08-40-006f
-, r
y
•
•
M„y• -y -V __ V
5966 S. DIXIE HIGHWAY SOUTH MIAMI, FLORIDA
MA 0605
MATEU ARCHITECTURE INC.
AA- 26000522
18001 OLD CUTLER ROAD -SUITE 550
PALMETTO BAY, FLORIDA 33157 .
PH: 305- 233 -3304
FX: 305- 233 -326
PISTORINO & ALAM M. A. SUAREZ
CONSULTING ENG., INC. &ASSOCIATES, INC.
CIVIL ENGINEERING STRUCTURAL ENGINEER
} 7171 S.W. 62ND AV. 4TH FLOOR PA -25414
MIAMI, FLORIDA 33143 4869 S.W. 75TH AVENUE
PH: 305 -669 -2700 MIAMI, FLORIDA 33 1.55
FX: 305 -669 -2165 PH: 305 - 260 -0363
FX: 305- 260 -0364
MARIANO CORRAL JMM CONSULTING
LANDSCAPE ARCHITECT . ENGINEERS, LLC
3001 SW 109TH COURT M /E /P /FP CONSULTING ENGINEERS
MIAMI, FL. 33165 12651 SOUTH DIXIE HIGHWAY
PH: (305) 551 -1262 SUITE 209
FX: (305) 553 -2088 MIAMI, FL. 33156
PH: (305) 255 -1621
FX: (305) 255 -1732
PERMIT DRAWINGS
DECEMBER 10, 2007
-
INDEX OF DRAWINGS
SURVEY STRUCTURAL
6509 S -200 BUILDING SECTIONS
CIVIL S -201 BUILDING SECTIONS
C -1 DEMOLITION SITE PLAN y S -202 SECTIONS
C -2 GEOMETRY, PAVING, PAVEMENT MARKING AND S -300 FOOTING SCHEDULES AND DETAILS
SIGNAGE SITE PLAN S -301 BEAM AND SOFFIT SCHEDULES AND DETAILS
C -3 GRADING AND DRAINAGE SITE PLAN S -302 BEAM AND SOFFIT SCHEDULES AND DETAILS
C -4 WATER AND SEWER SITE PLAN S -303 BEAM AND SOFFIT SCHEDULES AND DETAILS
C -5 WATER AND SEWER PROFILES AND GENERAL NOTES S -304 COLUMNS SCHEDULES AND DETAILS
C -6 SITE AND DRAINAGE DETAILS S -305 SCHEDULES & DETAILS }
GENERAL S -400 WIND PRESSURES _
G -001 ABBREVIATIONS & SYMBOLS LEGEND ELECTRICAL
0-002 GENERAL NOTES E -101A BASEMENT PARKING LIGHTING PLAN
G -003 SPECIFICATIONS E -101 B BASEMENT EMERGENCY LIGHTING PLAN
G -004 SPECIFICATIONS E -101 BASEMENT ELECTRICAL PLAN
G -005 SPECIFICATIONS E -102A GROUND FLOOR PARKING LIGHTING PLAN
G -006 SPECIFICATIONS E-1 02B GROUND FLOOR GARAGE AREA EMERGENCY
LIFE SAFETY LIGHTING PLAN
LS -01 BASEMENT LIFE SAFETY PLAN E -102 GROUND FLOOR ELECTRICAL PLAN
LS -02 GROUND FLOOR LIFE SAFETY PLAN E -103A INTERMEDIATE PARKING LIGHTING PLAN
LS -03 INTERMEDIATE PARKING LIFE SAFETY PLAN E-1 03B INTERMEDIATE PARKING EMERGENCY
LS -04 SECOND FLOOR LIFE SAFETY PLAN LIGHTING PLAN
LS -05 THIRD FLOOR LIFE SAFETY PLAN E -103 INTERMEDIATE PARKING ELECTRICAL PLAN
LS -06 FOURTH FLOOR LIFE SAFETY PLAN E-1 04A SECOND FLOOR PARKING LIGHTING PLAN
ARCHITECTURE E-1 04B SECOND FLOOR EMERGENCY LIGHTING PLAN
A -100 SITE PLAN /SITE DATA E -104 SECOND FLOOR ELECTRICAL PLAN
A -101 BASEMENT FLOOR PLAN E -105 THIRD FLOOR ELECTRICAL PLAN
A -102 GROUND FLOOR PLAN E-1 06 FOURTH FLOOR ELECTRICAL PLAN
A -103 INTERMEDIATE FLOOR PLAN E -107 ELECTRICAL ROOF PLAN
A -104 SECOND FLOOR PLAN E -201 ELECTRICAL RISER DIAGRAM
A -105 THIRD FLOOR PLAN E -202 TELEPHONE /CATV RISER DIAGRAM
-- - A -i� F=OURTH FLOOR PLAN E -203 PANEL SCHEDULES
, �" -3ASEMENT REFLECTED CEILING PLAN E -204 NOTES AND DETAILS
A., .. ; aROUND FLOOR REFLECTED CEILING PLAN FIRE PROTECTION
A -11� iNTERMEDIATE PARKING REFLECTED CEILING PLAN FP -001 FIRE PROTECTION NOTES AND DETAILS
A -113 SECOND FLOOR REFLECTED CEILING PLAN FP -002 FIRE PROTECTION DETAILS AND PIPING DIAGRAM
- A -114 THIRD FLOOR REFLECTED CEILING PLAN FP -101 BASEMENT FLOOR FIRE PROTECTION PLAN . .
A -115 FOURTH FLOOR REFLECTED CEILING PLAN FP -102 GROUND FLOOR FIRE PROTECTION PLAN
A -120 ROOF PLAN FP -103 INTERMEDIATE FLOOR FIRE PROTECTION PLAN
A -201 ELEVATIONS FP -104 SECOND FLOOR FIRE PROTECTION PLAN
A -202 ELEVATIONS FP -105 THIRD FLOOR FIRE PROTECTION PLAN
A -203 ELEVATIONS FP -106 FOURTH FLOOR FIRE PROTECTION PLAN
A -301 SECTIONS FP -107 ROOF FIRE PROTECTION PLAN
A -302 SECTIONS MECHANICAL
A -401 ENLARGED TOILET PLANS, ACCESSORY LEGEND M -101 BASEMENT MECHANICAL FLOOR PLAN
A -420 STAIR SECTIONS M -102 GROUND FLOOR MECHANICAL PLAN
A -421 RAMP SECTIONS M -103 INTERMEDIATE PARKING MECHANICAL FLOOR PLAN
A -422 ELEVATOR SECTION M -104 SECOND FLOOR MECHANICAL PLAN
A -501 DETAILS M -105 THIRD FLOOR MECHANICAL PLAN
A -502 DETAILS M -106 FOURTH FLOOR MECHANICAL PLAN
A -503 DETAILS M -107 MECHANICAL ROOF PLAN
A -504 DETAILS M -201 MECHANICAL DETAILS
A -505 - DETAILS M -202 MECHANICAL DETAILS
A -601 DOOR SCHEDULE, DOOR TYPES, FINISH SCHEDULE M -203 MECHANICAL RISERS
- A --602 DOOR HARDWARE SCHEDULE M -204 MECHANICAL NOTES
A -603 WINDOW SCHEDULES AND WINDOW TYPES M -205 MECHANICAL SCHEDULES
A -604 PARTITION TYPES PLUMBING
LANDSCAPE P -101 BASEMENT PLUMBING FLOOR PLAN
LP -1 SITE LANDSCAPE PLAN P -102 GROUND FLOOR PLUMBING PLAN
LP -2 PLANT DETAILS P -103 INTERMEDIATE PARKING PLUMBING FLOOR PLAN a
IR -1 SITE IRRIGATION P -104 SECOND FLOOR PLUMBING PLAN
STRUCTURAL P -105 THIRD FLOOR PLUMBING PLAN ti
S -00 GENERAL NOTES P -1069 FOURTH FLOOR PLUMBING PLAN
- S -01 GENERAL NOTES P -107 PLU', ,IBING ROOF PLAN
I. .'.° S -100 BASEMENT FRAMING PLAN P -201 SANNRY PIPING ISOMETRIC
S -101 GROUND FLOOR FRAMING PLAN P -202 DON :STIC WATER PIPING ISOMETRIC
55 �' S -102 INTERMEDIATE PARKING FRAMING PLAN P -203 STORM WATER PIPING ISOMETRIC
S -103 SECOND FLOOR FRAMING PLAN 13-204 PLUOING DETAILS
. S -104 THIRD FLOOR FRAMING PLAN P -205 PLUM131NG NOTES AND SCHEDULES ..
S -105 FOURTH FLOOR FRAMING PLAN
S -106 ROOF FRAMING PPS
w.