Loading...
6820 SW 78 TERR_EB-90-029 O City of South Miami Y u�, 6130 Sunset Drive, South Miami, Florida 33134 663-6300 DEPARTMENT OF BUILDING AND ZONING Application for Approval by Environmental Review and Preservation Board Applicant: Phone:Phone: �3Y-2-Z3L4 Use of Development: Q< Residential ( ) Commercial Address: /64 , 3 Aye ( ) Others: Represented By Aa� Phone: 6 35-Z2 3 ' Signature: Address: Name and Title: Architec_t:p � clue. Phone: 6(a�-�g�0 Date: Engineer: Phone: OFFICE USE ONLY Brief Description of Development: Remarks: At: ( ) Preliminary Review f Final Review Date of Hearing: '� IqD Signatu of the Board's Chairman Estimated Cost: 00 MATERIALS TO BE SUBMITTED IN TRIPLICATE: 1. Completed ERPB application 2. Current survey/signed and sealed 3. Site Plan / 4. Landscape plan 5. Elevations 6. Elevations of the proposed changes and entire building 7. Structural/ construction detai1,9 8. Energy Computations 9. Electrical Plans and data_ -10. Plumbing plans and data /_11 11. Mechanical plans and data 12. Materials and Colors and/or samples 13. Clear photographs of entire site/development and adjacent ones 14. Model, (scale 1"=201 ) , one only. It is required for nonresidential development of 5000 sq. ft. or more only 15. Dimensions and style of signs and letters 16. Illumination detail 17. Application fee $25, if in violation $50 NEW DEVELOPMENTS, Submit Items: 1, ,21 3, 4, 5, 7, 8, 9, 10, 11, 12, 13 , 14, and 17. ADDITIONS AND EXTERIOR RENOVATIONS, Stui)mi c items: 1, 2, 3, 6, 7, 8; 9, 10, 11 , 12, 13 , and 17. SIGN, Submit Items: 1, 2, 6, 7, 9, 12, 13, 15, 16, and 17. FENCE, Submit Items: 1, 2, 5, 7, 12, 13, and 17. EXTERIOR PAINTING, Submit Items: 1, 5, 12, 13 , and 17. PARKING, DRIVEWAY, LANDSCAPING, Submit Items: 1, 2, 3, 6, 12, and 16. c r t INSTRUCTIONS FOR ERPB APPLICANTS SUBMISSION REQUIREMENTS AND GUIDELINES NOTE: All construction and improvements visible -from the public right-of-way MUST be approved by the Environmental Review and Preservation Board. 1. Each sheet of plans, for any improvement, costing $15,000 or more (including: labor, materials and services) shall bear the date and the impress seal and signature of a licensed Architect or registered Professional Engineer. 2. All applications are reviewed for accuracy, completeness and compliance with South Miami's Land Development Code. If a problem is found with your application, .you will be notified as soon as possible. Problems that are not resolved before the application deadline will result in the exclusion of the application from the upcoming agenda. 3. Neither applicants nor their representatives are REQUIRED to attend the ERPB meeting. However, your chances of receiving approval are much greater if someone is present at the meeting who. can answer questions about the project and is authorized to make corrections and modifications to the ,plans. ' It is recommended that architects and engineers represent their projects in person. 4. APPROVAL FROM THE ERPB IS NOT . AUTHORIZATION TO BEGIN CONSTRUCTION. You must obtain a valid building permit after receiving approval from the ERPB. Applications for building permits for single family residential projects will be processed and issued as soon as possible after ERPB approval. All other permit applications must observe a fifteen (15) day appeal period before they can be issued. In order to allow the entire process to proceed as quickly as possible, submit a COMPLETED BUILDING PERMIT APPLICATION when you apply to appear before the ERPB. Those plans submitted without complete building permit applications will be disposed of sixty (60) days after, being reviewed by the ERPB. 5. Development orders shall not be issued by the City unless public facilities and services which meet or exceed the level of service standards established in the City's adopted Comprehensive Plan are available concurrent with the impacts of the development. PROOF OF ADEQUACY SHALL BE THE RESPONSIBILITY OF THE APPLICANT. INFORMATION TO BE SUBMITTED FOR ZONING REVIEW -- Net Lot Area -- Lot frontage. -- Easements & Dedications -- Setbacks -- No. of Stories & Height -- F.A.R. -- Building Gross Floor Area -- Building Coverage -- Impervious Coverage -- Parking Data � ` ~ ` _- - ----.__ ` IZZI- qseo 10 quawas.AOPU@ C) cn