B SQUARE CONSTRUCTION PROPOSAL PW2014-05 South Miami MedianSUU Lf 1i
Miami
: €W. N(
CITY OF SOUTH MIAMI
Sunset Drive Downtown Median
From SW 57' Court to SW 58t'Avenue
Proposal Due Date- 10 AM, July 3, 2014
(0)'T'homas F Pepe, 2014,
03/24/14
Maria M. Menendez, CMC
City Clerk
21�
END OF SECTION
Page 2 of 7
Cc.) Thomas F. 11epe, 2014
4/28/2014
No.
Event
ate*
Advertisement/ Distribution of RFP & Cone f
6/20/2014
5:00 PM
silence begins
�n-- a. tea - 1 cane
City of South Miami, i ity Hall Chambers,
6/2512014
ffi
a
1 onset Drive, oath i 33143
3
Deadline to Submit Questions
6/2712014
10:00 AM
4
Deadline to City Responses to uecstions
7/1/2014
10 :00 AM
Deadline to Submit Bid-Response
713/2014
10:00 AM
Evaluation of Bid Responses
7/3/2014
10:00 AM
7
Agenda for Commission Approval of
7/15/2014
7:00 P
-Contractors/Cone of Silence ends
END OF SECTION
Page 2 of 7
Cc.) Thomas F. 11epe, 2014
4/28/2014
30�* „
The Project is generally described as construction of a landscaped median, The scope of work for this
project includes milling and resurfacing, curbing, new signage, pavement marking and striping, tree
planting, sodding, and irrigation,
I. Site Location:
The site is located along Sumer Drive between SW 57th Avenue and SW 58th Avenue,
MRMK���
The current estimate to complete construction of the project is 30 days from issuance of
Notice to Proceed.
V. Warranty:
The standard manufacturer's warranty information must be provided in writing for all equipment
being proposed, including installation by an authorized dealer. Native trees planted by the
awarded vendor for this project shall be warranted to be healthy and growing for a period of
one (1) year from the date of planting.
Note: A Proposal Bond is NOT required for this project.
Page 3 of 72
V Thomas Fr Pepe, 2014
4/28/2014
Page 4 of 72
OThomas F. Pepe, 2014
4128,'2014
Page 5 of 72
t) Thomas F. Pepe, 2014
4,'2h/2014
Page 6 of 72
Q Thomas F. Pepe, 2014
4/281'2014
0 1
Thomas F Npe, 2014
4/28/2014
applicable 33. Proposal Guarantee: The successful Respondent shall execute the Contract (Agreement) and provide the
and Payment
days of Notice of Award by the City, The Respondent who has the Contract awarded to him and who fails to
execute the Contract and/or furnish the required Bonds and Insurance documents within the specified time
shall, at the City's sole and absolute discretion, forfeit the Proposal Bond/Security that accompanied the
Page 8 of 7
0 Thomas F Pepe, 2014
Q Thomas F. Pepe, 2014
4/28/2014
by the deadline set for within the solicitation, Fulfillment of all solicitation requirements listed is mandatory for
l 'derat'on of re ponse to the solicitation, Additional documents may be required and, if so� they will be
I s
identified in an addendum to this RFJ The response shall include the following 'items:
Bid Form
Proposal Bid and
N/A
Bond Power Attorney
4 r, M /.-
Performance of
BIDDER Qualification Statement
k"
Non- Collusion Affidavit
V/
Public Entity Crimes and Conflicts of Interest
V/"
Drug Free Workplace
Acknowledgement of Conformance with OSHA Standards
List of Proposed Subcontractors and Principal Suppliers
Related Party Transaction Verification Form
Indemnification and Insurance Documents
11 1 1 Jill I
MEMO' I I I I i I I I JIM I • M F! I �iii J
Submit this checklist along with your proposal indicating the completion and submission of each required forms
and/or documents.
Page 10 of 72
C')Thomas F, Pepe, 2014
4/28/2014
Steven Alexander
City Manager
City of South Miami
6130 Sunset Drive
South Miami, FIL 33143
Addendum No. 1 Dated: June 27, 2014
Addendum No, Dated:
Addendum No. Dated:
Addendum No, Dated:
Addendum No. Dated:
Addendum No. Dated:
Page I I of 72
0 Thomas F. Pepe, 2014
4[28,'2014
d. Respondent has given the City written notice of all conflicts, errors or discrepancies that it has
discovered in the Contract Documents and, if any conflicts, errors or discrepancies have been
found and notice given, the Respondent represents, by submitting its proposal to the City, that
the Respondent has received sufficient notice of the resolution thereof from the City, that such
resolution is acceptable to Respondent and that the Respondent waives any claim regarding the
conflicts, errors or discrepancies,
#3 N/A #7
#4 N/A #8
0 Thomas F Pepe, 2014
4/28/2014
M
M
A fee breakdown, if applicable, for each task must be completed in the table shown above. Failure to
complete this information shall render the proposal non-responsive,
5, The ENTIRE WORK shall be completed, in full, within 30 working days from the date stipulated in the
NOTICE TO PROCEED, Failure to complete the entire work during the described time period shall
result in the assessment of liquidated damages as set forth in the Contract,
RESPONDENT: -Gabriel Martinez
Address:
Telephone: 786 325 2759
Facsimile: _Z86-20&
Attention:
7. The terms used in this Proposal which are defined in the Contract shall have the same meaning as is
assigned to them in the Contract Documents, unless specifically defined in this RFP Package.
SUBMITTED THIS 03 DAY OF JULY 20 14
PROPOSAL SUBMITTED BY�
B Square Construction Management Group, LL C 7863252759
Company Telephone Number
Manager / Owner
—fit—le-
0 Thomas F. Pepe, 2014
4/28/2014
786 206 3087
Fax Number
info@b2cmg.com
Email Address
END OF SECTON
MOM=
STATE OF FLORIDA
COUNTY OF MIAMI-DADE
IN WITNESS WHEREOF, the above bonded parties have executed this instrument Linder their
several seals this - day of , 20__, the name and the corporate seal of
each corporate party being hereto affixed and these presents being duty signed by its undersigned representative,
Page 14 of 72
,()Thomas F Pepe, 2014
4/28/2014
SM
(individual or Partnership Principal)
(Business Address)
(City/State/Zip)
(Business Telephone)
Secretary (Corporate Surety)*
M3
*Impress Corporate Surety Seal
!M—PORTA.NT Surety companies executing bonds must appear on the Treasury Department's most current list
(circular 570 as amended) and be authorized to transact business in the State of Florida.
wounjawn MANIONVOWWWAM
Page 15 of 72
0Thomas F. Pepe, 2014
4/28/2014
KNOW ALL MEN BY THESE PRESENTS:
Page 16 of 72
CUThornas F Pepe, 2014
4/28/2014
No right of action shall accrue on this Bond to or, for the use of any person or corporation other than the
City named herein.
The Surety hereby waives notice of and agrees that any changes in or under the Contract Documents and
compliance or noncompliance with any formalities connected with the Contract shall not affect the Surety's
obligation under this Bond.
IN WITNESS WHEKEOF, the above bonded parties have executed this instrument under their several
seals on this — day of 20_� the name and the corporate seal of each
corporate party being hereto affixed and these presents being duty signed by its undersigned representative.
and Attorney -in -fact Signature)
STATE OF FLORIDA
COUNTY OF MIAMI -DADS
(individual, President, Managing Member or General Partner, etc.)
(Business Address)
(City/State( Zip)
(Business Telephone)
(President)
(Business Address)
(City/State/Zip)
(Business Telephone)
INSURANCE COMPANY:
BY:— (SEAL)
(City/State/Zip
M
On this, the _ day of _____,20 —, before me, the undersigned notary public of the State of
Florida, the foregoing performance be was acknowledged by (Corporate Officer),
(Title), of (Name of Corporation), a
(State of Incorporation) corporation, on behalf of the corporation.
WITNESS my hand and official seal.
Notary Public, State of Florida
Personally known to me, or
Personal identification:
Type of Identification Produced
Did take an oath, or — Did Not take an oath,
,0Thomas F Pepe, 2014
4/28/2014
(Name of Notary Public. Print, Stamp
or Type as commissioned.)
That, pursuant to the requirements of Florida Statute 255.01, et seq., Florida Statutes, we,
, whose business address is and whose
(individual, President, Managing Member or General Partner, etc.)
(Business Address)
(Business Telephone)
OR
(Corporate Name)
ATTEST:
(President)
Secretary (Business Address)
Page 18 of 72
(0 Thornas F Pejw, 2014
4/28/2014
IS THE PRINCIPAL AND
IN THE PRESENCE OF:
STATE OF FLORIDA
COUNTY OF MIAMI -DADE
(City/State/Zip)
(Business Telephone)
NSURANCE COMPANY:
On this, the _ day of 20 before me, the undersigned notary public of the State of
Florida, the foregoing payment bond was acknowledged by (Corporate Officer),
(Title), of (Name of Corporation), a
(State of Incorporation) corporation, on behalf of the corporation.
WITNESS my hand and official seal. Notary Public, State of Florida
NOTARY PUBLIC:
SEAL OF OFFICE: (Name of Notary Public; Print, Stamp
or Type as commissioned.)
Personally known to me, or
Personal identification:
Did take an oath, or
Did Not take an oath.
*Power of Attorney must be attached,
END OF SECTION
C
d Thomas F. Pepe, 2014
4/29/2014
2. List the last three (3) completed similar projects,
a) Project Name:
RMNIZZEM
Owner Telephone:
Original Contract Completion Time
(Days):
KINNSIM
Original Contract Completion Date: May 2, 2013
Actual Final Contract Completion
Date: May 2, 2013
Original Contract Price:
Actual Final Contract Price:
b) Project Name�
(0, Thomas F Pepe, 2014
4,"418/2014
$48,964,25
Sweetwater Parking
Owner Name- Jorge Ballarena
Owner Address: 8678 NW 58th Street or 1, FIL 33166
Owner Telephone: 786-295-8985
Original Contract Completion Time
(Days): 45 Days
Original Contract Completion Date: 4-2013
Actual Final Contract Completion 4-2013
Date:
Original Contract Price: $62,142.33
Actual Final Contract Price $62, 142,33
Owner Telephone:
Original Contract Completion Time
(Days):
Original Contract Completion Date:
Actual Final Contract Completion
Date:
Page 21 of 72
CO Thomas F Pepe, 2014
V28/21014
Original Contract Price:
Actual Final Conti-act Price:
3, Current workload
4, The following information shall be attached to the proposal,
a) RESPONDENT's home office organization chart,
b) RESPONDENT's proposed project organizational chart.
c) Resumes of proposed key project personnel, including on-site Superintendent.
5. List and describe any:
gy or against Ln onoenT or any
b) Any arbitration or civil or criminal proceedings, or
Suspension of contracts or debarring from Bidding or Responding by any public agency brought
c) against the Respondent in the last five (5) years
1. Government References:
V.; "Thomas F Pepe, 2014
V2812014
'0W"0r'NA'M''6
'Teloph on ' Nu
miber,',
r 4col"",
Fort Lauderdale Ex utive
Uity of Fort Lauderdale
Airport Expansion
3055920832
$360,000V
"0"
Phase 7
& Waste Managerrient Deet,
FDOT T-4358
8004352368
FDOT T-4382
FDOT
8663368435
I,III
Traffic Signal Installation,
=Dept.
305-592-0
----------------------------- -
Community We force Program
& Waste Manag_ernent
4, The following information shall be attached to the proposal,
a) RESPONDENT's home office organization chart,
b) RESPONDENT's proposed project organizational chart.
c) Resumes of proposed key project personnel, including on-site Superintendent.
5. List and describe any:
gy or against Ln onoenT or any
b) Any arbitration or civil or criminal proceedings, or
Suspension of contracts or debarring from Bidding or Responding by any public agency brought
c) against the Respondent in the last five (5) years
1. Government References:
V.; "Thomas F Pepe, 2014
V2812014
List other Government Agencies or Quasi-government Agencies for which you have done business within
the past five (5) years.
Name of Agency: FDOT
Address: 1000 NVV 111th Avenue Miami, FL 33172
Telephone No,: 786-278-0728
Contact Person: Armando Rodriguez
Type of Project: FDOT Push Button
Name of Agency: Miami-Dade County Public Works & Waste Management Dept.
Address:
Telephone No.:
Contact Person:
Type of Project:
Name of Agency:
Address:
Telephone No,:
Contact Person:
Type of Project:
0'rhornas F Pepe, 2014
4128/2014
111 NW 1st Street, 16th floor Miami, FL 33128
305-375-2960
GUI1IerMO Marrero
Intersections improvements
zla��
STATE OF FLORIDA
COUNTY OF MIAMI-DADE
Page 24 Q22
Fhornas F Pepe, 2014
4/28/2014
mmmflffl��
Page 25 of 72
(Q)Thomas F. Flepe, 2014
4/28/2014
The award of any contract hereunder is subject to the provisions of Chapter 112, Florida State Statutes.
Respondents must disclose with their Proposals, the name of any officer, director, partner� associate or agent who
is also an officer or employee of the City of South Miami or its agencies,
I understand that an "affiliate" as defined in Paragraph 287.133 (1) (a), Elorida -Statutes, means:
(a) A predecessor or successor of a person convicted of a public entity crime; or
(b) An entity under the control of any natural person who is active in the management of the entity
and who has been convicted of a public entity crime, The terrn "affiliate" includes those officers,
Page 26 of 72
CU Thomas F llepe, 2014
4�28/2014
Whenever two or more Bids or Proposals which are equal with respect to price, quality and service are received
by the State or by any political subdivisions for the procurement of commodities or contractual services, a Bid or
proposal received from a business that certifies that it has implemented a drug-free workplace program shall be
given preference in the award proces& Established procedures for processing tie Bids or proposals shall be
followed if none of the tied vendors have a drug-free workplace program, In order to have a drug-free workplace
program a business shall:
V Thomas F Pepe, 2014
4/28C ON
TO THE CITY OF SOUTH MIAMI
We, 6 "- (Name of CONTRACTOR), hereby acknowledge and agree that as
CONTRACTORs for the project as specified have the sole responsibility for compliance with all the
requirements of the Federal Occupational Safety and Health Act of 1970, and all State and local safety and health
regulations, and agree to indemnify and hold harmless the City of South Miami and against any and all liability,
claims, damages, losses and expenses they Tay incur due to the failure of (Sub-Contractor's names).
to comply with such act or regulation.
OThomas F. Pepe, 2014
4/28/2014
Witness
BIDDER shall list all Proposed Subcontractors to be used on this project if they are awarded the Contract.
Landscape Jenny Sod
7i 0 S.W. 1 i7 Avegnue
Miguel Marrero (305) 978-9601
pp
Sodding and Turf Work Jenny Sod
1715fl S.W. venue
Miguel Marrero (305) 978-9601
Miami Florida 33187
Electrical
Irrigation
Paving Arrow Asphalt Engineering
ST 1
3051 NW 29th
Fax 305-688-8484
Opa-locka, FL 330
Park Amenities
Graphics
Utilities
Excavation
Building
Structures
Plumbing
Painting
Testing Laboratory 71, INC
14005 NW 186th Street
Phone: 305-829-8922
Hialeah FL 33018
Fax: 305-829-8217
Soil Fumigator
Signs Miami Striping Inc
14025 SW 142nd Avenue
Phone: 305-235-7333
Miami, FL 33186
miaM,striping@yahoo.com
Other:
This list shall be provided to the City of South Miami by the apparent lowest responsive and responsible Bidder
within five (5) business days after Bid Opening.
Page 30 of 72
0 Thomas F, Pepe, 2014
4/28/2014
necessary use a separate sheet to supply additional information that will not fit on this line but make reference on
the line above to the separate sheet, i.e., "see attached additional information" and make reference to this
document and this paragraph on the additional sheet which additional sheet must be signed under oath). [See
Note #1 below]; and
I to ule aU% knowledge, Drope= or resource wh
contract with t t:�-Ufte d bFU,-Iw
we may not disclose or use information, not available to members of the general public, for our personal gain or
benefit or for the personal gain or benefit of any other person or business entity, outside of the normal gain or
benefit anticipated through the performance of the contract
r
.0 Thomas F. Pepe, 2014
4�2912014
(6) 1 and the Firm hereby acknowledge that we have not contracted or transacted any business with the City or
any person or agency acting for the City, and that we have not appeared in representation of any third party
before any
board, commission or agency of the City within the past two years other than as follows:
Page 32 of 72
tD Thomas R pipe, 2014
4f278/2014
I e person 7YRIs Term M
5 employees, the statement in this section shall be based solely on the signatory's personal knowledge and he/she is not
required to make an independent investigation as to the relationship of employees; if the firm is a publicly traded company,
Sec, BA- I - Conflict of interest and code of ethics ordinance.
Municode Page I OM
Sec. 8A- I . - Conflict of interest and code of ethics ordinance.
Page 33 of 72
0 Thomas F. Pepe, 2014
4/2812014
Page 34 of '7
CCI Thomas F. Pepe,: 014
4128%2014
Page 3S of 72
C'Fhoms F, Pepe, 2014
4[2 VZO 14
Page 36 of 72
C) Thomas F. Pepe, 2014
4/28/2014
(Ord, No 6-99-1680, § 2, 3-2-99)
Editor's note- Ord. No. 6-99-1680, § 1, adopted 3-2-99, repealed §§ 8A- I and 8A-2 in their entirety and replaced
than with new H
8A- I and 8A-2. Former §§ 8A- I and 8A-2 pertained to declaration of policy and definitions, respectively, and
derived from Ord, No. 634, §§ I (I A-1), I (IA-2) adopted Jan ...I 1, 1969,
OThom is R Pepe, 2014
4/2812014
WMA Lei AM J1, �+': �;
The City has considered the Proposal submitted by your firm for the Sunset Drive Downtown Median in
response to its advertisement for Request for Proposal and Instructions to Respondents.
lump sum amount of $ broken down as follows�
OUREITIMM
You are required by the Instructions to Respondents to execute the Contract and furnish the required
Performance Bond, Payment Bond, Insurance documents (see Proposal Submittal Checklist Form) within ten (10)
day from the date of this Notice to you.
If you fail to execute said Contract and to furnish said bonds or required Insurance documents within ten (10)
calendar days from the date of this notice, the CITY, at its sole and absolute discretion, shall be entitled to
disqualify the Proposal, revoke the award and retain the Proposal Bond/Security. Please be advised that if the
contract price exceeds $5,000,00 or if it is a multi-year contract requiring payment out of more than one year's
appropriation, the award and the contract must be approved by the City Commission before it is binding on the
City.
M
11,11111� 1111111111111 iiiiiiiii �111 III III ''I I'll Mir I!! Ill
OWN
Page 38 of 72
FhcaRnas F, Pepe, 2014
4/28/2014
MW
Sunset Drive Downtown Median
th
THIS CONTRACT was made and entered into on this - day of -, 20_, by and
between hereafter referred to as "Contractor", and the City of South Miami, hereafter
referred to as "Owner", through its City Manager, hereafter referred to as "City",
Page 39 of 72
(0 Thomas F, Pepe, 2014
4/28/2014
IN WITNESS WHEREOF, the parties hereto have executed this Contract on or prior to the day and date first
above written, in five (5) counterparts, each of which shall, without proof or accounting for the other counterpart
be deemed an original Contract.
WITNESSES: CONTRACTOR:
Signature:
Name:
(print name of Witness) Title:
(print name of Witness)
AUTHENTICATION:
CD Thomas K Pepe, 2014
4/28/2014
OWNER: CITY OF SOUTH MIAMI
Signature:
Steven Alexander
City Manager
Sunset Drive Downtown Median
Page 41 of 72
C Thomas F Pepe, 2014
4/28/2014
Page 42 of 72
C) Thomas F Pepe, 2014
4/28/2014
Page 43 of 72
Oc Thomas F Pepe, 2014
4/26fZO 14
!;;ommencement of ContEacLTime:
15 The Contract Time shall commence to run on the date stated in the Notice to Proceed.
StaqLing, -thePro`[act.
16 CONTRACTOR shall start to perform its obligations under the Contract Documents on the date the
Contract Time commences to run, No Work shall be done at the site (as defined in Article 1), prior to
the date on which the Contract Time commences to run, except with the written consent of the CITY.
Page 44 of 72
0 Thomas F. Pepe, 2014
4128/2014
i %;:ZjUI IL at, U IV k.Vl tMIM a reTrese-rmam
Representatives, CONTRACTOR and its Superintendent.
mmmalm
C' Thomas F Pepe, 2014
4/28/20 14
other data published by regulating agencies or accepted organizations, including but not limited to
Subsurface Conditigns:
4.3 The CONTRACTOR acknowledges that he has investigated prior to bidding and satisfied himself as to
the conditions affecting the Work, including but not limited to those bearing upon transportation,
disposal, handling and storage of materials, availability of labor, water, electric power, roads and
Page 46 of 72
Thomas F Pepe, 2014
4/28,12014
Page 47 of 72
OThomas F, Ilepe, 2014
4/2V2014
Page 48 of 72
CD Thomas F. Pepe, 2014
4/28/2014
I
O'Nomas F Pepe, 2014
4/28/2014
A-RIKLE k-- CONTRACDO-U -RESPONSIBILITIES
0 lK
'Dom as F Pepe, 2014
4/28/2Q 14
C�oqe r Q LmZ-5q b a qatrac to rs.
6.7 The CONTRACTOR shall not employ any Subcontractor, against whom the CITY or the
C.) Thomas F Pepe, 2014
4/28/2014
6,12A Discrimination: No action shall be taken by the any subcontractor with regard to the fulfilment of the
terms of the subcontract, including the hiring and retention of employees for the performance of Work
that would discriminate against any person on the basis of race, color, creed, religion, national origin, sex,
age, sexual orientation, familial status or disability, This paragraph shall be made a part of the
subcontractor's contract with the Contractor,
Electrical Peer and Li htin
6.16 Electrical power required during construction shall be provided by each prime CONTRACTOR as
required by it. This service shall be installed by a qualified electrical Contractor approved by the
CONSULTANT, Lighting shall be provided by the CONTRACTOR in all spaces at all times where
necessary for good and proper workmanship, for inspection or for safety. No temporary power shall be
used off temporary lighting lines without specific approval of the CONTRACTOR.
-Discrimination:
6.17A No action shall be taken by the Contractor with regard to the fulfilment of the terms of the Contract,
including the hiring and retention of employees for the performance of Work that would discriminate
against any person on the basis of race, color, creed, religion, national origin, sex, age, sexual orientation,
familial status or disability.
!axes:
6,18 Cost of all applicable sales, consumer use, and other taxes for which the CONTRACTOR is liable under
the Contract shall be included in the Contract Price stated by the CONTRACTOR.
c' Thomi
, s F. Pepe, 2014
V28/2014
mm��
C'Fhomas F. Pepe, 2014
C2812014
Sanitarx Pr visions:
5.31 The CONTRACTOR shall provide can -site office, and necessary toilet facilities, secluded from public
observation, for use of all personnel on the Work Site, whether or not in his employ. They shall be kept
in a clean and sanitary condition and shall comply with the requirements and regulations of the Public
Authorities having jurisdiction, They shall commit no public nuisance. Temporary field office and sanitary
facilities shall be removed upon completion of the Work and the premises shall be left clean:
EMMM
(O T'2 omas K Pere, 2014
V28/2014
6,37 The CONTRACTOR
departments, public utilities, public carriers, service companies and corporations (hereinafter referred
a "th'rd parties") owning or controlling roadways, railways, water, sewer, gas, electrical condui
telephone, and telegraph facilities such as pavements, tracks, piping, wires, cables, conduits, poles, guy
etc., including incidental structures connected therewith� that are encountered in the Work in order th
�> Thomas F Pere 2014
4129/2014
Page S6 of 72
0 Thomas 1. Pepe, 2014
4,'28/2014
Cait "s � resentative:
9.1 The C7N 11i TANT shall be the CITY'S representative during the construction permed. The duties and
responsibilities and the limitations of authority of the CONSULTANT as the CITY'S representative during
Page 57 of 72
Ct.' 'Morris F. Pepe„ 2014
Page 58 of 72
(O'Fhomas F. Ilepe, 2014
V-) 811-7014
LL _Consultant sppn5Abihti(zL,'
9J 1 The CONSULTANT will not be responsible for the construction means, methods, techniques, sequences
or procedures, or the safety precautions and programs incident thereto,
9.12 The CONSULTANT will not be responsible for the acts or omissions of the CONTRACTOR, or any
Subcontractors, or any of their agent, servants or employees, or any other person performing any of the
Work under or through them.
Page 60 of 72
(0 Fhoinas F, Ilepe, 2014
4/28,12014
V Thomas F. Pepe, 2014
4/28/2014
Page 62 of 72
C, The masF Pepe, 014
4/28/2014
Page 63 of 72
(unThomas F. Pepc, 2014
4/28/2014
1-0 Thomas F. Pepe, 2014
4/28/2014
(0 Fhomas F. Pepe, 2014
4/28112014
Page 66 of 72
(0 Thomas R Pepe, 2014
4/2812014
(O'rhomas F Pepe, 2014
4[28,'2014
ARTICLE LE 1 - 1V IVE QRY TRIAL
17.1 OWNER and CONTRACTOR knowingly, irrevocably voluntarily and intentionally waive any right either
may have to a trial by jury in Stag or Federal Court proceedings in respect to any action, proceeding,
lawsuit or counterclaim arising out of the Contract Documents or the performance of the Work
thereunder.
(0 Thomas F. Pepe; 2014
4/1$/21)14
193 If CONTRACCTOR or its subcontractor does not comply with a public records request,
provision have the right to enforce this contract provision by specific performance and the person who violates this
proceedings, incurred in all proceedings, whether administrative or civil court and in all appellate
ARTICLE 20 @ SEVERABILITY"
20.1 If any provision of the Contract or the application thereof to any person or situation shall to any extent,
be held invalid or unenforceable, the remainder of the Contract, and the application of such provisions to
persons or situations other than those as to which it shall have been held invalid or unenforceable shall
not be affected thereby, and shall continue in full force and effect; and be enforced to the fullest extent
permitted by lave.
IN WITNESS WHEREOF, the parties hereto have executed the General Conditions to acknowledge their
Inclusion as part of the Contract [documents on this day of '20—
WITNESSES: CONTRACTOR:
R:
Signature:
Flame:
Title:
AUTHENTICATION: OWNER: CITY OF SOUTH MIAMI
Signature; Signature.
Maria Menendez Steven Alexander,
City Clerk City Manager
Legality, and Execution Thereof:
Page 69 of 7
<'i Thomas F. Pepe, 20I4
V28f2014
alloaffiffim
Consultant: City's Designated Representative
Ricardo A, Ayala, RE,
Capital Improvement Project Manager
4795 SW 75 Ave 400
Miami, Fl. 33 155
Phone 305-403-2072
Fax 305-668-7208
B. Supplemental [definition: Work that does not conform to the Contract Documents includes work that is
unsatisfactory, faulty, or deficient or that does not meet the requirements of any applicable inspection, reference
standard, test, or approval referred to in the Contract Documents, or has been damaged prior to
CONSULTANT's recommendation of final payment (unless responsibility for the protection thereof has been
assumed in writing by CITY).
C Termination or Substitutiow Nothing herein shall prevent the CITY from terminating the services of the
CONSULTANT or from substituting another "person" as to act as the CONSULTANT�
D, Disputes If any dispute concerning a question of fact arises under the Conti-act, other than termination
ji,iii mi i ration of the
thi id in at
WOMEN
Men Lneveparutmm 171-51 Lim 707-7 -7-177-7777-01 11-1 -11
and send a written copy of 'its decision to the CONTRACTOR, which shall be binding on both parties,
F. Default Provision: In case of default by the CONTRACTOR, the City of South Miami may procure the
articles or services from other sources and hold the CONTRACTOR responsible for any excess costs occasioned
or incurred thereby
G. Secondary/Other Contractors The CITY reserves the right in the event the CONTRACTOR cannot
pwodi!W,v�� s from other
sources and deducting the cost from the Contract Price without violating the intent of the Contract,
H Assignment: The CONTRACTOR shall not transfer or assign any of its rights or duties, obligations and
under the terms, conditions and Drovisions of this Contract witho Her written consent
Ut
Page 70 of 72
('Thomas F. Pepe, 2014
VM2014
ON I
the assignee� tne assignee meets all ot the U I 'I's requirements e a soie saluSTaction aria executes au OT
the Contract Documents that were required to be executed by the CONTRACTOR..
L Plans for Construction: The successful CONTRACTOR r will be furnished four sets of Contract
Documents without charge. Any additional copies required will be furnished to the CONTRACTOR at a cost to
the CONTRACTOR equal to the reproduction cost.
Warranty/Guarantee,, CONTRACTOR shall act as agent, on a limited basis for the OWNER, solely for
41 Ut:b MN ULU �Idvlz VA%
inclusion as part of the Contract on this _ day of 20_,
WITNESSES: CONTRACTOR:
Signature:
Name:
mm
AUTHENTICATION: OWNER: CITY OF SOUTH MIAMI
Signature: Signatures
Maria Menendez Steven Alexander
City Clerk City Manager
Legality, and Execution Thereofi
Signature:
City Attorney
END OF SECTION
Page 71 of 72
Thomis F. Pepe, 2014
4/28/20
Im
NOTICE TO PROCEED
RM
PROJECT DESCRIPTION: <<PROJECT>> in accordance with Plans and Contract Documents as may be
prepared in whole or in part by < >'
You are hereby notified to commence Work in accordance with the Contract dated
on or before I You are to complete the work within 30 days. The date of
completion of all Work is therefore
City of South Miami
on this — day of 1 20—.
Page 72 of 72
K)Thomas F. Pepe, 2014
4/28/21014
Project Name: Sunset Drive Downtown Median
RFP NO, PW2014-05
Date: June 27, 2014
Sent: Fax/E-mail/webpage
This addendum submission is issued to clarify, supplement and/or modify the previously issued
Request for Qualifications (RFQ) Documents, and is hereby made part of the Documents. All
requirements of the Documents not modified herein shall remain in full force and effect as
originally set forth. It shall be the sole responsibility of the bidder to secure Addenda that
may be issued for a specific solicitation.
Please explain the responsibility of the Contractor as it relates to the installation of the irrigation
meter.
Miami-Dade County Water and Sewer (WASD) will install the meter. The Contractor must
prepare the site, dig the trench and cover the trench with a plate until WASD completes, the
installation of the meter. The Contractor must coordinate with WASD for the meter installation
and incorporate the work performed by WASD into the project tinteline.
Which permits are required to be pulled by the Contractor?
Answer t2_Qmesdon #2:
All permits are to be pulled and applied for by the Contractor. Permit fees will be waived for all
City of South Miami permits. The Contractor will be responsible for permit fees associated
with this project that are required by other govemment agencies or entities,
Page I aft
Are there any exceptions to possible delays to the project timeline that are out of the Contractors
control?
Should there be delays to the project timeline, the Contractor must inform the City's PM for this
project that the Contractor performed their "due diligence" with respect to timely coordination
with other government agencies and/or utilities. Should there be delays as a result of weather,
those weather delay claims will be investigated by the City's PM. In all cases, the PM will
determine if the delay claims have any merit and whether penalties will be imposed.
Please clarify the planting detail specifying a width of 3 times the rootball size, to fit within the
proposed raised median.
Answer Lo Question #4-.
Note For Clarification:
For clarification, the construction documents refer to 80 Hrs for Police officers as a basis. It is
the contractor's responsibility based on their means and methods to include within the bid ally
additional, hours, if required, for police officers. The contractor shall evaluate if the quantity is
adequate for their work approach and if not, to include the estimated fee within their proposal,
Page 2 -oft
5
/
\�
\
� ?
d #
� d
\ �
\ \
� \
�
W�
%
&
�-
_
%
�
5�
�«
«9:
�
�
m
0
m
%
CL
« »9.
\ \
QJ
0
\�»
» <.
\\ \ \
I
cr
CL
�
�
m
0
m
%
CL
« »9.
\ \
QJ
0
\�»
» <.
\\ \ \
I
Gabriel Martinez
31001 iW 17'ri, Street 0 Nfian-n, FL 33125-1908 * Cell (786) 325-2759
Results-driven construction and project manager with over five years of construction experience as a
superintendent and construction manager relating to roadway construction. Successful business owner of
B Square Construction Management Group, LLC for over a year in the South Florida market. Recently
graduated Florida International University, 01-IL School of Construction obtaining a bachelors degree in
Construction Management,
Professiona Em)erience
Feb 2013 — Present B Square Construction Management Group LLC Nfiarn; FL
2010 — Feb 2013 Pontifex Construction Group, Inc. Nfiarni, R.
Cell (786) 325-2759 * E- ail info @b2crn9,com
310 0 NW 17" Street & Miami, Fl 33125-1908 * Phone (305) 633-3355
2009-2010 Pontifex Construction Group, Inc. Nfiarm, FL
• Interned as an Estimator and Project Manager
• Attended Pre-Bid and Pre-Construction Meetings
• Assisted in the management of projects
• Involved with daily operations
• Tasked with Submittals, RFI's and Organization
Nfia -Dade Counq, General Engineering — Paving Engineering Contractor #E1400204
Florida Certified General Contractor — CC' , C 1522260
FDOT Maintenance of Traffic
EE0 Officer
OSHA 30 Hour Certification
Educadon
Primavera, On-Screen Takeoff, Auto-Cad, Bilingual, Business Development, Project Planning and
Management, Team Building and Leadership, Intuit QuickBooks
References available upon request
Cell (786) 325-2759 * E- Mail info@b2cmg.com
310 0 NW 17" Street * M6 ami, Fl 33125-1908 * Phone (305) 633-3355
Ij' Square Construction Management Group, LLC
Previous Completed Projects
5. SW 54" Place
20526 SW 54" Place
Project Cost: $6,000400
Previous Completed Projects
I. Financial Project ID: 414636-1-52-01
State Road A 1 511, Street from West Avenue to Collins Avenue
Project Cost: $585,000.00
2. Financial Project ID: 407633-3-52-01 and Financial Project ID: 428482-1-52-01
Sate Road No, 953 / SW 4-2 Ave / Lejunc Rd. From SR-5/U5 -1 to SR-90/SW 8 Street
Project Cost: $463 485.00
I FENfA Signal Replacement Project 20100375
NW 11 St & NW 8 St Rd,, NW 32 Ave & NW 46 St, NW 30 Ave & NW I I St
Project Cost: $56,201.00
4. Financial Project 11). 422990-1-52-01
State Road No. 802 / Lake Worth Road (From East of SR 807 / Congress Avenue to West of Lake
Osborne)
Project Cost: $398,852.27
5. Bid Number: 201207092012
CDBG - Miami-Dade County, Sidewalks and Curbs - City of West Manh
Project Cost: $82,778.43
6. Financial Project ID: 418027-1-58-01, City Project No.08-15
84th :Avenue Greenway Improvements Project
Project Cost® $596,851.77
7. Financial Project ID: 423007-1-52-01
S11 -A1 A from Cordova Road to a Pt W of Eisenhower Blvd,
Project Cost: $51,301.84
S. Financial Project ID: 423000-1-52-01
SR -All (Oakland Park Blvd. to Flamingo Road)
Project Cost: $263,521.84
9. Financial Project ID: 424666-1-52-01
SR 70 (Commercial Blvd) From SR 817 (University Dr to A Pt, W of NW 64th Ave)
Project Cost: $302,851.95
10. Financial Project ID: 423000-1-52-01
SIGNAL TECHNOLOGY, INC- FIRE RESCUE STATION #5 EMERGENCY TRAEFIC
SIGNAL
Project Cost: $32,054.57
11. Kendall Drive & 162 Ave Safety Improvement
Project Cost: $27,521.00
12. Financial Project ID: 427502-1-52-01 and Financial Project ID: 427502-1-56-01
SW 88th ST / Kendall Drive from SR 821-SB (off-ramp) to SR 821-NB (off-ramp)
Project Cost: $189,258.46
13. Financial Project ID: 426851-1-52-01 and Financial Project ID: 426852-1-52-01
Sunrise Blvd,
Project Cost: $308,951.77
14, SUU Push Button, SW 88di s'r & 152 Ave.
Project Cost® $30,249.00
15. S Push Button, US1 & 312st Crosswalk Modification
Project Cost: $27,237.43
16. Financial Project ID: 425348-1-52-01 and Financial Project ID: 425348-1-56-01
SR-5 (US-1) From SW 168 Street to a Pt N of SW 136 Street
Project Cost: $128,873.00
17. Financial Project ID: 428488-1-52-01
Kendall Dr. from SW 7q,h'Ik-VC. to SW 73,d Place
Project Cost: $84,348.17
Professional .
B Square Construction Miami, FL
Management Group, LLC
RIBRON _
,� a �r « «•
Cargoes Trading Inc, Miami, F
Wine & Spirits Division
1992 ®- Present Property Manager Miami, FL
ii (3 05) 1 -7396 - ii rt99 45bells � th. net
31 " Street Miami, F133125 -19 Phone (305) 491 -7396
B Square Construction Management Group, LLC
Previous Completed Projects
1. Poinciana —Phase 1
8700-8732 SW 5th Street Nfianai, FL 33174
Project Cost. $3,300.00
2. Poinciana —Phase 2
8700-8732 SW 51h Street.Nfiarrii, FL 33174
Project Cost: $48,964.25
3. Sweetwater Parking
8678 NW 58th Street Dural, FL 33166
Project Cost: $62,142.33
4. Dollar General Belle Glade
890 S Main St Belle Glade, PL 33430
Project Cost: $7,400.00
5. SW 54t" Place
20526 SW 54h Place
Project Cost: $6,000.00
XOGER WAYNE NEWMAN,
rwneWMAn1ZQ@hptp1g!!j�pM
(305) 467-4462
SUMMARY OF EXPERIENCE
Twenty-seven years experience in Construction Project Management as a Prime Contractor, Resident Engine
and Owner's Representative, Certified General Contractor and Certified Underground utility & Excavatick
a
Contractor, both in Florida, Professional (Civil) Engineer with active registration in Florida and Californ
Masters of Science degree in Construction Management from Stanford University.
Project Manager for General Contractor (Educational Facilities) — Signa Consulting- 1998-1999
Managed a team of Project Engineers, and Superintendents on Miami-Dade School Construction Projects under
their Construction Manager at-Risk and Design-Build Contract delivery mechanisms,
Managed subcontractors for twenty medium-sized Wastewater Pump Station, Force Main, and Potable Water
Main installation projects, as part of Miami-Dade County's Miscellaneous Pump Station Improvement Project,
Prepared and negotiated Change Orders for Extra Work and Delays on behalf of Subcontractors,
Managing member — TPOC, LLC: 2011-2013
Supported Contractors and Private Owners with Project Management services including Estimating and
Budgeting, Bidding, Project Controls and Scheduling, Product and Equipment Submittals, Payment Processing,
Change Management, and Project Closeout,
&ESIDENT ENGINEER
Resident Engineer for ALE Wolfberg, Alyarez & Eartxers 20ni -71
11 P a6 e
ROGER WAYNE NEWMAN, P.E.,
rwnewman32 Tilhotmail.
(305) 467-4462
1`11111111:11 qil�ilii ii 1 lil�
1111, 1"1 Jill
RESIDENT PROJECT REPRESENTATIVE
Resident Project Representative for Surety— The St Paul Surety: 1999-2001
Resident Project Representative on South Broward County Neighborhood Improvement Project on behalf of the
Surety responsible for completion of a project where the original Contractor had been terminated by the Owner,
OWNER'S REPRESENTATIVE
Construction Manager for Municipal Utility — Los Angeles Department of Water & Power: 1987-1995
Managed project teams of Architects, Engineers, and General Contractors to successfully complete seven
construction Contracts on a variety of over facilities.
EDUCATION
Stanford University, CA — M.S. Civil Engineering - Construction Management emphasis (1987)
Stanford University, CA — B.S. Civil Engineering (1986)
EROFESSIONAL LICENSES
Certified General Contractor — Florida License No. CGC059626 (1998)
Certified Underground Utilij-� & Excavation Contractor — Florida Lice iae-N-xmQ&W��'z*4c3)
Professional Engineer in Civil Engineering - Florida License No. 70519 (2009)
Professional Engineer in Civil Engineering - California License No. 46766 (1991)
fflxnz�.�
Microsoft Office Applications: Proficient in Excel, Word, PowerPoint, Vision, and Outlook
Program Management Information Systems: Proficient with e-Builder Construction Program Management
Software
CPM Scheduling: Proficient with Primavera P3 & Microsoft Project
2 P a g e
jp; I
M.
�
�
to
m
MIAMI-DADE COUNTY
PUBLIC WORKS DEPARTMENT
Ill NW 1ST' STREET, SUITE 1510
MIAMI, FL 33128
(305) 375• 2705
CONTRACTOR'S BUSINESS CERTIFICATE OF COMPETENCY
ISSUED MAY 01, 2014
THIS IS TO CERTIFY THAT B SQUARE CONSTRUCTION MANAGEMENT ROUP LLC
0007 PAVING ENGINEERING
WITH ALL WORK TO BE DONE UNDER mE SUPERVISION, DIRECTION AND CONTROL
OF QUALIFYING AGENT MARTINEZ GABRIEL S,S,N - -4735
ALTERATION, REPRODUCTION OR TRANSFER OF THIS CERTIFICATE IS PROHIBITED,
JULIANA H, SALAS, P,E,
SECRETARY, CONSTRUCTION TRADES QUA-LIFYING BOARD
B SQUARE CONSTRUCTION MANAGEMENT GROG
3100 NW 17TH ST
MIAMI FL 33125
c',« 2 \
The EIPTAIC above MOlis
d For awo Inforourfloo, ■
DATE (MMIDD
ACC>RE0 CERTIFICATE OF LIABILITY INSURANCE p
R
0613012014
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,
EXTEND ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER,
IMPORTANT If the certificate holder Is an ADDITIONAL INSURED, the policy(les) must be endorsed. If SUBROGATION IS WAIVED, subject to
the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the
certificate holder in lieu of such endorsoment(s);
PRODUCER
NAPd}E: Arai Medtrla
Emmanuel Insurance & Associates, Inc.
PHONE (305) 693-0003 gip„ Rd� (305) 691 4381
2370 E 8TH AVE
E-MAii
ADDRESS: tae( ein anuelinsurance,corn
INSURER(S) AFFORDING COVERAGE NAIL.:#
HIALEAH FL 33013 -4236
INCUR A United Specialty insurance Company 12537
INSURED
INSURER B : Progressive Express Insurance Company 10193
INSURER C r RetailFlrst Insurance Company 10700
B SQUARE CONSTRUCTION MANAGEtu ENT GROUP, LLC
INSURER D:
:
3100 NW 17TH ST
-.—
INSURER E
_ _ - - -- - — - -
MIAMI FL 33125 -1908
_
1 INSURER F;
COVERAGES CERTIFICATE NUMBER:
REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMES? ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE
BEEN REDUCED B`! PAID CLAIMS.
lhYSR _d............,..._..._.._ ...,w..______..... .._._.... ..... AWE SUOR
LTR TYPE OF INSURANCE NSR MD POLICY NUMBER
P Li Y EFF P0LtCY XP _....
LIMITS
GENERAL LIABILITY
EACH OCCURRENCE $ 1,000,000.00
COMMERCIAL GENERAL. LIABILITY
_..__
PREMSES Ea:raccurr6nr.8 $ 50100"o
CLAIMS -MADE X OCCUR
MED EXP (Any one person) .$ 5`.60?O.0 0
A Y Y 584582
0613012014 06/30/2015 PLRsONAL & ADV INJURY $ 1,000,000:00
GENERAL AGGREGATE $ 2,000,000.00
GEN'L AGGREGATE LIMIT APPLIES PER:
PRODUCTS - COMP/OP AGG $ 2,000,000.00
PRO- CYC
POLICY T L
$
AUTOMOBILE LIABILITY
Eccide a 7 IN L LIMt $ 1,000,000.00
a accident _
ANY AUTO
BODILY INJURY (Per person) $
B ALL OWNED
AUTOS
SCHEDULED 02206511 -1
AUTOS
0511412014 � 0511412015 BODILY INJURY (Per accident) $
X
NON -OWNED
13REOFETYDAMAGE $
HIRECYAUTOS
AUTOS
Per accident _.
$
UMBRELLA C.PAB
OCCUR
EACH OCCURRENCE
EXCESS:L €AB
CLAIMS - MADE:
AGGREGATE
.. y.._...._
._
,.._..._.._E
___..__.____
GED _ i2ETENTION $
$
WORKERS COMPENSATION
WC STATtI- OTH-
AND B PC.OYERS " "LiA88LI7Y
Tf>RY LIh_l ER _.......__..:.... _ .._,_.____
ANY PROPRIETORIPARTNERIEXECUTIVE (YIN
OFFICERIMEMBEREXCLUDED? NIA 0520 - 44854 -0
E.L. EACH ACCIDENT $ 1,000 000.00
06/07/2014 06/07/2015 _.
(Mandatary In Nm L_.__I
E.L: DISEASE.. EA EMPLOYE $ I,OC)C) „C }OO.C;Ci
It S describe under
DESCRIPTION OF OPERATIONS below
_ _
E.L. DISEASE - POLICY LIMIT $ 1.066.666.06
DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (Attach ACCIRD 101, Additional Remarks Schedule, If more spate is required)
General Contractor.
City of South Miami is listed as an additional insured with respects to general Liability
policy.
CERTIFICATE HOLDER
CANCELLATION
City of South Miami
6130 Sunset Drive
SHOULD ANY OF THE ABOVE, DESCRIBED POLICIES BE CANCELLED BEFORE
South Miami, FL 33143
THE EXPIRATION BATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISION
AUTHORIZED REPRESENTATIVE
G 1988 -2010 ACORD CORPORATION, All rights reserved.
r+ a% U k4u nnvug ► he ACORD name and Ingo are registered marks of ACORD