08-40-029.3"PECIFICATIONS
INSTRUCTION TO BIDDERS SECTION 00100
AIA DOCUMENT A701, INSTRUCTIONS TO BIDDERS, 1987 EDITION IS
THE FORM BEING USED. COPIES OF THIS DOCUMENT MAY BE
OBTAINED FROM THE OFFICE OF THE ARCHITECT BEFORE
PROCEEDING WITH WORK.
SUPPLEMENT TO THE INSTRUCTIONS TO BIDDERS 1. AT THE END
OF SUBPARAGRAPH 32.1. ADD:
3.2.1.1. THE CONTRACTOR SHALL VERIFY ALL MEASUREMENTS AT
THE SITE AS HE SHALL BE RESPONSIBLE FOR ADAPTING THE PLAN
TO EXISTING CONDITIONS. IN THE CASE OF DISCREPANCIES
BETWEEN THE DRAWINGS AND THE EXISTING CONDITIONS, THEY
SHALL BE REPORTED TO THE ARCHITECT.
GENERAL CONDITIONS SECTION 00700
AIA DOCUMENT A 201-1997 EDITION: "GENERAL CONDITIONS OF THE
CONTRACT FOR CONSTRUCTION" IS HEREBY INCLUDED AS A PART OF
THE CONTRACT DOCUMENTS BY REFERENCE.
SUPPLEMENTS TO THE "GENERAL CONDITIONS" AS REQUIRED, WILL
BE WRITTEN BY THE ARCHITECT OF RECORD.
ERRORS AND OMISSIONS
ERRORS, INCONSISTENCIES, AND OR AMBIGUITIES SHALL BE BROUGHT
TO THE ARCHITECTS ATTENTION IMMEDIATELY, AND SHALL NOT BE
CONSIDERED SUFFICIENT REASON TO DEPART FROM THE DESIGN
INTENT OF THE CONSTRUCTION DOCUMENTS.
SUMMARY OF WORK SECTION 01010
THE WORK CONSISTS OF A 4 STORY COMMERCIAL BUILDING WITH
RETAIL, BUSINESS, PARKING AND A PARKING BASEMENT, INCLUDING
ALL ITS APPUTENANCES, SITE WORK AND ANY OFF SITE
IMPROVEMENT REQUIRED OR NECESSARY, SHOWN ON THE DRAWINGS,
EXCLUDING ONLY THOSE ITEMS SPECIFICALLY SHOWN, NOTED OR
SPECIFIED AS NOT IN CONTRACT (NIC).
- CONSTRUCTION SCHEDULE:
THE CONTRACTOR SHALL PREPARE AND SUBMIT TO THE OWNER AND
ARCHITECT, A BAR CHART TYPE PROGRESS SCHEDULE FOR THE ENTIRE
PROJECT, WITHIN THREE (3) DAYS AFTER AWARD OF CONTRACT.
PROVIDE A SEPARATE BAR FOR EACH WORK ITEM LISTED IN THE
SCHEDULE OF VALUES. INCLUDE APPROPRIATE TIME FOR PROJECT
MOBILIZATION PROCUREMENT OF PRODUCTS, REVIEW AND RETURN OF
SHOP DRAWINGS, FABRICATION INSTALLATION, TESTING, FINAL CLEANUP
AND INSTALLATION TIME FOR WORK UNDER SEPARATE CONTRACTS.
IDENTIFY EACH CALENDAR DAY THROUGH -OUT THE SCHEDULE.
HIGHLIGHT "CRITICAL PATH" ELEMENTS OF THE SCHEDULE THAT ARE
IMPORTANT TO COMPLETE THE WORK ON TIME. CORRELATE THE
ORGANIZATION OF THE SCHEDULE WITH THE DATE OF SUBSTANTIAL
/- COMPLETION INDICATED IN THE OWNER -CONTRACTOR AGREEMENT.
PROJECT COORDINATION do ADMINISTRATION:
COORDINATE THE WORK OF THE COMPLETE PROJECT TO ASSURE AN
EFFICIENT AND ORDERLY SEQUENCE OF INSTALLATION OF CONSTRUCTION
ELEMENTS, AND FOR INSTALLATION OF ITEMS FURNISHED AND INSTALLED
BY OTHERS, WITH PROVISIONS FOR ACCOMMODATING OTHER ITEMS TO BE
INSTALLED LATER. COORDINATE SPACE REQUIREMENTS AND
INSTALLATION OF MECHANICAL AND ELECTRICAL WORK WHICH ARE
INDICATED ON THE DRAWINGS. UTILIZE SPACE EFFICIENTLY TO MAXIMIZE
ACCESSIBILITY FOR OTHER INSTALLATIONS, AND FOR MAINTENANCE.
MAINTENANCE OF CONSTRUCTION DOCUMENTS: THE CONTRACTOR SHALL
MAINTAIN AT THE PROJECT SITE, A "RECORD" SET OF CONSTRUCTION
DOCUMENTS AND THE FOLLOWING RELATED DRAWINGS OR DOCUMENTS
PREPARED BY OTHERS: CASEWORK SHOP DRAWINGS PREPARED BY THE
CASEWORK FABRICATOR INTERIOR AND EXTERIOR SIGNAGE SHOP
DRAWINGS, BY THE SIGNAGE CONTRACTOR, AND ANY OTHER SHOP
DRAWINGS REQUIRED TO PERFORM WORK.
DO NOT CONSTRUCT ANY PORTION OF THE WORK RELATED TO THESE
DRAWINGS AT ANY TIME WITHOUT SUCH DRAWINGS BEING AVAILABLE AT
THE PROJECT SITE, AND ONLY AFTER REVIEW BY ARCHITECTS OFFICE.
APPLICATION FOR PAYMENT SECTION 01025
PAYMENT REQUESTS: THE PAYMENT REQUEST CYCLE IS TO BE
REGULAR. EACH APPLICATION MUST BE CONSISTENT WITH PREVIOUS
APPLICATIONS AND PAYMENTS. CERTAIN APPLICATIONS FOR PAYMENT,
SUCH AS THE INITIAL APPLICATION, THE APPLICATION AT SUBSTANTIAL
COMPLETION, AND THE FINAL PAYMENT APPLICATION INVOLVE ADDITIONAL
REQUIREMENTS.
PRIOR TO SUBMITTAL OF INITIAL APPLICATION FOR PAYMENT, THE
FOLLOWING ITEMS SHALL BE SUBMITTED: (1) LISTING OF
SUBCONTRACTORS AND PRINCIPAL SUPPLIERS AND FABRICATORS, (2)
THE PROGRESS SCHEDULE, (3) PRELIMINARY SCHEDULE OF VALUES, (4)
PERFORMANCE AND/OR PAYMENT BONDS, IF REQUIRED, AND (5) COPIES
OF ACQUIRED BUILDING PERMITS FOR PERFORMANCE OF THE WORK.
FORM AND QUANTITY APPLICATION: SUBMIT THREE (3) EXECUTED COPIES
OF AIA DOCUMENT G702, APPLICATION AND CERTIFICATION FOR PAYMENT,
SUPPORTED BY AIA DOCUMENT G703, CONTINUATION SHEET.
SUBMIT CONDITIONAL LIEN RELEASES WITH EACH APPLICATION FOR
PAYMENT CONTINGENT UPON RECEIPT AND BANK CLEARANCE OF THE
CURRENT INVOICED AMOUNT.
SUBMIT UNCONDITIONAL LIEN RELEASES COVERING THE PREVIOUSLY PAID
AMOUNT RECEIVED BY THE GENERAL CONTRACTOR AND ALL
SUB -CONTRACTORS OR MATERIAL SUPPLIERS, WITH SUBSEQUENT
APPLICATIONS FOR PAYMENT.
PRELIMINARY SCHEDULE OF VALUES: BEFORE START OF CONSTRUCTION,
SUBMIT A PRELIMINARY SCHEDULE OF VALUES. SUPPORT WITH BACK-UP
DATA TO SUBSTANTIATE ITS ACCURACY UPON REQUEST.
FINAL SCHEDULE OF VALUES: AT THE COMPLETION OF THE WORK, AS
AN A CONDITION OF FINAL COMPLETION, SUBMIT A REVISED SCHEDULE
OF VALUES, REFLECTING THE FINAL COST OF THE WORK, INCLUDING ALL
REVISIONS OR CHANGES MADE DURING CONSTRUCTION. ARRANGE
SCHEDULE IN ORDER OF WORK ITEMS LISTED ABOVE, AND SUPPORT
SCHEDULE WITH BACKUP DATA IF REQUESTED.
MODIFICATION PROCEDURES SECTION 01250
1. CHANGE ORDER REQUESTS
A. OWNER -INITIATED: THE ARCHITECT WILL ISSUE A DETAILED
DESCRIPTION WITH ATTACHMENTS FOR THE MODIFICATION OF
SCOPE, TIME AND BUDGET. THIS PROPOSAL IS FOR
INFORMATION ONLY. WITHIN 20 DAYS THE CONTRACTOR SHALL
SUBMIT A PROPOSAL FOR THE OWNERS REVIEW IN COMPLIANCE
WITH THE ARCHITECT'S PROPOSAL.
B. CONTRACTOR -INITIATED: WHEN NECCESSARY CONDITIONS
REQUIRE MODIFICATIONS TO THE CONTRACT, THE CONTRACTOR
MAY PROPOSE CHANGES BY SUBMITTING A REQUEST FOR A
CHANGE TO THE ARCHITECT. THIS REQUEST IS REQUIRED TO
BE A COMPLETE DETAILED DESCRIPTION FOR THE MODIFICATION
OF SCOPE, TIME AND BUDGET, AND IN COMFORMANCE WITH AIA
DOCUMENT G709.
2. CONSTRUCTION CHANGE DIRECTIVE:
WHEN NECCESSARY, THE ARCHITECT MAY ISSUE A CONSTRUCTION
CHANGE DIRECTIVE TO THE CONTRACTOR UTILIZING FORM AIA DOCUMENT
G714.
3. CHANGE ORDER PROCEDURES:
UPON OWNERS APPROVAL OF THE PROPOSAL REQUEST, THE ARCHITECT
WILL ISSUE A CHANGE ORDER UTILIZING AIA DOCUMENT G701.
J -
CONSTRUCTION PROGRESS SECTION 01320
1. MEETINGS:
A. PRE -CONSTRUCTION CONFERENCE SHALL BE SCHEDULED NO LATER
THAN 15 DAYS AFTER THE EXECUTION OF THE AGREEMENT. AGENDA
WILL BE PROVIDED BY THE ARCHITECT.
B. PROGRESS MEETINGS WILL BE CONDUCTED AT THE SITE AT
REGULAR INTERVALS AND COORDINATED WITH THE PREPARATION
FOR PAYMENT REQUESTS,
C. PROVIDE SPECIAL MEETINGS AT THE SITE AS REQUIRED FOR
THE PROPER COORDINATION OF THE WORK.
D. PRE -INSTALLATION CONFERENCES SHALL BE SCHEDULED FOR
ALL MANUFACTURERS AND FABRICATORS OF EQUIPMENT THAT
REQUIRES COORDINATION WITH OTHER CONSTRUCTION OR
FIXTURES.
2. SCHEDULE:
THE CONSTRUCTION SCHEDULE AS REQUIRED IN SUMMARY OF WORK
SHALL BE UPDATED AT REGULAR INTERVALS AND MADE AVAILABLE AT
THE REGULAR PROGRESS MEETINGS.
3. REPORTS:
A. PROGRESS REPORTS OF THE CONSTRUCTION SHALL BE MAINTAINED
AT REGULAR INTERVALS AND MADE AVAILABLE AT THE PROGRESS
MEETINGS.
B. PROVIDE SPECIAL REPORTS FOR ANY UNUSUAL EVENTS AND MAKE
THEM AVAILABLE AT SPECIAL OR PROGRESS MEETINGS.
SHOP DRAWINGS SECTION 01350
CONTRACTOR SHALL PROVIDE THE ARCHITECT WITH SHOP DRAWINGS,
PRODUCT DATA AND SAMPLES FOR REVIEW. SHOP DRAWINGS WILL
REQUIRE A MINIMUM OF 15 WORKING DAYS FOR REVIEW AND
RETURN TO CONTRACTOR.
TEMPORARY FACILITIES/CONTROL SECTION 01500
CONTRACTOR SHALL CONNECT TO EXISTING SYSTEMS AT THE
PROJECT SITE, AND COORDINATE WITH APPLICABLE UTILITY SERVICE
COMPANIES, TO PROVIDE FOR WATER, ELECTRICAL POWER, LIGHTING
AND PHONE SERVICE COSTS FOR SUCH SERVICES SHALL BE
INCLUDED IN THE BASE BID AMOUNT, UNLESS OTHERWISE INDICATED
BY CONTRACTUAL AGREEMENT BETWEEN THE OWNER AND THE
CONTRACT.
TEMPORARY ELECTRICAL POWER: PROVIDE A GROUNDED POWER
DISTRIBUTION SYSTEM WITH OVERLOAD PROTECTION, SUFFICIENT TO
ACCOMMODATE CONSTRUCTION OPERATIONS REQUIRING POWER, USE
OF POWER TOOLS, ELECTRICAL HEATING, LIGHTING, AND START-UP
TESTING OF PERMANENT ELECTRIC - POWERED EQUIPMENT PRIOR
TO ITS PERMANENT CONNECTION TO ELECTRICAL SYSTEM. LOCATE
MULTIPLE OUTLETS (MINIMUM OF 4 -GANG) SPACED SO THAT THE
ENTIRE AREA OF CONSTRUCTION CAN BE REACHED BY POWER
TOOLS ON A SINGLE EXTENSION CORD OF 50' MAXIMUM LENGTH.
TEMPORARY LIGHTING: PROVIDE TEMPORARY LIGHTING FIXTURES AS
REQUIRED.
SANITARY FACILITIES: PROVIDE ON-SITE TOILET FACILITY FOR THE
USE OF ALL WORKMEN ON THE JOB SITE, UNTIL NEW FACILITIES
ARE IN SERVICE. PROVIDE SEPARATE FACILITIES FOR MALE AND
FEMALE PERSONNEL WHEN BOTH SEXES ARE WORKING AT PROJECT
SITE.
TEMPORARY PHONE SERVICE: SHALL BE PROVIDED BY THE GENERAL
CONTRACTOR. THE TEMPORARY TELEPHONE SHALL BE MADE
AVAILABLE TO SUB -CONTRACTORS, AND THE ARCHITECT OR
CONSTRUCTION MANAGER OR HIS REPRESENTATIVE FOR LOCAL
TELEPHONE CALLS. LONG DISTANCE SHALL BE PAID FOR BY THE
PARTY MAKING SUCH CALLS.
SCAFFOLDING: PROVIDE ALL SCAFFOLDING AND CONSTRUCTION AIDS
REQUIRED, INCLUDING GUARD RAILS, LIGHTS AND PLATFORMS
NECESSARY FOR THE COMPLETION OF THE WORKMEN AND THE
PUBLIC.
PROGRESS CLEANING: AT ALL TIMES, KEEP THE PROJECT SITE
FREE FROM ACCUMULATION OF WASTE MATERIALS OR RUBBISH
CAUSED BY CONSTRUCTION DEBRIS, AND ARRANGE FOR
TRANSPORTATION AND LEGAL DISPOSAL OF MATERIALS OFF SITE.
CONSTRUCTION WASTE MANAGEMENT SECTION 01505
1.01 WASTE MANAGEMENT GOALS FOR THE PROJECT
THE OWNER HAS ESTABLISHED THAT THIS PROJECT SHALL MINIMIZE
THE CREATION OF CONSTRUCTION AND DEMOLITION WASTE ON THE
JOB SITE. [CONTRIBUTING FACTORS INCLUDE OVER -PACKAGING,
ORDERING ERROR, POOR PLANNING, IMPROPER STORAGE, BREAKAGE,
MISHANDLING, AND CONTAMINATION.]
'RECYCLE AS MANY OF THE WASTE MATERIALS AS ECONOMICALLY
FEASIBLE. MINIMIZE WASTE SENT TO LANDFILLS.
1.02 RELATED SECTIONS
A. SECTION 01736- DEMOLITION/DISMANTLING/SALVAGE
PART 2 -SERVICES
2.01 PRE -QUALIFIED CONSTRUCTION WASTE RECYCLING SERVICES
A. SUN RECYCLING (954) 428-4190
B. UHEL POLLY HAULING (954) 971-3870
PART 3 -EXECUTION
3.01 WASTE MANAGEMENT PLAN IMPLEMENTATION
A. COORDINATE WASTE MATERIALS HANDLING AND SEPARATION FOR
ALL TRADES, AND DOCUMENT RESULTS OF THE WASTE MANAGEMENT
PLAN.
B. PROVIDE SEPARATION, HANDLING, TRANSPORTATION, RECYCLING,
SALVAGE, AND LANDFILLING FOR ALL DEMOLITION AND WASTE
MATERIALS.
C. DESIGNATE A SPECIFIC AREA FOR SEPARATION OF MATERIAL FOR
SALVAGE AND RECYCLING. RECYCLING AND WASTE BIN AREAS ARE
TO BE KEPT NEAT AND CLEAN AND CLEARLY MARKED IN ORDER TO
AVOID CONTAMINATION OR MIXING MATERIALS.
D. DO NOT HANDLE, SEPARATE, STORE, SALVAGE, OR RECYCLE
HAZARDOUS MATERIALS WITH OTHER MATERIALS. FOLLOW
MATERIAL -SPECIFIC INSTRUCTIONS ANY HAZARDOUS MATERIALS.
CONTACT PROJECT MANAGER IF NO INSTRUCTIONS ARE EVIDENT.
PRODUCTS & SUBSTITUTIONS SECTION 01600
PRODUCTS OPTIONS: PRODUCTS SPECIFIED BY REFERENCE
STANDARDS OR BY DESCRIPTION ONLY. ANY PRODUCT MEETING
THOSE STANDARDS OR DESCRIPTION PRODUCTS SPECIFIED BY
NAMING ONE OR MORE MANUFACTURERS: PRODUCTS OF
MANUFACTURER NAMED AND MEETING SPECIFICATIONS, NO OPTIONS
OR SUBSTITUTIONS ALLOWED. PRODUCTS SPECIFIED BY NAMING ONE
OR MORE MANUFACTURERS WITH A PROVISION FOR SUBSTITUTIONS.
CONTRACTOR'S SUBSTITUTION REPRESENTATION: BY SUBSTITUTION OF
A MATERIAL, PRODUCT, EQUIPMENT ITEM OR SYSTEM, THE
CONTRACTOR: (1) REPRESENTS THAT HE HAS PERSONALLY
INVESTIGATED THE PROPOSED SUBSTITUTE PRODUCT AND DETERMINED
THAT IT IS EQUAL OR SUPERIOR IN ALL RESPECTS TO THAT
SPECIFIED, (2) WILL PROVIDE THE SAME WARRANTY FOR THE
SUBSTITUTION THAT THE CONTRACTOR WOULD HAVE PROVIDED FOR
THE SPECIFIED PRODUCT, (3) WAIVES ALL CLAIMS FOR ADDITIONAL
COSTS RELATED TO THE SUBSTITUTION OF THE ACCEPTED
SUBSTITUTE MAKING SUCH CHANGES AS MAY BE REQUIRED FOR THE
WORK TO BE COMPLETE IN ALL RESPECTS."
APPLICATION/ACCEPTANCE: APPLICATION OF A MATERIAL OR
EQUIPMENT ITEM TO WORK INSTALLED BY OTHERS CONSTITUTES
ACCEPTANCE BY G.C. OF THAT WORK AND ASSUMPTION OF FULL
RESPONSIBILITY FOR SATISFACTORY INSTALLATION.
PRODUCTS IN QUANTITIES SHALL BE ALIKE AND INTERCHANGEABLE.
WHERE ADDITIONAL AMOUNTS OF A PRODUCT ARE LIKELY TO BE
NEEDED BY THE OWNER AT A LATER DATE FOR MAINTENANCE AND
REPAIR, PROVIDE STANDARD, DOMESTICALLY PRODUCED PRODUCTS
WHICH ARE LIKELY TO BE AVAILABLE TO THE OWNER AT SUCH LATER
DATE.
SUPPLY PRODUCTS COMPLETE WITH ALL STANDARD DEVICES, TRIM
FINISH, AND ALL ACCESSORIES INDICATED IN THE LATEST EDITION OF
THE MANUFACTURER'S CATALOG OR BROCHURE PUBLISHED AT THE
DATE OF THE AWARD OF THE CONTRACT. FURNISH SUCH ITEMS
COMPLETE WITH COMPONENT PARTS NECESSARY FOR THE OBVIOUS
AND INTENDED USE AND INSTALLATION, WHETHER OR NOT
DESCRIPTIONS OR CATALOG NUMBERS CONTAIN ALL SUPPLEMENTED
INFORMATION AND/OR NUMBERS OF SUCH COMPONENTS.
EQUIPMENT NAMEPLATES: PROVIDE PERMANENT NAMEPLATES ON
EACH ITEM OF SERVICE -CONNECTED OR POWER OPERATED
EQUIPMENT. INDICATE MANUFACTURER, PRODUCT NAME, MODEL
NUMBER, SERIAL NUMBER, CAPACITY, SPEED, RATING, AND SIMILAR
ESSENTIAL OPERATING DATA. LOCATE NAMEPLATES ON AN EASILY
ACCESSIBLE SURFACE. LOCATE REQUIRED LABELS AND STAMPS ON
AN ACCESSIBLE SURFACE WHICH, IN OCCUPIED SPACES, IS NOT
CONSPICUOUS.
MANUFACTURER'S INSTRUCTIONS: WHENEVER PRODUCTS ARE
REQUIRED TO BE INSTALLED AND/OR PERFORM IN ACCORDANCE WITH
A SPECIFIED MANUFACTURER'S INSTRUCTION OR PROCEDURE,
PROCURE, DISTRIBUTE AND MAINTAIN AT THE SITE COPIES OF SUCH
INFORMATION.
NO ALLOWANCE OR CONSIDERATION WILL BE MADE FOR CLAIMED
IGNORANCE AS TO WHAT A CITED REFERENCE STANDARD CONTAINS,
AS EACH TRADESMAN IS CONSIDERED TO BE EXPERIENCED AND
FAMILIAR WITH THE PUBLISHED STANDARDS OF QUALITY AND
WORKMANSHIP FOR HIS OWN TRADE. IT IS THE RESPONSIBILITY OF
THE G.C. TO DISTRIBUTE AND INFORM ALL SUBCONTRACTORS OF
THESE SPECIFICATIONS AND ALL APPLICABLE GENERAL NOTES IN
THESE CONTRACT DOCUMENTS
INSTALLERS INSPECTIONS: BEFORE INSTALLATION, INSPECT
SUBSTRATE MATERIAL AND THE CONDITIONS UNDER WHICH THE WORK
WILL BE PERFORMED. DO NOT PROCEED UNTIL UNSATISFACTORY
CONDITIONS HAVE BEEN CORRECTED. APPLICATION OF A MATERIAL OR
EQUIPMENT ITEM TO WORK INSTALLED BY OTHERS CONSTITUTES
ACCEPTANCE OF THAT WORK BY G.C. AND ASSUMPTION OF
RESPONSIBILITY FOR SATISFACTORY INSTALLATION. INSPECT EACH ITEM
OF MATERIAL OR EQUIPMENT IMMEDIATELY PRIOR TO INSTALLATION -
REJECT DAMAGED AN DEFECTIVE ITEMS.
PERFORM INSTALLATION WORK BY PERSONS QUALIFIED TO PRODUCE
WORKMANSHIP OF SPECIFIED QUALITY, IN ACCORDANCE WITH
MANUFACTURER'S PRINTED INSTRUCTIONS. INSTALL WORK DURING
CONDITIONS OF TEMPERATURE, HUMIDITY, EXPOSURE, FORECASTED
WEATHER, AND STATUS OF THE PROJECT COMPLETION WHICH WILL
ENSURE THE BEST POSSIBLE RESULTS FOR EACH UNIT OF WORK.
ISOLATE EACH UNIT OF WORK FROM NON -COMPATIBLE WORK, AS
REQUIRED TO PREVENT DETERIORATION. MAKE ALLOWANCES FOR
EXPANSION, CONTRACTION, AND BUILDING MOVEMENTS. PROVIDE
ATTACHMENT AND CONNECTION DEVICES AND METHODS FOR
SECURING THE WORK PROPERLY AS IT IS INSTALLED, TRUE TO LINE
AND LEVEL. PROVIDE UNIFORM JOINT WIDTHS IN EXPOSED WORK,
ORGANIZED FOR BEST POSSIBLE VISUAL EFFECT.
COORDINATE CLOSING -IN OF WORK WITH REQUIRED INSPECTIONS
AND TESTS, SO AS TO MINIMIZE THE NECESSITY OF UNCOVERING
COMPLETED WORK.
PROTECTION: AFTER INSTALLATION, PROVIDE COVERINGS TO PROTECT
INSTALLED PRODUCTS FROM DAMAGE FROM TRAFFIC AND
CONSTRUCTION OPERATIONS, REMOVE WHEN NO LONGER REQUIRED.
REPAIR AND REPLACE DAMAGED ITEMS, AT NO ADDITIONAL COST TO
THE OWNER. ADDITIONAL TIME REQUIRED TO SECURE REPLACEMENTS
AND TO MAKE REPAIRS WILL NOT BE CONSIDERED TO JUSTIFY AN
EXTENSION OF TIME TO COMPLETE THE WORK.
PROJECT CLOSEOUT SECTION 01700
FINAL CLEANING: PRIOR TO OWNER OCCUPANCY, CLEAN ALL
SURFACES INCLUDING FIXTURES AND EQUIPMENT, INCLUDING OWNER
SUPPLIED EQUIPMENT. REMOVE ALL TRACES OF SOIL, STAINS, DIRT,
WASTE MATERIALS, SMUDGES, AND OTHER FOREIGN MATTER FROM
ALL FINISHED SURFACES. CLEAN ALL EQUIPMENT AND FIXTURES TO
A SANITARY CONDITION. CLEAN TRANSPARENT MATERIALS, INCLUDING
MIRRORS AND GLASS IN DOORS WINDOWS, AND CASEWORK, TO A
POLISHED CONDITION, FREE OF DUST, PUTTY, FILMS OR SIMILAR
SUBSTANCES WHICH ARE NOTICEABLE AS VISION -OBSCURING.
SUBSTANTIAL COMPLETION: AFTER FINAL CLEANING OPERATIONS HAVE
BEEN COMPLETED, AND WHEN THE PROJECT IS READY FOR OWNER
OCCUPANCY, OBTAIN AN OCCUPANCY PERMIT ON BEHALF OF THE
OWNER, AND APPROVAL BY ANY OTHER GOVERNMENTAL AUTHORITIES
HAVING JURISDICTION OVER THE PROJECT. SUBMIT ORIGINALS OF
SUCH APPROVALS TO THE OWNER FOR HIS RECORDS.
CERTIFICATE OF OCCUPANCY: CONTRACTOR SHALL OBTAIN
CERTIFICATE OF OCCUPANCY, WHICH IS TO REMAIN IN THE
POSSESSION OF THE OWNER.
PUNCH LIST: THE GENERAL CONTRACTOR SHALL PREPARE A LIST
OF WORK ITEMS YET TO BE COMPLETED OR CORRECTED COMPLETE
WITH SCHEDULED DATES FOR COMPLETION. SUBMIT THIS LIST TO THE
ARCHITECT AND OWNER FOR REVIEW AND COMMENTS. THE
ARCHITECT WILL THEN PERFORM A FINAL INSPECTION, AND WILL
PREPARE A PUNCH LIST OF ITEMS WHICH ARE INCOMPLETE,
DAMAGED, OR OTHERWISE NOT IN CONFORMANCE WITH THE
REQUIREMENTS OF THE CONSTRUCTION DOCUMENTS. THE FAILURE
TO INCLUDE ANY ITEM ON SUCH LIST DOES NOT ALTER THE
RESPONSIBILITY OF THE CONTRACTOR TO COMPLETE ALL THE WORK
REQUIRED BY THE CONSTRUCTION DOCUMENTS.
INSTRUCTION TO PERSONNEL: FULLY INSTRUCT THE OWNER'S
DESIGNATED PERSONNEL IN THE OPERATION, ADJUSTMENT, AND
MAINTENANCE OF MECHANICAL, PLUMBING, AND ELECTRICAL SYSTEMS.
OPERATION AND MAINTENANCE DATA: ORGANIZE TWO (2) SETS OF
OPERATING AND MAINTENANCE DATA. BIND DATA IN HEAVY DUTY
3 -INCH, 3 -RING VINYL -COVERED BINDERS, PROPERLY IDENTIFIED
AND INDEXED. INCLUDE THE FOLLOWING TYPES OF INFORMATION IN
OPERATING AND MAINTENANCE MANUALS: PAINT MATERIALS AND
COLOR FORMULAS USED, MATERIAL SUPPLIERS AND PRODUCT
IDENTIFICATIONS FOR FUTURE REPLACEMENT OF INTERIOR FINISHES,
OPERATING MANUALS AND EMERGENCY INSTRUCTIONS FOR HVAC
EQUIPMENT FURNISHED (ID APPLICABLE), SPARE PARTS LISTINGS,
COPIES OF WARRANTIES, WIRING DIAGRAMS, INSPECTION PROCEDURES,
AIR TESTING AND BALANCING REPORTS, SUB -CONTRACTOR LISTING
AND SIMILAR APPROPRIATE ITEMS.
COMPLETE ALL WORK ITEMS AS EXPEDITIOUSLY AS POSSIBLE,
PROVIDING LABOR AT TIMES WHEN THE PROJECT IS NOT IN
OPERATION, IF NECESSARY. COORDINATE WITH THE OWNER'S
MANAGER AND PERFORM THE WORK SO THAT IT WILL NOT INTERFERE
WITH THE OWNER'S OPERATIONS.
FINAL PAYMENT - CLOSEOUT SUBMITTALS: SUBMIT THE FOLLOWING
ITEMS TO THE OWNER, UPON APPLICATION FOR FINAL PAYMENT: (1)
FINAL OCCUPANCY PERMIT AND HEALTH DEPARTMENT APPROVAL,
WHEN REQUIRED; (2) LIEN WAIVERS; (3) FINAL SCHEDULE OF
VALUES; (4) EXTRA CONSTRUCTION DOCUMENT SETS, (5)
MARKED -UP SET OF "RECORD DOCUMENTS"; (6) EXTRA STOCK OF
FINISH MATERIAL ITEMS; AND (7) THE PUNCH -LIST OF INCOMPLETE
WORK ITEMS, PREPARED AT SUBSTANTIAL COMPLETION, INDICATING
ACTUAL COMPLETION DATES FOR EACH ITEM LISTED HEREIN.
SELECTIVE DEMOLITION /
DISMANTLING / SALVAGE SECTION 01736
PART 1 - GENERAL
1.01 RELATED SECTIONS
A. SECTION 01505 - CONSTRUCTION WASTE MANAGEMENT
B. LANDSCAPE PLAN
1.02 SUMMARY
A. DISMANTLE DESIGNATED BUILDINGS ON-SITE. IFBUILDINGS ARE TO
BE DEMOLISHED, SALVAGE ITEMS LISTED IN 2.01 OF THIS
SPECIFICATION SECTION BEFORE DEMOLISHING.
B. SALVAGE DESIGNATED EXISTING CONSTRUCTION FOR USE BY
OWNER.
PART 2 - PRODUCTS
2.01 DEMOLITION MATERIALS
A. CONCRETE: CRUSHED AND GRATED CONCRETE TO BE USED AS
RIP RAP IN GABION CONTAINERS (AS PER LANDSCAPE PLANS),
AGGREGATE, SUB -BASE MATERIAL, AND/OR FILL.
B. BRICK/CONCRETE MASONRY: BROKEN UNITS USED FOR SUB -BASE
MATERIAL OR FILL.
C. LAND -CLEARING WOOD: TO BE CHIPPED OR SHREDDED FOR USE
AS MULCH.
D. ASPHALT MATERIAL: SORT BY TYPE (PAVING OR ROOFING
MATERIAL). TO BE RECYCLED.
E. WOOD: SORT BY TYPE AND SIZE FOR SALVAGE. (WOOD
UNSUITABLE FOR SALVAGE TO BE CHIPPED OR SHREDDED FOR USE
AS MULCH; DO NOT CHIP OR SHRED STAINED, PAINTED, OR TREATED
WOOD.
F. BUILDING COMPONENTS AND FIXUTURES TO BE SALVAGED:
1. GIVEN TO OWNER: WINDOWS
2.DONATED TO HABITAT FOR HUMANITY OR EQUIVALENT NON -FOR
PROFIT ORGANIZATION: DOORS, CABINETS, HARDWARE, ELECTRICAL
APPLIANCES AND PLUMBING FIXTURES. (PORCELAIN PLUMBING
FIXTURES UNSUITABLE FOR SALVAGE MAY BE CRUSHED FOR FILL.)
CONSULT WITH OWNER TO VERIFY ALL SALVAGED MATERIALS
DESTINATION.
G. METAL: SALVAGE METALS FOR RECYCLING
H. GYPSUM BOARD TO BE RECYCLED
PART 3 -EXECUTION
3.01 WASTE MANAGEMENT
A. SEPARATE AND RECYCLE WASTE MATERIALS IN ACCORDANCE WITH
THE WASTE MANAGEMENT PLAN AND TO THE MAXIMUM EXTENT
ECONOMICALLY FEASIBLE.
SITE WORK SECTION 02000
ALL DEMOLITION, CLEARING AND GRUBBING, EARTHWORK, ASPHALT
PAVING SITE DRAINAGE WORK SHALL AS A MINIMUM, CONFORM TO
ALL LOCAL CODES METHODS, STANDARDS AND SPECIFICATIONS.
SIGNIFICANT LANDSCAPE FEATURES IDENTIFIED ON DRAWINGS SHALL
BE IDENTIFIED ON SITE BY APPROPRIATE TAGS AND PROTECTED BY
CONSTRUCTION FENCING. A LIST OF SIGNIFICANT LANDSCAPE
FEATURES AND PENALTIES FOR DAMAGE SHALL BE POSTED AT THE
JOB -SITE CONSTRUCTION OFFICE.
CLEARING AND GRUBBING SECTION 02110
REFER TO ALL TRASH, RUBBISH, SHRUBS, TREES AND STUMPS FROM
ENTIRE LOT UNLESS NOTED OTHERWISE ON SITE PLAN, TO 6" BELOW
FINISH GRADE MINIMUM. IN AREAS TO BE OCCUPIED BY
IMPROVEMENTS GREATER THEN 6" STUMPS SHALL BE ENTIRELY
REMOVED.
REMOVE THE ENTIRE DEPTH OF TOPSOIL FROM AREAS TO BE
OCCUPIED BY BUILDINGS, ROAD, PARKING AREAS AND WALKS, AND
PLACE IN A DESINATED AREA FOR RE -USE ON THE SITE.
PROTECT DESIGNATED AGAINST DAMAGE TO ANY LAWNS, SHRUBS,
TREES, ROADS, WALKS, PONDS AND OTHER WORK THAT IS TO
REMAIN IN PLACE.
EARTHWORK SECTION 02200
CONTRACTOR SHALL ESTABLISH TWO BENCH MARKS OFF SITE PRIOR
TO EXCAVATION. ELEVATION OF BENCH MARKS SHALL BE
COORDINATED WITH BENCH MARK LISTED ON SITE PLAN.
EXCAVATE FOR BUILDINGS, STRUCTURES AND ADJACENT AREAS TO
GRADES AND LEVELS AS INDICATED OR REQUIRED FOR FOUNDATION
ON PLANS, INCLUDE MISCELLANEOUS EXCAVATION AS INDICATED ON
DRAWINGS OR IN SPECIFICATIONS FOR FOOTINGS, UNDERGROUND
UTILITIES, STEPS, TAMPS, RETAINING WALLS, LIGHT POLES, POST
HOLES, DRYWELLS, AREA DRAINS ETC.
MATERIALS TO BE EXCAVATED ARE ASSUMED TO BE EARTH OR
OTHER MATERIALS THAT CAN BE REMOVED BY POWER SHOVEL OR
OTHER NORMAL EXCAVATING EQUIPMENT, BUT NOT REQUIRING THE
USE OF EXPLOSIVES OR DRILLS. IF OTHER IS ENCOUNTERED WITHIN
THE LIMITS OF THE EXCAVATION, NOTIFY THE ARCHITECT IMMEDIATELY
MATERIALS:
A. SUB -BASE FILL MATERIAL: CLASS 2 OR 3 MATERIAL CONSISTING
OF NATURALLY OR ARTIFICIALLY GRADED MIXTURE OF ROCK,
CRUSHED CONCRETE, CONCRETE BLOCK, OR CRUSHED SLAG FREE
OF VEGETATION AND DEBRIS.
1. ON-SITE MATERIAL GENERATED FROM GRADING AND DEMOLITION
OPERATIONS
2. OFF-SITE MATERIAL FROM GRADING AND DEMOLITION OPERATIONS
B. ENGINEERED FILL MATERIAL
1. ON-SITE MATERIAL
2. IMPORTED FILL MATERIAL FROM CLOSEST AVAILABLE SOURCE.
PRODUCTS:
A. SLOPE PROTECTION AND EROSION CONTROL:
1. CELLULAR CONFINEMENT SYSTEM:
a. EXPANDABLE PLASTIC CELLS: MINIMUM 50% RECYCLED CONTENT
b. PLASTIC RING AND GRID MOLDED TO GEOTEXTILE FABRIC: 100%
RECYCLED CONTENT
2, EROSION -CONTROL NETTING/MATTING:
a. NATURAL FIBER BIODEGRADABLE NETTING: COIR OR JUTE
3. EROSION -CONTROL BLANKET:
a. WOOD EXCELSIOR CONTAINED IN A PHOTO DEGRADABLE MESH
b. NATURAL FIBERS SEWN TOGETHER WITH COTTON THREAD
4. EROSION -CONTROL MEMBRANE:
a. NEEDLE -PUNCHED POLYESTER GEOTEXTILE: MINIMUM 75%
RECYCLED CONTENT
b. CONTAINMENT MAT: MINIMUM 90% RECYCLED CONTENT
5. SILT FENCING:
a. WOOD AND BURLAP FENCING
6. RETAINING WALL SYSTEMS:
a. RUBBER BLOCK: 100% RECYCLED RUBBER
b. PLASTIC BLOCK / PLANK: 100% RECYCLED PLASTIC
c. GABION SYSTEMS: DEBRIS FROM HOUSE
7. SOIL STABILIZATION
a. SPRAY -APPLIED MULCH: 100% RECYCLED CELLULOSE WITH OR
WITHOUT GRASS SEED MIX
b. NATIVE GRASS SEED MIX
EXECUTION
SITE CLEARING:
A. PLAN EQUIPMENT ACCESS TO MINIMIZE AND CONFINE SOIL
DISTURBANCE AND COMPACTION TO AS MINIMAL AREAS AS POSSIBLE
B. DO NOT DISTURB TOPSOIL AND VEGETATION IN AREAS OUTSIDE
THOSE INDICATED ON DRAWINGS
C.PROTECT TREES, VEGETATION, AND OTHER DESIGNATED FEATURES
BY ERECTING A HIGH -VISIBILITY, REUSABLE CONSTRUCTION FENCE.
LIMIT ACCESS OF PEOPLE, EQUIPMENT, AND SUPPLIES INSIDE
FENCING. LOCATE FENCE NO CLOSER THAN THE DRIP LINE.
D. PROVIDE ON-SITE LOCATIONS FOR STORING EXCAVATED ROCK,
SOIL, AND VEGETATION.
E. PROVIDE EROSION CONTROL AND SEEDING TO PROTECT SLOPES.
USE NATIVE SEED MIXES.
MAINTAIN TEMPORARY BARRICADES, FENCES AND BRIDGES AROUND
EXCAVATED AREAS WITH WARNING SIGNS AND/OR LIGHTS AS
REQUIRED BY CODE, TO PROTECT PUBLIC AND WORKMEN FROM
INJURY DURING WORK CARRIED OUT UNDER THIS CONTRACT.
SUITABLE BEARING FOR FOUNDATIONS: REFER TO STRUCTURAL
DRAWINGS
COMPACTION CERTIFICATES ARE MANDATORY FOR PARKING LOT,
BUILDING SLAB AND FOUNDATIONS SUB -GRADE.
FILL FOR UNPAVED AREAS SHALL BE CLEAN EARTH, FREE OF ALL
OBJECTIONABLE FOREIGN OBJECTS.
IF SUITABLE BEARING IS NOT ENCOUNTERED AT THE DEPTH
INDICATED ON DRAWINGS FOR FOUNDATIONS, THE CONTRACTOR
SHALL IMMEDIATELY NOTIFY THE ARCHITECT IN WRITING. DO NOT
PROCEED FURTHER UNTIL INSTRUCTIONS ARE GIVEN BY AUTHORIZED
REPRESENTATIVE OF THE ARCHITECT.
FINISH GRADING: SPREAD STOCKPILED AND/OR TOPSOIL EVENLY
OVER LAWN AND PLANTING AREAS. BRING TO FINISH GRADES
ALLOWING FOR SETTLEMENT.
ROUGH GRADE ENTIRE AREAS OF PROPERTY TO REASONABLY TRUE
AND EVEN SURFACES. SLOPE GROUND AWAY FROM BUILDING WALLS
TO FACILITATE DRAINAGE. PAVING AND WALKS SHALL BE GRADED TO
THE UNDER SIDE OF PAVEMENT, PLANTING AREAS TO BE 8" BELOW
FINISH GRADE AND LAWN AREAS TO BE 4" BELOW FINISH GRADES.
SOIL TREATMENT SECTION 02280
CONTRACTOR SHALL PROVIDE A CONCENTRATE MIXTURE OF EPA
APPROVED TOXIC CHEMICAL MIXTURES TO 5'-0" OUTSIDE BUILDING
LIMITS.
CONTRACTOR SHALL PROVIDE A ONE-YEAR WARRANTY OF TERMITE
TREATMENT BY AN APPLICATOR APPROVED BY THE ARCHITECT.
SITE UTILITIES SECTION 02800
WATER SEWER, TELEPHONE AND ELECTRIC SERVICE SHALL BE
CONNECTED TO EXISTING UTILITIES BY CONTRACTOR AS REQUIRED BY
UTILITY COMPANIES.
CONCRETE WORK SECTION 03300
PROVIDE CONCRETE AS INDICATED ON THE DRAWINGS FOR BUILDING
FOUNDATIONS, FLOOR SLABS, RETAINING WALLS, WALLS AND
EXTERIOR PAVING AND SLABS.
FORMWORK: ERECT FORMWORK, SHORING AND BRACING TO ACHIEVE
DESIGN REQUIREMENTS, IN ACCORDANCE WITH REQUIREMENTS OF ACI
301 AND 347. PROVIDE FORMED OPENINGS WHERE REQUIRED FOR
ITEMS TO BE EMBEDDED OR PASSING THROUGH CONCRETE WORK.
LOCATE AND SET IN PLACE ITEMS TO BE CAST DIRECTLY INTO
CONCRETE. COORDINATE WITH WORK OF OTHER SECTIONS IN
FORMING AND PLACING OPENINGS, SLEEVES, BOLTS, ANCHORS, AND
OTHER INSERTS AND COMPONENTS OF OTHER WORK.
JOINT DEVICES AND FILLER MATERIALS: JOINT FILLER: ASTM D1751:
ASPHALT IMPREGNATED FIBERBOARD OR FELT, THICKNESS TO SUIT
APPLICATION.
CONCRETE MIX: MIX CONCRETE IN ACCORDANCE WITH ACI 304.
DELIVER CONCRETE IN ACCORDANCE WITH ASTM C94. SELECT
PROPORTIONS FOR NORMAL WEIGHT CONCRETE IN ACCORDANCE WITH
ACI 301 METHOD 1.
PROVIDE CONCRETE TO THE FOLLOWING CRITERIA:
1. FOOTINGS
UNIT - MEASUREMENT
COMPRESSIVE STRENGTH (28 DAY) -4,000 PSI
WATER/CEMENT RATIO (MAXIMUM) - .42 BY WEIGHT (MASS)
AIR ENTRAINED - 4 TO 6 PERCENT
SLUMP - PLUS OR MINUS 1 INCH (50 MM) - 4 INCHES (76 MM)
MATERIALS
A. POZZOLANS:
1. GROUND GRANULATED BLAST FURNACE SLAG: ASTM C989
B. AGGREGATES:
1. RECYCLED, CRUSHED CONCRETE AGGREGATE MEETING
REQUIREMENTS OF ASTM C33, MINIMUM 25% AGGREGATE SHALL BE
RECYCLED CONCRETE AND SUBJECT TO APPROVAL BY STRUCTURAL
ENGINEER.
USE ACCELERATING ADMIXTURES IN COLD WEATHER ONLY WHEN
APPROVED BY ARCHITECT/ENGINEER. USE OF ADMIXTURES WILL NOT
RELAX COLD WEATHER PLACEMENT REQUIREMENTS. DO NOT USE
CALCIUM CHLORIDE. USE SET RETARDING ADMIXTURES DURING HOT
WEATHER ONLY WHEN APPROVED BY ARCHITECT/ENGINEER.
CONCRETE MATERIALS: AS SPECIFIED AND INDICATED ON THE
DRAWINGS.
PLACING CONCRETE: PLACE CONCRETE IN ACCORDANCE WITH AC1
301. NOTIFY TESTING AGENCY A MINIMUM 24 HOURS PRIOR TO
COMMENCEMENT OF OPERATIONS. ENSURE REINFORCEMENT, INSERTS
AND EMBEDDED PARTS ARE NOT DISTURBED DURING CONCRETE
PLACEMENT.
INSTALL VAPOR BARRIER INTERIOR SLABS ON GRADE. LAP JOINTS
MINIMUM 6 INCHES (150 MM) AND SEAL WATERTIGHT BY TAPING
EDGES AND ENDS. INSTALL JOINT FILLERS IN ACCORDANCE WITH
MANUFACTURER'S INSTRUCTIONS. SEPARATE SLABS ON GRADE FROM
VERTICAL SURFACES WITH 1/2 INCH (13MM) THICK JOINT FILLER,
UNLESS OTHERWISE SHOWN ON DRAWINGS. EXTEND JOINT FILLER
FROM BOTTOM OF SLAB TO WITHIN 1/4 INCH (6MM) OF FINISHED
SLAB SURFACE.
MAINTAIN RECORDS OF CONCRETE PLACEMENT. RECORD DATE,
LOCATION, QUANTITY, AIR TEMPERATURE, AND TEST SAMPLES TAKEN.
PLACE CONCRETE CONTINUOUSLY BETWEEN PREDETERMINED
EXPANSION, CONTROL, AND CONSTRUCTION JOINTS. PLACE FLOOR
SLABS ON GROUND IN CHECKERBOARD PATTERN.
�vv V•G v v uu wr
rV!•• Y • VV•rY u Yv+Gr
4 V
♦ • v ! Y Y JWrvY
rY V V YY ! Y try
r ! V r
! ♦ ! G V V V ! Y
! ! w ! 4 4 V Y } y ! V
W V r V fi V
V G V V V
• " Y • Y } G „ r !
IG •}
urry u•ryG Yru ! �u
G
YG•v u ! W �
• ! V V V
u Y V V v
V V Y V •
Y f• Y V V V• V u V Y V V • Y y' J
V
#26000522
ARCHITECTURE INTERIOR DESIGN PLANNING
SEAL
MONEY J. MATEU '
AR 0008220
JMM CONSULTING ENGINEERS, LLC
M.E.P.
12651 S DIXIE HIGHWAY, SUITE 209
MIAMI, FLORIDA 33156
M.A. SUAREZ CONSULTING ENGINEERS
STRUCTURAL ENGINEERING
4869 SW 75TH AVENUE
MIAMI, FLORIDA 33155
RISTORINO & ALAM CONSULTING ENG. INC.
CIVIL ENGINEERING
7171 SW 62ND AVENUE, 4TH FLOOR
MIAMI, FLORIDA 33143
OXFORD UNIVERSAL
4,311 PONCE DE LEON BLVD.
CORAL GABLES, FLORIDA 33146
5066 SOUTH
DIXIE BUILDING
5966 & 5970
SOUTH DIXIE HIGHWAY
MIAMI, FLORIDA 33133
MATEU ARCHITECTURE INC
THIS DRAWING IS THE PROPERTY OF MATEU
ARCHITECTURE INC UNLESS OTHERWISE PROVIDED
FOR NY CONTRACT THE CONTENTS OF THIS
DRAWING AHE' CONFIDENTIAL AND SHALL NOT
BE: TRANSMITTED TO ANY PARTY EXCEPT AS
AUTHORIZED BY THE: ARCHITFCT(ENGINEERS OF
RECORD.
PHASE
PERMIT DRAWINGS
FILE NAME.
IVI:\0605\CD\SH EET\GNRL\G-003.DWG
PROJECT NO.
MA0605
DRAWN BY
RAG
CHECKED .Y:
RJM
ISSUE: DATE:
NOUEMBER 5029097
REVISIONS
SHEET TITLE
SPECIFICATIONS
SHEET Or
G-003 6