Loading...
11-1105-021MATERIALS WATER LINES WATER PIPIVC1, SHALL BE TYPE "L" COPPER FOR 2" AND UNDER AND TYPE K COPPER FOR 2-1/2 AND ABOV ALL UNDERGROUND WATER PIPING SHALL BE TYPE K COPPER. SANITARY. STORM AND CONDENSATE LINES SCHEDULE 40 PVC D.W.V. FOR SANITARY STORMDRAINS AND CONDENSATE LINES WHERE LOCAL dOODE AND ORDINANCES OMNR7RNRNMSADNMYAC EONg RATED WALL OR FLOORS. PIPE INSULATION INSUVg; CONDENSATE LINES ABOVE GRADE AND FIRST 8-0 OF COLD WATER LINE FROM WATER HEATER AS FOLLOWS: CW HW SUPPLY AND RETURN - 1" THICK PREFORMED FIBERGLASS PIPE INSULATION W/ FACTORY JACKET. CONDENSATE PIPING - 3/4- ARMAFLEX PREFORMED. PIPE SLOPE SCHEDULE PIPE SIZE PIPE SLOPE 2 1/2" 1/4" PER FOOT 3" TO 6" 1 /8" PER FOOT 8" OR LARGER 1/16" PER FOOT PLUMBING LEGEND COLD WATER - - HOT WATER (110') S SANITARY SOIL OR WASTE PIPING -�- ID INDIRECT WASTE PIPING (SAFE WASTE) -i•-- -�(•- --�► TRAP PRIMER LINE DRAIN I V V.T.R. (VENT THRU ROOF) -- POINT OF CONNECTION TO NEW OR EXISTING PIPING H.B.VB HOSE BIB WITH VACUUM BREAKER PIPING TURN DOWN -Q PIPING TURN UP C.O. CLEAN -OUT F.D. O FLOOR DRAIN ® DENOTES FIXTURE NUMBER NOTES: THESE ARE STANDARD SYMBOLS AND MAY NOT ALL APPEAR ON PROJECT DRAWINGS; HOWEVER, WHEREVER THE SYMBOL ON THE PROJECT DRAWINGS OCCURS, THE ITEM SHALL BE PROVIDED & INSTALLED BY THE PLUMBING CONTRACTOR. FOR STANDARD HEIGHTS SEE ELECTRICAL SPECIFICATION OR AS OTHERWISE NOTED ON DRAWINGS. GENERAL SPECIFICATIONS 1. ALL WORK SHALL BE PERFORMED BY A LICENSED PLUMBING CONTRACTOR IN A FIRST CLASS WORKMAN LIKE MANNER. SAID CONTRACTOR SHALL MEET ALL REQUIRMENTS SET FORTH BY THE FLORIDA PLUMBING CODE 2007 EDITION, ANY LOCAL ORDIANCE AND OR GOVERNING AUTHORITIES. j 2. ALL WORKMANSHIP AND MATERIALS SHALL BE IN STRICT ACCORDANCE WITH APPLICABLE NATIONAL, STATE, AND LOCAL CODES, AND ORDINANCES. 3. IT SHALL BE THE RESPONSIBILITY OF THE PLUMBING CONTRACTOR TO PROVIDE ALL LABOR, MATERIALS, AND SUPERVISION NECESSARY TO ACCOMPLISH THE WORK SHOWN AND/OR NOTED ON THE DRAWINGS. 4. ALL REQUIRED INSURANCE SHALL BE PROVIDED FOR PROTECTION AGAINST PUBLIC LIABILITY AND PROPERTY DAMAGE FOR THE DURATION OF THE WORK. 5. PLUMBING CONTRACTOR SHALL VISIT THE JOB SITE PRIOR TO BID AND VERIFY ALL CONDITIONS, LOCATIONS, DIMENSIONS AND COUNTS AS SHOWN AND/OR NOTED ON THE DRAWINGS. THIS SHALL INCLUDE ANY AND ALL FABRICATIONS REQUIRED PRIOR TO INSTALLATION. 6. IT SHALL BE THE RESPONSIBILITY OF THE PLUMBING CONTRACTOR FOR THE ADVANCED ORDERING OF LONG LEAD ITEMS AS NOT TO INTERFER WITH THE PRODUCTION OF OTHER TRADES RESULTING IN ANY DOWN OR LAG TIME. 7. PLUMBING CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORKMANSHIP FREE FROM DEFECTS FOR A PERIOD OF NOT LESS THAN (1) YEAR FROM DATE OF ACCEPTANCE, UNLESS INDICATED OR SPECIFIED ORTHERWISE• 8. CORRECTION OF ANY DEFECTS SHALL BE COMPLETED WITHOUT ADDITIONAL CHARGE AND SHALL INCLUDE REPLACEMENT OR REPAIR OF ANY OTHER PHASE OF THE INSTALLATION WHICH MAY HAVE BEEN DAMAGED THEREBY. 9. THE PLUMBING CONTRACTOR SHALL BE RESPONABLE TO REPAIR TO ORIGINAL CONDITION ANY AND ALL DAMAGES TO BUILDING SURFACES, EQUIPMENT, AND FURNISHINGS CAUSED DURING PERFORMANCE OF WORK. 10. LOCATION OF PLUMBING ROUGH -IN MAY CHANGE. VERIFY EXACT LOCATION WITH ARCHITECT/ENGINEER PRIOR TO INSTALLATION. DRAWINGS ARE DIAGRAMMATIC, DO NOT SCALE FOR THE EXACT LOCATION OF FIXTURES, PIPING, EQUIPMENT, ETC. 11. ALL MATERIALS SHALL BE NEW AND SHALL BEAR UNDERWRITER'S LABEL WHERE APPLICABLE. 12. THE COMPLETED SYSTEM SHALL BE FULLY OPERATIVE AND ACCEPTANCE BY ARCHITECT/ENGINEER MUST BE A CONDITION OF THE CONTRACT. 13. ALL EXCAVATION AND BACKFILL AS REQUIRED FOR THIS PHASE OF CONSTRUCTION SHALL BE A PART OF THIS CONTRACT. 14. CONTRACTOR SHALL PAY FOR ALL PERMITS, FEES, INSPECTIONS, AND TESTING& 15. ARCHITECTURAL AND/OR ENGINEERING EXPENSES THAT ARE INCURRED DUE TO REVISIONS OR SUBSTITUTIONS REQUESTED BY THE CONTRACTOR SHALL BE PAID FOR BY THAT CONTRACTOR. 16. THE CONTRACTOR SHALL FURNISH ALL WATER METERS UNLESS OTHERWISE NOTED. 17. ALL WORK SHALL BE COORDINATED WITH OTHER TRADES TO AVOID INTERFERENCE WITH THE PROGRESS OF CONSTRUCTION. 18. VERIFY LOCATION, SIZE, ELEVATION, MATERIALS, AND PRESENT STATE OF ALL EXISTING UTILITIES. PLUMBING FIXTURE SCHEDULE NO. DESCRIPTION MANUFACTURER MODEL NO. DRAIN WATER REMARKS COLD I HOT LAV LAVATORY * * 1_1/2- 1/2- VITREOUS CHINA SH SHOWER * * 1-1/2" 1/2- 1/2- WC WATER CLOSET * * 3- 1/2" VITREOUS CHINA WM WASHING MACHINE * * 3" 1/2" 1/2" SK SINK * * 1-1/2- 1/2" 1/2- STAINLESS STEEL * OWNER SUPPLIED PRODUCT NOTES: SEE KITCHEN EQUIPMENT SCHEDULE FOR ITEMS NOT FOUND ON THIS SCHEDULE ALL PLUMBING FIXTURES SHALL COMPLY WITH A.D.A. REQUIREMENTS WATER HEATER SCHEDULE SYMBOL MANUFACTURER MAG. CAT, NO. INPUT BTU'S NOTE V13LTS PH CYCLE CAP. KV E.F. LOCATION EVH-1 L13CHINVAR LTA120KK - 1,2,3,4 208 1 60 1 GAL 45 .92 SEE DRAWING NOTESs 1) SET HEATER WATER AT 110 DEGREES FAHRENHEIT 2) ASME CERTIFIED TO 150 PSI WORKING PRESSURE. 3) PLUMBING CONTRACTOR OPTION TO PROVIDE AND INSTALL ON THE COLD WATER SUPPLY LINE A THERMAL EXPASION DEVICE SUCH AS 'DIAPHRAM TYPE THERMAL EXPANSION 1.5us GALLONS TANK' OR A 1125ps1 PRESSURE RELIEF VALVE' IN A SUITABLE, ACCESIBLE 6 SAFE DISCARGE AREA. 4) ELECTRICAL CONTRACTOR TO PROVIDE AND INSTALL ALL REQUIRED WIRING, DISCONNECTS, BREAKERS, ETC, FOR A 1007 INSTALLATION. COORDINATE INSTALLATION WITH ALL DISCIPLINES INVOLVED, 19. INSTALL READILY ACCESSIBLE GATE VALVES IN ALL BRANCH WATER LINES SERVING ANY ROOM HAVING PLUMBING FIXTURES. ALL FIXTURES SHALL BE PROVIDED WITH READILY ACCESSIBLE VALVES. 20. MAIN WATER SUPPLY SHALL BE EQUIPTED WITH A BACKFLOW PREVENTER WHERE REQUIRED. 21. ALL THREADED WATER OUTLETS SHALL BE FURNISHED WITH WATTS #BA APPROVED VACUUM BREAKERS. 22. FURNISH AND INSTALL APPROVED AIR CHAMBERS AT EACH PLUMBING'' FIXTURE. 23. WHERE DISSIMILAR METALS ARE TO BE JOINED, APPROVED INSULATING UNIONS SHALL BE USED. 24. CORRECTION OF ANY DEFECTS SHALL BE COMPLETED WITHOUT ADDITIONAL CHARGE AND SHALL INCLUDE REPLACEMENT OR REPAIR' OF ANY OTHER PHASE OF THE INSTALLATION WHICH MAY HAVE BEEN DAMAGED THEREBY. 25. IF THE CONTRACTOR PROPOSES TO USE ANY ARTICLE, DEVICE,PRODUCT, OR MATERIALS WHICH IS NOT AS SPECIFIED, THE CONTRACTOR SHALL BE RESPONSIBILITY TO PROVE TO THE ARCHITECT/ENGINEER THAT THE PROPOSED SUBSTITUTION IS EQUAL. 26. THE PLUMBING CONTRACTOR SHALL KEEP ALL AREAS IN WHICH WORK IS BEING PERPOORMED, FREE FROM DEBRIS AT ALL TIMES AND SAID AREAS SHALL. BE LEFT BROOM CLEAN AT THE END OF EACH WORKING DAY. 27. THE PLUMBING CONTRACTOR SHALL FURNISH A COMPLETE SET OF AS -BUILT DRAWINGS, SHOWING ALL CHANGES AND DEVIATIONS, TO THE ARCHITECT/ENGINEER PROIR TO COMPLETION OF THE PROJECT.' ROLLED LEAD FLASHING 1" DOWN INTO PIPE PLUMBING VENT STACK MASTIC AT EDGES OF ROOFING MEMBRANE SET LEAD FLANGE IN MASTIC STRIP IN W / TWO PLIES OF FELT -PRIME FLANGE BEFORE STRIPPING. ° TAPERED ROOF INSUL DOWN TO DRAIN AND OVERFLOW DRAINS ROOF STRUCTURE (SEE ARCHITECTURAL PLANS) VENT THRU ROOF DETAIL NO SCALE THERMAL EXPANSION TANK COLD WATER SUPPLY 3/4" HEAT TRAP SHUT-OFF VALVE HOT WATER TO 1 EAT TRAP SYSTEM. -.- WATER SUPPLY P & T RELIEF - - TO HEATER. VALVE. P & T RELIEF LINE FULL SIZE ELECTRIC WATER HEATER 3/4- PR LINE TO OUTSIDE, TERMINATEPOINTING DOWN 6' ABOVE GRADE. DRAIN VALVE FLOOR 30000 GALVANIZED DRAINPAN " DP LINE TO OUTSIDE, TERMINATE POINTING DOWN 6" ABOVE GRADE TYPICAL WATER HEATER DETAIL NO SCALE HANGER ROD HANGER ROD LOCKING NUT ALL THREAD ROD SUPPORT NUT HEAVY DUTY CLEVIS SUPPORT NUT SUPPORT NUT HANGER -•"- HEAVY DUTY CLEVIS ALL THREAD RODHEAVY GER n a VAPOR BARRIER STIC PIPE CLEVIS HANGER INSULATION PIPE ' ' 16 GAUGE ZINC COATED CLEVIS HANGER SHEET STEEL SADDLE AT LEAST 8 LONG SINGLE HORIZONTAL RUNS NO VAPOR BARRIER INSULATION CLEVIS HANGER PIPE HANGER DETAIL SINGLE HORIZONTAL RUNS IN EXPOSED AREAS WITH VAPOR BARRIER INSULATION BENT STRAP 1 �2 WEB MEMBERS GALVANIZED ALL THREAD ROD 3/16" OVER VER . -HANGER NUT LESS OF ANGLES --•-ONE ANGLE ON EACH ° • SIDE OF WEB MEMBERS .-• ° °• '°• '^ ' •• � ' -•!-°• �• BOTTOM CHORDS REST ON TOP OF BOTTOM CHORDS STEEL °• •0.'$'aa .'$°�g•�:• STRUCTURAL FLOOR SLAB OF STEEL JOIST STEEL JOIST JOISTS BETWEEN PANEL • : °% • : �' POINTS. SIZE FOR LOAD HANGER ROD SUPPORT NUT HEAVY DUTY CONCRETE PLASTIC ALL THREAD ROD STEEL INSERT WITH ELONGATED STRAP BEAM HEAVY DUTY CLEVIS HANGER PIPE •' ° ; ' � e_ ;;$' - EAM CLAMP PIPE HANGER DETAIL 10- `�- HANGER ROD -•--HANGER ROD. UNDER STRUCTURAL FLOOR INSERT NUT = SIZE AS REG. STEEL BEAM CONCRETE INSERT PIPE SUPPORT DETAIL (FOR SANITARY + WATER PIPING) NO SCALE -A-1- "A-2" -I" "B-2" -B-1- "CA-1" -C-2w •C-to U.L NO. U.L NO. U.L NO. U.L NO. U.L NO. U.L NO. C-AJ-1106 C-AJ-2039 C-AJ-1146 C-AJ-1146 F-8-1003 F-A-20D9 POURED INPLACE CONCRETE U.L NO. U.L NO. SLEEVES AND FIRESTOPPING F-A-2007 F-A-2006 USE PROSET "FIRESTOP PENETRATORS-. U.L CLASSIFIED IN THE BUILDING MATERIALS DIRECTORY, TESTED BY ASTM E-814. USE FOR ALL APPLICABLE PIPE PENETRATIONS THROUGH FIRE RATED FLOORS, WALLS OR FLOOR/CEILING ASSEMBLIES IN ACCORDANCE WITH THE MANUF. INSTRUCTIONS. A. SYSTEM "A" PENETRATORS FOR WATER LINES, HEATING AND COOLING LINES, FIRE STANDPIPE AND SPRINKLER LINES, TEMPERATURE CONTROL. ACID WASTE GLASS PIPE AND ELECTRIC AND COMMUNICATION CONDUIT PENETRATING FLOORS OR WALLS. B. SYSTEM "B" PENETRATORS FOR CAST IRON DWV PIPES FOR STACKS AND DRAINS PENETRATING FLOORS OR WALLS. C. SYSTEM "C- PENETRATORS FOR PLASTIC DWV PIPES FOR STACKS AND DRAINS PENETRATING FLOORS OR WALLS. CA. SYSTEM "CA' PENETRATORS FOR POLYPROPYLENE ACID WASTE PIPE PENETRATING FLOORS OR WALLS. 1. CAST -IN -COUPLING PENETRATORS FOR POURED -IN -PLACE CONCRETE ON STEEL OR WOOD FORMS IN FLOORS OR WALLS. 2. CORED HOLE COUPLING PENETRATORS FOR CORED HOLES THROUGH PRECAST OR EXISTING CONCRETE IN FLOORS OR WALLS. 3. SPLIT WALL SLEEVE PENETRATORS FOR PIPES PASSING THROUGH GYPSUM WALLS OR FLOOR / CEILING ASSEMBLIES. 4. SUP FLANGE CM COUPLING FOR POURED -IN -PLACE CONCRETE ON CORRUGATED METAL DECK. "A-4" -B-4" -8-4" "C-4- 'C-1. -B-1- CORRUGATED DECT'KK PURED NPLACE CONCRETE C-AJ-1106 C-AJ-1146 F-A-2006 C-AJ-1146 FIRESTOP PENETRATOR DETAILS NO SCALE NISH GRADE ZURN 2N-1400 CLEAN -OUT COVER O O O O O O o ipo o0y+o oOO Q op• �a'e.4 pOeoo,+.pQeoo,<,pOeo•Oeo 0O+0e:OpyOaOO'o;+400p0o::eQe0 potep+i00p0o:4 12"x12"x8" POURED CONC. F---I-LONGSWEEP. E AS BLOCK WHEN MAX. SAME SIZE AS CLEANOUT IS TWO - WAY CLEANOUT SEWER - MAX. NOT IN USE SHORT� OR LONG SWEEP SIZE 4" PAVED AREA REQUIRES MASONRY WALL -A-1- :1:: t! U.L NO. W-L-1038 "B-1" �'• U.L NO �'L;' C-AJ-1146 •. Y -C-1- �c r U.L NO. �•f'.: W-J-2010 _ -A-2- U.L NO. W-L-1038 _ -A-3" U.L NO. W-L-1038 - "CA" ElU.L NO. W-J-2010 GYPSUM WALL STAINLESS STEEL COVER SCREWED TO THREADED C.O. PLUG FACE OF WALL 1-WAY, CLEAN -OUT 2-WAY, INTERIOR WALL -TYPE AT GRADE CLEAN OUT CLEAN -OUT TYPICAL CLEAN -OUT DETAILS N.T.S. Q' o I� 0ME "^ w Y P Uz T : 0 a n Uj LU Cr M a Fine<.Une'Engineering Inc. E ectrical, Mechanical, Plumbing Fare Proft'gi�� `C''oit O-udion, Administration 5975..W,,.6`t�r+r sse`61 'Stilt,.$ #216 Sunrise, FI. 33313 "ca_ 4. 84.3368�. �al:954.584-3393 Fwlik cad�n gtflengpeers.com ti° T. o' j ° STC V(d fgEUO;,P.E. N0. 32578 ,;�TA 02 A • TE frt lia LRRCMg (B. Cl) Z L1J 0 W 0 z Z 0o W Z O Q J m w w N a LUAU M M W"' U" J Z Q WC) � t� 0 W CD � W � w J = Q(0 LO 00 v c 4 a o zLU -��� a W w l> S W W - Z 47 C? � 0 w 01. a 0 q u7 w a. L Lij 2 C Q < w a a w a Ziox p oQ 4 w C a w��a�< 4 < C* U, Z aa� - <nz u u u m W� <��� CD CD CO W r' r 0 O r. ": Z C7 o��Qa� w m zo< mW O LLI Y. Oco_jUw= US2n-coati P1.0 01