5Agenda Item No:5. City Commission Agenda Item Report Meeting Date: June 5, 2018 Submitted by: Shari Kamali Submitting Department: City Manager Item Type: Resolution Agenda Section: CONSENT AGENDA Subject: A Resolution authorizing the City Manager to negotiate and to enter into a contract with Canyon Construction, Inc., for the installation of a new gateway monument sign to be placed at Fuchs Park. 3 / 5 (City Manager-Public Works) Suggested Action: Attachments: Memo_for_Gateway_Sign_at_Fuchs_Park_PWD_5-21-2018-1CArev sa.docx Reso_for_Gateway_Sign_at_Fuchs_PArk__PWD_5-21-2018CArevwNos.docx email from Canyon Construction related to Gateway Sign.pdf email from IMF related to Gateway Sign.pdf Finance Account Balance 301-1790-519-6450.pdf Bid Opening Report Fuchs Park Gateway Sign 7.25.17.pdf Pre Bid Sign In Sheet RFP PW2017-15 7.6.17.pdf Proposal Summary Fuchs Park Gateway Sign 7.25.17.pdf Demand Star Fuchs Park Gateway Sign 7.25.17.pdf Notice Fuchs Park Gateway Sign RFP.pdf Sun Biz Canyon Construction 7.25.17.pdf After Action Commission Meeting 8-15-2017.pdf 134 CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM TO:The Honorable Mayor &Members of the City Commission FROM:Steven Alexander, City Manager DATE:June5,2018 Agenda Item No.:_____ SUBJECT:A Resolution authorizing the City Manager to negotiate and to enter into a contract with Canyon Construction, Inc., for the installation of a new gateway monument sign to be placedat Fuchs Park. BACKGROUND:This item to provide a new gateway monument sign to be placed at Fuchs Park was presented at the August 15, 2017 Commission meeting and Vice Mayor Welsh, encouraged the Commission to allow him to attempt to have proper engineering drawings done by his very low price engineer and subsequently to allow Mr Welsh to construct at least a portion of the sign himself at significant cost reduction to the City. The City received drawings but they could not reach a standard necessary for the City Building Official to be able to approvethem. After significant urging, and almost a years time, the City still does not have proper drawings necessary to continue this project. The Administration, Mayor and City Commission wish to proceed withthe bids received on July 25, 2017 for a new gateway monument sign to be placed at Fuchs Park. The contractors have recently confirmed the prices will remain the same as submitted on July 25, 2017. The project scope shall include and is not limited to tree relocation, tree root pruning, tree protection; electrical work related to sign and landscape lighting and an irrigation pump station; structural work including reinforced concrete foundation and wall; rough and fine grading; and fabrication and installation of anarchitectural sculptural sign including the Citylogo. The awarded contractor is responsible for furnishing all labor of Contractor and the labor of all allowablesubcontractors, and cost of disposal of materials as well as all necessary machinery, tools,transportation, equipment rental and permits, to perform the installation of thenew gateway monument sign to be placed at Fuchs Park. Through the Procurement Division, the City's Public Works Department submitted a Request for Proposal ("RFP") #PW2017-15onTuesday, June 18, 2017 for "Fuchs Park Gateway Sign Fabrication and Installation Project." The City received two(2) proposalson July 25, 2017; Canyon Construction, Inc. is the secondlowest bidder and is in compliance with the terms of the RFP.135 CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM The lowest vendor, IMF Estimating & Construction Corp. was established in 2012 and demonstrates the least experience in comparison to its competitor. This firm has not completed any jobsin the past five (5) yearsthat requires the specialty and trades for this project. VENDOR & BID AMOUNT:Please see below a breakdown of all submitted bids. Contractor Bid Price IMF Estimating & Const Corp $193,129.49 Canyon Construction Inc.$210,237.13 A contingency amount of $10,000 will be included over the proposal amount of $210,237.13to address for unknown factors that may arise during the work. AMOUNT:Amount not to exceed $220,237.13which includes $10,000 for contingency. FUND &ACCOUNT:The expenditure shall be charged totheCapital Improvement ProgramFund account number 301-1790-519-6450, which has a balance of $1,006,139.80. ATTACHMENTS:Canyon Construction Inc., price confirmation email dated 5-16-2018 IMF Estimating & Const Corp. price confirmation email dated 4-24-2018 Bid Opening Pre-bid RFPProposal Proposal Summary Demand Star Results DBR Ad Sun Biz Registration 136 Page 1of 2 RESOLUTION NO: _______________1 A Resolution authorizing the City Manager to negotiate and to enter into a contract with 2 Canyon Construction, Inc., for the installation of a new gateway monument sign to be 3 placed at Fuchs Park4 WHEREAS, theMayor and City Commission wish to proceed with the bids received on July 5 25, 2017 to provide a new gateway monument sign to be placed at Fuchs Park;and6 7 WHEREAS, theContractors have confirmed via email the prices will remain the same as 8 submitted on July 25, 2017;and9 WHEREAS, the project scope shall include and is not limited to tree relocation, tree root 10 pruning, tree protection; electrical work related to sign and landscape lighting and an irrigation 11 pump station; structural work including reinforced concrete foundation and wall; rough and fine 12 grading; and fabrication and installation of anarchitectural sculptural sign including the City logo; 13 and 14 WHEREAS,through the Procurement Division, the City's Public Works Department 15 submitted a Requestfor Proposal ("RFP") #PW2017-15 on Tuesday, June 18, 2017 for "Fuchs Park 16 Gateway Sign Fabrication and Installation Project."; and17 WHEREAS,The City received two (2) proposalson July 25, 2017as follows; and18 19 20 21 22 WHEREAS, the lowest vendor, IMF Estimating & Construction Corp. did not have sufficient 23 experience with certain elements of the work;and24 25 WHEREAS, Canyon Construction Inc. is the most responsive and responsible bidder;and26 27 WHEREAS,the City desires to provide a contingency of $10,000 over the proposal amount 28 to address for unknown factors that may arise during the work; and29 WHEREAS,the Mayor and City Commission desire to authorize the City Manager to 30 negotiate and enter into a contract with Canyon Construction, Inc., for the installation of a new 31 gateway monument sign to be placed at Fuchs Parkfor a total amount not to exceed 32 $210,237.13.33 NOW THEREFORE BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY 34 OF SOUTH MIAMI, FLORIDA;35 Contractor Bid Price IMF Estimating & Const Corp $193,129.49 Canyon Construction Inc.$210,237.13 137 Page 2of 2 Section 1.The City Manager is authorized to negotiate the price, terms and conditions 1 and to execute a contract with Canyon Construction, Inc.for the installation of a new gateway 2 monument sign to be placed at Fuchs Park for a total amount not to exceed $210,237.13. The3 City Manageris authorized to expend up to $10,000to address any condition that the contractor, 4 using reasonable diligence, could not have foreseen when formulating its bid. A copy of the 5 approved form of contract is attached. The expenditure shall be chargedto theCapital 6 Improvement ProgramFund account number 301-1790-519-6450, which has a balance of 7 $1,006,139.80before this request was made.8 Section 2. Severability.If any section clause, sentence, or phrase of this resolution is for 9 any reason held invalid or unconstitutional by a court of competent jurisdiction, the holding shall 10 not affect the validity of the remaining portions of this resolution11 Section 3. Effective Date: This resolution shall take effect immediately uponadaption.12 PASSED AND ADOPTED this___ day of __________, 2018.13 14 ATTEST:APPROVED:15 16 17 _____________________________________________________18 CITY CLERK MAYOR19 20 21 COMMISSION VOTE:22 READ AND APPROVED AS TO FORM,23 LANGUAGE, LEGALITYAND EXECUTION Mayor Stoddard:24 EXECUTION THEREOF Vice Mayor Harris:25 Commissioner Welsh:26 _______________________CommissionerGil:27 CITY ATTORNEY Commissioner Liebman:28 138 139 140 141 142 143 144 Bidder Bid Package (1 Org; 4 Copies; 1 Digital) Bid Form Bidder Qualif. Sched. Of Values Ref.List of Subs' Non Coll. Affidavit Public Entity Crimes and Conflicts of Interest Drug free Workplace OSHA Stds Fed. State Listings Related Party Presentation Dec Proof of Ins Signed Contract with Original (1) Perf Bond Sun Biz IMF Const.X X X X See Note X X X X X X X X X X X Canyon Const.X X X X X X X X X X X X X X X X NOTE: IMF References; no sculptured sign experience (1) Condition of Award Fuchs Park Gateway Sign RFP #PW2017-15 NOTE: RESULTS ARE NOT FINAL UNTIL AN AWARD RECOMMENDTION BY THE CITY MANAGER 145 Member Name City of South Miami Bid Number RFP-0-0-2017/SK Bid Name Fuchs Park Gateway Sign Fabrication and Installation Project 10 Planholder(s) found. 218 NOTIFIED Supplier Name Address 1 City State Zip Phone Attributes Allied Environmental Signage 69 Megill Road Farmingdale NJ 07727 7327511818 1. Hispanic 2. Small 3. Woman Construction Journal, Ltd. 400 SW 7th Street Stuart FL 34994 8007855165 JCI International, Inc. 12315 SW 132 Court Miami FL 33186 3052541833 PRIDE Enterprises P.O. Box 440 Cross City FL 32628 8138902174 Seaside Works Inc. 2264 Great Neck Street Virginia Beach VA 23451 7576623313 1. Small Business 1. Hispanic Owned Link Systems LLC 5870 Hummingbird Court Titusville FL 32780 4074010031 3056008939 FASTSIGNS 175301 118 Hialeah Drive Hialeah FL 33010 7866152179 9049987227 1. Small Business CityTech Construction 11671 SW 50th Court Cooper City FL 33330 CCS Presentation Systems, Inc. 5530 S Florida Mining Boulevard Jacksonville FL 32257 FL 33014 3053623333 1. Small Business 4 Document(s) found for this bid Acolite Claude United Sign Co., Inc. 540 West 83 Street Hialeah 146 147 148 149 150 151 152 153 154 155