Loading...
5895 5899 SW 67 ST_GREEN MISC PART I1 City of South Miami PLANNING DEPARTMENT MISC. AND DOCUMENT FEES DATE: CHECK NO: 7 9 r _ JJ� � CNAME: T f--j / ADDRESS: PHONE NO: s6 / 03.41.300 DUMPSTER/CONSTRUCTION TRAILER AGREEMENT($50.00) 03.41.300 NEWSRACK APPLICATION FEE($50.00) [Plus$10.00 per Newsrack] 03.41.300 OUTDOOR DINING/SEATING PERMIT($250 per year) (public sidewalks only)(waived first year) 03.41.300 TEMPORARY SIGN PERMIT($50/each time) 131g`Issuance;Renewals: 0 2"d 0 3" 03.41.300 TREE REMOVAL PERMIT($50.00) 03.41.300 CLOSING OF PUBLIC RIGHTS-OF-WAY ($1500) 03.41.300 WAIVER OF ROW IMPROVEMENTS ($1500) 03.41.300 SIDEWALK SALES ($50/each time) 0ZONING/LAND USE VERIFICATION LETTER ($50) / (} 03.41.300 OPEN PERMIT / (y $25) 03.41.400 REQUEST FOR MICROFILM RESEARCH($25.00) 03.41.400 MICROFILM Reader/Printer copies($7.50/each image) 02.19.162 BLUEPRINT MAPS AND OTHER MAPS [Zoning Maps,City Official Maps,Future Land Use Maps,G.I.S. Maps] 03.69.920 LDC,COMP PLAN&ALL PHOTOCOPIES Al [$0.15 per single-side copy; $0.20 per double-sided copy] /� „l TOTAL (/ 02.19.162 Blueprints and Other Maps: 03.69.920 LDC,Coma Plan,Photoconies: Small Zoning Map $2.68 (Tax Included) Land Development Code $53.50 (Tax Included) Small Official City Map $2.68 (Tax Included) Comprehensive Plan $33.71 (Tax Included) Large Official City Map $3.75 (Tax Included) Hometown Regulations $ 4.49 (Tax Included) Land Use Color Map $4.28 (Tax Included) Census Data Packet $ 2.41 (Tax Included) Custom G.I. S.Map $10.05(Tax Included) All Charrette Booklets FREE (No charge at all) E:\Forms\Receipt forms\RECEIPT FORM Part II.9-16-05.doc White copy to Planning; Pink copy to Customer; Yellow copy rof finance 5.05F'Fi �iISCELLOFiEl7U a10i7.00 Ord. No. 15-04-1822, adopted 12121104 PLANNING&ZONING DEPT. - ;c t!j w South Miami ,4 ,� n F l o r i d a 6130 SUNSET DRIVE ��� � 1- SOUTH MIAMI,FL 33143 !% RAK TEL: 305-663-6326 ?' FAX: 305-668-7356 2001 December 19, 2005 A-1 Title Support Services, Inc. P.O. Box 55-7097 Miami, Fl. 33255-7097 Re: 5899 SW 67 Street. South Miami, FL Dear Sir: Regarding your inquiry, the South Miami zoning district for the above property is "RS-4" Single Family Residential. Based upon the City's Land Development Code regulations this site is non-conforming because the lot frontage is below the minimum required 60 feet in the RS-4 district. Therefore a new building on this lot can not be constructed without a variance being granted or a zone change. A copy of the RS-4 zoning district regulations are attached. If you have any further questions or concerns, do not hesitate to contact this office at 305- 663-6326 Sincerely, rISanfor A. Youkilis, AICP Acting Planning Director Attachment SAY E:\Zoning letters\5899 SW 67 St..doc ZONING REGULATIONS 20-3.1 ARTICLE III. ZONING REGULATIONS 20-3.1 Zoning use districts and purposes. (A) Zoning Districts Established. In order to implement the intent of this Code and the city's adopted Comprehensive Plan, the City is hereby divided into eighteen (18) zoning use districts with the symbol designations and general purposes listed below and permitted uses set forth in Section 20-3.3(D). A planned unit development (PUD) district is also created in Section 20-3.7. Standards shall be uniform throughout each zoning use district. District symbols and names shall be known as: Symbol Name RS-1 Estate Residential RS-2 Semi-Estate Residential RS-3 Low Density Single-Family RS-4 Single-Family RS-5 Single-Family(50'lots) RT 6 Townhouse Residential RT-9 Two-Family/Townhouse Residential RM-18 Low Density Multi-Family Residential " RM-24 Medium Density Multi-Family Residential RO Residential Office LO Low-Intensity Office MO Medium-Intensity Office NR Neighborhood Retail SR 13pecialty Retail GR General Retail TODD Transit-Oriented Development District H Hospital PI Public/Institutional PR Parks and Recreation HP-OV Historic Preservation Overlay ',(B) District Purpose Statements. "RS-4"Small Lot Single-Family Residential District. The purpose of this district is to provide for single-family residential development located on smaller lots and to protect and improve the character of existing development in the area. This district is appropriate in areas designated"Single-Family" on the city's adopted Comprehensive Plan. Supp.No. 9 20-3.5 SOUTH MIAMI LAND DEVELOPMENT CODE (D) Reserved. Section 20-3.5E DIMENSIONAL REQUIREMENTS SINGLE-FAMILY DISTRICTS REQUIREMENT RS-1 RS-2 RS:3 RS-4 RS-5 Min.Lot Size Net Area(sq.ft.) 40,000 15,000 10,000 6,000 6,000 Frontage(ft.) 125 100 75 . 60 50 Min.Yard Setbacks(ft.) Front 50 35 25 25 25 Rear 25 25 25 25 25 Side(Interior)° For strut- 12.5 10 7.5 7.5b 7.5b ture 12'or less in height,as mea- sured from the first floor finished floor ele- vation Portion of 25 20 15` 10` 7.5 structure above 12' high as mea- sured from the first floor finished floor ele- vation Side(Street) 20 15 15 15 15 Max.Building Height Stories 2 2 2 2 2 Feet 25 25 25 25 25 Max.Building Coverage M) First floor 20 30 30 30 30 Second 60 60 60 60 60 floor:% of the first floor Max.Impervious Coverage M) 30 40 40 45 45 a Cumulative width of both side yards shall be not less than 20 percent of total lot width. b Except that additions to existing structures may have 5 feet interior side setbacks where any portion of the building already has a 5 feet setback. For pre-existing improved lots of record in the RS3 or RS4 districts,that are 50 feet or less in lot width, the second floor setback shall be the same as the first floor setback. Supp.No.8 50' A1HI•,, • �► Sty o f south Miant INTER—OFFICE MEMORANDUM TO: DATE: Sonia Lama, AIA 11-03-92 Bldg. & Zoning Director FROM' SUBJECT: Kathy Vazquez Johnny Jackson Chief CE Officer E5895F/99 SW 67, St.4 Mr. Jackson received a notice on 9/29/92 to submit a plan within 30 days for cleaning his property. Donna Gordon of DERM met with Mr. Jackson on 10/21/92, which was within that 30 day period. Due to Mr. Jackson's inability to read and write, he was not able to provide a written proposal, therefore, a verbal agreement was established. This agreement is in three phases and includes all previously established time-tables. PHASE I: On November 6th, a DERM inspector will meet with Mr. Jackson at the property where Mr. Jackson will set aside all solid wastes and chemicals such as acids, paints, etc. The Program Manager has approved his taking these items on November 7th and 8th for disposal at a, minimum fee at Joe Robbie Stadium. Mr. Jackson will receive a receipt as proof of his having disposed of these items. PHASE II: Mr. Jackson will be required to clear the property of tires, shopping carts, etc. (The time-table on this, which could be . as long as 45 days, will be determined by the DERM inspector after Phase I is in compliance. ) PHASE III: Mr. Jackson must provide DERM with proof of excavation (disposal of soils) and re-sampling. If this cannot be done due to lack of funds, DERM will do the re-sampling to ensure compliance. If the DERM inspector finds that Mr. Jackson has made no effort to clean this property, he will be given Notice of 30 days in which to comply. An inspection will be made at the end of the 30 days following which he will be allowed an additional 10 days. At the end of this period of time, if Mr. Jackson has done nothing to indicate that he intends to comply with these requirements, court action will be brought against him, which could result in penalties. Donna Gordon will FAX copies of inspections reports to us as they become available. DERM will not enforce removal of vehicles and/or other junk. The City of South Miami is responsible for this action as well as removal of the unsafe structure on the site.