Loading...
Attachment - 2 Letter of IntentShubinBass4 PROFESSIONAL ASSOCIATION VIA HAND DELIVERY Ms . Jane K. Tompkins Planning Director City of South Miami 6130 Sunset Drive South Miami, Florida 33143 JTompkins@southmiamifl.gov October 16, 2017 Re: Letter of Intent -Redevelopment of The Shops at Sunset Place Property: 5701 SW 72 Street, South Miami, Florida Folio No.: 09-4025-031-0060 Dear Ms. Tompkins: We represent the owner of the above-referenced property -FRIT Shops at Sunset Place Fee Owner LLC (the "Owner"). Please consider this correspondence -together with the enclosed materials -the Owner's submittal for review by the Planning Board of the above referenced applications (the "Planning Board Submissions"). The Planning Board Submissions reflect a series of technical program refinements and improvements as well as a program adjustment to accommodate the addition of a modest, internal office component. None of the proposed office space will be located on the ground floor. We are quite excited about the addition of office to our program. We believe that our office component will help energize the downtown area and drive business to the local shops and restaurants during the workday. As we explained in our application materials, the Owner proposes a transformational redevelopment of The Shops at Sunset Place designed to inject life and dynamism into this underperforming but very important location. In short, the Owner proposes to create a lively-mixed use urban district featuring substantial public realm improvements, the addition of a significant residential component, accompanied by hotel, retail, restaurant, office and rooftop uses (the "Project"). The precise details of the Project and the specific entitlement requests are all set forth in our application materials. For your ease of reference, however, we briefly summarize the main 46 SW 1st Street, 3rd Floor I Miami, Florida 33130 I Shubin8ass,com I Tel 305 381 6060 I Fax 305 381 9457 Page 2 of4 features of the development program and highlight our specific public hearing requests below. Development Program The Project is designed in two phases along the property's north and south sides. Phase I will re-invigorate and renew the existing shopping center on the southern section of the property through strategic and selective demolition together with the substantial re- design of the existing commercial space. Phase I will also include the introduction of approximately 32,840 square feet of office space. Phase II involves the complete demolition of the structures within the northern portion of the property and the construction of three new buildings : two residential buildings with approximately 414 units and a hotel with approximately 182 hotel rooms. The existing and proposed development plans are summarized below: Land Use Existing Development Proposed Development Shopping Center 524,180 SF 440,149 SF (Including 4,000 seat theater) (Including 4,000 seat theater) Office 15,000 SF 32,840 SF Condominium 40DUs 40DUs Apartment -414DUs Hotel -182 Rooms In addition to the development plans detailed above, the Project also includes significant public realm improvements -including the creation of new public spaces and an improved network of sidewalks. We are building a new, approximately 15,000 square feet, public gathering "square" at the intersection of San Remo and Red Road as well as an approximately 7,400 square foot public plaza at Red Road and South Dixie Highway. Public Hearing Requests As more particularly set forth within our attached Exhibit A, the Project contemplate the following City actions and approvals: ShubinBass~ PROFESSIONAL ASSOCIATION 46 SW 1st Street. 3rd floor I Miami, Florida 33130 Page 3 of4 • Request 1: Small scale text amendment to the City's Comprehensive Plan (the "Comp Plan Amendment"); • Request 2: Small scale map amendment to the City's Future Land Use Map (the "FLUM Amendment"); • Request 3: Text amendment to the City's Zoning Code (the "Zoning Code Text Amendment"); • Requests 4 and 5: Map amendments to the City's Official Zoning Map (collectively the "Zoning Map Amendment"); • Request 6: Initial Site Plan approval for the Project (the "Site Plan"); and Public Outreach In advance of our public hearings before the City, the Owner has engaged in substantial public outreach and community engagement. Neighborhood and community meetings occurred on the Property on the following dates: • November 12,2016 • February25,2017 • March 25, 2017 • May 20, 2017 • August 2, 2017 Our professional design team includes Zyscovich Architects, Dover, Kohl & Partners, LAND Landscape Architects, Street-Works Studio, and David Plummer & Associates. In addition to undersigned counsel our legal team also includes Joseph G. Goldstein, Esq. and Ines Marrero-Priegues, Esq. from the law firm of Holland & Knight. We provide the following additional application materials together with this Letter ofIntent: • Project Narrative and Overview dated October 16,2017; • Design Concept Exhibits dated October 16, 2017; • Shops at Sunset Place Parking Study dated October 16,2017; • Sunset Place Traffic Study prepared October 2017; and • Sunset Place Valet Operations Plan. Sh u bi n Bass-:i PROFESSIONAL ASSOCIATION 46 SW 1st Street, 3rd Floor I Miami. Florida 33130 Page 4 of4 The Project Narrative and Overview describes and illustrates the urban concepts that animate the technical Design Concept Exhibits. Although we have divided these submissions into two booklets for your ease of review they are intended to be read together. We reserve the right to amend and supplement these application materials as needed throughout the City review and approval process. On behalf of our entire team, we look forward to working with the City and you on this exciting, trans formative Project. As always, please do not hesitate t ct me if you have any questions concerning this correspondence. CC (via email without enclosures): Mr. Steven J. Alexander, City Manager (SAlexander@southmiamifl.gov) Mr. Marcus Lightfoot, Zoning Review Coord. (MLightfoot@southmiamifl.gov) Ms. Ines Marrero-Priegues, Esq. (Ines.Marrero@hklaw.com) Mr. Joseph G. Goldstein, Esq. (Joseph.Goldstein@hklaw.com) Mr. Alex David (ADavid@cgasolutions.com) Ms. Emily Vaughan (evaughan@shubinbass.com) Mr. George Spillis (gspillis@grassriver.com) ShubinBass-:i PROHSSIONAL ASSOCIATION 46 sw 1st Street. 3rd Floor I Miami. Florida 33130