08-40-006M„y• -y -V __ V
5966 S. DIXIE HIGHWAY SOUTH MIAMI, FLORIDA
MA 0605
MATEU ARCHITECTURE INC.
AA -26000522
18001 OLD CUTLER ROAD -SUITE 550
PALMETTO BAY, FLORIDA 33157 .
PH: 305-233-3304
FX: 305-233-326
PISTORINO & ALAM M. A. SUAREZ
CONSULTING ENG., INC. &ASSOCIATES, INC.
CIVIL ENGINEERING STRUCTURAL ENGINEER
} 7171 S.W. 62ND AV. 4TH FLOOR PA -25414
MIAMI, FLORIDA 33143 4869 S.W. 75TH AVENUE
PH: 305-669-2700 MIAMI, FLORIDA 331.55
FX: 305-669-2165 P H : 305-260-0363
FX: 305-260-0364
MARIANO CORRAL JMM CONSULTING
LANDSCAPE ARCHITECT . ENGINEERS, LLC
3001 SW 109TH COURT M/E/P/FP CONSULTING ENGINEERS
MIAMI, FL. 33165 12651 SOUTH DIXIE HIGHWAY
P H : (305) 551-1262 SUITE 209
FX: (305) 553-2088 MIAMI, FL. 33156
P H : (305) 255-1621
FX: (305) 255-1732
PERMIT DRAWINGS
DECEMBER 10, 2007
-
INDEX OF DRAWINGS
SURVEY STRUCTURAL
6509 S-200 BUILDING SECTIONS
CIVIL S-201 BUILDING SECTIONS
C-1 DEMOLITION SITE PLAN y S-202 SECTIONS
C-2 GEOMETRY, PAVING, PAVEMENT MARKING AND S-300 FOOTING SCHEDULES AND DETAILS
SIGNAGE SITE PLAN S-301 BEAM AND SOFFIT SCHEDULES AND DETAILS
C-3 GRADING AND DRAINAGE SITE PLAN S-302 BEAM AND SOFFIT SCHEDULES AND DETAILS
C-4 WATER AND SEWER SITE PLAN S-303 BEAM AND SOFFIT SCHEDULES AND DETAILS I
C-5 WATER AND SEWER PROFILES AND GENERAL NOTES S-304 COLUMNS SCHEDULES AND DETAILS
C-6 SITE AND DRAINAGE DETAILS S-305 SCHEDULES & DETAILS }
GENERAL S-400 WIND PRESSURES _
G-001 ABBREVIATIONS & SYMBOLS LEGEND ELECTRICAL
0-002 GENERAL NOTES E -101A BASEMENT PARKING LIGHTING PLAN
G-003 SPECIFICATIONS E-101 B BASEMENT EMERGENCY LIGHTING PLAN
G-004 SPECIFICATIONS E-101 BASEMENT ELECTRICAL PLAN
G-005 SPECIFICATIONS E -102A GROUND FLOOR PARKING LIGHTING PLAN
G-006 SPECIFICATIONS E-1 02B GROUND FLOOR GARAGE AREA EMERGENCY
LIFE SAFETY LIGHTING PLAN
LS -01 BASEMENT LIFE SAFETY PLAN E-102 GROUND FLOOR ELECTRICAL PLAN �—
LS-02 GROUND FLOOR LIFE SAFETY PLAN E -103A INTERMEDIATE PARKING LIGHTING PLAN
LS -03 INTERMEDIATE PARKING LIFE SAFETY PLAN E-1 03B INTERMEDIATE PARKING EMERGENCY
LS -04 SECOND FLOOR LIFE SAFETY PLAN LIGHTING PLAN
LS -05 THIRD FLOOR LIFE SAFETY PLAN E-103 INTERMEDIATE PARKING ELECTRICAL PLAN
LS -06 FOURTH FLOOR LIFE SAFETY PLAN E-1 04A SECOND FLOOR PARKING LIGHTING PLAN
ARCHITECTURE E-1 04B SECOND FLOOR EMERGENCY LIGHTING PLAN
A-100 SITE PLAN /SITE DATA E-104 SECOND FLOOR ELECTRICAL PLAN
A-101 BASEMENT FLOOR PLAN E-105 THIRD FLOOR ELECTRICAL PLAN
A-102 GROUND FLOOR PLAN E-1 06 FOURTH FLOOR ELECTRICAL PLAN
A-103 INTERMEDIATE FLOOR PLAN E-107 ELECTRICAL ROOF PLAN
A-104 SECOND FLOOR PLAN E-201 ELECTRICAL RISER DIAGRAM
A-105 THIRD FLOOR PLAN E-202 TELEPHONE/CATV RISER DIAGRAM
-- - A-i�. F=OURTH FLOOR PLAN E-203 PANEL SCHEDULES
, �" -3ASEMENT REFLECTED CEILING PLAN E-204 NOTES AND DETAILS
A., .. ; aROUND FLOOR REFLECTED CEILING PLAN FIRE PROTECTION
A-11� iNTERMEDIATE PARKING REFLECTED CEILING PLAN FP -001 FIRE PROTECTION NOTES AND DETAILS
A-113 SECOND FLOOR REFLECTED CEILING PLAN FP -002 FIRE PROTECTION DETAILS AND PIPING DIAGRAM
- A-114 THIRD FLOOR REFLECTED CEILING PLAN FP -101 BASEMENT FLOOR FIRE PROTECTION PLAN . .
A-115 FOURTH FLOOR REFLECTED CEILING PLAN FP -102 GROUND FLOOR FIRE PROTECTION PLAN
A-120 ROOF PLAN FP -103 INTERMEDIATE FLOOR FIRE PROTECTION PLAN
A-201 ELEVATIONS FP -104 SECOND FLOOR FIRE PROTECTION PLAN
A-202 ELEVATIONS FP -105 THIRD FLOOR FIRE PROTECTION PLAN
A-203 ELEVATIONS FP -106 FOURTH FLOOR FIRE PROTECTION PLAN
A-301 SECTIONS FP -107 ROOF FIRE PROTECTION PLAN
A-302 SECTIONS MECHANICAL
A-401 ENLARGED TOILET PLANS, ACCESSORY LEGEND M-101 BASEMENT MECHANICAL FLOOR PLAN
A-420 STAIR SECTIONS M-102 GROUND FLOOR MECHANICAL PLAN
A-421 RAMP SECTIONS M-103 INTERMEDIATE PARKING MECHANICAL FLOOR PLAN
A-422 ELEVATOR SECTION M-104 SECOND FLOOR MECHANICAL PLAN
A-501 DETAILS M-105 THIRD FLOOR MECHANICAL PLAN
A-502 DETAILS M-106 FOURTH FLOOR MECHANICAL PLAN
A-503 DETAILS M-107 MECHANICAL ROOF PLAN 1
A-504 DETAILS M-201 MECHANICAL DETAILS
A-505 -DETAILS M-202 MECHANICAL DETAILS
A-601 DOOR SCHEDULE, DOOR TYPES, FINISH SCHEDULE M-203 MECHANICAL RISERS
- A--602 DOOR HARDWARE SCHEDULE M-204 MECHANICAL NOTES
A-603 WINDOW SCHEDULES AND WINDOW TYPES M-205 MECHANICAL SCHEDULES
A-604 PARTITION TYPES PLUMBING
LANDSCAPE P-101 BASEMENT PLUMBING FLOOR PLAN
LP -1 SITE LANDSCAPE PLAN P-102 GROUND FLOOR PLUMBING PLAN
LP -2 PLANT DETAILS P-103 INTERMEDIATE PARKING PLUMBING FLOOR PLAN a
IR -1 SITE IRRIGATION P-104 SECOND FLOOR PLUMBING PLAN
STRUCTURAL P-105 THIRD FLOOR PLUMBING PLAN ti
S-00 GENERAL NOTES P-1069 FOURTH FLOOR PLUMBING PLAN
- S-01 GENERAL NOTES P-107 PLU',,IBING ROOF PLAN
I. .'. S-100 BASEMENT FRAMING PLAN P-201 SANNRY PIPING ISOMETRIC
S-101 GROUND FLOOR FRAMING PLAN P-202 DON :STIC WATER PIPING ISOMETRIC
55 S-102 INTERMEDIATE PARKING FRAMING PLAN P-203 STORM WATER PIPING ISOMETRIC
S-103 SECOND FLOOR FRAMING PLAN P-204 PLUOING DETAILS
. S-104 THIRD FLOOR FRAMING PLAN P-205 PLUM'31NG NOTES AND SCHEDULES ..
c: S-105 FOURTH FLOOR FRAMING PLAN
S-106 ROOF FRAMING PPS
w.
- --- - --- - ----- - _.., -- - ______`ter -