Loading...
08-40-005i ,_i / A - V••V •YY U VYVGV VUM W • Y V V Y V U V UVY • Y W U U V U W V Y .' '• - V V U V V • v v• V � W U V V Y • W • • V • U - _ • U • V • U U • i ` YY Y Y• Y V U Y U V U VV • • . V• V V u" I. _. © VV VV VV VV VJ VVUUU • W V V V V i V V 5966 S. DIXIE HIGHWAYSOUTH MIAMI, FLORIDA MA 0545 MATEU ARCHITECTURE INC. PISTORINO & ALAM CONSULTING ENG., INC. CIVIL ENGINEERING 7171 S.W. 62ND AV. 4TH FLOOR MIAMI, FLORIDA 33143 PH: 305- 669 -2700 FX: 305- 669 -2165 MARIANO CORRAL LANDSCAPE ARCHITECT 3001 SW 109TH COURT MIAMI, FL. 33165 y PH: (305) 551 -1262 FX: (305) 553 -2088 AA- 26000522 18001 OLD CUTLER ROAD - SUITE 550 PALMETTO BAY, FLORIDA 33157 PH: 305 - 233 -3304 FX: 305 - 233 -3326 M. A. SUAREZ, &ASSOCIATES, INC. ' STRUCTURAL ENGINEER PA -25414 4869 S.W. 75TH AVENUE MIAMI, FLORIDA 33155 PH: 305 - 260 -0363 FX: 305 - 260 -0364 JMM CONSULTING ENGINEERS, LLC M /E /P /FP CONSULTING ENGINEERS 12651 SOUTH DIXIE HIGHWAY SUITE 209 MIAMI, FL. 33156 PH: (305) 255 -1621 FX: (305) 255 -1732 77.7 1 77. _ ilk r 2004 FeC 10.3.6.4.4 THRESHOLD OUILDING TO THE BEST FI OUR KNOWLEDGE, THESE PLANS AND SPECIFICATIONS COMPLY WITH THE APPLICABLE PERMIT �� MINIMUM BUILDING CODES AND THE APPLICABLE FIRE- SAFETY STANDARDS AS DETERMINED QYTNF: LOCAL AUTHORITY IN ACCORDANCE WITH SECT90N 109.3.6 AND DECEMBER � 0' 20�� CHAPTER 633, FLORIDA STATUTES , INDEX OF DRAWINGS SURVEY STRUCTURAL 6504 S -200 BUILDING SECTIONS CIVIL S -201 BUILDING SECTIONS C -1 DEMOLITION SITE PLAN S -202 SECTIONS C -2 GEOMETRY, PAVING, PAVEMENT MARKING AND S -300 FOOTING SCHEDULES AND DETAILS SIGNAGE SITE PLAN S -301 BEAM AND SOFFIT SCHEDULES AND DETAILS C -3 GRADING AND DRAINAGE SITE PLAN S -302 BEAM AND SOFFIT SCHEDULES AND DETAILS C -4 WATER AND SEWER SITE PLAN S -303 BEAM AND SOFFIT SCHEDULES AND DETAILS C -5 WATER AND SEWER PROFILES AND GENERAL NOTES S -304 COLUMNS SCHEDULES AND DETAILS C -6 SITE AND DRAINAGE DETAILS S -305 SCHEDULES A DETAILS GENERAL S -400 WIND PRESSURES G -001 ABBREVIATIONS A SYMBOLS LEGEND ELECTRICAL G -002 GENERAL NOTES E -101A BASEMENT PARKING LIGHTING PLAN G -003 SPECIFICATIONS E -101 B BASEMENT EMERGENCY LIGHTING PLAN G -004 SPECIFICATIONS E -101 BASEMENT ELECTRICAL PLAN G -005 SPECIFICATIONS E -102A GROUND FLOOR PARKING LIGHTING PLAN G -006 SPECIFICATIONS E-1 02B GROUND FLOOR GARAGE AREA EMERGENCY LIFE SAFETY LIGHTING PLAN LS -01 BASEMENT LIFE SAFETY PLAN E -102 GROUND FLOOR ELECTRICAL PLAN LS -02 GROUND FLOOR LIFE SAFETY PLAN E -103A INTERMEDIATE PARKING LIGHTING PLAN LS -03 INTERMEDIATE PARKING LIFE SAFETY PLAN E -103B INTERMEDIATE PARKING EMERGENCY LS -04 SECOND FLOOR LIFE SAFETY PLAN LIGHTING PLAN LS -05 THIRD FLOOR LIFE SAFETY PLAN E -103 INTERMEDIATE PARKING ELECTRICAL PLAN LS -06 FOURTH FLOOR LIFE SAFETY PLAN E-1 04A SECOND FLOOR PARKING LIGHTING PLAN ARCHITECTURE E-1 04B SECOND FLOOR EMERGENCY LIGHTING PLAN A -100 SITE PLAN /SITE DATA E -104 SECOND FLOOR ELECTRICAL PLAN A -101 BASEMENT FLOOR PLAN E -105 THIRD FLOOR ELECTRICAL PLAN A -102 GROUND FLOOR PLAN E -106 FOURTH FLOOR ELECTRICAL PLAN A -103 INTERMEDIATE FLOOR PLAN E -107 ELECTRICAL ROOF PLAN A -104 SECOND FLOOR PLAN E -201 ELECTRICAL RISER DIAGRAM A -105 THIRD FLOOR PLAN E -202 TELEPHONE /CATV RISER DIAGRAM A -106 FOURTH FLOOR PLAN E -203 PANEL SCHEDULES A -110 BASEMENT REFLECTED CEILING PLAN E -204 NOTES AND DETAILS A -111 GROUND FLOOR REFLECTED CEILING PLAN FIRE PROTECTION A -112 INTERMEDIATE PARKING REFLECTED CEILING PLAN FP -001 FIRE PROTECTION NOTES AND DETAILS A -113 SECOND FLOOR REFLECTED CEILING PLAN FP -002 FIRE PROTECTION DETAILS AND PIPING DIAGRAM A -114 THIRD FLOOR REFLECTED CEILING PLAN FP -101 BASEMENT FLOOR FIRE PROTECTION PLAN A -115 FOURTH FLOOR REFLECTED CEILING PLAN FP -102 GROUND FLOOR FIRE PROTECTION PLAN A -120 ROOF PLAN FP -103 INTERMEDIATE FLOOR FIRE PROTECTION PLAN A -201 ELEVATIONS FP -104 SECOND FLOOR FIRE PROTECTION PLAN A -202 ELEVATIONS FP -105 THIRD FLOOR FIRE PROTECTION PLAN A -203 ELEVATIONS FP -106 FOURTH FLOOR FIRE PROTECTION PLAN A -301 SECTIONS FP -107 ROOF FIRE PROTECTION PLAN A -302 SECTIONS MECHANICAL A -401 ENLARGED TOILET PLANS, ACCESSORY LEGEND M -101 BASEMENT MECHANICAL FLOOR PLAN A -420 STAIR SECTIONS M -102 GROUND FLOOR MECHANICAL PLAN A -421 RAMP SECTIONS M -103 INTERMEDIATE PARKING MECHANICAL FLOOR PLAN A -422 ELEVATOR SECTION M -104 SECOND FLOOR MECHANICAL PLAN A -501 DETAILS M -105 THIRD FLOOR MECHANICAL PLAN A -502 DETAILS M -106 FOURTH FLOOR MECHANICAL PLAN A -503 DETAILS M -107 MECHANICAL ROOF PLAN A -504 DETAILS M -201 MECHANICAL DETAILS A -505 DETAILS M -202 MECHANICAL DETAILS A -601 DOOR SCHEDULE, DOOR TYPES, FINISH SCHEDULE M -203 MECHANICAL RISERS A -602 DOOR HARDWARE SCHEDULE - M -204 MECHANICAL NOTES A -603 WINDOW SCHEDULES AND WINDOW TYPES M -205 MECHANICAL SCHEDULES A -604 PARTITION TYPES PLUMBING LANDSCAPE P -101 BASEMENT PLUMBING FLOOR PLAN LP -1 SITE LANDSCAPE PLAN P -102 GROUND FLOOR PLUMBING PLAN LP -2 PLANT DETAILS P -103 INTERMEDIATE PARKING PLUMBING FLOOR PLAN IR -1 SITE IRRIGATION P -104 SECOND FLOOR PLUMBING PLAN STRUCTURAL P -105 THIRD FLOOR PLUMBING PLAN 5 -00 GENERAL NOTES P -106 FOURTH FLOOR PLUMBING PLAN S -01 GENERAL NOTES P -107 PLUMBING ROOF PLAN S -100 BASEMENT FRAMING PLAN P -201 SANITARY PIPING ISOMETRIC S -101 GROUND FLOOR FRAMING PLAN P -202 DOMESTIC WATER PIPING ISOMETRIC S -102 INTERMEDIATE PARKING FRAMING PLAN P -203 STORM WATER PIPING ISOMETRIC S -103 SECOND FLOOR FRAMING PLAN P -2d4 PLUMBING DETAILS 5 -104 THIRD FLOOR FRAMING PUN'" P -205 PLUMBING NOTES AND SCHEDULES S -105 FOURTH FLOOR FRAMING PLAN S -106 ROOF FRAMING PLAN +Y i [t