Loading...
06-774-012.'.Or VIPJ''� CONCRETE BASE- W 16X6 -10110 WWF 1)om - PROVIDE ANCHOR BOLT WITH A MINIMUM OF 500 POUND PULL-OUT RESISTANCE. SHALL SECURE THE AIR CONDITIONING CONDENSER UNIT FROM WITHIN THE UNIT TO THE CONCRETE SLAB ON WHICH THE UNIT RESTS TO WITHSTAND 150 MPH HURRICANE FORCE. 2) -UNITS SHALL BE CLEAR BY 3" MIN. FROM DRIP LINE. A S.FASTENED OE AT EACH SUP 2 "m x 1 -112" PORT) AND PROVIDE SOLID ISOLATION PAD FOR CORROSION INHIBITOR SUCTION LINE W/ 112 ARMAFLEX INSULATION do VAPOR BARRIER C.U. MOUNTING DETAIL N.T.9 SPLIT A/C SYSTEM SCHEDULE INIT NUMBER A141.1-2 too MANU=ACTURER RI-EEM MODEL NU!"MR ww -I1 �V TOTAL CF1'1. 100 O/A CFJt 0 H ENT. AIR TEMP. (F) 80/61 SENSIBLE COOLING (BTUH) 18,000 TOTAL COOLING (BTUH) 24 ;00 BLOIl,ER MOTOR HP. 1/3 J VOLTAGE 230 -1 -60 MAX. BREAKER SIZE 25 = UNIT UEIGNT (LBSJ OL MATCHING CONDENSING UNIT ACCT! -2 4 ELECTRIC 1E4TER au 50 BTUH Il fd00 STAGE 1 VOLTAGE 230 -1 -60 UNIT NJ1SER ACCU-2 MAMFACTURER RHEEM MODEL NUMBER RAMC- 024JAB }- NOMNAL TONS 210 NUMBER OF COMPRESSORS 1 RLA EACH 109 LRA. EACH 54 ZL1 NUMBER OF CONDENSER FANS I FLA EACH 0 9 VOLTAGE 230 -1 -60 MAX. BREAKER SIZE 25 UNIT QE*W 145 SYSTEM E.E.R. / SEER 140 LIQUID LINE (N) 46 SUCTION LINE (IN) % AREA SERVED FAMILY ROOM GENERAL H.V.A.C. NOTES I- MCHANICAL CONTRACTOR SMALL 1 A) Verify all space conditions and dimensions at job site prior to fabrication of ductwork and installation of equipment. B) Coordinate work with other trades. C) Do all work In accordance with state and local codes. D) Do all work in accordance either latest ASHRAE guide and SMACNA standards. E) Pay for all permits, fees, inspections and testing. F) Adjust and balance diffuser in accordance with quantities shown on plans. G) Submit shop drawings to engineer for approval. H) Furnish all labor material and equipment for a complete H.V.A.C. system in accordance with referenced standards and these drawings. J) (") these doors with 314" under cut. 2- GUARANTEES s A) All new equipment and materials shall be guarantee for one year after date of acceptance. All compressors shall carry standard factory 5 year guarantee. B) Provide 90 day free service. 3 - A/C DUCTS s Shall be constructed of 1.5" thick R -6.0 insulation value, standard duty fiberglass board flameproof reinforced aluminum faced cover in accordance with N.F.P.A. No. 90A and as manufactured by Owens - Corning. Ductwork shall be fabricated and installed according with manufacturer is instruction. Install air volume extractors at each duct tap. - If round / flexible duct is used then shall be 2" thick with R -6.0 insulation. - Duct sizes shown are net free area inside. - All air devices (diffusers, registers and grilles) shall be all aluminum construction, with exposed surface chemically treated to receive point to match color or AIRGUIDE or approved equal. - Provide opposed blade dampers at all diffusers and registers. - Thermostats shall be combination cooling /heating with system Cool /Auto /Heat /Off and Fan On /Auto selector switches. - Refrigerant piping shall be copper type V with 314" armaflex. Insulation shall be provided for suction lines. - Provide new filters for fan coil before starting. These filters must also be replaced prior to final acceptance by owner. 4- VENTILATION DUCTS s Shall be constructed of galvanized sheet metal and sized as per plans or drawings shown. 5- EXISTING CONDITIONS s(Ir applicable) A) Contractor Fs t f miliarti a hhimself rt existing conditions in t�elc� pnor 17 Ing and /h ors art of construction. B) Contractor to reuse most of the existing grilles as possible only after cleaning has been done if owner allowed. POWER do CONTROL LOCATION LIQUID LINE W/ 0 INSULATION I L INES /L SUCTION CONNECTION PLUG I LIQUID CONNECTION CLEANOUT % L 11/2" LONG "HILTV POUTER SLAB ACTIVATED � ,INTO � � A H U PROVIDE 4" PVC SLEEVE a FOR 125 TO 3 TONS t 6" PVC SLEEVE FOR 3.5 TO 5 TONS IF REFRIG. LINES RUN UNDER SLAB CONDENSING UNIT MOUNTING DETAIL N.T.S. HORIZONTAL UNION RUN.PITCH 1 /8 " /FT TRAP DEPTH AS SHOWN OR AS REQUIRED TO MAKE , J J�ROPER SEAL /0�� Su. CONDENSATE CONN. TO A/C UNIT N.T.S. DDUBLE THICKh TURNING V/ ELBOW WITH TURNING VANES DETAIL N.T.S. DUCT NOTE 1. X =2" FOR UNITS UP TO 3 TONS. 2. X =3" FOR UNITS OVER 3 TONS. 3. CONNECTIONS TO THE UNIT DRAIN PANS MAY BE EITHER FLEXIBLE CONNECTIONS OR RIGID PIPING. FLEXIBLE CONNECTIONS USED TO FORM A TRAP SHALL NOT EXCEED 18 INCHES IN LENGTH 4. THE UNIT DRAIN PAN IS PART OF THE EQUIPMENT. L- EX15T. C.U. *1 A.G.G.U. n MECHANICAL PLAN SCALE 1/4" = 1`0 REVISIONS BY too CH mom O :5 asp AS S 4ovW-V �V ,,Ilium 7,w/x, AI ,APR 2 12006 ro ¢Mt b i- Q �0 �w W� ^ 00 ft 50 U I. V) �. a cn W 0 F• U _Q n•� W s Q •.s 4A x� �WUJ � Q U d- � p Q o W UJ a: F-p o c C) I� O� Z � J Q Z O Q �F=\10� U Q l7� Q maw - - - too CH mom O _ _ 1M% ----- q_O -9- asp AS S 4ovW-V ,,Ilium