6820 SW 78 TERR_EB-90-029 O
City of South Miami
Y u�,
6130 Sunset Drive, South Miami, Florida 33134
663-6300
DEPARTMENT OF BUILDING AND ZONING
Application for Approval by Environmental Review and Preservation Board
Applicant: Phone:Phone: �3Y-2-Z3L4 Use of Development: Q< Residential
( ) Commercial
Address: /64 , 3 Aye ( ) Others:
Represented By Aa� Phone: 6 35-Z2 3 ' Signature:
Address: Name and Title:
Architec_t:p � clue. Phone: 6(a�-�g�0 Date:
Engineer: Phone:
OFFICE USE ONLY
Brief Description of Development:
Remarks:
At:
( ) Preliminary Review
f Final Review
Date of Hearing: '� IqD
Signatu of the Board's Chairman
Estimated Cost: 00
MATERIALS TO BE SUBMITTED IN TRIPLICATE:
1. Completed ERPB application
2. Current survey/signed and sealed
3. Site Plan /
4. Landscape plan
5. Elevations
6. Elevations of the proposed changes and entire building
7. Structural/ construction detai1,9
8. Energy Computations
9. Electrical Plans and data_
-10. Plumbing plans and data /_11
11. Mechanical plans and data
12. Materials and Colors and/or samples
13. Clear photographs of entire site/development and adjacent ones
14. Model, (scale 1"=201 ) , one only. It is required for
nonresidential development of 5000 sq. ft. or more only
15. Dimensions and style of signs and letters
16. Illumination detail
17. Application fee $25, if in violation $50
NEW DEVELOPMENTS, Submit Items:
1, ,21 3, 4, 5, 7, 8, 9, 10, 11, 12, 13 , 14, and 17.
ADDITIONS AND EXTERIOR RENOVATIONS, Stui)mi c items:
1, 2, 3, 6, 7, 8; 9, 10, 11 , 12, 13 , and 17.
SIGN, Submit Items:
1, 2, 6, 7, 9, 12, 13, 15, 16, and 17.
FENCE, Submit Items:
1, 2, 5, 7, 12, 13, and 17.
EXTERIOR PAINTING, Submit Items:
1, 5, 12, 13 , and 17.
PARKING, DRIVEWAY, LANDSCAPING, Submit Items:
1, 2, 3, 6, 12, and 16.
c
r
t
INSTRUCTIONS FOR ERPB APPLICANTS
SUBMISSION REQUIREMENTS AND GUIDELINES
NOTE: All construction and improvements visible -from the public
right-of-way MUST be approved by the Environmental Review
and Preservation Board.
1. Each sheet of plans, for any improvement, costing $15,000 or
more (including: labor, materials and services) shall bear
the date and the impress seal and signature of a licensed
Architect or registered Professional Engineer.
2. All applications are reviewed for accuracy, completeness and
compliance with South Miami's Land Development Code. If a
problem is found with your application, .you will be notified
as soon as possible. Problems that are not resolved before
the application deadline will result in the exclusion of the
application from the upcoming agenda.
3. Neither applicants nor their representatives are REQUIRED to
attend the ERPB meeting. However, your chances of receiving
approval are much greater if someone is present at the meeting
who. can answer questions about the project and is authorized
to make corrections and modifications to the ,plans. ' It is
recommended that architects and engineers represent their
projects in person.
4. APPROVAL FROM THE ERPB IS NOT . AUTHORIZATION TO BEGIN
CONSTRUCTION. You must obtain a valid building permit after
receiving approval from the ERPB. Applications for building
permits for single family residential projects will be
processed and issued as soon as possible after ERPB approval.
All other permit applications must observe a fifteen (15) day
appeal period before they can be issued. In order to allow
the entire process to proceed as quickly as possible, submit
a COMPLETED BUILDING PERMIT APPLICATION when you apply to
appear before the ERPB. Those plans submitted without
complete building permit applications will be disposed of
sixty (60) days after, being reviewed by the ERPB.
5. Development orders shall not be issued by the City unless
public facilities and services which meet or exceed the level
of service standards established in the City's adopted
Comprehensive Plan are available concurrent with the impacts
of the development. PROOF OF ADEQUACY SHALL BE THE
RESPONSIBILITY OF THE APPLICANT.
INFORMATION TO BE SUBMITTED FOR ZONING REVIEW
-- Net Lot Area -- Lot frontage.
-- Easements & Dedications -- Setbacks
-- No. of Stories & Height -- F.A.R.
-- Building Gross Floor Area -- Building Coverage
-- Impervious Coverage -- Parking Data
�
`
~
`
_- -
----.__ `
IZZI-
qseo 10 quawas.AOPU@ C)
cn