETE POUR. NO STRENGTH VERIFICATION IS REQUIRED PROVIDED THE AIR TEMPERATURE DOES NOT FALL BELOW 600 F DURING THE 24 HOUR PERIOD FOLLOWING THE POUR AND NORMAL TIME OF SET IS ACHIEVED. NO RESHORING IS REQUIRED. B) FOR SLAB SPANS LESS THAN OR EQUAL TO 10'-O", FORMS MAY BE REMOVED 72 HOURS AFTER COMPLETING CONCRETE POUR PROVIDED CONCRETE STRENGTH ISA MINIMUM OF 2100 PSI. NO RESHORING IS REQUIRED. C) FOR SLAB SPANS GREATER THAN 10'-0", FORMS MAY REMOVED 72 HOURS AFTER COMPLETING CONCRETE POUR PROVIDED CONCRETE STRENGTH IS 70% OF THE SPECIFIED 28 DAY STRENGTH BUT NOT LESS THAN 2500 PSI. RESHORE EACH BAY AS SOON AS FORMS ARE REMOVED 5. DO NOT REMOVE SHORING UNTIL CONCRETE HAS REACHED 70% OF THE SPECIFIED 28 DAY STRENGTH, BUT NOT LESS THAN 2500 PSI. AS A MINIMUM, SHORING AND RESHORING SHALL REMAIN IN PLACE AS FOLLOWS: (TIME MEASURED FROM COMPLETION OF CONCRETE POUR) SHORES/RESHORES SLABS, SPANS GREATER THAN 10'-0"JOISTS J O I STS BEAMS CANTILEVERS: SLABS JOISTS BEAMS SHORES RESHORES 72 HOURS 7 DAYS 72 HOURS 7 DAYS 7 DAYS 14 DAYS 7 DAYS 14 DAYS 7 DAYS 14 DAYS 7 DAYS 14 DAYS 6. FOR SPECIAL CONDITIONS SUCH AS TRANSFER BEAMS, TRASNFER COLUMNS OR WALLS OR ANY OTHER STRUCTURAL ELEMENTS TRANSFERING LOAD, THE SPECIALTY ENGINEER PREPARING THE FORMWORK SHOP DRAWINGS SHALL CONTACT THE ENGINEER OF RECORD FOR ADDITIONAL INFORMATION REGARDING LOADS TO BE TRANSFERED AT THOSE ELEMENTS. 7. THE SHORING AND RESHORING IS TO BE INSPECTED BY THE SPECIALTY ENGINEER OR HIS AUTHORIZED REPRESENTATIVE, PRIOR TO EACH CONCRETE POUR HE SHALL SUBMIT A WRITTEN INSPECTION REPORT TO THE SPECIAL INSPECTOR AND CONTRACTOR STATING THAT THE WORK IS IN GENERAL COMPLIANCE WITH THE SHORING AND RESHORING DRAWINGS, THE FIELD REPORTS SHALL BE SIGNED BY THE INDIVIDUAL CONDUCTING THE INSPECTION, COPIES OF THE FIELD REPORTS SHALL BE SUBMITTED TO THE ARCHITECT, ENGINEER, SPECIAL INSPECTOR AND BUILDING OFFICIAL UNDER A COVER LETTER SIGNED, SEALED, AND DATED BY THE SPECIALTY ENGINEER ON A SEMI-MONTHLY BASIS. THE SHORING AND RESHORING REPORT SHALL CONTAIN, AS A MINIMUM, THE FOLLOWING' A. NAME AND LOCATION OF PROJECT, NAME OF SPECIALTY ENGINEER AND FIELD REPRESENTATIVE, PERMIT NUMBER, DATE, TIME OF DAY, WORKING CONDITIONS INCLUDING WEATHER AND TEMPERATURE. B. ITEMS REQUIRING CORRECTIONS. C. ACCEPTED DEVIATIONS FROM SHORING AND RESHORING DRAWINGS. D. AREAS ACCEPTED AND RELEASED FOR CONCRETE POUR. yy y #260DD522 V U V • V • V V V V U O � C ~ O U V V V +! w VV • � U V Y Y Y V C � w F- F - w W Y u'+ • y,, Jlui • Yuu'r. o.. � u N � M h M Q N C � C en LL � r U O M o w O C u UILC IL [� d r Lu Z ARCHI7ECTURF MITERIOR DESIGN PLANNING SEAL - to �-- MARID A.+SUARE2� _ P.E. 25414 OXFORD UNIVERSAL 4311 PONCE DE LEON BLVD. CORAL GABLES, FLORIDA 33146 5966 SOUTH DIXIE BUILDING 5966 & 5970 SOUTH DIXIE HIGHWAY MIAMI, FLORIDA 33133 MATEU ARCHITECTURE INC. THIS DRAWING IS THE PROPERTY OF MATEU ARCHITECTURE INC. UNLESS OTHERWISE PROVIDED FOR BY CONTRACT. THE CONTENTS OF THIS DRAWING ARE CONFIDENTIAL AND SHALL NOT BE TRANSMITTED TO ANY PARTY EKCEPT AS AUTHORIZED BY THE ARCHITECT/ ENGINEERS OF RECORD. PHASE PERMIT DRAWINGS FILE NAME. PROJECT NO MA0605 DRAWN BY M.A.S. CHECKED BY ISSUE DATE: DECEMBER 10, 2007 REVISIONS SHEET TITLE GENERAL NOTES FOUNDATION PERMIT SHEET: DF; 5-01 y 19 Z 0 a C w M d LL C07 V X c� U Lu rU_ W OILZ Z Q Q Z U .� LSI z w N V M wZ �o 0� <�LOo Q c/) u) u- d �n = 2 •,v! �O OXFORD UNIVERSAL 4311 PONCE DE LEON BLVD. CORAL GABLES, FLORIDA 33146 5966 SOUTH DIXIE BUILDING 5966 & 5970 SOUTH DIXIE HIGHWAY MIAMI, FLORIDA 33133 MATEU ARCHITECTURE INC. THIS DRAWING IS THE PROPERTY OF MATEU ARCHITECTURE INC. UNLESS OTHERWISE PROVIDED FOR BY CONTRACT. THE CONTENTS OF THIS DRAWING ARE CONFIDENTIAL AND SHALL NOT BE TRANSMITTED TO ANY PARTY EKCEPT AS AUTHORIZED BY THE ARCHITECT/ ENGINEERS OF RECORD. PHASE PERMIT DRAWINGS FILE NAME. PROJECT NO MA0605 DRAWN BY M.A.S. CHECKED BY ISSUE DATE: DECEMBER 10, 2007 REVISIONS SHEET TITLE GENERAL NOTES FOUNDATION PERMIT SHEET: DF; 5-01 y 19