07-1196-057SPECiRCAT�ONS
(4) ALL EQUIPMENT AND SYSTEMS SHALL BE RUN THROUGH THEIR
CYCLE TO CHECK FOR CORRECT WIRING AND SEQUENCING.
(5) ALL INSTRUMENTS, FORMS AND PROCEDURES SHALL MEET THE
REQUIREMENTS SET FORTH BY THE NATIONAL ENVIRONMENTAL
BALANCING BUREAU (N.E.B.B.).
(6) COPY OF BALANCE REPORT SHALL BE SENT TO THE ARCHITECT
OR OWNER.
F. EQUIPMENT — AS SPECIFIED ON THE PLANS
G. AIR DISTRIBUTION — AS SPECIFIED ON THE PLANS
H. WARRANTY
(1) THE ENTIRE AIR CONDITONING AND VENTILATION SYSTEM TO BE
FREE OF DEFECTIVE WORKMANSHIP AND MATERIALS FOR A
PERIOD OF ONE YEAR FROM DATE OF START --UP.
(2) EQUIPMENT FURNISHED AND INSTALLED BY THE AIR CONDITIONING
CONTRACTOR SHALL CARRY MANUFACTURERS REPLACEMENT PART
WARRANTY FOR A PERIOD OF ONE YEAR FROM THE DATE OF
START —UP.
(3) ALL AIR CONDITIONING COMPRESSORS FURNISHED AND
INSTALLED WILL CARRY AN ADDITIONAL FOUR YEAR
MANUFACTURERS REPLACEMENT WARRANTY AT EXPIRATION OF
ORIGINAL ONE —YEAR WARRANTY.
(4) THE EQUIPMENT WARRANTIES ARE BASED UPON PROPER AND
NORMAL MAINTENANCE OF THE EQUIPMENT DURING THE
WARRANTY PERIOD BY A QUALIFIED, LICENSED AIR
CONDITIONING COMPANY, REGULARLY ENGAGED IN THE
SERVICE AND MAINTENANCE OF AIR CONDITIONING EQUIPMENT.
I. SUBMITTALS AND SUBSTITUTIONS
(1) THE AIR CONDITIONING CONTRACTOR SHALL FURNISH SIX (6)
SETS OF COMPLETE PROJECT SUBMITTALS TO THE ARCHITECT FOR
APPROVAL, (FULLY BOUND AND INDEXED ONLY, PARTIAL AND / OR
"LOOSE — LEAF" WILL BE REJECTED & DISCARDED WITHOUT REVIEW)
(2) SUBMITTALS SHALL CLEARLY INDENTIFY ALL MAKE AND MODEL
NUMBERS OF ALL HVAC RELATED EQUIPMENT, COMPONENTS,
MATERIALS AND ACCESSORIES TO BE INSTALLED ON THE PROJECT.
(3) ALL ALTERNATE EQUIPMENT, COMPONENTS OR MATERIALS SHALL BE
INDENTIFIED AS "SUBSTITUTION ". ONLY APPROVED SUBSTITUTIONS
SHALL BE PERMITTED. APPROVED SUBSTITUTIONS WHICH RESULT
IN ADDITIONAL EXPENSE TO OTHER TRADES SHALL BE AT THE
EXPENSE OF THE AIR CONDITIONING CONTRACTOR
DUCT TO TERti
EXTERIOR WALI
WEATHER BROI
S.S. SCREEN i
E
6" HIGH LEVEI
HOUSE KEEPIN
REQUIRED
4_ H a 2-11;
EXTERIOR WALT
Oa Oet-o"M r-Zs viaay teVi !N $UYIY DOt IIEI atY7k
t-aw yaJiicNy WOO JIAAIMNMY S-us vo#*Y W O N 61ZYLW
U04P3 V66L a Iealurgaayy Y -avi iopoo i3AAfWAAY
l��RiSiy
= m euellewnlu ""f uo� ; eolue as
W-Z6-LLV#Y3w � NVAJN � m I I .l P3t65L 1 W P!
leu
g3lmseildwoo 1411m W-xs-LMV3VY `94wi? S 3
sepdwoo yl!m wildwoD QUsa;te1
0 d 0 O '8 t9!m
S*ildwoC)
el ue "I /i X Iz /G t x "%L
�1
_. poi Ja uau Jejewalp .1/e 'ulW
A. — DUCTWORK
B.
INSULATION
(1)
GAUGE AND CONSTRUCTION: GALVANIZED SHEET METAL IN
(1) DUCT LINING: ALL SUPPLY AIR AND RETURN AIR DUCTWORK
E
ACCORDANCE WITH RECOMMENDATIONS OF S.M.A.C.N.A. FOR
AND PLENUMS EXPOSED ON ROOF AND EXTENDED BELOW ROOF
GaM lonCl ,IalseVywy Sie gel OWL
LOW VELOCITY DUCTWORK, LATEST EDITION AND TO COMPLY
LINE TO BE LINED WITH 1 1/2" THICK, 1 1/2 LBS. DENSITY FIBERGLASS
9
WITH ALL NATIONAL AND LOCAL CODE REQUIREMENTS.
DUCT —LINER FACED WITH BLACK FIRE — RESISTANT COATING
(2)
GREASE EXHAUST DUCTWORK: SHALL BE WELDED GALVANIZED
MEETING REQUIREMENTS OF N.F.P.A. 90A AND INSTALLED AS PER
z
SHEET METAL GAUGE AS INDICATED ON THE DRAWINGS AND
MANUFACTURER'S RECOMMENDATIONS. DUCT DIMENSIONS
C1NE103 1
INSTALLED PER N.F.P.A. 96., (16 GA MINIMUM)
SHOWN ON THE DRAWINGS BY (L) ARE FULL SHEET METAL SIZE
(3)
PAINTING: ALL DUCTWORK VISIBLE THROUGH OPENINGS SHALL
WITH ALLOWANCE FOR DUCT —LINER THICKNESS. DUCT WITHIN
BE PAINTED FLAT BLACK PAINT OR INTERNALLY LINED WITH APPROVED
CONCEALED SPACES WHICH HAS BEEN INDICATED WITH (L) SHALL BE
TYPE BLACK FACED DUCT — LINER, (CONTRACTOR'S OPTION)
LINED WITH 1" THICK, 3/4 LBS. DENSITY FIBERGLASS DUCT —LINER
(4)
FLEXIBLE DUCT:
FACED WITH BLACK FIRE — RESISTANT COATING MEETING REQUIREMENTS
OF N.F.P.A. 90A AND INSTALLED AS PER MANUFACTURER'S
(A) MATERIAL: PRE — INSULATED FLEXIBLE FIBERGLASS AIR
RECOMMENDATIONS
DUCT, ENCASED IN A VAPOR BARRIER JACKET, K FACTOR
(2) DUCT WRAP: ALL SUPPLY AIR AND RETURN AIR
OF 0.24 AT 75 DEG. F, MEET REQUIREMENTS OF N.F.P.A. 90A FOR
DUCTWORK INSTALLED IN CONCEALED SPACES SHALL BE
AIR DUCTS, SPIN —IN TYPE WITH MANUAL VOLUME DAMPER.
WRAPPED WITH 1" THICK ULTRALIGHT 3/4 POUND DENSITY WITH
(B) INSTALLATION: INSTALL IN FULLY EXTENDED POSITION
FOIL FACE VAPOR BARRIER. (OSA & RELIEF AIR DUCTWORK
USING ONLY MINIMUM LENGTH REQUIRED TO MAKE THE
SHALL ALSO BE WRAPPED)
CONNECTIONS WITH 1/2" WIDE POSITIVE LOCKING STEEL
(3) MINIMUM STANDARD OF INSTALLATION: END JOINTS ARE
STRAPS OR APPROVED EQUAL. SUPPORT DUCT AT 36" O.C.
CLOSED WITH 2" OVERLAPPING VAPOR BARRIER FLAP AND 2"
OR AS PER LOCAL CODES., (72` LONG MAXIMUM LENGTH
JOINT FLAP IS FORMED OVER LONGITUDINAL JOINT.
ALLOWED PER BRANCH RUN)
OVERLAPPING FLAPS ARE STAPLED AND SEALED WITH PRESSURE
(5)
MANUAL VOLUME DAMPERS:
SENSITIVE TAPE OR PLAIN TAPE APPLIED WITH MASTIC.
(A) DAMPERS WITH LOCKING AND INDICATING QUADRANTS TO C.
CONTROL SYSTEMS
I
BE INSTALLED N EACH BRANCH OF ALL DUCTS AS
INDICATED ON THE DRAWINGS IN ADDITION TO ANY
() 1 HONEYWELL T7350 THERMOSTATS INTERNALLY PREWIRED WITHIN
VOLUME CONTROL AT OUTLETS.
A UL LISTED CONTROL PANEL FURNISHED BY THE AIR CONDITIONING
CONTRACTOR AND INSTALLED BY THE ELECTRICAL CONTRACTOR,
(B) AFTER FINAL ADJUSTMENT OF SYSTEM, LOCK QUADRANTS
COMPLETE WITH REMOTE SENSORS FOR ZONE CONTROL OF HP- 1 /FC -1
AND MARK CLEARLY SHOWING DAMPER POSITION, OPEN
THRU HP- 3 /FC -3
AND SHUT POSITIONS.
D.
BALANCING
(C) DAMPERS IN ROUND DUCTS SHALL BE OF THE SINGLE
BLADE TYPE.
1 THE AIR CONDITIONG CONTRACTOR SHALL BALANCE, ADJUST AND TEST
( )
ALL AIR MOVING EQUIPMENT, AIR DISTRIBUTION, HEATING SYSTEMS, EXHAUST
DAMPERS IN RECTANGULAR DUCTS:
AND MAKE —UP AIR SYSTEMS AS SPECIFIED AND AS INDICATED ON
— DUCTS 11" IN HEIGHT OR LESS SHALL BE OF THE
DRAWINGS.
SINGLE BLADE TYPE.
(2) BALANCING AND TESTING SHALL NOT BEGIN UNTIL ALL SYSTEMS
-- DUCTS 12" IN HEIGHT OR HIGHER SHALL BE OF THE
ARE COMPLETED AND IN FULL WORKING ORDER.
OPPOSED BLADE TYPE.
(6)
FIRE DAMPERS:
(3) CHANGES IN FILTERS, DRIVES AND DAMPERS OR THE ADDITION
OF DAMPERS, CONTROL DEVICES OR GAUGES REQUIRED TO
WHERE REQUIRED BY LOCAL CODES SHALL BE OF PROPER RATING,
CORRECT BALANCE AS REQUIRED SHALL BE MADE AT NO
FURNISHED AND INSTALLED BY THE AIR CONDITIONING CONTRACTOR
ADDITIONAL COST TO OWNER.
PER MANUFACTURES SPECIFICATIONS AND INSTALLATION INSTRUCTIONS.
ALL FIRE DAMPERS SHALL BE APPROVED BY CITY OF SOUTH MIAMI
FIRE MARSHALL
(4) ALL EQUIPMENT AND SYSTEMS SHALL BE RUN THROUGH THEIR
CYCLE TO CHECK FOR CORRECT WIRING AND SEQUENCING.
(5) ALL INSTRUMENTS, FORMS AND PROCEDURES SHALL MEET THE
REQUIREMENTS SET FORTH BY THE NATIONAL ENVIRONMENTAL
BALANCING BUREAU (N.E.B.B.).
(6) COPY OF BALANCE REPORT SHALL BE SENT TO THE ARCHITECT
OR OWNER.
F. EQUIPMENT — AS SPECIFIED ON THE PLANS
G. AIR DISTRIBUTION — AS SPECIFIED ON THE PLANS
H. WARRANTY
(1) THE ENTIRE AIR CONDITONING AND VENTILATION SYSTEM TO BE
FREE OF DEFECTIVE WORKMANSHIP AND MATERIALS FOR A
PERIOD OF ONE YEAR FROM DATE OF START --UP.
(2) EQUIPMENT FURNISHED AND INSTALLED BY THE AIR CONDITIONING
CONTRACTOR SHALL CARRY MANUFACTURERS REPLACEMENT PART
WARRANTY FOR A PERIOD OF ONE YEAR FROM THE DATE OF
START —UP.
(3) ALL AIR CONDITIONING COMPRESSORS FURNISHED AND
INSTALLED WILL CARRY AN ADDITIONAL FOUR YEAR
MANUFACTURERS REPLACEMENT WARRANTY AT EXPIRATION OF
ORIGINAL ONE —YEAR WARRANTY.
(4) THE EQUIPMENT WARRANTIES ARE BASED UPON PROPER AND
NORMAL MAINTENANCE OF THE EQUIPMENT DURING THE
WARRANTY PERIOD BY A QUALIFIED, LICENSED AIR
CONDITIONING COMPANY, REGULARLY ENGAGED IN THE
SERVICE AND MAINTENANCE OF AIR CONDITIONING EQUIPMENT.
I. SUBMITTALS AND SUBSTITUTIONS
(1) THE AIR CONDITIONING CONTRACTOR SHALL FURNISH SIX (6)
SETS OF COMPLETE PROJECT SUBMITTALS TO THE ARCHITECT FOR
APPROVAL, (FULLY BOUND AND INDEXED ONLY, PARTIAL AND / OR
"LOOSE — LEAF" WILL BE REJECTED & DISCARDED WITHOUT REVIEW)
(2) SUBMITTALS SHALL CLEARLY INDENTIFY ALL MAKE AND MODEL
NUMBERS OF ALL HVAC RELATED EQUIPMENT, COMPONENTS,
MATERIALS AND ACCESSORIES TO BE INSTALLED ON THE PROJECT.
(3) ALL ALTERNATE EQUIPMENT, COMPONENTS OR MATERIALS SHALL BE
INDENTIFIED AS "SUBSTITUTION ". ONLY APPROVED SUBSTITUTIONS
SHALL BE PERMITTED. APPROVED SUBSTITUTIONS WHICH RESULT
IN ADDITIONAL EXPENSE TO OTHER TRADES SHALL BE AT THE
EXPENSE OF THE AIR CONDITIONING CONTRACTOR
DUCT TO TERti
EXTERIOR WALI
WEATHER BROI
S.S. SCREEN i
E
6" HIGH LEVEI
HOUSE KEEPIN
REQUIRED
4_ H a 2-11;
EXTERIOR WALT
Oa Oet-o"M r-Zs viaay teVi !N $UYIY DOt IIEI atY7k
t-aw yaJiicNy WOO JIAAIMNMY S-us vo#*Y W O N 61ZYLW
U04P3 V66L a Iealurgaayy Y -avi iopoo i3AAfWAAY
l��RiSiy
= m euellewnlu ""f uo� ; eolue as
W-Z6-LLV#Y3w � NVAJN � m I I .l P3t65L 1 W P!
leu
g3lmseildwoo 1411m W-xs-LMV3VY `94wi? S 3
sepdwoo yl!m wildwoD QUsa;te1
0 d 0 O '8 t9!m
S*ildwoC)
el ue "I /i X Iz /G t x "%L
L
_. poi Ja uau Jejewalp .1/e 'ulW
9
VI19AO IeUIPnI! uol !E
9
elaano Mlawlie „I~
b
ulpueg
E
A ElluowlepA
Z
GaM lonCl ,IalseVywy Sie gel OWL
L
aN3J31
9
•sllelap alaldwoo jol apinb
u011ellelsul 10 0L•g 46noi(41 L'9 uolloeS aaS
:010N
N011OnsHlSNOO �neusnsmo Ol 30Nb'UV310 083Z
`31nNIIN OC (INV 3AUVNIH3171`d lJVHS an0H Z U0 L
LN31SAS Iona 3SV380 Q831SWOUld
� 3unei_�
m
SEE PLAN FOR APPLICATION LOCATION
z
ll
jkz�
1 j
ail
slnu Uum aalawe!p i /4
Z L
sppa papeajyi .col seoep lops
L I.
se pa lea ul wnulwnIV
UL
s !15 paa S
6
elmo , L dejM Iona aolseWaalH
B
leIJ8A0 ,, I. dSJM lonq a9lseW5j!H
L
eaM IOn(3 aalsieW9ji -I
9
_ peplann — suld uollrInsul
9
a ne 9L - asnpo sappy
17
spoa Peaa41 lie aalawelp .,%
E
IOnp of peplam owed ssaaay
z
01014 aOOa
l
C1NE103 1
N0l V ll"t lSNl 3mnSO -'l0N3
uma ss3oov Iona 35w3mu
! f i• f• f Ei • f• Y r s f f A
ii• N • • i • r • •
• i
u
ELEVATION ' 2ND EF�l FLOOR
NITS
ORO EG'ERTG
GROUP, INC.
18652 Florida Street, Suite 150
Huntington Beach, CA 92648
P {714 }847 -7100
F 714 841 -6004
{ • • •
11 f u • U • •
N V• Y/ Y Ali N N
1414 �{
F,A SUSHI COPPOPATION
SCOTTSDALE, AZ
140 s0!t `-
H
0
III 12 -22 -OG
1.,
a {
,a
ip
1
k
0 REVISIONS
C)
O
Ll_
Q
l�.
f
rO
V J
❑ 06. 15.07
15t LANDLORD SUBMITTAL
08.21-07
15t CITY SUBMITTAL
❑ 02.07.08
2nd CITY SUBMITTAL
❑ DATE
C/
5829 5W 73RD ST
SOUTH MIAMI, FL
RM3.0
MECHANICAL NOTES
DETAIL