08-623-003GENERAL NOTES OCONTRACTOR SHALL COMPLY WITH THE LATEST EDITIONS OF ALL APPLICABLE BUILDING CODES AND SHALL FOLLOW ALL 1 REQUIREMENTS SET UP BY THE BUILDING MANAGEMENT AND THE CITY OF SOUTH MIAMI APPLICABLE BUILDING CODES: - AMERICANS WITH DISABILITIES ACT 2004 FLORIDA BUILDING CODE (FBC) - FLORIDA ACCESSIBILITY CODE (FBC CHAPTER 11) 2004 FLORIDA MECHANICAL CODE - 2001 FLORIDA FIRE PREVENTION CODE, INCLUDING: 2004 FLORIDA PLUMBING CODE NFPA 101, LIFE SAFETY CODE, FLORIDA 2005 EDITION 2003 NATIONAL ELECTRIC CODE, NFPA 70 NFPA 1, UNIFORM FIRE CODE, FLORIDA 2005 EDITION OCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) OCONTRACTOR IS TO BECOME FAMILIAR WITH ANY CONSTRUCTION RESTRICTIONS AND SHALL COORDINATE ALL SCHEDULING WITH BUILDING MANAGER PRIOR TO BEGINNING OF CONSTRUCTION. OCONTRACTOR SHALL BE RESPONSIBLE FOR ERECTING TEMPORARY BARRICADES OR WINDOW GRAPHICS DURING CONSTRUCTION UNTIL COMPLETION OF WORK IF REQUIRED. COORDINATE INSTALLATION WITHBUILDING MANAGEMENT. PROVIDE GRAPHICS FOR LANDLORD REVIEW & APPROVAL. OCITY OF SOUTH MIAMI REQUIREMENTS & MATERIAL CONTAINED IN THE FLORIDA BUILDING CODE LATEST EDITION REQUIREMENTS FOR PERMIT SHALL BECOME A PART OF THESE 4 DOCUMENTS. CONTRACTOR SHALL BECOME FAMILIAR WITH THESE REQUIREMENTS AND, WHERE REQUIRED, SHALL INCORPORATE PORTIONS OF THESE DOCUMENTS AS PART OF THE BASIC CONTRACT. OPRIOR TO CONSTRUCTION, CONTRACTOR SHALL FIELD VERIFY SITE DIMENSIONS. IF A DISCREPANCY EXISTS ON THE DRAWINGS, CONTRACTOR IS TO NOTIFY ARCHITECT BEFORE PROCEEDING WITH WORK. IF CONTRACTOR PROCEEDS WITHOUT NOTIFICATION TO ARCHITECT, CONTRACTOR SHALL BE RESPONSIBLE FOR MODIFICATION TO IMPROVEMENTS. OPRIOR TO INSTALLATION OF CEILING UTILITIES, IF A CONFLICT EXISTS, CONTRACTOR IS TO NOTIFY ARCHITECT OR ENGINEER FOR FIELD VERIFICATION PRIOR TO DEVIATION FROM 6 DESIGN INTENT. ANY CHANGES MADE BY THE GENERAL CONTRACTOR WHICH DEVIATE FROM THE CONSTRUCTION DOCUMENTS MUST BE REPORTED TO THE ARCHITECT OR ENGINEER OF RECORD. ALL DETAILS AND SECTIONS IN THE CONSTRUCTION DOCUMENTS ARE INTENDED TO BE TYPICAL AND SHALL BE CONSTRUED TO APPLY TO ANY SIMILAR CONDITION ELSEWHERE ON THE PROJECT EXCEPT WHERE A DIFFERENT DETAIL OR NOTE IS INDICATED. DO NOT SCALE THE DRAWINGSI THE CONTRACTOR SHALL VERIFY ALL DRAWING DIMENSIONS. SHOULD THERE BE ANY INCONSISTENCIES NOTIFY THE ARCHITECT. CONTRACTOR SHALL OBTAIN THE LATEST SET OF DRAWINGS, INCLUDING ANY REVISIONS, BEFORE STARTING THE JOB. IT IS THE INTENT OF THE CONSTRUCTION DOCUMENTS TO PRODUCE A COMPLETE AND FINISHED PROJECT. ANY ITEM REQUIRED TO COMPLETE THE PROJECT NOT SPECIFICALLY INDICATED, BUT GENERALLY UNDERSTOOD TO BE REQUIRED TO COMPLETE THE PROJECT, SHALL BE PART OF THE CONSTRUCTION DOCUMENTS. THE ARCHITECT DOES NOT HAVE CONTROL OR CHARGE OF, AND SHALL NOT BE HELD RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES OR FOR SAFETY PRECAUTIONS OR PROGRAMS IN CONNECTION WITH THE WORK. THE ARCHITECT IS NOT RESPONSIBLE FOR THE ACTS OR OMISSIONS OF THE GENERAL CONTRACTOR, SUBCONTRACTORS OR ANY OTHER PERSONS PERFORMING ANY OF THE WORK, OR FOR THE FAILURE OF ANY OF THEM TO CARRY OUT WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. ♦,� CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL TRADES AND THEIR ASSOCIATED SEQUENCING. OCONTRACTOR SHALL BE RESPONSIBLE FOR SECURING UTILITIES NECESSARY DURING CONSTRUCTION. ODO NOT DISTURB LANDLORD SYSTEMS OR EQUIPMENT. VERIFY WITH BUILDING MANAGEMENT IF REQUIRED. 1 O DO NOT ABANDON ANY UTILITY OR MATERIAL WITHIN THE LEASE SPACE, REMOVE BACK TO SOURCE. COVER RETURN AIR OPENINGS BEFORE & DURING CONSTRUCTION. 11 MAINTAIN EXISTING FIRE RATINGS AT ALL DEMISING WALLS. 12 ALL CONSTRUCTION MATERIALS TO BE ASBESTOS FREE. 13 ALL WOOD BLOCKING SHALL BE KILN DRIED AND FIRE RETARDENT TREATED. 14 ALL CONTRACTORS WORK TO BE PERFORMED IN A FIRST CLASS WORKMAN LIKE MANNER, MATCHING & ALIGNING ALL SURFACES WHERE APPLICABLE TO AFFORD A FINISHED, NEAT APPEARANCE. CONTRACTOR SHALL CLEAN ALL SURFACES FREE OF DIRT AND REFUSE CAUSED BY DEBRIS FROM INSTALLATION TECHNIQUES OF THE TRADE. 15 CONTRACTOR TO REPAIR AND / OR REPLACE ANY LANDLORD PROPERTY DAMAGED DURING CONSTRUCTION. 16 DO NOT USE POWER ACTUATED ANCHORS IN PRE -CAST STRUCTURE. ANY ANCHORING TO STRUCTURE, ANY CEILING MOUNTED ITEMS WEIGHING OVER 2501b, AND ANY PENETRATIONS OF LANDLORD'S STRUCTURE TO BE COORDINATED WITH BUILDING MANAGEMENT & PRE -CAST MANUFACTURE. 17 CONTRACTOR IS TO COMPLY WITH ALL APPLICABLE LAWS CONCERNING HAZARDOUS MATERIALS. THE TENANT SHALL NOT PERMIT THE INSTALLATION OR USE OF ANY HAZARDOUS SUBSTANCES IN ANY COMPONENT DURING ITS TENANCY. THE TENANTS LEASE PREMISES MUST COMPLY W/ TITLE III OF THE AMERICAN'S WITH DISABILITIES ACT ACCESSIBILITY GUIDELINES. COMPLIANCE WILL INCLUDE, BUT IS NOT LIMITED TO 1$ TO DESIGN, CONSTRUCTION, AND/ OR ALTERATION OF THE LEASED PREMISES. OCONTRACTOR TO FIELD VERIFY EXISTING ELECTRICAL SERVICE & TO MAKE ANY & ALL MODIFICATIONS REQUIRED TO ENSURE THAT TOTAL CONNECTED ELECTRICAL LOAD DOES NOT 19 EXCEED THE ELECTRICAL SERVICE. PO THE ELECTRICAL CONTRACTOR SHALL INCLUDE ALL COSTS NECESSARY FOR CONNECTING AND MAKING LIGHTING FIXTURES OPERATIONAL 21 UNLESS OTHERWISE NOTED, ALL EXPOSED DRYWALL AREAS TO BE PAINTED WITH ONE COAT OF SEALER & TWO COATS OF SEMI -GLOSS INTERIOR LATEX (WHERE OCCURS - PLEASE SEE FLOOR PLAN AND INTERIOR ELEVATIONS). 22 ALL ELECTRICAL OUTLET PLATES TO MATCH COLOR OF SURFACE ON WHICH THEY ARE PLACED 23 UNLESS OTHERWISE SPECIFIED, DOOR HARDWARE TO BE SCHLAGE BRUSHED CHROME NEPTUNE'S' SERIES LEVER HANDLES MEDIUM DUTY. PROVIDE INT. PRIVACY LOCK. 24 NO SUBSTITUTIONS OF ANY ITEM SPECIFIED SHALL BE PERMITTED UNLESS NOTED. OALL INTERIOR FINISHES SHALL MEET OR EXCEED APPLICABLE CODE AND MINIMUM CLASS AND FLAME SPREAD REQUIREMENTS. 25 VERIFY WITH AUTHORITY HAVING JURISDICTION. 26 CONTRACTOR IS TO TAKE CARE TO PROTECT ADJACENT AREAS FROM DUST AND DAMAGE DURING THE CONSTRUCTION PROCESS AND SHALL CLEAN UP AFTER THEMSELVES AT THE END OF EACH WORKDAY. ALL RUBBISH AND TRASH TO BE REMOVED FROM THE PREMISES AND PROPERLY DISPOSED OF EACH DAY. NO RUBBISH SHALL BE LEFT IN PREMISES AFTER EACH WORKDAY. (G.C. IS RESPONSIBLE FOR ALL TRASH HAULING.) OG.C. SHALL PURCHASE AND MAINTAIN INSURANCE COVERAGE IN ACCORDANCE WITH THE REQUIREMENTS OF THE LANDLORD AND THE TENANT. VERIFY AND COORDINATE WITH 27 TENANTS PROJECT MANAGER FOR ANY ADDITIONAL REQUIREMENTS. 26 ALL CONTRACTORS TO STAY BEHIND THE BARRIERS AND MAINTAIN ACCESS TO SUCH AREAS CLEAN AND FREE OF CONSTRUCTION MATERIALS AND DEBRIS. OTHE FOLLOWING MATERIALS SHALL BE LEFT AT THE JOB SITE. THEY SHALL BE TAKEN FROM THE SAME MATERIAL, LOT OR RUN USED TO CONSTRUCT AND FINISH THE PROJECT: 29 ONE FULL QUART OF EACH PAINT COLOR IN A CLEAN, TIGHTLY CLOSED CAN, AND CLEARLY MARKED. ONE CARTON OF RESTROOM AND FLOOR TILES ONE CARTON OF EACH TYPE OF ACOUSTICAL CEILING TILE. 30 PERFORM ALL WORK IN ACCORDANCE WITH ACCEPTABLE TRADE PRACTICE TO INSURE THE HIGHEST QUALITY FINISHED PRODUCT EXPRESSED, OR IMPLIED. ALL WORK TO BE PERFORMED BY SKILLED PERSONNEL IN ACCORDANCE WITH ESTABLISHED STANDARDS OF WORKMANSHIP IN EACH OF THE VARIOUS TRADES. 31 COORDINATE BLOCKING REQUIREMENTS WITH ADJACENT OR RELATED TRADES, ACCESSORIES, EQUIPMENT, AND FIXTURE INSTALLATION THAT REQUIRE BLOCKING AT NO ADDITIONAL COST TO THE CONTRACT. 32 G.C. TO PROVIDE SECURITY OF THE WORK, INCLUDING TOOLS AND UNINSTALLED MATERIALS. PROTECT THE WORK, STORED PRODUCTS, CONSTRUCTION EQUIPMENT AND OWNER'S PROPERTY FROM THEFT AND VANDALISM, AND FROM ENTRY BY UNAUTHORIZED PERSONNEL UNTIL FINAL ACCEPTANCE. 33 MAINTAIN A FULLY CHARGED FIRE EXTINGUISHER AT THE PROJECT SITE AT ALL TIMES. OGENERAL CONTRACTOR TO SUBMIT SHOP DRAWINGS, CUT SHEETS OR SAMPLES OF THE FOLLOWING FOR APPROVAL: 1. ALL LIGHT FIXTURES 2. A/C GRILLES - SEE MECHANICAL DRAWINGS 3. SPRINKLER HEADS, CALCULATIONS, AND FINAL LAYOUT 4. FLOOR TILE (WI SLIP RESISTANT FINISH) 5. WOOD BASE BOARD 6. PAINT COLORS BLITSTEIN DESIGN ._. A S S • ii ■■i■ ■ii■■iiii 0007570 ARCHITECTURE - INTERIOR DESIGN 285 Sevilila Avemn Coral Gables, FI 33134 MAIL 44- 433 a _2 2 ellsouthr>tet 305. 4444181 Client: Mr. Mark Richman M.R. Properties Inc. 18500 NE 5th Avenue Miami, Florida IV SITE PLAN Interior White -box Build -out Retail Space #2 South Miami Municipal Parking Facility 5829 S.W. 73rd Street, South Miami, Florida 33143 SCALE: 1" = 30' -0" date May 8, 2008 i i ■ ■i ■ ■i i■ ■viii revision LOCATION SKETCH N.T LEGEND j SYMBOL DESCRIPTION SYMBOL DESCRIPTION -- PROPERTY LINE — — — — OBJECTS OVERHEAD -- -- CENTER LINE ----- - - - -'� OBJECTS HIDDEN — — — EASEMENT INT SPACE ' GREEN AREA C.M.U. WALLS x��,� SITE ELEVATION FT. ABOVE SEA LEVEL SWIM DEM019" OESCIgN SHEET uxGG710q sheet title SITE PLAN project number drawn by D.M. Scale: 1 "= 30' -0" sheet numbe'yJ� \\ w� �.