08-40-032PAINTING SECTION 09900
PART 1 — GENERAL
1.01 SUBMITTALS
A. PRODUCT DATA: SUBMIT A COMPLETE LIST OF PAINT MATERIALS PROPOSED FOR USE,
TOGETHER WITH THE MANUFACTURER'S TECHNICAL INFORMATION, INCLUDING PAINT LABEL
ANALYSIS, VOC CONTENT, AND MATERIAL SAFETY DATA SHEETS (MSDS).
PART 2 — PRODUCTS
2.01 MATERIALS
A. WATERBORNE LATEX (ACRYLIC) EMULSION PAINT:
1. ZERO—VOC PAINT: FLAT AND EGGSHELL, VOC CONTENT LESS THAN 5 GRAMS/LITER
2. LOW—VOC PAINT: SEMI—GLOSS AND GLOSS, VOC CONTENT LESS THAN 100
GRAMS/LITER
B. OIL—BASED: LOW—VOC PAINT (MAXIMUM VOC CONTENT LESS THAN 5 GRAMS/LITER);
MAXIMUM 10% AROMATIC HYDROCARBONS CONTENT.
C. EPDXY: WATERBORNE; MAXIMUM VOC CONTENT: 200 GRAMS/LITER
D. MINERAL SILICATE PAINT: FOR MINERAL SURFACES INCLUDING CONCRETE AND STONE;
CONSISTS OF INORGANIC FILLERS AND PIGMENTS SUSPENDED IN POTASSIUM SILICATE,
I. TRANSPARENT FINISHES:
1. POLYURETHANE, WATER—BASED: MAXIMUM VOC CONTENT:170 GRAMS/LITER
2. PENETRATING OIL: OIL—BASED, WATER—REDUCIBLE EXTERIOR FINISH
J. PAINT STRIPPERS— LOW—EMITTING: SHALL NOT CONTAIN METHYLENE CHLORIDE. AVOID
PRODUCTS CONTAINING METHANOL AND TRICHLOROETHANE.
PART 3 — EXECUTION
3.01 INDOOR AIR QUALITY
A. WEAR PROTECTIVE CLOTHING AND RESPIRATORS WHEN APPLYING OIL—BASED PAINTS
OR USING SPRAY EQUIPMENT WITH ANY PAINTS.
B. MAXIMIZE VENTILATION DURING APPLICATION AND DRYING.
C. ISOLATE AREA OF APPLICATION FROM REST OF BUILDING,
D. VACATE SPACE FOR AS LONG AS POSSIBLE AFTER APPLICATION. WAIT A MINIMUM OF
48 HRS BEFORE OCCUPYING FRESHLY PAINTED ROOMS.
3.02 WASTE MANAGEMENT
A. SEPARATE WASTE IN ACCORDANCE WITH THE WASTE MANAGEMENT PLAN. SET ASIDE
EXTRA PAINT FOR FUTURE COLOR MATCHES, OR REUSE BY OWNER, HABITAT FOR
HUMANITY, ETC. WHERE LOCAL OPTIONS EXIST FOR LEFTOVER PAINT RECYCLING, COLLECT
ALL WASTE PAINT BY TYPE AND PROVIDE FOR DELIVERY TO RECYCLING OR COLLECTION
FACILITY.
B. CLOSE AND TIGHTLY SEAL ALL PARTLY USED PAINT AND FINISH CONTAINERS AND
STORE PROTECTED IN WELL—VENTILATED, FIRE SAFE AREA AT MODERATE TEMPERATURE.
C. PLACE EMPTY CONTAINERS OF SOLVENT—BASED PAINTS IN AREAS DESIGNATED FOR
HAZARDOUS MATERIALS.
D. DO NOT DISPOSE OF PAINTS OR SOLVENTS BY POURING ON THE GROUND. PLACE IN
DESIGNATED CONTAINERS FOR PROPER DISPOSAL.
WORK INCLUDES SURFACE PREPARATION AND PAINTING OF INTERIOR AND EXTERIOR
SURFACES FOR THE TOTAL PROJECT. WHERE ITEMS OR SURFACES ARE NOT SPECIFICALLY
MENTIONED, POINT THE SAME AS SIMILAR ADJACENT MATERIALS OR AREAS.
PAINTING NOT REQUIRED: UNLESS OTHERWISE INDICATED, PAINTING IS NOT REQUIRED
ON CASEWORK, PLASTIC LAMINATE, MECHANICAL EQUIPMENT, PLUMBING FIXTURES,
ELECTRICAL EQUIPMENT (EXCLUDING EXPOSED DISTRIBUTION CABINETS) ELECTRICAL
DEVICES. PAINTING IS NOT REQUIRED ON SURFACES SUCH AS WALLS OR CEILINGS IN
CONCEALED OR INACCESSIBLE AREAS. METAL SURFACES OF ANODIZED ALUMINUM,
STAINLESS STEEL, CHROMIUM PLATE AND SIMILAR FINISHED MATERIALS DO NOT REQUIRE
FINISH PAINTING, DO NOT PAINT OVER CODE—REQUIRED LABELS OR EQUIPMENT
IDENTIFICATION LABELS.
JOB CONDITIONS: APPLY PAINTS ONLY WHEN TEMPERATURE OF SURFACES TO BE
PAINTED AND SURROUNDING AIR TEMPERATURES ARE WITHIN RECOMMENDED RANGE
PERMITTED BY THE PAINT MANUFACTURER'S PRINTED INSTRUCTIONS.
MATERIALS: PAINT AND STAIN MATERIALS AS LISTED IN THE FINISH LEGEND UNLESS
OTHERWISE INDICATED IN CONTRACT DOCUMENTS
SURFACE PREPARATION: CLEAN SURFACES OF DIRT, RUST, SCALE, GREASE, MOISTURE,
OR OTHER CONDITIONS OTHERWISE DETRIMENTAL TO FORMATION OF A DURABLE PAINT
FILM. PERFORM PREPARATION AND CLEANING PROCEDURES IN ACCORDANCE WITH PAINT
MANUFACTURER'S PRINTED INSTRUCTIONS FOR EACH PARTICULAR SUBSTRATE CONDITION.
REMOVE HARDWARE, ACCESSORIES, PLATES, LIGHTING FIXTURES, AND SIMILAR ITEMS IN
PLACE AND NOT TO BE FINISH—PAINTED, OR PROVIDE PROTECTION PRIOR TO SURFACE
PREPARATION AND PAINTING OPERATIONS. REMOVE, IF NECESSARY, FOR COMPLETE
PAINTING OF ITEMS AND ADJACENT SURFACES. FOLLOWING COMPLETION OF PAINTING OF
EACH SPACE OR AREA, REINSTALL REMOVED ITEMS.
COMPLY WITH MANUFACTURER'S PRINTED DIRECTIONS IN APPLYING PAINT MATERIALS.
USE APPLICATORS AND TECHNIQUES BEST SUITED FOR SUBSTRATE AND TYPE OF
MATERIAL BEING APPLIED.
SCHEDULING: APPLY FIRST—COAT MATERIAL TO SURFACES THAT, HAVE BEEN CLEANED,
PRE—TREATED OR OTHERWISE PREPARED FOR PAINTING AS SOON AS PRACTICAL AFTER
PREPARATION AND BEFORE SUBSEQUENT SURFACE DETERIORATION. ALLOW SUFFICIENT
TIME BETWEEN SUCCESSIVE COATINGS TO PERMIT PROPER DRYING. DO NOT RE—COAT
UNTIL PAINT HAS DRIED TO MANUFACTURER'S SPECIFICATIONS.
FORMULATE COLOR OF PRIME COAT TO MATCH COLOR OF FINISH COATS.
APPLY PAINT TO PROVIDE AN OPAQUE SMOOTH, SURFACE OF UNIFORM FINISH COLOR,
APPEARANCE AND COVERAGE. CLOUDINESS, SPOTTING, HOLIDAYS, LAP MARKS, BRUSH
MARKS, RUNS, SAGS, RAPIDNESS OR OTHER SURFACE IMPERFECTIONS WILL NOT BE
ACCEPTABLE AND WILL BE CORRECTED AT CONTRACTOR'S EXPENSE.
APPLY ADDITIONAL PAINT COATS WHEN UNDERCOATS, STAINS OR OTHER CONDITIONS
SHOW THROUGH FINAL COAT OF PAINT, UNTIL PAINT FILM IS OF UNIFORM FINISH,
COLOR AND APPEARANCE. GIVE SPECIAL ATTENTION TO INSURE THAT SURFACES,
INCLUDING EDGES, CORNERS, CREVICES, AND EXPOSED FASTENERS RECEIVE A DRY FILM
THICKNESS EQUIVALENT TO THAT OF FLAT SURFACES. REMOVE, REFINISH OR REPAINT
WORK NOT IN COMPLIANCE WITH SPECIFIED REQUIREMENTS.
CLEAN UP: UPON COMPLETION OF PAINTING WORK, CLEAN WINDOW GLASS AND OTHER
DAMAGED PAINT—SPLATTERED SURFACES. REMOVE SPLATTER PAINT AND CLEAN DAMAGED
FINISH SURFACES. TOUCH—UP AND RESTORE ALL DAMAGED OR DEFACED PAINTED
SURFACES AFTER COMPLETION OF WORK OF OTHER TRADES.
SCHEDULE —SHOP PRIMED ITEMS FOR SITE FINISHING
METAL FABRICATION (SECTION 05500): EXPOSED SURFACES OF BALLARDS, TRASH
ENCLOSURE FRAME AND EXPOSED SURFACES OF LINTELS,
PRE—FORMED METAL ROOFING (SECTION 07631): EXPOSED SURFACES OF METAL
ROOFING PANELS.
MANUFACTURED ROOF SPECIALTIES (SECTION 07710): EXPOSED SURFACES OF METAL
COPINGS AND TRIM.
STEEL DOORS do FRAMES (SECTION 081 1 1): INTERIOR AND EXTERIOR FACES OF
STEEL DOORS AND FRAMES.
ROOF VENTILATORS: EXPOSED SURFACES OF ROOF VENTILATORS TO MATCH ROOFING.
FINISH LEGEND SCHEDULE — EXTERIOR SURFACES
STUCCO — ONE COAT PRIMER, 2 COASTS LATEX, FLAT
WOOD — PAINTED: ONE COAT ALKYD PRIMER SEALER. TWO COATS ALKYD ENAMEL,
SURFACE AS SCHEDULED.
CONCRETE, CONCRETE BLOCK: ONE COAT BLOCK PRIMER. ONE COAT PRIMER SEALER
LATEX. ONE COAT LATEX, FLAT ENCLOSURE.
STEEL — UNPRIMED: ONE COAT ZINC CHROMATE PRIMER. TWO COATS ALKYD ENAMEL,
GLOSS
STEEL — SHOP PRIMED: TOUCH—UP WITH ZINC CHROMATE PRIMER. TWO COATS ALKYD
ENAMEL, GLOSS.
STEEL — GALVANIZED: ONE COAT ZINC CHROMATE PRIMER. ONE COAT PRIMER SEALER
LATEX. ONE COAT LATEX, FLAT.
SCHEDULE_ —__INTERIOR SURFACES
WOOD — TRANSPARENT: AWI SYSTEM #3 AS SPECIFIED IN CARPENTRY SECTIONS.
WASHCOAT. ONE COAT STAIN. FILLER COAT (FOR OPEN GRAINED WOOD ONLY). ONE
COAT SEALER. TOP COAT, REFER TO MILLWORK DRAWINGS.
WOOD — PAINTED: ONE COAT ALKYD PRIMER SEALER. TWO COATS ALKYD ENAMEL,
SURFACE AS SCHEDULED.
STEEL — UNPRIMED: ONE COAT ZINC CHROMATE PRIMER. TWO COATS LATEX— ENAMEL
STAIN.
STEEL — PRIMED: ONE COAT ZINC CHROMATE PRIMER. ONE COAT LATEX— ENAMEL,
SATIN.
STEEL — PRIMED: ONE COAT ZINC CHROMATE PRIMER. ONE COAT ALKYD ENAMEL,
GLASS.
STEEL — GALVANIZED: ONE COAT ZINC CHROMATE PRIMER. ONE COAT LATEX— ENAMEL,
SATI N.
PLASTER GYPSUM BOARD: ONE COAT LATEX PRIMER SEALER. TWO COATS LATEX,
SURFACE AS SCHEDULED.
ALL PAINT COLORS TO BE SELECTED BY ARCHITECT UNLESS OTHERWISE NOTED.
GRILLES AND SCREENS SECTION 10240
PRODUCT DATA: SUBMIT MANUFACTURER'S SPECIFICATIONS, TECHNICAL DATA, AND
INSTALLATION INSTRUCTIONS FOR REQUIRED PRODUCTS, INCLUDING FINISHES.
SHOP DRAWINGS: SUBMIT SHOP DRAWINGS FOR FABRICATION AND ERECTION OF
SCREEN UNITS AND ACCESSORIES. INCLUDE PLANS, ELEVATIONS AND DETAILS OF
SECTIONS AND CONNECTIONS TO ADJOINING WORK. INDICATE MATERIALS, FINISHES,
FASTENERS, JOINERY AND OTHER INFORMATION TO DETERMINE COMPLIANCE WITH
SPECIFIED REQUIREMENTS.
SCREEN CONSTRUCTION: GRILLES TO BE FABRICATED FROM 2"X.25" EXTRUDED
ALUMINUM BAT VERTICAL MEMBERS, AND 7/8"0 EXTRUDED HORIZONTAL TUBE SPACERS
VERTICAL BARS TO BE SPACED 12" ON CENTER.
HORIZONTAL TUBES TO BE SPACED 6" ON CENTER.
INSTALLATION:
LOCATE AND PLACE SCREEN UNITS PLUMB, LEVEL AND IN PROPER ALIGNMENT WITH
ADJACENT WORK.
USE ISOLATION TAPE WHERE ALUMINUM COMES IN CONTACT WITH STEEL OR CONCRETE.
EQUIP & FURNISHING INSTALLATION SECTION 11300
WORK INCLUDED: INSTALL OWNER FURNISHED EQUIPMENT AND FURNISHINGS, WHERE
SHOWN ON THE DRAWINGS, AS SPECIFIED HEREIN AND AS NEEDED FOR A COMPLETE
AND PROPER INSTALLATION. COORDINATE FOR DELIVERY, RECEIVE AT THE SITE, UNLOAD,
PROTECT, SET—IN—PUCE, AND COORDINATE FINAL CONNECTIONS.
COORDINATION: VERIFY AND COORDINATE ROUGH—IN LOCATIONS OF ELECTRICAL AND
PLUMBING CONNECTIONS. EXAMINE AND INSPECT ROUGH—IN SERVICES, AND INSTALLATION
OF FLOOR, CEILING OR OTHER CONDITIONS UNDER WHICH THE EQUIPMENT IS TO BE
INSTALLED — VERIFY THAT DIMENSIONS OF SUCH ITEMS ARE ACCEPTABLE BEFORE
INSTALLATION OF THE WORK. DO NOT PROCEED UNTIL UNSATISFACTORY CONDITIONS
HAVE BEEN CORRECTED.
INSTALLATION: SET EACH ITEM OF NON—MOBILE AND NON—PORTABLE EQUIPMENT
SECURELY IN PLACE, LEVELED AND ADJUSTED TO CORRECT HEIGHT. ANCHOR TO
SUPPORTING SUBSTRATE WHERE INDICATED AND WHERE REQUIRED FOR SUSTAINED
OPERATION AND USE WITHOUT SHIFTING OR DISLOCATION. CONCEAL ANCHORAGES WHERE
POSSIBLE.
ADJUST AND CLEAN: TEST EACH ITEM OF OPERATIONAL EQUIPMENT TO DETERMINE THAT IT
IS OPERATING PROPERLY. COORDINATE REPAIR OR REPLACEMENT OF EQUIPMENT FOUND
TO BE DEFECTIVE WITH THE EQUIPMENT SUPPLIER. REMOVE PROTECTIVE COVERINGS IF
ANY AND CLEAN ITEMS, READY FOR USE.
PLUMBING SECTION SECTION '15400
THE WORK INCLUDES PROVIDING THE PLUMBING SYSTEM AND PROVIDING NEW MATERIALS, FITTINGS
AND ACCESSORIES NECESSARY FOR A COMPLETE FUNCTIONING PLUMBING SYSTEM. ALL WORK SHALL
BE IN ACCORDANCE WITH LOCAL CODES AND/OR ORDINANCES AND IS SUBJECT TO INSPECTION.
HOOK—UP CHARGES, PERMITS AND ALL OTHER EXPENSES RELATED TO A COMPLETE AND
FUNCTIONING PLUMBING SYSTEM ARE INCLUDED AS A PART OF THIS SECTION.
THE INTENT OF THE DRAWINGS IS TO INDICATE THE GENERAL EXTENT OF WORK REQUIRED FOR THE
PROJECT. THE DRAWINGS FOR PLUMBING WORK ARE DIAGRAMMATIC SHOWING THE GENERAL
LOCATION, TYPE, FIXTURES AND EQUIPMENT REQUIRED. THE DRAWINGS SHALL NOT BE SCALED FOR
EXACT MEASUREMENTS. REFER TO MANUFACTURER'S STANDARD ROUGH—IN DRAWINGS FOR PLUMBING
FIXTURES, FOR EXACT LOCATIONS. COMPLY WITH ALL APPLICABLE ADA INSTALLATION REQUIREMENTS.
COORDINATE WITH THE WORK OF OTHER SECTIONS, AND WITH EQUIPMENT FURNISHED BY OTHERS.
PIPING SYSTEMS — GENERAL: ALL PIPING SHALL BE RUN PARALLEL TO BUILDING LINES AND
SUPPORTED AND ANCHORED AS REQUIRED TO FACILITATE EXPANSION AND CONTRACTION. ALL PIPING
SHALL BE CONCEALED EXCEPT IN UNFINISHED SPACES. INSTALL AS REQUIRED TO MEET ALL
CONSTRUCTION CONDITIONS AND TO ALLOW FOR INSTALLATION OF OTHER WORK INCLUDING DUCTS AND
ELECTRICAL CONDUIT. AT ALL CONNECTIONS BETWEEN FERROUS PIPING AND NONFERROUS PIPING,
PROVIDE AN ISOLATING DIELECTRIC UNION. ALL HANGERS SHALL BE COMPATIBLE WITH PIPING MATERIAL
TO PREVENT CORROSION.
PROVIDE ALL FITTINGS, ACCESSORIES, OFFSETS, AND MATERIALS NECESSARY TO FACILITATE THE
PLUMBING SYSTEM'S FUNCTIONING AS INDICATED BY THE DESIGN AND THE EQUIPMENT INDICATED.
FIXTURES FURNISHED BY OTHERS: PROVIDE WATER SUPPLIES AND WASTE TRAPS AT ALL HAND SINKS
AND KITCHEN SINKS FURNISHED BY KITCHEN EQUIPMENT SUPPLIER INCLUDED ARE STOP VALVES,
ESCUTCHEONS, AND CHROME PLATED BRASS TUBING WITH COMPRESSION FITTINGS.
SEWER AND WASTE PIPING: SANITARY DRAINAGE PIPING ABOVE FLOOR SHALL BE HUB LESS
CAST --IRON PIPE, FITTINGS AND CONNECTIONS. SANITARY DRAINAGE PIPING BELOW GRADE SHALL BE
SERVICE—WEIGHT HUB AND SPIGOT TYPE CAST—IRON WITH NEOPRENE GASKET JOINTS. ALL DRAINAGE
PIPING SHALL BE UNIFORMLY PITCHED, 1/4" PER FOOT UNLESS OTHERWISE REQUIRED BY SITE SEWER
CONDITIONS.
VENTS AND DOWN SPOUTS: PROVIDE A COMPLETE SYSTEM OF SCHEDULE 40 GALVANIZE PIPE WITH
BLACK CAST IRON THREADED DRAINAGE FITTINGS. PROVIDE 4 LB. LEAD FLASHING FOR VENTS
THROUGH ROOF AND ROOF DRAINS.
CONDENSATE AND INDIRECT DRAIN PIPING: TYPE M COPPER TUBING UP TO 1" ID, TYPE DWV
TUBING AND FITTINGS FOR 1 1/4" AND LARGER SIZES,
CLEANOUTS. PROVIDE CLEANOUTS AT THE END OF EACH HORIZONTAL RUN, AND AT THE BASE OF
ALL VERTICAL WASTE AND DRAIN PIPES. CLEANOUTS SHALL BE OF THE SAME SIZE AS THE PIPES
THEY SERVE. PROVIDE WALL AND FLOOR CLEANOUTS WITH ACCESSORIES TO OBSCURE FROM VIEW.
WATER DISTRIBUTION PIPING: LAYOUT WATER PIPING SO THAT THE ENTIRE SYSTEM CAN BE DRAINED.
HOT AND COLD WATER PIPING SHALL BE TYPE L COPPER TUBING WITH WROUGHT COPPER FITTINGS
AND SWEAT CONNECTIONS. PROVIDE MIN. 16" HIGH FULL AIR CHANGER AT EACH FIXTURE STOP.
INSTALL CHROME PLATED BRASS ESCUTCHEON PLATES AT ALL PENETRATIONS THROUGH FINISHED
SURFACES (INCLUDING CABINET INTERIORS). USE TIN— ANTIMONY SOLDER, 95/5 FOR ALL SWEAT
FITTINGS OF COPPER PIPING.
PIPE INSULATION: INSULATE ALL HOT AND COLD WATER PIPING AND DOWNSPOUTS. PROVIDE 1"
PREFORMED FIBERGLASS, ASJ—VB, FLAME SPREAD 25, SMOKE DEVELOPED 50, ASTM C--547.
SHUTOFF VALVES, WITH UNIONS SHALL BE PROVIDED FOR SERVICE TO EACH PLUMBING FIXTURE, FOOD
SERVICE EQUIPMENT ITEM OR OTHER EQUIPMENT ITEM, TO FACILITATE ISOLATION FOR REPAIR OR
REPLACEMENT. SEE DRAWING NO. P-3 FOR VALVE SCHEDULE.
ACCESS PANELS SHALL BE PROVIDED WHERE CONCEALED CONTROL DEVICES, VALVES, ETC. ARE
CONCEALED WITHIN WALLS. WHERE ACCESS FOR ADJUSTMENT AND MAINTENANCE IS POSSIBLE
THROUGH LAY—IN SUSPENDED CEILINGS, ACCESS PANELS ARE NOT REQUIRED.
SUPPLIES AND TRAPS: PROVIDE WATER SEALED TRAPS AND/OR SUPPLIES INSTALLED AS CLOSE AS
POSSIBLE TO ALL PLUMBING FIXTURES, DRAINS, AND FOOD SERVICE EQUIPMENT OR BEVERAGE
DISPENSING EQUIPMENT ITEMS FURNISHED BY OTHERS, HAVING A WASTE CONNECTION, OR REQUIRING
WATER SERVICE. EXPOSED TRAPS AND SUPPLIES IN EXPOSED AREAS (INCLUDING CABINET INTERIORS)
SHALL BE CHROMIUM PLATED BRASS, WITH CHROME PLATED ESCUTCHEON PLATES. PROVIDE TYPE
DWV PLASTIC WASTE PIPING FITTINGS FOR THE THREE --COMPARTMENT SINK. REMOVE ALL MARKING
FROM ALL PIPING WHEN INSTALLATION IS COMPLETE. USE SUITABLE CLEANER AND JOINT GLUE WITH
DWV PIPING.
INSTALLATION: THOROUGHLY CLEAN ITEMS BEFORE INSTALLATION. CAP PIPE OPENINGS TO EXCLUDE
DIRT UNTIL FIXTURES ARE INSTALLED AND FINAL CONNECTIONS HAVE BEEN MADE. PROCEED AS
RAPIDLY AS CONSTRUCTION WILL PERMIT. SET FIXTURES LEVEL AND IN PROPER ALIGNMENT. INSTALL
SUPPLIES IN PROPER ALIGNMENT WITH FIXTURES, INSTALL SILICONE SEALANT BETWEEN FIXTURES AND
ADJACENT MATERIAL, FOR SANITARY JOINT, AND OMIT ESCUTCHEONS.
TEST WATER SYSTEM UNDER 150 PSIG HYDROSTATIC PRESSURE, FOR FOUR (4) HOURS MINIMUM.
WHEN TESTING INDICATES MATERIALS OR WORKMANSHIP IS DEFICIENT, REPLACE OR REPAIR AS
REQUIRED, AND REPEAT TEST UNTIL STANDARDS ARE ACHIEVED.
HVAC SYSTEM SECTION 15500
THE WORK INCLUDES PROVIDING THE HVAC SYSTEM AND PROVIDING NEW DUCTWORK, GRILLES,
INSULATION, CONTROLS AND EQUIPMENT NECESSARY FOR A COMPLETE FUNCTIONING SYSTEM. HVAC
SYSTEM INCLUDES BUT IS NOT NECESSARILY LIMITED TO THE FOLLOWING:
INSTALLATION OF VENTILATION AND AIR CONDITIONING HVAC UNITS. NEW SUPPLY, RETURN do
EXHAUST DUCTWORK SYSTEM WITH GRILLES, DIFFUSERS, AND FILTERS.
DRAWINGS FOR HVAC WORK ARE DIAGRAMMATIC, SHOWING THE GENERAL LOCATION, TYPE, LAYOUT AND
EQUIPMENT REQUIRED. THE DRAWINGS SHALL NOT BE SCALED FOR EXACT MEASUREMENTS. REFER TO
MANUFACTURER'S STANDARD INSTALLATION DRAWINGS FOR EQUIPMENT CONNECTIONS AND INSTALLATION
REQUIREMENTS, AS REQUIRED. FURNISH AND INSTALL DUCTWORK, CONNECTIONS, ACCESSORIES,
OFFSETS, AND MATERIALS NECESSARY TO FACILITATE THE SYSTEM'S FUNCTIONING AS INDICATED BY
THE DESIGN AND THE EQUIPMENT INDICATED. THE WORK SHALL BE IN ACCORDANCE WITH LOCAL
CODES OR ORDINANCES AND SUBJECT TO INSPECTION.
COORDINATE WITH THE WORK OF OTHER SECTIONS AND WITH EQUIPMENT FURNISHED BY OTHERS.
EXTRA STOCK: PROVIDE TWO (2) COMPLETE SETS OF REPLACEMENT FILTERS FOR EACH HVAC UNIT.
DUCT DIMENSIONS: UNLESS OTHERWISE NOTED, DUCT DIMENSIONS ON DRAWINGS ARE NET INSIDE
CLEAR DIMENSIONS INDICATED ARE FREE AREA.
SHEET METAL DUCTWORK: SHEET METAL FABRICATED AND INSTALLED TO ASHRAE AND SMACNA
STANDARDS. SHEET METAL SHALL BE GALVANIZED SHEET STEEL OF LOCK—FORMING QUALITY, ASTM
A-525. UNLESS OTHERWISE NOTED, DUCT DIMENSIONS ON DRAWINGS ARE NET INSIDE CLEAR
DIMENSIONS ON LINED DUCTS OR SHEET METAL DIMENSIONS ON UNLINED DUCTS. ALL ANGLE IRON
USED FOR SUPPORT SHALL BE GALVANIZED. CONNECTIONS TO WALLS OR FLOORS SHALL BE AIRTIGHT
WITH ANGLE IRON AND CAULKING. SEAL ALL DUCT SEAMS, TRANSVERSE AND LONGITUDINAL, AIR—TIGHT.
PROVIDE TURNING VANES AT ALL SQUARE THROAT ELBOWS. SEE DETAILS ON DRAWING NO. M-1.
FLEX DUCT: PROVIDE FACTORY ASSEMBLED CLASS I AIR DUCT (UL 181) WITH 1" THICK 1 PCF
FIBERGLASS INSULATION ND REINFORCED OUTER PROTECTION COVER/VAPOR BARRIER. FLEX DUCT SHALL
MEET NEPA 90A WITH FLAME SPREAD UNDER 25. SMOKE DEVELOPED UNDER 50, AND SHALL BE RATED
FOR 2" W.G. PRESSURE AND 0 TO 250 DEGREE TEMPERATURE. PROVIDE METAL ADJUSTABLE CLAMPING
DEVICES, SCREW OPERATED. USE TWIST LOCK CONICAL TAP COLLARS AT CONNECTIONS INTO SHEET
METAL DUCTWORK. DO NOT EXCEED 2 FEET IN LENGTH FOR ANY FLEX DUCT.
ACCESS PANELS: PROVIDE HINGED ACCESS PANELS IN DUCTWORK WHERE REQUIRED FOR ACCESS TO
EQUIPMENT. PROVIDE INSULATED ACCESS DOORS IN INSULATED DUCTWORK.
AUTOMATIC TEMPERATURE CONTROL: LOW VOLTAGE TEMPERATURE CONTROL WITH A 24 VOLT ENERGY
SAVING, SEVEN DAY SETBACK TYPE THERMOSTAT. PROVIDE SOLID STATE ELECTRONICS, TWO STAGE
HEAT/COOL WITH AN AUTO CHANGEOVER FEATURE. WIRING SHALL COMPLY WITH SECTION 16400
REQUIREMENTS.
ROOF PENETRATIONS SHALL COMPLY WITH SMACNA AND NRCA STANDARDS.
TEST AND ADJUST EACH PIECE OF EQUIPMENT AND EACH SYSTEM AS REQUIRED TO ASSURE PROPER
BALANCE AND OPERATION, FOLLOW NEBB AND ASHRAE STANDARDS. ELIMINATE NOISE AND VIBRATION,
AND ASSURE PROPER FUNCTION OF ALL CONTROLS, MAINTENANCE OF TEMPERATURE, AND OPERATION.
BALANCE MECHANICAL SYSTEM, AND SUBMIT COMPLETED TEST REPORT TO CONSTRUCTION MANAGER,
PRIOR TO REQUEST FOR FINAL PAYMENT.
ELECTRICAL SYSTEM SECTION 10400
THE WORK IS THE INSTALLATION OF THE COMPLETE ELECTRICAL SYSTEM AS SHOWN AND SPECIFIED
ON THE DRAWINGS.
ALL WORK SHALL BE IN ACCORDANCE WITH LOCAL CODES OR ORDINANCES AND SUBJECT TO
INSPECTION.
COORDINATE WITH THE WORK OF OTHER SECTIONS, AND MAKE ALL CONNECTIONS TO EQUIPMENT
FURNISHED BY OTHERS. REFER TO ARCHITECTURAL EQUIPMENT DRAWINGS FOR ADDITIONAL
INFORMATION REGARDING EQUIPMENT AND CASEWORK, AND ELECTRICAL CONNECTIONS REQUIRED
THEREIN.
SPECIFICATIONS: THE SPECIFICATIONS, NOTES, AND SCHEDULES ON THE ELECTRICAL DRAWINGS ARE
THE SPECIFICATIONS FOR THE PROJECT.
rYov v•4
• v 4�.,c
4 V • V V
Y V V
r i 4 i Y V V
4 Y• Y• M • V u G V V
V V u
i ! • 1 G V Y V V V•
N • i • V V • V V p
W • • Y V VV Y
V V V 4 V
• YYr 4 wY u
rYV •uVGV V4u V`
:*000 • u V r
V 1 i • V
V V i i V V
u Y Y
i• Y V Y V V Vis (, V V V
v•
V u V
�4yY S #26000522
� d
4a
.r
ci
Y � IAJ
Y z
n rc
.0
Y,
V
Y � h
N
� m
y m
O m
OiV
C �
w
n
d
m
O N
a
w
�ti n
s
w q
h- ,L
.] O
LLI
e;
ARCHITECTURE INTERIOR DESIGN PLANNING
SEAL
r
'c"
RONEYJ. MATEU
AR 0008220:'
JMM CONSULTING ENGINEERS, LLC
M.E.P.
12651 S DIXIE HIGHWAY, SUITE 209
MIAMI, FLORIDA 33156
M.A. SUAREZ CONSULTING ENGINEERS
STRUCTURAL ENGINEERING
4869 SW 75TH AVENUE
MIAMI, FLORIDA 33155
PISTORINO A ALAM CONSULTING ENG. INC.
CIVIL ENGINEERING
7171 SW 62ND AVENUE, 4TH FLOOR
MIAMI, FLORIDA 33143
OXFORD UNIVERSAL
4311 PONCE DE LEON BLVD.
CORAL GABLES, FLORIDA 33146
5966 SOUTH
DIXIE BUILDING
5966 & 5970
SOUTH DIXIE HIGHWAY
MIAMI, FLORIDA 33133
MATEU ARCHITECTURE INC
THIS DRAWING IS THE PROPERTY OF MATEU
ARCHITECTURE ING UNLESS OTHFRWISE PROVIDED
FOR BY CONTRACT THE CONTENTS OF THIS
DRAWING ARE CONFIDENTIAL AND SHALL NOT
RE: TRANSMITTED TO ANY PARTY EXCEPT AS
AUTHORIZED OY THF ARCHITEGT/ENGINEERS OF
RECORD.
PHASE
PERMIT DRAWINGS
FILE NAME:
M:\0605\CD\SHEET\GNRL\G-006.DWG
PROJECT NO:
MA0605
DRAWN BY,
RAG
CHECKED RY'
RJM
ISSUE: DATE:
DECEMBER 10, 2007
RE'VISIoNS
SHEET TITLE
SPECIFICATIONS
SHEFT: or
G-006 6