08-497-020SPECIFICATIONS DIVISION 1 GENERAL REQUIREMENTS (SEE SHEET A -01) SECTION 01015 -OWNER FURNISHED ITEMS & EQUIPMENT 1. ITEMS SHOWN OR NOTED 'BY OWNER" ON THE DRAWINGS AND /OR IN THE SPECIFICATIONS SHALL BE FURNISHED BY OWNER AND INSTALLED BY GENERAL CONTRACTOR. THE CONTRACTOR SHALL RECEIVE UNLOAD AS REQUIRED, STORE AND BE RESPONSIBLE THE EXTENT OF CARRYING NECESSARY INSURANCE TO COVER ITEMS IN CASE OF THEFT, FIRE, LOSS, MALICIOUS DAMAGE. INCLUDED IN THIS CATEGORY ARE: 2. KITCHEN EQUIPMENT, INCLUDING WALK -IN COOLER/FREEZER Wi1H ATTENDANT REFRIGERATION EQUIPMENT. THIS EQUIPMENT SHALL BE FURNISHED, UNLOADED, ASSEMBLED AND SET IN PLACE UNDER SEPARATE CONTRACT WITH ROUGH -INS AND FINAL CONNECTIONS BY CONTRACTOR. 3. STAINLESS STEEL FABRICATION INCLUDING COUNTERS, FURNISHED BY OWNER WITH FINAL CONNECTION BY CONTRACTOR. 4. ALL LOOSE FURNISHIGS SUCH AS SOFA, CHAIRS, AND SIDE TABLES TO BE FURNISHED AND INSTALLED BY OWNER. A. SECURITY SYSTEM. B. SOUND SYSTEM. C. WOOD FLOORING (IF NOTED). D. SAFE. E. EXTERIOR SIGNAGE AND ACCENT LIGHTING (OWNER INSTALLED WIRE BY CONTRACTOR). 5. OWNER WILL PROVIDE THE CONTRACTOR WiTH A USTiNG OF SUPPLIERS, ADDRESSES, AND CONTACTS FOR OWNER- FURNISHED /CONTRACTOR - INSTALLED EQUIPMENT. 6. CONTRACTOR SHALL PROVIDE ALL ROUGH -IN SERVICES AND MAKE ALL FINAL CONNECTIONS. CONTRACTOR SHALL BE REQUIRED TO REQUEST SHOP - DRAWINGS, CATALOG CUTS, SCHEDULES, ETC., FROM THE OWNER, AS NECESSARY TO PROPERLY COORDINATE UTILITY CONNECTIONS, PREPARATIONS, AND EQUIPMENT SUPPORTS TO ACCOMODATE ACTUAL FURNISHED ITEMS AND EQUIPMENT. 7. CONTRACTOR SHALL DESIGNATE A COMPETENT INDIVIDUAL ON THE JOB SITE STAFF AS HIS "AUTHORIZED REPRESENTATIVE" FOR OWNER - FURNISHED EQUIPMENT. THIS INDIVIDUAL WILL BE RESPONSIBLE FOR FURNISHING INFORMATION ON DESIRED DELIVERY SHEDULES, PROPER RECEIPT AND REPORTING OF ALL SHIPMENT RECEIVED AS DESCRIBED HEREINAFTER AND SHALL BE REPONSIBLE FOR PROPER STORAGE AND HANDLING OF THE EQUIPMENT AT ALL TIMES. SECTION 01017 - CUTTING AND PATCHING 1. EXECUTING, CUTTING (INCLUDING EXCAVATING), FITTING OR PATCHING OF WORK, REQUIRED TO: A. MAKE SEVERAL PARTS FiT PROPERLY. B. UNCOVER WORK TO PROVIDE FOR INSTALLATION OF ILL-TIMED WORK. C. REMOVE AND REPLACE DEFECTIVE WORK. D. REMOVE AND REPLACE WORK NOT CONFORMING TO REQUIREMENTS OF CONTRACT DOCUMENTS. E. REMOVE SAMPLES OF INSTALLED WORK AS SPECIFIED FOR TESTING. 2. EXECUTE CUTTING AND PATCHING BY METHODS WHICH WILL PREVENT DAMAGE TO OTHER WORK AND WILL PROVIDE PROPER SURFACES TO RECEIVE INSTALLATION OF REPAIRS AND NEW WORK. 3. EMPLOY ORIGINAL INSTALLER TO PERFORM CUTTING AND PATCHING FOR EXPOSED FINISHED SURFACES. 4. REFINISH ENTIRE SURFACE AS NECESSARY TO PROVIDE AN EVEN FINISH. A. CONTINUOUS SURFACES: TO NEAREST INTERSECTION. B. ASSEMBLY' REFINISHING. SECTION 0 1 200-PRECONSTRUCTION MEETING 1. OWNER WILL ADMINISTER PRE - CONSTRUCTION CONFERENCE FOR EXECUTION OF OWNER - CONTRACTOR AGREEMENT AND EXCHANGE OF PRELIMINARY SUBMITTALS. 2. OWNER WILL ADMINISTER MOBILIZATION AT PROJECT SITE FOR CLARIFICATION OF CONTRACTOR RESPONSIBILITIES IN USE OF SiTE AND FOR REVIEW OF ADMINISTRATIVE PROCEDURES. 3. ATTENDANCE: JOB SUPERINTENDENT, REPRESENTATIVE OF THE CONTRACTORS HOME OFFICE, MAJOR SUBCONTRACTORS, AND SUPPLIERS, AND OWNER REPRESENTATIVE. OTHERS AS APPROPRIATE TO AGENDA TOPICS. 4. SUGGESTED AGENDA: REVIEW PROGRESS SCHEDULE AND ADJUSTMENT THERETO, DELIVERY SCHEDULES, SUBMITTAL, MAINTENANCE OF QUALITY STANDARDS, PENDING CHARGES AND SUBSMAON, AND OTHER ITEMS AFFECTING PROGRESS OF WORK. 5. CONTRACTOR SHALL SCHEDULE, ORGANIZE AND SHARE ANY SUBSEQUENT PROJECT MEETING DURING NORMAL WORKING HOURS. SECTION 01300 - SUBMITTALS 1. DELIVER SUBMITTALS TO LOCUS ARCHITECTURE, INC. UNLESS OTHERWISE DIRECTED. 2. IDENTIFY SUBMITTALS WITH CONTRACTOR'S NAME, PROJECT NAME/LOCATiON AND DATE OF SUBMITTAL. 3. MAKE ANY CORRECTIONS TO THE SUBMITTALS REQUIRED BY ARCHITECT AND RESUBMIT UNTiL APPROVED. 4. CONSTRUCTION SCHEDULE: A. WITHIN TEN (10) DAYS AFTER EXECUTION OF THE CONTRACT OR THE DATE OF WRITTEN NOTICE TO COMMENCE THE WORK, WHICHEVER IS EARLIER, SUBMIT THREE (3) COPIES OF A DETAILED CONSTRUCTION SCHEDULE FOR APPROVAL. B. SCHEDULE SHALL GRAPHICALLY SHOW THE RELATIONSHIP AND INTERDEPENDANCE OF ALL ACTIVITIES NECESSARY TO FULLY COMPLETE THE WORK AND SHALL SHOW THE SEQUENCE IN WHICH EACH ACTIVITY IS TO BE ACCOMPLISHED. THE DETAIL OF INFORMATION SHALL BE SUCH THAT DURATION 71MES OF ACTIVITIES SHALL NORMALLY RANGE FROM ONE (1) TO FIFTEEN (15) DAYS. C. SCHEDULE SHALL GIVE DESCRIPTION OF EACH ACTIVITY, SHOW ITS DURATION IN CALENDER DAYS AND REFERENCE iTS START AND FINISH DATES TO CALENDAR DATES. 5. SHOP - DRAWINGS AND SAMPLES: A. SUBMIT ALL DRAWINGS, DIAGRAMS, ILLUSTRATIONS, SCHEDULES, PERFORMANCE CHARTS, INSTRUCTIONS, SPECIFICATIONS AND OTHER PRODUCT DATA ILLUSTRATING PORTION OF THE WORK AS REQUIRED BY THE SPECIFICATION SECTIONS. SUCH SUBMITTALS, WHETHER OR NOT REFERRED TO AS SHOP DRAWINGS, SHALL COMPLY WITH THE REQUIREMENTS OF SHOP DRAWINGS HEREINAFTER PRESCRIBED. UNLESS OTHERWISE NOTED IN THE SPECIFICATIONS SECTIONS, SUBMIT A MIN. OF THREE (3) SETS OF SHOP DRAWINGS TO ARCHITECT. NO DRAW WILL BE ACCEPTED UNTIL ALL SHOP - DRAWINGS HAVE BEEN SUBMITTED. B. UNLESS THE PRECISE COLOR AND PATTERN IS SPECIFICALLY SPECIFIED IN THE SPECIFICATIONS SECTION, AND WHENEVER A CHOICE OF COLOR OR PATTERN IS AVAILABLE IN A SPECIFIED PRODUCT, SUBMIT ACCURATE COLOR AND PATTERN CHARTS AND SAMPLES FOR REVIEW AND SELECTIONS. C. REVIEW, STAMP WITH CONTRACTOR APPROVAL, SIGNATURE, AND SUBMIT WITHIN THIRTY (30) DAYS AFTER EXECUTION OF THE CONTRACT OR THE DATE OF WRITTEN NOTICE TO COMMENCE THE WORK, WHICHEVER IS EARLIER, ALL SHOP DRAWINGS AND SAMPLES. SHOP DRAWINGS OR SAMPLES SUBMITTED WITHOUT CONRACTOR'S APPROVAL STAMP WILL BE RETURNED WITHOUT REVIEW. SUBMIT SHOP - DRAWINGS AND SAMPLES IN AN ORDERLY SEQUENCE SO AS TO CAUSE NO DELAY IN THE WORK OR IN THE WORK OF OTHER CONTRACTORS. D. SHOP DRAWINGS AND SAMPLES WILL BE REVIEWED AND APPROVED BY ARCHITECTS TO DETERMINE IN GENERAL IF THEY ARE IN COMPLIANCE WITH THE CONTRACT DOCUMENTS. SUCH APPROVAL SHALL NOT RELIEVE CONTRACTOR OF RESPONSIBILITY FOR ANY DEVIATIONS FROM THE REQUIREMENTS OF THE CONTRACT DOCUMENTS NOR FROM THE RESPONSIBILITY FOR ERRORS OR OMISSIONS IN THE SHOP DRAWINGS OR SAMPLES. 6. SCHEDULE OF VALUES A. SUBMIT A SCHEDULE OF VALUES FOR VARIOUS PORTIONS OF THE WORK WITHIN TEN (10) DAYS AFTER EXECUTION OF THE CONTRACT OR THE DATE OF WRITTEN NOTICE TO COMMENCE THE WORK, WHICHEVER IS EARLIER. SHOW THE AMOUNTS OF THE CONTRACT SUM ALLOCATED TO EACH PORTION OF WORK, ON AIA G702. 7. CERTIFICATES OF COMPLIANCE A. SUBMIT IN DUPLICATE, CERTIFICATES OF COMPLIANCE FOR EACH PRODUCT SPECIFIED, PRIOR TO INSTALLATION OF THE APPLICABLE PRODUCT. B. CERTIFICATES OF COMPLIANCE SHALL INCLUDE CERTIFIED LABORATORY TEST REPORTS, MANUFACTURERS CERTIFICATES OR OTHER EVIDENCE SUFFICIENT TO VERIFY COMPLIANCE WITH THE PRODUCTS SPECIFIED. SECTION 01400- QUAUTY CONTROL 1. PERFORM WORK IN THE MOST WORKMANLIKE MANNER AND ACCORDING TO BEST STANDARD PRACTICES. ALL WORK SHALL BE FREE FROM FAULTS AND DEFECTS IN WORMANSHIP. 2. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR QUALITY CONTROL OF THE WORK AND SHALL MAINTAIN QUALITY CONTRAL OVER SUPPLIERS, MANUFACTURERS, PRODUCTS, SERVICES, SITE CONDITIONS AND WORKMANSHIP, TO PRODUCE WORK OF SPECIFIED QUALITY. 3. TESTING AND INSPECTION, WHERE REQUIRED BY THE SPECIFICATIONS SECTIONS, SHALL COMPLY WiTH THE SPECIFIC REQUIREMENTS OF THE APPLICABLE SPECIFICATION SECTION AND THE GENERAL REQUIREMENTS CONTAINED HEREIN. 4. ALL TESTING AND INSPECTION WHETHER REQUIRED BY THE SPECIFICATION SECTION OR BY LAWS, ORDINANCES, RULES, REGULATIONS, CODES OR ORDERS OF ANY PUBLIC AUTHORITY HAVING JURISDICTION OR WHETHER PERFORMED BY CONTRACTOR FOR QUALITY CONTROL SHALL BE AT CONTRACTOR'S EXPENSE UNLESS OTHERWISE INDICATED IN THE CONTRACT DOCUMENTS. 5. WHERE THE SPECIFICATIONS SECTIONS REQUIRE TESTING OR INSPECTION BYATESTING LABORATORY, ENGAGE A REPUTABLE, INDEPENDENT TESTING LABORATORY SPECIALIZING IN THE REQUIRED SERVICES UNLESS THE TESTING OR INSPECTION IS INDICATED AS FURNISHED BY OWNER. TESTING LABORATORY SHALL BE APPROVED BY THE OWNER. 6. SECURE REQUIRED CERTIFICATES OF TESTING, INSPECTION OR APPROVAL AND PROMPTLY DELIVER TO OWNER. 7. PROMPTLY REPLACE OR CORRECT ALL WORK FOUND NOT TO BE IN COMPLIANCE WiTH THE REQUIREMENTS OF THE CONTRACT DOCUMENTS AND THE REQUIREMENTS OF ANY PUBLIC AUTHORITY HAVING JURISDICTION SO AS NOT TO DELAY THE WORK OR THE WORK OF OTHER CONTRACTORS REGARDLESS OF HOW SUCH FAILURE TO COMPLY MAY BE REVEALED. REPLACEMENT AND CORRECTION SHALL BE EXPEDITED AS REQUIRED TO MAINTAIN INTERIM CONTRACT COMPLETION DATES AND THE FULL COMPLETION DATE. SECTION 01500 - CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS I. ALL TEMPORARY FACILITIES AND SERVICES SHALL BE FURNISHED IN STRICT ACCORDANCE WiTH EXISTING GOVERNING REGULATIONS. 2. SANITARY FACILITIES: THE CONTRACTOR SHALL BE PROVIDED TEMPORARY SANITARY FACILITIES FOR THE WORKMEN. 3. WATER FACILITIES: THE CONTRACTOR SHALL FURNISH AND PAY FOR TEMPORARY WATER FOR THE PURPOSE OF CONSTRUCTION AS REQUIRED. 4. POWER AND LIGHT: A. THE CONTRACTOR SHALL ARRANGE FOR TEMPORARY POWER FOR TOOLS AND LIGHTS AS REQUIRED, TO THE CONSTRUCTION SITE. B. COST OF THE ELECTRICAL POWER CONSUMED FOR THE TEMPORARY SERVICE FOR TOOLS AND LIGHTS, SHALL BE BORNE BY THE CONTRACTOR. COST OF DISTRIBUTING POWER TO THE CONSTRUCTION SITE SHALL BE BORNE BY THE CONTRACTOR. C. THE CONTRACTOR SHALL REMOVE TEMPORARY POWER ONLY WHEN PERMANENT SERVICE IS ARRANGED AND APPROVED. 5. REMOVE ALL TEMPORARY FACILITIES UPON COMPLETION OF THE WORK OR WHEN NO LONGER REQUIRED. 6. PROVIDE PLUMBING, TEMPORARY DRAINAGE, WATER DIVERSION, WEATHER PROTECTION AND CONTROLS AS REQUIRED TO ENSURE NO DELAY IN THE WORK OR THE WORK OF OTHER CONTRACTORS. SECTION 0 1 600-MATERUU AND EQUIPMENT 1. WHERE ACCEPTABLE MANUFACTURERS ARE LISTED IN THE SPECIFICATION SECTIONS, OBTAIN MATERIALS AND EQUIPMENT IN COMPLIANCE WiTH THE REQUIREMENTS SPECIFIED FROM ONE OF THE MANUFACTURERS LISTED. 2. COMPONENTS REQUIRED TO BE SUPPLIED IN QUANTITY WITHIN A SPECIFICATION SECTION SHALL BE THE SAME, SUPPLIED BY SAME MANUFACTURER AND SHALL BE INTERCHANGEABLE. 3. ALL MATERIALS AND EQUIPMENT SHALL BE NEW, UNLESS OTHERWISE SPECIFIED, AND OF FIRST CLASS QUALITY, FREE FROM ANY FAULTS OR DEFECTS INCLUDING BLEMISHES, DENTS, IMPERFECTIONS, RUST, AND STAINS. DO NOT INCORPORATE FAULTY OR DEFECTIVE MATERIALS OR EQUIPMENT IMO TO WORK. 4. HANDLE AND STORE MATERIALS AND EQUIPMENT IN ACCORDANCE WITH MANUFACTURERS' AND SUPPLIERS' RECOMMENDATIONS AND STORE PACKAGED MATERIALS AND EQUIPMENT IN ORIGINAL, UNDAMAGED CONDITION WITH MANUFACTURER'S LABEL AND SEALS INTACT. 5. NO SUBSTITUTIONS FOR THE MATERIALS AND EQUIPMENT SPECIFIED SHALL BE MADE UNLESS WRITTEN APPROVAL HAS BEEN GIVEN AS REQUIRED IN THE GENERAL CONDITIONS BY OWNER. SUBSi1TUTiONS WILL BE CONSIDERED ONLY IF OWNER RECEIVES THE ADVANTAGE OF LESSER COST WiTH DECREASE INCREASE IN QUALITY, OR EARLIER COMPETITION DATE OR BOTH. SECTION 01700- CONTRACT CLOSEOUT 1. DURING THE PROGRESS OF THE WORK MAINTAIN A SET OF DRAWINGS AT THE PROJECT SITE FOR PREPARING RECORD DRAWINGS. NEATLY RECORD ALL CHANGES IN THE WORK AND RECORD SPECIFIC LOCATIONS OF WORK SHOWN SCHEMATICALLY ON THE DRAWINGS. IN ADDITION, RECORD THE FOLLOWING ON MECHANICAL AND ELECTRICAL DRAWINGS: A. LOCATION OF CONCEALED WATER AND ELECTRICAL SERVICES, WATER PIPING, SEWERS, WASTES, VENTS, DUCTS, CONDUIT, AND OTHER PIPING BY INDICATION OF MEASURED DIMENSIONS TO SUCH LINE FROM READILY IDENTIFIABLE WALLS OR CORNERS OF BUILDINGS B. INVERT ELEVATIONS OF SEWERS AND TOP OF WATER LINES. 2. SUBMIT THE RECORD DRAWINGS TO ARCHITECT FOR APPROVAL WiTH THE PUNCH LIST AND WRITTEN NOTICE THAT THE WORK IS READY FOR VERIFICATION OF SUBSTANTIAL COMPLETION REQUIRED IN THE GENERAL CONDITIONS. IF ARCHITECT DETERMINES THAT THE DRAWINGS ARE INCOMPLETE OR INCORRECT IN ANY WAY, HE WILL ADVICE CONTRACTOR OF THE REQUIRED CORRECTIONS AND CONTRACTOR SHALL PROMPTLY SUBMIT CORRECTED DRAWINGS. RECORD DOCUMENTS SHALL BE DELIVERED TO OWNER PRIOR TO FINAL PAYMENT FOR THE WORK. 3. PREPARE THREE (3) COMPLETE SETS OF MANUALS CONTAINING THE MANUFACTURERS INSTRUCTIONS FOR OPERATION AND MAINTENANCE OF EACH ITEM OF EQUIPMENT, APPARATUS AND OPERATIONAL SYSTEM FURNISHED UNDER THE CONTRACT AND ANY ADDITIONAL DATA SPECIFICALLY REQUIRED IN THE SPECIFICATION SECTIONS. A. MANUALS SHALL BE BOUND WiTH COVERS OF DURABLE MATERIAL, ARRANGED IN THE SEQUENCE OF THE SPECIFICATION SECTIONS AND SHALL INCLUDE THE FOLLOWING: 1) NEATLY TYPEWRITTEN INDEX. 2) COMPLETE INSTRUCTION REGARDING OPERATION, SERVICE AND MAINTENANCE INCLUDING LUBRICATION, DISASSEMBLY, AND REASSEMBLY. 3) COMPLETE NOMENCLATURE OF ALL PARTS AND PART NUMBERS OF ALL REPLACEABLE PARTS. 4) COMPLETE LIST OF SOURCES TO BE CONTACTED FOR SERVICE AND REPLACEMENT PARTS INCLUDING NAMES, ADDRESSES AND ALL OTHER PERTINENT DATA REGARDING PROCUREMENT PROCEDURE. 5) COPY OF ALL REQUIRED GUARANTEE AND WARRANTIES. 6) MANUFACTURER'S BULLETINS, CUTS, AND DESCRIPTION DATA CLEARLY INDICATING THE PRECISE ITEMS INCLUDED IN THIS INSTALLATION AND DELETING, OR OTHERWISE CLEARLY INDICATING ALL MANUFACTURERS' DATA WITH WHICH THIS INSTALLATION IS NOT CONCERNED. 7) ANY OTHER DATA REQUIRED IN THE SPECIFICATIONS SECTIONS. B. THE OPERATING AND MAINTENANCE MANUALS SHALL BE DELIVERED TO THE OWNER PRIOR TO FINAL PAYMENT OF FOR THE WORK. C. IF REQUESTED BY OWNER, GIVE PHYSICAL DEMONSTRATIONS AND ORAL INSTRUCTION FOR THE OPERATION OF EQUIPMENT, APPARATUS, AND OPERATIONAL SYSTEMS FURNISHED UNDER THE CONTRACT. SUCH DEMONSTRATIONS AND INSTRUCTIONS SHALL BE GIVEN TO OWNER AND /OR OTHERS AS OWNER MAY CHOOSE. 4. IN ADDITION TO THE INFORMATION LISTED, THE CONTRACTOR SHALL INCLUDE IN THE PROJECT MANUAL THE FOLLOWING: A. GENERAL CONTRACTOR'S 1 -YEAR WRITTEN GURANTEE. B. ALL FINAL LIEN WAIVERS. C. COPY OF CERTIFICATE OF OCCUPANCY. D. COPY OF SIGNED OFF PERMIT CARD. E. LIST OF SUBCONTRACTOR WiTH NAMES OF CONTACT PERSON AND PHONE NUMBERS. F. SOIL POISONING WARRANTY. G. ALL TEST RESULTS (SOILS, CONCRETE, ETC.) H. AS -BUILT DRAWINGS. SECTION 0171 o- CLEANING 1. ALL CLEANING SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR UNLESS SPECIFICALLY NOTED OTHERWISE. 2. MAINTAIN PREMISES AND PUBLIC PROPERTIES FREE FROM ACCUMULATIONS OF WASTE, DEBRIS AND RUBBISH CAUSED BY OPERATIONS. 3. AT COMPLETION OF WORK, REMOVE WASTE MATERIALS, RUBBISH, TOOLS, EQUIPMENT, MACHINERY AND SURPLUS MATERIALS AND CLEAN ALL EIGHT EXPOSED SURFACES, LEAVE PROJECT CLEAN AND READY FOR OCCUPANCY. 4. MAINTAIN PROJECT IN ACCORD WITH OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970, AS AMENDED IN TERMS OF CLEAN -UP. 5. CONDUIT CLEANING AND DISPOSAL OPERATIONS TO COMPLY WITH LOCAL ORDINANCES AND ANTI- POLLUTiON LAWS. 1) DO NOT BURN OR BURY RUBBISH AND WASTE MATERIALS ON PROJECT SiTE. 2) DO NOT DISPOSE OF VOLATILE WASTES SUCH AS MINERAL SPIRITS, OIL OR PAINT THINNER IN STORM OR SANITARY DRAINS. 6. DURING CONSTRUCTION A) EXECUTE CLEANING TO ENSURE THAT ROADWAY, WALKS, GROUND AND PUBLIC PROPERTIES ARE MAINTAINED FREE FROM ACCUMULATIONS OF WASTE MATERIALS AND RUBBISH. B) WET DOWN DRY MATERIALS AND RUBBISH TO LAY DUST AND PREVENT BLOWING DUST. C) PROVIDE OWSITE CONTAINERS FOR COLLECTION OF WASTE MATERIALS, DEBRIS AND RUBBISH. D) REMOVE WASTE MATERIALS, DEBRIS AND RUBBISH FROM SiTE AND LEGALLY DISPOSE OF AT PUBLIC OR PRIVATE DUMPING AREA OFF OWNER'S PROPERTY. E) EACH CONTRACTOR SHALL BE REQUIRED TO DISPOSE OR WASTE MATERIALS ON A REGULAR BASIS. 7. FINAL CLEANING A) IN PREPARATION FOR OCCUPANCY, CONDUCT FINAL INSPECTION OF SIGHT - EXPOSED INTERIOR AND EXTERIOR SURFACES AND OF CONCEALED SPACES. B) REMOVE GREASE, DUST, DIRT, STAINS, LABELS, FINGERPRINTS, AND OTHER FOREIGN MATERIAL FROM SIGHT- EXPOSED INTERIOR AND EXTERIOR FINISHED SURFACES; POLISH SURFACES SO DESIGNATED TO A SHINY FINISH. C) REPAIR, PATCH, AND TOUCHUP MARRED SURFACES TO SPECIFIED FINISH, TO MATCH ADJACENT SURFACES. D) REMOVE ALL FOREIGN MATERIALS FROM ROOF AND SITE AREA. E) PERFORM ALL FINAL CLEANING, INCLUDING THE FOLLOWING: 1) EMPLOY EXPERIENCED WORKMEN OR PROFESSIONAL CLEANERS FOR FINAL CLEANING. 2) WASH AND CLEAN ALL GLASS, REMOVING LABELS AND PAINT. 3) BROOM CLEAN PAVED SURFACES. 4) CLEAN ALL FLOORS OF DIRT AND DUST. F) RESPECTIVE CONTRACTORS SHALL PERFORM CLEANING OF THEIR EQUIPMENT. G) ALL STRAINERS AND FLOOR DRAINS IN RESPECTIVE PIPE WORK SHALL BE CLEANED. H) REPLACE BRINED OUT OR INOPERATIVE LIGHTING LAMPS. 1) OWNER WILL ASSUME RESPONSIBILITY FOR CLEANING AS OF TIME DESIGNATED ON CERTIFICATE OF FINAL ACCEPTANCE, CONDITIONAL ACCEPTANCE OR PARTIAL OCCUPANCY, WHICHEVER IS FIRST, FOR OWNER'S ACCEPTANCE OF PROJECT OR PORTION THEREOF. DIVISION 6 WOOD & PLASTICS SECTION 06100 - CABINETRY 1. FRAMING LUMBER: AMERICAN SOFTWOOD LUMBER STANDARS PS20, S4S, SELECT GRADE "D" OR BETTER. 19% MAXIMUM MOISTURE CONTENT, WiTH THE FOLLOWING MIN. WORKING STRESSES: BENDING (FB)= 1500 PSI HORIZONTAL SHEER (FV)= 95 PSI COMPRESSION PERPENDICULAR TO GRAIN (FC)= 390 PSI MODULUS OF ELASTICITY (E)= 1,500,000 A) MEMBERS IN CONTACT WiTH CONCRETE, MASONRY, OR ROOF SHALL BE PRESERVATIVE TREATED, AWPB LP -2. B) FIRE RETARDANT TREATED LUMBER: AWPA C20 2. PLYWOOD: PS1. FACTORY MARKED APPRORIATE APA TRADEMARK. WATER OR PARTICLE BOARD IS NOT ACCEPTABLE. PROTECT ALL PLYWOOD FROM MOISTURE BY USE OF ALL REQUIRED WATERPROOF COVERING UNTiL THE PLYWOOD HAS IN TURN BEEN COVERED WITH THE NEXT SUCEEDING COMPONENT OF FINISH. A) ROOF SHEATHING: NOT USED B) WALL SHEATHING: APA RATED SHEATiNG, 40/20, 5/8' NOMINAL, EXPOSURE 1. SECTION 09510 ACOUSTICAL CEILING 1. ACOUSTICAL PANELS: A) SIZE: 24' X 48' X 5/8' B) EDGES: (FL) C) COLOR: WHITE D) INSULATION: WHEN CALLED FOR 6' FIBERGLASS BAiTS PER SECTION 07210 (24' X 480) E) GRID SYSTEM: USG, DONN BRAND SUSPENSION SYSTEM 15/16' DX/DXL, HEAVY DUTY. F) BASIS OF DESIGN: USA, SANDRIFT, CUMAPLUS. 2. MISCELLANEOUS MATERIALS: A) HANGER WIRE: GALVANIZED CARBON STEEL WIRE, ASTM A641, SOFT TEMPER, PRESTRETCHED, CLASS 1 COATING, SIZED SO THAT STRESS AT 3 -TIMES HANGER DESIGN LOAD (ASTM 0635, TABLE 1, DIRECT HUNG) WILL BE LESS THAN YIELD STRESS OF WIRE, BUT PROVIDE NOT LESS THAN 12 GAUGE. B) EDGE MOLDINGS AND TRIM: METAL OF TYPES AND PROFILES INDICATED OR, IF NOT INDICATED, PROVIDE MANUFACTURER'S STANDARD MOLDING FOR EDGES AND PENETRATIONS ON CEILING WHICH FITS WITH TYPE OF EDGE DETAIL AND SUSPENSION SYSTEM SPECIFIED. 3. INSTALLATION: A) INSTALL SUSPENSION SYSTEMS TO COMPLY WiTH ASTM C636, ASTM C635, OR CISCA . SECTION 09666- RESILIENT SHEET AND VINYL FLOORING ' KONECTO" FLOORS BY METROFLOR I. INSTALLATION: SUBFLOOR AND UNDERLAYMENT REQUIREMENTS ALL SUBFLOORS MUST BE SOUND, SOLID AND HAVE LITTLE FLEXIBILITY A. FOR CONCRETE APPLICATIONS: ANY LARGE CRACKS OR VOIDS MUST BE FILLED WiTH A CEMENTITOUS PATCHING COMPOUND. MAXIMUM OPERATING TEMPERATURE SHOULD NEVER EXCEED 85 'F. RADIANT HEAT COMPONENTS MUST BE A MINIMUM OF 1/20 SEPARATED FROM KONECTO. THIS IS THE ONLY TYPE OF RADIANT HEAT THAT IS APPROVED. 2. MATERIAL HANDLING AND STORAGE: MUST BE STORED IN A WARM, DRY AREA WITH THE CARTONS LYING FLAT, AND NEVER ON EDGE.. DO NOT EXPOSE TO VERY HOT OR COLD TEMPERATURES. R IS REQUIRED THAT YOU ADAPT MATERIALS TO JOBSITE CONDITIONS A MINIMUM OF 24 TO 48 HOURS BEFORE SCHEDULED INSTALLATION. CHECK TO MAKE SURE COLOR AND LOT NUMBERS ARE THE SAME ON JOBS REQUIRING MORE THAN ONE BOX OF PLANKS. TEMPERATURE FOR STORAGE & INSTALLATION: FLOORING AND SUBFLOOR ROOM TEMPERATURE SHOULD BE BETWEEN 65 ° AND 85 ° FAHRENHEIT. MAINTAIN PROPER TEMPERATURE FOR 48 HOURS BEFORE AND AFTER INSTALLATION. AFTER THAT, MAINTAIN TEMPERATURES BETWEEN 55 ° F AND 85' F. THE BUILDING'S HEATING AND AIR - CONDITiONING SYSTEM SHOULD BE TURNED ON AT LEAST ONE WEEK BEFORE INSTALLATION. FAILURE TO FOLLOW THESE GUIDELINES MAY RESULT IN AN INSTALLATION FAILURE (I.E. FLOORING MAY EXPAND OR CONTRACT RESULTING IN GAPPING). 3. SUBFLOOR PREPARATION IN GENERAL, ALL SUBSTRATES MUST BE FREE OF DIRT, DEBRIS, ETC. WILL CONFORM TO MOST IRREGULAR SUBFLOORS, BUT CAUTION MUST BE USED IF THE IRREGULARITIES ARE VERY NOTICEABLE OR ARE OF A SHARPLY DEFINED NATURE. THESE IRREGULARITIES MUST BE EITHER LEVELED OR FILLED WiTH A HIGH QUALITY CEMENTITOUS PATCHING MATERIAL. 4. KONECTO TILE INSTALLATION INSTRUCTIONS DMDE THE ROOM INTO EQUAL QUADRANTS USING CHALK LINES. DRY -LAY A ROW OF TILES USING THE ENCLOSED WAX PAPER TO PROTECT THE KONECTO STRIP, AND THEN FROM THE CENTER LINE TO THE SIDE WALL DETERMINE THE SPACE LEFT FOR THE BORDERS TiLES ADJUST THE CHALK LINES TO ACHIEVE A BALANCE LAYOUT WITH EQUAL SIZE BOARDERS ALL AROUND. (THIS CAN READILY BE FIGURED OUT FROM THE ROOM DIMENSIONS WITHOUT PUTTING DOWN THE TiLES IF DESIRED.) ONCE THE BORDER TiLES ARE DETERMINED CUT TiLE DOWN TO SIZE. START IN CORNER OF ROOM WITH BORDER TILES AND LAY DOWN A ROW TO END OF WALL WITH KONECTO STRIP FACING OUT FROM THE WALL. THEN LAY ADJOINING ROW CREATING A 90 DEGREE ANGLE. MAKE SURE BY USING A PLUM LINE OR LASER GUN THAT BOTH ROWS ARE COMPLETELY STRAIGHT AND SQUARE. USE DOUBLE FACE TAPE TO KEEP BOTH ROWS IN PLACE. IF THE WALL IS UNEVEN, ADJUSTMENTS CAN BE MADE BY SCRIBING THE BOARDER TILES ON THE OVER EDGE. THEN PROCEED IN LAYING TILES IN A STAIRCASE FASHION. REFER TO MANUFACTURERS SPECIFICATION FOR FURTHER INFORMATION ON TiLE LAYOUT. IMPORTANT: ALL KONECTO TiLE SEAMS MUST BY ROLLED WiTH A MINIMUM 100 -LB ROLLER AFTER INSTALLATION. USE A HAND ROLLER IN AREAS NOT REACHED WiTH A 100 -LB. ROLLER. 5. WARRANTY CONTRACTOR TO PROVIDE OWNER WITH 10 YEAR COMMERICAL WARRANTY FROM MANUFACTURER. LATICRETE 9235 WATERPROOFING MEMBRANE LATiCRETE INTERNATIONAL, INC. 1 LATICRETE PARK NORTH BETHANY, CT 06524 -3423 USA TELEPHONE: 203.393.0010, EXT. 235 TOLL FREE: 800.243.4788, EXT. 235 FAX: 203.393.1684 INTERNET: WWW.LATiCRETE.COM 1. PRODUCT DESCRIPTION LATICRETE 9235 WATERPROOFING MEMBRANE IS A THIN, LOAD - BEARING WATERPROOFING DESIGNED SPECIFICALLY FOR THE SPECIAL REQUIREMENTS OF CERAMIC TiLE, STONE AND BRICK INSTALLATIONS. SELF - CURING LIQUID RUBBER POLYMER AND A REINFORCING FABRIC ARE QUICKLY APPLIED TO FORM A FLEXIBLE, SEAMLESS WATERPROOFING MEMBRANE THAT BONDS TO A WIDE VARIETY OF SUBSTRATES. KEYNOTES - - - JOLOCUS ARCHI'TBCTURB I N C O R P O R A T E D 500 South Dbde Highway, Sulle 310 Coral Gables, Fbrlda 33146 Tel (305) 740-0120 Fax (305) 740-0520 License No. AA0002733 CONSULTANT($) NO. REVISION/SUBMISSION DATE SPECIAL USE PLANNING 12 -14 -07 BOARD REVIEW PERMIT SET 03 -20 -08 PROJECT Interior Plan for: CAVAS WINE CAFE SOUTH MIAMI MUNICIPAL GARAGE 5829 SW 73rd Street, Units #7 -8 South Miami, Florida 33143 DRAWING Specifications SCALE NIS DRAWN LM REVIEWED NDL PROD. NO. N AR 13937 123.0 SHEET NO. SPEC -1.0