September 25, 2008 1 AA 26000522
Fire Engineering & Water Supply Bureau
Miami -Dade County
11505 SW 26th Street, Suite 15
Miami, Florida 33175
Re: Process Number: M2008000262 �
i"
Municipality. S. Miami
Name of Project: Four Story Office Building
Note: This letter shall be delivered to Mr. George Hernandez only.
Please accept our written responses to the Fire Review Disapproval Remarks dated 07/2x/2008
for this project:
Disapproval comment 1) -- Plans shall be stamped "impact fees paid" prior to approval.
Response:
Impact fees have been paid; refer to stamp on drawings.
Disapproval comment 23) - Elevator to be provided with enclosed elevator lobbies at third and
fourth floors.
'Response:
On July 30, 2008, Captain Tola, George Hernandez, Eduardo Fernandez
(owner) and Russell A. Grover (architect) agreed that an enclosed lobby at
the elevators on the third and fourth floors would not be required if the City
of South Miami building reviewer would approve the plans.
On September 25, 2008, George Hernandez, Eduardo Fernandez (owner)
and Russell A. Grover (architect) agreed that an enclosed lobby at the
elevators on the third and fourth floors would not be required because the
City of South Miami building reviewer approved the plans with no lobbies.
Disapproval comment 24) — Plans must be previously approved by the City of South Miami Building
Department before approval by Fire Department.
Response:
The plans were approved September 22, 2008 by the City of South Miami
building reviewer, and the plans were approved September 24, 2009 by the
City of South Miami structural reviewer.
Note: A copy of the previously approved Water Main Extension (process number
M2008003409) has been attached to both sets of permit drawings.
Please accept this letter. Should you require any further information, please do not hesitate to
contact our office.
Very truly yours,
Russell A. Grover AIA
Project Manager
Mateu Architecture, Inc.