07-1196-078•
= 614L
b
ilR
1 7 1
01,
7
LL
MUA-1
71 /,-, ".'N
4
-J,
----
—7 - - - - --
... ..... ... .
THIRD FL
OOR PLUMBING PLAN
L
- ----------
(27 TONS) 1
Fll 7 HP-2
11/2-GAS
11 /rCD
+
L
11/4-CD
11/2"GAS - - -- ----------
. ............
L.--.L - - -----------
2 i (27 TONS)
NORTH
SCALE
1/4 0 = f2l
SECOND FLOOR PLUMBING PLAN
0060 •r•
: • • : * 0 g u 0 0 0 0 •
0 0
PLAN NOTES
a 0 0 a 0 0 0
El 11 /2" GAS TO NEW MECHANICAL EQUIPMENT (270 CFH).
11/2- GAS ON - SEE SHEET P-4 FOR CONTINUATION.
11/2- GAS ON,
11le CONDENSATE TO NEW MECHANICAL UNIT WITH TRAIN VENT.
11/4' CONDENSATE DRAIN ON.
F61 11/4" CONDENSATE DRAIN ON - SEE SHEET P-4 FOR CONTINUATION.
EflNEW MECHANICAL EQUIPMENT - SEE MECHANICAL DRAWINGS.
F±l APPROXIMATE.Y 330 FT FROM EXISTING GAS METER - GAS PIPING IS SIZED ON 350 FT • 7" W.C.
PRESSURE (1/4 PSI). RA SUSHI CORPORATION
El 11/2* GAS UP. 5COTTSDALE, AZ
Fl—ol 11l4" CONDENSATE DRAIN UP. I I
CONDENSATE SIZING TABLE
PIPE SIZE CAM9Y IN T S OF REFRIGEM110N
3/4* UP TO 3 TONS
in 4 TO 20 TONS
ll/r 21 TO 90 TONS
11/2w 91 TO 125 TONS
2p 126 TO 250 TONS
GENERAL NOTES
I. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS & EXACT SIZE, DEPTH, LOCATION, & CONDITION
OF ALL EXISTING UTILITIES PRIOR TO THE START OF ANY NEW WORK - CONTRACTORS BID SHALL REFLECT
ALL EXISTING SITE CONDITIONS.
2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE START OF ANY NEW WORK
3. PROVIDE QUICK DISCONNECT SWIVEL GAS HOSES AT ALL GAS FEED MOVABLE ApIqjq4CES.
CRO ENGINEERING
GROUP, INC.
NORTH 18652 Florida Street, Suite 150
Huntington Beach, CA 92648
SCALE P 714 847- -7100
F 714)841 -6000
ty
)NIP
f1di, j
14"r
0
0 12-22-OG
■ REVISIONS
C)
R/
Q 0
(s)
❑ OG. 15.07
15t LANDLORD 5UBMITTAL
❑ 08.21 .07
15t CITY SUBMITTAL
❑ DATE
❑ DATE
5829 5W 73RD 5T
SOUTH MIAMI, fl-