Loading...
07-1196-078• = 614L b ilR 1 7 1 01, 7 LL MUA-1 71 /,-, ".'N 4 -J, ---- —7 - - - - -- ... ..... ... . THIRD FL OOR PLUMBING PLAN L - ---------- (27 TONS) 1 Fll 7 HP-2 11/2-GAS 11 /rCD + L 11/4-CD 11/2"GAS - - -- ---------- . ............ L.--.L - - ----------- 2 i (27 TONS) NORTH SCALE 1/4 0 = f2l SECOND FLOOR PLUMBING PLAN 0060 •r• : • • : * 0 g u 0 0 0 0 • 0 0 PLAN NOTES a 0 0 a 0 0 0 El 11 /2" GAS TO NEW MECHANICAL EQUIPMENT (270 CFH). 11/2- GAS ON - SEE SHEET P-4 FOR CONTINUATION. 11/2- GAS ON, 11le CONDENSATE TO NEW MECHANICAL UNIT WITH TRAIN VENT. 11/4' CONDENSATE DRAIN ON. F61 11/4" CONDENSATE DRAIN ON - SEE SHEET P-4 FOR CONTINUATION. EflNEW MECHANICAL EQUIPMENT - SEE MECHANICAL DRAWINGS. F±l APPROXIMATE.Y 330 FT FROM EXISTING GAS METER - GAS PIPING IS SIZED ON 350 FT • 7" W.C. PRESSURE (1/4 PSI). RA SUSHI CORPORATION El 11/2* GAS UP. 5COTTSDALE, AZ Fl—ol 11l4" CONDENSATE DRAIN UP. I I CONDENSATE SIZING TABLE PIPE SIZE CAM9Y IN T S OF REFRIGEM110N 3/4* UP TO 3 TONS in 4 TO 20 TONS ll/r 21 TO 90 TONS 11/2w 91 TO 125 TONS 2p 126 TO 250 TONS GENERAL NOTES I. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS & EXACT SIZE, DEPTH, LOCATION, & CONDITION OF ALL EXISTING UTILITIES PRIOR TO THE START OF ANY NEW WORK - CONTRACTORS BID SHALL REFLECT ALL EXISTING SITE CONDITIONS. 2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE START OF ANY NEW WORK 3. PROVIDE QUICK DISCONNECT SWIVEL GAS HOSES AT ALL GAS FEED MOVABLE ApIqjq4CES. CRO ENGINEERING GROUP, INC. NORTH 18652 Florida Street, Suite 150 Huntington Beach, CA 92648 SCALE P 714 847- -7100 F 714)841 -6000 ty )NIP f1di, j 14"r 0 0 12-22-OG ■ REVISIONS C) R/ Q 0 (s) ❑ OG. 15.07 15t LANDLORD 5UBMITTAL ❑ 08.21 .07 15t CITY SUBMITTAL ❑ DATE ❑ DATE 5829 5W 73RD 5T SOUTH MIAMI, fl-