08-40-142Page Two
Mariano Corral -Landscape Architect
General Notes and Instructions:
1. F RTILIZ R TO USE AT TIME OF INSTALLATION:
Attention: Owner, General Contractor, City Reviewer, Landscape Contractor and any individual
Because some Landscape Contractors have the tendency to purchase fertilizers from sources that are NOT compatible or consistent to
involved in this project.,
the FNGA and the University of Florida Agricultural Extension Services recommendations (to save money), it is therefore mandatory
0 0 C)
that all fertilizers to be used on M projects will be purchased from a qualified supplier AS LONG AS IT IS THE SAME PRODUC T
14.
0 C� Q 1i
The notes below are unconditional and there shall be no excuses that it has not been read or overlooked or
:
AND SPECIFICATIONS DESCRIBE BELOW: I
'Ibis
VE PLANTS
NATIV
�i- �wm�.�a
A
S
g
'k,
A
The recommended type of fertilizer to be used on all newly installed plant materials is PALM SPECIAL # 9836. is an 8-2-12
$
Adl
Attention: Owner, General Contractor, City Reviewer, Landscape Contractor and any individual
Because some Landscape Contractors have the tendency to purchase fertilizers from sources that are NOT compatible or consistent to
involved in this project.,
the FNGA and the University of Florida Agricultural Extension Services recommendations (to save money), it is therefore mandatory
0 0 C)
that all fertilizers to be used on M projects will be purchased from a qualified supplier AS LONG AS IT IS THE SAME PRODUC T
14.
0 C� Q 1i
The notes below are unconditional and there shall be no excuses that it has not been read or overlooked or
:
AND SPECIFICATIONS DESCRIBE BELOW: I
'Ibis
VE PLANTS
NATIV
rate of 10 pounds per 1,000 square feet. (1 lb 100 square feet).
followed.
The recommended type of fertilizer to be used on all newly installed plant materials is PALM SPECIAL # 9836. is an 8-2-12
6.
General Contractor at his own discretion, (it is recommended) shall call Landscape Architect to make site obsery ations in overseeing if
n Q
(nitrogen, potassium, and minor elements) for all Trees, Palms, shrubs and groundcovers. It can be obtained from ATLANTIC
THIS IS A 30 GALLON -12'X 61- 2" CALIPER
rom the public for their safety and
Durim installation Landscape Contractor shall make all possible intent to secure area of work f
1. The Plans are copyrighted and it is the ownership of Mariano Corral, Landscape Architect for all the designs shown.
FERTILIZER IN HOMESTEAD, FL. 18375 SW 260'h Street. Contact Patrick Coyle at (305) 986-0671. Landscape Contractor shall
Therefore, no copy or reproduction shall be made without his approval. By doing so, the individual or entity shall be liable and
treg, _per shrub for all and each shrub and groundcover. Palm trees shall receive 2 lbs:
use I 12ound per and a hand full or 3 tablespoons
.. . . . . ...
subjected to penalti s, fines and punitive damages to the full extend of the law.
ie
of fertilizer per palm tree. Fertilizer shall be place on top of root ball and 2" inches away from trunk. Milorganite, will not be
4.
Landscape architect will put forth his best effort to help contractor with any questions or information he/she requests.
2. All photographs are the property of Mariano Corral Landscape Architect. Any reproduction, or use without his consent shall
acceptable, however, slow release tablet fertilizers can be used at time of planting if Palm Special is not available and installation of
U 0 L� U 0
U Q
be prohibited, doing so will be subjected to penalties and fines as to the full extend of the law.
materials is on a sandy loam VS rock -limestone condition.
v u u
3. These drawings are for the sole purpose of this project. In the event it is use on another development without the knowledge of
MAINTENANCE AFTER INSTALLATION:
plans as approved and submitted to the City.
Landscape Architect, the contractor/owner shall be liable for fines, penalties and punitive damages to the full extend of the law.
It is recommended that all trees, palms, shrubs and groundcovers to be fertilize 4 times a year. By using Palm Special at a rate of I
Q 0 U Q 0- v
v
4. GENERAL CONTRACTOR WHEN SELECTING LANDSCAPE CONTRACTOR (LC) SHALL HAVE HIM OR HER
pound per 100 square feet, will at least insure that the plants are receiving the proper nutrients. On Palm trees in poor sandy soil a
In the event Value Engineering is perforined by Landscape Contractor, as directed by General Contractor without the approval, consent
6.
Landscape contractor mu st work with a set of drawings with the signature and seal of the landscape architect. Any plans without seal
UNDER CONTRACT ONE YEAR BEFORE PROJECT COMPLETION. THIS MEANS THAT IF A RETAINER TO LC IS
fertilizer with 2:13: 1: (N -P -K -Mg) will provide the important nutrients. See recommended application by manufacturer.
or knowledge of the Landscape Architect, Landscape Architect shall no longer ASUMME ANY TYPE OF RESPONSIBILITY, and
C,
0? 0�
0 0 0 0
U, U
NECESSARY THEN MAKE IT HAPPEN. THIS WILL INSURE THAT THE LANDSCAPE CONTRACTOR CAN BEGIN
c�
it will become the responsibility of parties involve to provide the City, all revisions or as -built drawings, and obtain their approval for
v U 0 u
General contractor shall have on site- one set of landscape plans at all times for review by the City inspector and Landscape Architect
ACQUIRING THE PLANT MATERIALS AHEAD OF TIME AND WILL MEET TH I E SPECIFIED PLANT HEIGHT AND
2. All lawn areas marked on plans as "SOD or LAWN" shall be St. Augustine -PALMETTO solid sod, unless otherwise noted on MYRSINE (MYR)
CAST IRON PLANT (ASE)
SPECIFICATIONS. THERE SHALL BE NO EXCUSES THAT THE PLANT SPECIFIED CAN NOT BE OBTAIN, AND
plans. Prior to installation of the sod, the area shall be raked clean of rocks and debris. A 2" toping of the approve soil mix or 70% s and
THEREFORE REQUIRES A SUBSTITUTION. THIS WILL NOT HAPPEN. I WILL GIVE NO LANDSCAPE
30% black clean soil thoroughly mix, shall be installed, and graded correctly. Water newly installed sod for a period of 2 months or
C, 0 110 Q
CONTRACTOR A SUBSTITUTION. IF ANOTHER PLANT IS INSTALLED THAN SPECIFIED, IT WILL BE REMOVED,
until the irrigation -system is fully operable. Water every day for a week, and 3 times a week after, until sod has established itself, for a
AND YOU WILL NOT RECEIVE CERTIFICATE OF COMPLETION OR OCCUPANCY UNTIL WORK IS COMPLETED
period of 10-15 minutes per zone. (Do not over water). In the event St. Augustine will be planted in the months of October through
In the event another Landscape Architect or Landscape Designer is called to make such revisions without the knowledge or consent of
NON-NATIVE PLANTS
W_,;
Bismarkia Palm (BN) LL -i
..........
CR A P -P M" T1 F. (T.11
TO MY SATISFACTION. I CAN NOT MAKE IT ANY CLEARER IN PLAIN ENGLISH THAN AS STATED HERE. December, it is best to Winterize by using and preconditioning the sod for cold weather with 3 -1-2 or 4-1 -,L fertilizer, before grass goes
5.
General Contractor at his own discretion (it is recommended) shall call for a meeting with Landscape Contractor and Landscape
Landscgpe Architect. Contractor is to unconditionally have on site and posted said certificate for tf inspection by ity or ounty
dormant. The newly installed sod shall be fertilized immediately with Palm Special # 9836 and be spread through out lawn areas at a
0 0 C)
Q U
14.
0 C� Q 1i
0 Q 0 Q
Architect to meet and discuss any procedures prior during and final installation of work.
Contractor shall have all utilities identified and carefully located for the safety, welfare of his workers as well as the general public.
rate of 10 pounds per 1,000 square feet. (1 lb 100 square feet).
�j U
Contact Sunshine State One-Calt of Florida, Inc.I-800-432-4770 - 48 hours before installation.
6.
General Contractor at his own discretion, (it is recommended) shall call Landscape Architect to make site obsery ations in overseeing if
n Q
Any discrepancies or questions shall be made to the attention of the Landscape Architect. Landscape contractor shall not assume
THIS IS A 30 GALLON -12'X 61- 2" CALIPER
rom the public for their safety and
Durim installation Landscape Contractor shall make all possible intent to secure area of work f
U cl C) u
V
anything. Any missing information shall be the responsibility of the contractor to contact Landscape Architect.
.. . . . . ...
inspections from City and for approval of payments to landscape Contractor.
4.
Landscape architect will put forth his best effort to help contractor with any questions or information he/she requests.
U 0 L� U 0
U Q
5.
Any material installed which are not on plans or approved by LA, contractor shall assume the responsibility for the costs and removal
v u u
00
plans as approved and submitted to the City.
of materials at no extra charge or compensation to the owner/ developer.
Q 0 U Q 0- v
v
8.
In the event Value Engineering is perforined by Landscape Contractor, as directed by General Contractor without the approval, consent
6.
Landscape contractor mu st work with a set of drawings with the signature and seal of the landscape architect. Any plans without seal
or knowledge of the Landscape Architect, Landscape Architect shall no longer ASUMME ANY TYPE OF RESPONSIBILITY, and
C,
0? 0�
0 0 0 0
U, U
c�
it will become the responsibility of parties involve to provide the City, all revisions or as -built drawings, and obtain their approval for
v U 0 u
General contractor shall have on site- one set of landscape plans at all times for review by the City inspector and Landscape Architect
CAST IRON PLANT (ASE)
such changes.
when he makes periodically site visits for inspections. Plans shall be clean and place in an area away from natures weather elements.
NOT be
C, 0 110 Q
CONFEDERATE
9.
In the event another Landscape Architect or Landscape Designer is called to make such revisions without the knowledge or consent of
8.
All beds shall be finish with either 3" of Eucalyptu s shredded mulch, pine straw or as specified on plans. Red mulch will
.7
Mariano Corral Landscape Architect, the Landscape Architect or Designer shall also be libel to the full extend of the Law for
gMroved. Cypress Bark Mulch will not be Mulch shall not be installed any closer to tree trunk than 4". Mulch shall have no
JASMINE
tampering.
9.
more than 1/2" to I" thickness over root ball. No berm mulching will be permitted.
It is that all trees shall be set 34" above finished grade.
V. DWARF "SCELLINGS" (ILE)
ILEX (CON)
10.
All CAD Files, PDF files supplied to Architect or any engineer shall not be copied or used for any other project. Landscape Cad Files,
recommended planted
-r A t, ; n"A A -v vif%r trN 1�krvtkn P rnntrnc-tnr installation of plant
f
7D
Bismarkia Palm (BN) LL -i
..........
CR A P -P M" T1 F. (T.11
TO MY SATISFACTION. I CAN NOT MAKE IT ANY CLEARER IN PLAIN ENGLISH THAN AS STATED HERE. December, it is best to Winterize by using and preconditioning the sod for cold weather with 3 -1-2 or 4-1 -,L fertilizer, before grass goes
5.
General Contractor at his own discretion (it is recommended) shall call for a meeting with Landscape Contractor and Landscape
Landscgpe Architect. Contractor is to unconditionally have on site and posted said certificate for tf inspection by ity or ounty
dormant. The newly installed sod shall be fertilized immediately with Palm Special # 9836 and be spread through out lawn areas at a
All plant materials to be Florida #1 or better as set by the State of Florida Grades and Standards 1998.
. . . . . . . . . . . ... ...... . . . . . . .
14.
Before commencing installation, it is recommended that the Landscape Contractor visit site and become familiarized with the site.
responsibility to remove any and all soil installed at his/ her expense.
Architect to meet and discuss any procedures prior during and final installation of work.
Contractor shall have all utilities identified and carefully located for the safety, welfare of his workers as well as the general public.
rate of 10 pounds per 1,000 square feet. (1 lb 100 square feet).
ILEX CASINE - DAHOON HOLLY (IC)
Contact Sunshine State One-Calt of Florida, Inc.I-800-432-4770 - 48 hours before installation.
6.
General Contractor at his own discretion, (it is recommended) shall call Landscape Architect to make site obsery ations in overseeing if
3.
Any discrepancies or questions shall be made to the attention of the Landscape Architect. Landscape contractor shall not assume
THIS IS A 30 GALLON -12'X 61- 2" CALIPER
rom the public for their safety and
Durim installation Landscape Contractor shall make all possible intent to secure area of work f
Landscape Contractor has followed the plans, quality of Plant materials, and proper installation procedures, to insure approval
anything. Any missing information shall be the responsibility of the contractor to contact Landscape Architect.
.. . . . . ...
inspections from City and for approval of payments to landscape Contractor.
4.
Landscape architect will put forth his best effort to help contractor with any questions or information he/she requests.
7.
General contractor and Landscape Contractor do not have the right nor permission to change anything from Landscape Architectural
5.
Any material installed which are not on plans or approved by LA, contractor shall assume the responsibility for the costs and removal
00
plans as approved and submitted to the City.
of materials at no extra charge or compensation to the owner/ developer.
8.
In the event Value Engineering is perforined by Landscape Contractor, as directed by General Contractor without the approval, consent
6.
Landscape contractor mu st work with a set of drawings with the signature and seal of the landscape architect. Any plans without seal
or knowledge of the Landscape Architect, Landscape Architect shall no longer ASUMME ANY TYPE OF RESPONSIBILITY, and
may be deem incorrect and not up to date plans.
it will become the responsibility of parties involve to provide the City, all revisions or as -built drawings, and obtain their approval for
7.
General contractor shall have on site- one set of landscape plans at all times for review by the City inspector and Landscape Architect
CAST IRON PLANT (ASE)
such changes.
when he makes periodically site visits for inspections. Plans shall be clean and place in an area away from natures weather elements.
NOT be
CONFEDERATE
9.
In the event another Landscape Architect or Landscape Designer is called to make such revisions without the knowledge or consent of
8.
All beds shall be finish with either 3" of Eucalyptu s shredded mulch, pine straw or as specified on plans. Red mulch will
Mariano Corral Landscape Architect, the Landscape Architect or Designer shall also be libel to the full extend of the Law for
gMroved. Cypress Bark Mulch will not be Mulch shall not be installed any closer to tree trunk than 4". Mulch shall have no
JASMINE
tampering.
9.
more than 1/2" to I" thickness over root ball. No berm mulching will be permitted.
It is that all trees shall be set 34" above finished grade.
V. DWARF "SCELLINGS" (ILE)
ILEX (CON)
10.
All CAD Files, PDF files supplied to Architect or any engineer shall not be copied or used for any other project. Landscape Cad Files,
recommended planted
-r A t, ; n"A A -v vif%r trN 1�krvtkn P rnntrnc-tnr installation of plant
photographs, and any other information on plans are the property of the Landscape Architect Mariano Corral, and shall not be fumished 10. General contractor is LO PrOVIUr, 41 1UUg1t glUU1119 011 W tv, %, Call 0 U I a "i F
to any entity without the consent of Mariano Corral, Landscape Architect. material, and any fine grading that is under his contract.
11. During Design Review and /or the permit process, if county reviewer has an issue with the plant materials, Landscape Contractor, nor 11. CLEAN-UP: Landscape Contractor shall remove all planting canisters, wood, plastics, tapes, rebars, excess soil, or any debris
expeditor, SHALL NOT HAVE THE RIGHT TO NEGOTIATE WITH THE COUNTY OR CITY. The County or City shall after completion of installation. A clean finished product must be delivered to owner/ client.
1-11-11-luc _+ +lk-+ *1, T 11 - Av�-b;fm-f nain mnict, onrrPotinngand/or decide 12. All Planting areas to be 100% irrigated, with 100% coverage- (head to head overlap).
point out denciencies and/ or areas ere WVavumi, JLJL.L , av cut av"F
rs to allowed specified plantings.
13. All irrigation lines shall be placed on the perimeter of all planting beds and/ or plante
e of plant materials to use,
what action to take. No City or County Reviewer has the right to decide for the Landscape Architect the typ
14. Separate water meters, backflow preventor, rain sensor, and controller shall be installed. Coordinate with electrical / mechanical
unless it is specifically and unconditionally specified in the codes (ie: Street Tree requirements for certain sections of City Master
engineer for location.
Plan). The landscape Architect is the sole unconditional responsible individual and qualified to make the final decision as to what is
15. All Fire building backfiow preventor shall be screen as per City Codes. In the event such information is not supplied to Landscape
appropriate on Copyrighted and sealed plans.
Architect, it is the responsibility of Landscape Contractor to contact LA for the type, quantity, and specs of plant material to be
choice of plant materials, rejection with no explanation is not
12. If County or City inspector/ reviewer has an issue with the
installed, so that LA can inform City and before receiving Certificate of Occupancy (CO) from City.
chitect can respond
sufficient to disapprove a plan. An explanation from reviewer will be fully welcomed so that the Landscape Ar
16. Landscape contractor is to guarantee all plant materials for A PERIOD OF one year after completion of installation. He will be
insist in suggesting to
accordingly if found reviewer has made a wrong decision or interpreted the plans incorrectly. If county reviewer
responsible for watering for at least 3 months or until irrigation system is fully operable.
use a. specified plant material which the Landscape architect deems inappropriate as to type and location, or cause a hazard to the public 17 Where as a Citv URBAN Street irr rovements LandscaDe codes calls for the use of Structural Soil then the following will apply: All
and welfare of the public, and can not come to an agreement, and reviewer will not approve plans until changes have been reflected, tile
Structural Soil CU) shall be obtain from Atlas Peat and Soil, Boynton Beach, Florida, the only certified agency in the State. Contact
Landscape Architect must receive a Certified Hold Harmless letter from County / City reviewer so as to not place Landscape Architect 'cate from Atlas Peat and Soil and Amereg Company that
Fred Marrero 1-561-734-7300. General contractor is to obtain a certift
Professional Liability insurance in jeopardy. structural soil has been delivered on site, and a copy must be sent to Landscape Architect for his record, as wellas to C�y
welfare.
A 18. Landscape Contractor must obtain all necessary permits prior to beginning installation. Any existing trees that must be removed or
transplanted must first receive approval by The Department of Environmental Resource Management (DERM).
19. All existing Trees to remain shall be barricaded (if space is allowed) to the tree canopy drip line to prevent damage to the tree or palm
during construction. A red color Vinyl fence 5' high, with 2 x4 posts for anchoring can be used. Careful care for tree trunks shall be
taken.
20. Landscape Contractor must provide documentation that any Coconut Palm Trees to be installed are numbered. and certified as being
4 f A; Qo,- nviA mrict h,- rnu;di-A in thi- PlInnninor and zoning departmei when seeking a permit for installation of plant materials
F
or his records.
and a copy sent to Landscape Architect f
21. Landscage Contractor: Documentation that all newly proposed / installed Sabal palmetto utilized on site have come from a
government approved donor site or were grown from seed at a register Florida nursery. This documentation shall be provided to the
A
"i Citv Plannina Devartment. (This is not applicable to Sabal Palms relocated within property.) A copy must be sent to Landscape
Architect for his records
22. Landscape Contractor or Owners representative shall provide to City a schedule for the timely removal of tree and palm guying. This
should be accomplished within a 12 month period after installation, and should NOT exceed the 12 month period.
W�
23. All lime rock within plating areas shall be removed to a depth of 3' feet. Replace material with specified planting soil, as per section 15
M�
%* N
below.
. . . ....... .......
ed to a depth of 3 Feet.
�'V
24. All lime rock, asphalt or debris within parking islands, comer parking islands, and entry islands, shall be remov
Av
N
Q " "
In the event a refurbishing or establishing a new Darkini! island with the used of extruded curves over an existing asphalt parking lot,
CALL 48 HOURS, 9-EMME YOU DIG it'l H `10A
AM
SUNS ',F FIORIDA;� INC.)
3HINF '_-'MfC OME rALL C
Landscgpe Architect. Contractor is to unconditionally have on site and posted said certificate for tf inspection by ity or ounty
13.
All plant materials to be Florida #1 or better as set by the State of Florida Grades and Standards 1998.
inspectors. If no certificate is shown, it will be assumed that structural soil has not been delivered and contractor bares the
14.
Before commencing installation, it is recommended that the Landscape Contractor visit site and become familiarized with the site.
responsibility to remove any and all soil installed at his/ her expense.
15.
Contractor shall have all utilities identified and carefully located for the safety, welfare of his workers as well as the general public.
18. A CIVIL ENGINEER SHALL ADJUST ALL SWALE AREAS AS DEEM NECESSARY FOR DRAINAGE.
Contact Sunshine State One-Calt of Florida, Inc.I-800-432-4770 - 48 hours before installation.
19. All final grading shall be done with a surveyor's instrument to assure proper heights and make any necessary adjustments to insure that
16.
Contractor shall have all utilities identified and carefully located for the safety, welfare of his workers as well as the public.
all water will remain on site.
17.
rom the public for their safety and
Durim installation Landscape Contractor shall make all possible intent to secure area of work f
welfare.
A 18. Landscape Contractor must obtain all necessary permits prior to beginning installation. Any existing trees that must be removed or
transplanted must first receive approval by The Department of Environmental Resource Management (DERM).
19. All existing Trees to remain shall be barricaded (if space is allowed) to the tree canopy drip line to prevent damage to the tree or palm
during construction. A red color Vinyl fence 5' high, with 2 x4 posts for anchoring can be used. Careful care for tree trunks shall be
taken.
20. Landscape Contractor must provide documentation that any Coconut Palm Trees to be installed are numbered. and certified as being
4 f A; Qo,- nviA mrict h,- rnu;di-A in thi- PlInnninor and zoning departmei when seeking a permit for installation of plant materials
F
or his records.
and a copy sent to Landscape Architect f
21. Landscage Contractor: Documentation that all newly proposed / installed Sabal palmetto utilized on site have come from a
government approved donor site or were grown from seed at a register Florida nursery. This documentation shall be provided to the
A
"i Citv Plannina Devartment. (This is not applicable to Sabal Palms relocated within property.) A copy must be sent to Landscape
Architect for his records
22. Landscape Contractor or Owners representative shall provide to City a schedule for the timely removal of tree and palm guying. This
should be accomplished within a 12 month period after installation, and should NOT exceed the 12 month period.
W�
23. All lime rock within plating areas shall be removed to a depth of 3' feet. Replace material with specified planting soil, as per section 15
M�
%* N
below.
. . . ....... .......
ed to a depth of 3 Feet.
�'V
24. All lime rock, asphalt or debris within parking islands, comer parking islands, and entry islands, shall be remov
Av
N
Q " "
In the event a refurbishing or establishing a new Darkini! island with the used of extruded curves over an existing asphalt parking lot,
CALL 48 HOURS, 9-EMME YOU DIG it'l H `10A
AM
SUNS ',F FIORIDA;� INC.)
3HINF '_-'MfC OME rALL C
Proper Royal Palm Bracing - use burlap, metal straps
brace and (4 )Wood Battens do not nail to trunk.
Use Four (4) wood planks 81 long to uphold palm tree
over 22' height or I O'greywood and above.
the same will apply as to removal of asphalt and lime rock as stated above and the use of proper planting soil as per Section 15.
ALL
25. NO PLANTS SHALL BE PLANTED ON TOP OF ROOT B For trees 3/4" to 2 1/2" Calipers
ized black
soil. Soil shall be thoroughly mix and
an pulver
26. All planting beds on site shall be composed of 70% silica sand, 20% good cle -,6
you may use Wellington Vynyl Straps
all be fumigated prior to mixing for any insects, contamination or weeds and follow
delivered on site free of debris and rocks. Soil sh
ur waiting period. -9 months.
method as approved by the EPA and Nursery Growers Association. Soil shall have a 72 ho to brace tree remove after 6
WW� You may need a 11/2"" x 11/2"" x flong
hnproper bracing of tree
trunk. No burlap shown.
Any Palm or Tree that
is installed in this form will be
removed by contractor at his expense.
Improper installation of mulch on top of
rootball. Do not follow this sample.
Otherwise I willhave contractor remove
it for every tree at contractorls
expense.
square wood stake to h 1p mainta tree
trunk straight.
RONEY J. MATEU
JMM CONSULTING ENGINEERS, LLC
��_,J�i
M.A. SUAREZ CONSULT ING ENGINEERS
M CONSULTING ENG. INC.
PISTORINO &ALA
4
A. J J
MARIANO CORRAL
OXFORD UNIVERSAL
4311 PONCE DE LEON BLVD.
CORAL GABLES, FLORIDA 33146
All trees shall have tree flare exposed.
For trees 3' and UP in Calipers
mulqb,
..... . . . . .
Bac011 AA1 size use three (3) 2" x 4" x 6-8'
Proper planting detail as per Dr. Ed Gillman - long wood planks to brace tree -
U of Florida Agriculture Department. remove after 12 months.
"o
5966 & 5970
SOUTH DIME FIIGI-IWAY
MIAMI, FLORIDA 33133
IN
VIATEU ARCHITECTURE ING.
THiS DRAWING IS THE PROPERTY OF MATEU
ARCHITECTURE ING. UNLESS OTHERWISE FROMED
FOP, BY CONTRACT. THE CONTENTS OF THIS
DRAWINIG ARE GONFIMITIAL AND SHALL HOT
'3�
RE TRANSMITTED TO ANY PARTY EXCEPT AS
ALITHOWED BY THE ARCHITECT/ENGMERS OF
RECORD.
PERMIT DRAWINGS
M:\0605\GD\FjriFE-R,�RCH\A-102.DWG
MA0605
RAG
RJM
�OCVUTEC�
Z C
............. 7
�a,
'R
PLANT DETAILS
,4,
LP -2
SIGI
Proper Royal Palm Bracing - use burlap, metal straps
brace and (4 )Wood Battens do not nail to trunk.
Use Four (4) wood planks 81 long to uphold palm tree
over 22' height or I O'greywood and above.
the same will apply as to removal of asphalt and lime rock as stated above and the use of proper planting soil as per Section 15.
ALL
25. NO PLANTS SHALL BE PLANTED ON TOP OF ROOT B For trees 3/4" to 2 1/2" Calipers
ized black
soil. Soil shall be thoroughly mix and
an pulver
26. All planting beds on site shall be composed of 70% silica sand, 20% good cle -,6
you may use Wellington Vynyl Straps
all be fumigated prior to mixing for any insects, contamination or weeds and follow
delivered on site free of debris and rocks. Soil sh
ur waiting period. -9 months.
method as approved by the EPA and Nursery Growers Association. Soil shall have a 72 ho to brace tree remove after 6
WW� You may need a 11/2"" x 11/2"" x flong
hnproper bracing of tree
trunk. No burlap shown.
Any Palm or Tree that
is installed in this form will be
removed by contractor at his expense.
Improper installation of mulch on top of
rootball. Do not follow this sample.
Otherwise I willhave contractor remove
it for every tree at contractorls
expense.
square wood stake to h 1p mainta tree
trunk straight.
RONEY J. MATEU
JMM CONSULTING ENGINEERS, LLC
��_,J�i
M.A. SUAREZ CONSULT ING ENGINEERS
M CONSULTING ENG. INC.
PISTORINO &ALA
4
A. J J
MARIANO CORRAL
OXFORD UNIVERSAL
4311 PONCE DE LEON BLVD.
CORAL GABLES, FLORIDA 33146
All trees shall have tree flare exposed.
For trees 3' and UP in Calipers
mulqb,
..... . . . . .
Bac011 AA1 size use three (3) 2" x 4" x 6-8'
Proper planting detail as per Dr. Ed Gillman - long wood planks to brace tree -
U of Florida Agriculture Department. remove after 12 months.
"o
5966 & 5970
SOUTH DIME FIIGI-IWAY
MIAMI, FLORIDA 33133
IN
VIATEU ARCHITECTURE ING.
THiS DRAWING IS THE PROPERTY OF MATEU
ARCHITECTURE ING. UNLESS OTHERWISE FROMED
FOP, BY CONTRACT. THE CONTENTS OF THIS
DRAWINIG ARE GONFIMITIAL AND SHALL HOT
'3�
RE TRANSMITTED TO ANY PARTY EXCEPT AS
ALITHOWED BY THE ARCHITECT/ENGMERS OF
RECORD.
PERMIT DRAWINGS
M:\0605\GD\FjriFE-R,�RCH\A-102.DWG
MA0605
RAG
RJM
�OCVUTEC�
Z C
............. 7
�a,
'R
PLANT DETAILS
,4,
LP -2