Loading...
6834 SW 78 TERR_EB-93-014-002 11V ATLANTIC BLUEPRINT 325190 ANTHONY ABBATE ARCHOTECT WC10 VA W5 A4- -r/tL4 f< ...... 6tK`__1 ��Pl illy,WN F, FIN N�;,� N, lr4l=I 711111:�_ �WAJII P?1t4F_rFZATJ04 INTO NF4,1 SL _ C WP-J,, rn, - r TAN r-' -rANK _M NOTP�:60NP9FZM --,PH CON C--4-,MF1TiCw5 A,4D UNF, SMrFS WT14 FN1,',Ir FLORIDA LICENSE NO.'AR11825 'Z&Lr,-OT[01,4. 0,4\5 PI F1 N Q I t�a&IW P--brl�-Xk3s --_-W,� F;� Celt4-iAIH F�ID POST OFFICE BOX 030304 FORTLAUDERDALE FL 33303-0304 TEL.463.8596 FAX.463.6137 GA6 ISO[--TE7F� IC SAN I I Af�'Nr I wco F,_PL,66� X , 1/5;;,"C V PIFE�6110F'PL�TlHrq' 11 r_* nFr-, V9 AN eV4 i�1/4_ a�iS�71�4 6� I HOT WKIE:P-S5-QWIC�,FPIF�,-- -ro E_-F_ ev V� 0 a5Wftr PI FC-TO e;�� Q ac-tT FvM -ro cow_Fzr-T%�� Ho-t-lil H�'4- �jk Im r17��. Zac VN rT�- -rO 6��;N MoUfTi�ci r;�P�5 , MAIN7A,14 Ho FFL,T� et�_ r_ r-,�Z,tF�4,_-H r_E-�PP_0-5zk,ij-r-)PE�6. rA�t;s V4t-Tq Ho _Wq4 +S� AHu-l?. r\ AH L)-I' VALME-:: 1.4 -TI, -ro 0 r- rT OwT ONCIN m M F:�1:,An e!;14,r;, -r4A -ro t 6F_IL4Wej & Ce4 L4 N 51 Y, VWX1 P KA I F4 P I A Kc:�r,- (,r,' H-5 V C1 ZAi--e --V4�',SOLA�l VA�V�r5- -11 70 le _r `�IJFI:ILI _a N N 511- -R�l E!-y 1,.-,T I N q 'al,41A ---------- Gazl4cl-�__ _re7 �__-= _T(2 F"Q��Vj[;�o < F' H LA c�,�N,4 Tr F_��i<:-n W F-W W A17--,ri FF- HVAC NOTES 14, T!!: 1 Drawings are diagrammatic. Do not scale drawings for the exact S,&-,­ST t"'k, ?:�7 -Y,-,r I L r location of equipment, piping, ductwork, etc. M�\T 2. These drawings are not intended to shuw every minor detail, but the contractor shall furnish and install elf items required for a complete, acceptable working installation. 3. ALI work shall be performed by a licensed contractor in a first class, workmanlike manner. The completed system shall be fully operative and acceptance by engineer/architect must be a condition of the subcontract. 4. Contractor shall pay for all permits, fees,Inspections and tests. 5. Contractor shall visit the job site and thoroughly familiarize himself with all existing conditions. 6. All work shall be coordinated'with other trades to avoid interference with the PLUMBING NOTES PLUMBING FIXTURE SCHEDULE VA�� L N progress of construction. rotection ��L U ik-1 I 7. All required insurance shall be provided by this contractor for p against public liability and property damage for the duration of the work. 1. Work to be performed is a remodel of an existing space. Plumbing Contractor SYMBOL/DESCRIPTION CW-HW-WASTE-FU COMMENTS S. All workmanship and materials shall be in strict accordance with applicable shall thoroughly familiarize himself with existing conditions and report any P-1 Am Std 2812.013 1/2-CW,3-WASTE, COLOR-.11HITE national,state and local codes, rules and ordinances. conflicts to the Architect prior to commencing work. w/.134 seat 4 Fixture units 9. All materials shall be new and shall bear underwriters label where applicable. 2) AU plumbing shall be done In 'accordance with state and local codes and 10. The mechanical contractor shall provide all labor, materials, tools and ordinances. P-2 Elkay RLR-12 1/2-CW,1/2-HW, ST.STL.BOWL equipment to Install a complete and operative IIVAC system. 3. Plumbing Contractor shall pay all fees, inspection and connection charges w/Speakman 1-1/2"WASTE, CHROME TRIM 11. The mechanical contractor shall provide a written warranty that shall required. SC3031D75 1 Fixture unit guarantee all workmanship and materials for one year from the date of.final 4. Plumbing Contractor shall verify all space conditions and dimensions at job site -CW,1/2-HW, CHROME TRI14 work acceptance. Equipment shall be U.L. approved. prior to fabrication and Installation of materials and equipment. P-3 Speakman Shwr 1/2 12. Architectural and/or engineering expenses that are incurred due to revisions 5. Coordinate work with other trades. SC1131AFI 1-112-WASTE, or substitutions requested by the contractor shall be paid for by the 6. S ubmit shop drawings to Engineer for approval of all equipment,materials and (S-2251-AF) 2 Fixture units contractor. layout prior to installation. 7. Furnish and Install fixtures as specified (by Architect). P-4 Washing Machine I/2"CW,1/2"HW, BY OWNER a. Plumbing Contractor shall guarantee all work free of defects In material and 2- WASTE, INSTALLATION workmanship for a period of one year from date of acceptance. 2 Fixture units 9� Provide shut-off valve for each fixture. 1. The mechanical contractor shall provide HVAC equipment as scheduled of the 10. WATER DISTRIBUTION PIPING P-5 Water Heater 3/4-CW,314-HW AS SPECIFE ED capacities shown on the plan. Hot and cold water piping shall be type L copper above ground and type K 2. Submit shop drawings on a.0 equipment and obtain approval prior to below. Use wroughtcopper fittings with maximum.2%lead content solder. Use installation. dielectric unions at connections to dissimilar metals. 3. The mechanical contractor shall provide motorstarters,relays,and contactors. 11. SANITARY AND VENT BATHROOM ACCESSORY SCHEDULE 4. The electrical contractor shall provide all switches and Install all control ABOVEGRADEt Cast iron,hubless,CIS PI 301 with no hub neoprene gasket and wiring. stainless steel clamp or Neoprene gasket with cast iron clamp. PVC Schedule SOAP DrSH/SOAP BASKET Hastings Serie Tris R90530 5. Refrigerant piping to be type 'k"copper with wrought copper solder fittings. 40 may be used at Owner's option. Insulate all,refrigerant suction lines with 1/2- armaflex or,approved equal. BELOW GRADE% ,ASTM D2665-78,Schedule 40 or 80 PVC D.W.V. TOILET PAPER HOLDER Hastings Serie Tris R91200 Provide,weatherproof coating to all refrigerant line insulation in exterior locations. 12. GAS PIPING ROBE HO I OK Hastings Serie Tris I R91500 2991 STREILKOW 6. Furnish and Install all temperature controls under this contract. Thermostats for A/C unit shall be heat/off/cool and fan/auto/on switches and shall be Provide Schedule 40 Black steel pipe with malleable iron screwed fittings; TOWEL BAR Hastings Seria Tris R91M13 approved by equipment manufacturer. provide galvanized where pipe or fittings are exposed (ASTM A-120). All 7. mount thermostats V-6' above finished floor, unless noted otherwise. i underground piping shall be provided with 2 coats of approved bituminous Locations for these Items to be determined by architect 8. Connect condensate drain piping from unit through a trap.to a drain. sealant Contractor shall provide Interstitial blocking as needed for secure Installation of these items. Verify locations at time WARRANTIES Fittings 2 inches and smaller shall be service weight cast iron type. of rough framing for installation of blocking. of any defects shall be completed without additional charge and 1) Correction shall include replacements or repair of any other phase of the installation Thoroughly clean items before installation. Cut pipe accurately and work into place without springing or forcing. Make changes in directions with fittings. which may have been damaged thereby. Changes in main sizes shall be made with eccentric reducing pipe fittings. Provide devices necessary for flexible piping connections to equipment. Provide complete dielectric Isolation between ferrous and non-ferrous metals. AIR CONDITIONING SCHEDULE Provide union and shutoff valves suitably located to facilitate maintenance and SYMBOL-MODEL COOLING HEATING CF14 SUPP SEER COP V-Ph-ilz removal of equipment and apparatus. Piping shallbe installedtoperrait access MANUFACTURER BTUH BTUH III HEAT for equipment maintenance. Piping shaII be sloped not less than 1/4 inch In 15 feet to prevent traps. Any AHU-1/CU_1 8803, 10900 235 1.0 9.9 3.04 115-1-60 piping through foundation walls or beneath the building shall be encased in 14ITSUBISIII a protective pipe. Annular space between the gas piping and the sleeve shall MSIj_O9CW be sealed to prevent entry of gas or water. AHU-1/CU-1 720 1.9 9.8 3.30 208/230-1-60 Provide personnel and equipment, and arrange for and pay the costs of, au 23100 24700 required tests and Inspections required by governmental agencies having All 11192 MITSUBISHI PKII-24AG jurisdiction. Where tests show materials or workmanship to be 6eficlent, replace or repair as necessary, and repeat the test until the specified standards are achieved. (1) Provide White finish- C r� C-F #44 IL IPTT'jiPIENAL REVIEW Ami r" 157 0 DATE Cf Al, MAN