Loading...
07-1196-057SPECiRCAT�ONS (4) ALL EQUIPMENT AND SYSTEMS SHALL BE RUN THROUGH THEIR CYCLE TO CHECK FOR CORRECT WIRING AND SEQUENCING. (5) ALL INSTRUMENTS, FORMS AND PROCEDURES SHALL MEET THE REQUIREMENTS SET FORTH BY THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (N.E.B.B.). (6) COPY OF BALANCE REPORT SHALL BE SENT TO THE ARCHITECT OR OWNER. F. EQUIPMENT — AS SPECIFIED ON THE PLANS G. AIR DISTRIBUTION — AS SPECIFIED ON THE PLANS H. WARRANTY (1) THE ENTIRE AIR CONDITONING AND VENTILATION SYSTEM TO BE FREE OF DEFECTIVE WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FROM DATE OF START --UP. (2) EQUIPMENT FURNISHED AND INSTALLED BY THE AIR CONDITIONING CONTRACTOR SHALL CARRY MANUFACTURERS REPLACEMENT PART WARRANTY FOR A PERIOD OF ONE YEAR FROM THE DATE OF START —UP. (3) ALL AIR CONDITIONING COMPRESSORS FURNISHED AND INSTALLED WILL CARRY AN ADDITIONAL FOUR YEAR MANUFACTURERS REPLACEMENT WARRANTY AT EXPIRATION OF ORIGINAL ONE —YEAR WARRANTY. (4) THE EQUIPMENT WARRANTIES ARE BASED UPON PROPER AND NORMAL MAINTENANCE OF THE EQUIPMENT DURING THE WARRANTY PERIOD BY A QUALIFIED, LICENSED AIR CONDITIONING COMPANY, REGULARLY ENGAGED IN THE SERVICE AND MAINTENANCE OF AIR CONDITIONING EQUIPMENT. I. SUBMITTALS AND SUBSTITUTIONS (1) THE AIR CONDITIONING CONTRACTOR SHALL FURNISH SIX (6) SETS OF COMPLETE PROJECT SUBMITTALS TO THE ARCHITECT FOR APPROVAL, (FULLY BOUND AND INDEXED ONLY, PARTIAL AND / OR "LOOSE — LEAF" WILL BE REJECTED & DISCARDED WITHOUT REVIEW) (2) SUBMITTALS SHALL CLEARLY INDENTIFY ALL MAKE AND MODEL NUMBERS OF ALL HVAC RELATED EQUIPMENT, COMPONENTS, MATERIALS AND ACCESSORIES TO BE INSTALLED ON THE PROJECT. (3) ALL ALTERNATE EQUIPMENT, COMPONENTS OR MATERIALS SHALL BE INDENTIFIED AS "SUBSTITUTION ". ONLY APPROVED SUBSTITUTIONS SHALL BE PERMITTED. APPROVED SUBSTITUTIONS WHICH RESULT IN ADDITIONAL EXPENSE TO OTHER TRADES SHALL BE AT THE EXPENSE OF THE AIR CONDITIONING CONTRACTOR DUCT TO TERti EXTERIOR WALI WEATHER BROI S.S. SCREEN i E 6" HIGH LEVEI HOUSE KEEPIN REQUIRED 4_ H a 2-11; EXTERIOR WALT Oa Oet-o"M r-Zs viaay teVi !N $UYIY DOt IIEI atY7k t-aw yaJiicNy WOO JIAAIMNMY S-us vo#*Y W O N 61ZYLW U04P3 V66L a Iealurgaayy Y -avi iopoo i3AAfWAAY l��RiSiy = m euellewnlu ""f uo� ; eolue as W-Z6-LLV#Y3w � NVAJN � m I I .l P3t65L 1 W P! leu g3lmseildwoo 1411m W-xs-LMV3VY `94wi? S 3 sepdwoo yl!m wildwoD QUsa;te1 0 d 0 O '8 t9!m S*ildwoC) el ue "I /i X Iz /G t x "%L �1 _. poi Ja uau Jejewalp .1/e 'ulW A. — DUCTWORK B. INSULATION (1) GAUGE AND CONSTRUCTION: GALVANIZED SHEET METAL IN (1) DUCT LINING: ALL SUPPLY AIR AND RETURN AIR DUCTWORK E ACCORDANCE WITH RECOMMENDATIONS OF S.M.A.C.N.A. FOR AND PLENUMS EXPOSED ON ROOF AND EXTENDED BELOW ROOF GaM lonCl ,IalseVywy Sie gel OWL LOW VELOCITY DUCTWORK, LATEST EDITION AND TO COMPLY LINE TO BE LINED WITH 1 1/2" THICK, 1 1/2 LBS. DENSITY FIBERGLASS 9 WITH ALL NATIONAL AND LOCAL CODE REQUIREMENTS. DUCT —LINER FACED WITH BLACK FIRE — RESISTANT COATING (2) GREASE EXHAUST DUCTWORK: SHALL BE WELDED GALVANIZED MEETING REQUIREMENTS OF N.F.P.A. 90A AND INSTALLED AS PER z SHEET METAL GAUGE AS INDICATED ON THE DRAWINGS AND MANUFACTURER'S RECOMMENDATIONS. DUCT DIMENSIONS C1NE103 1 INSTALLED PER N.F.P.A. 96., (16 GA MINIMUM) SHOWN ON THE DRAWINGS BY (L) ARE FULL SHEET METAL SIZE (3) PAINTING: ALL DUCTWORK VISIBLE THROUGH OPENINGS SHALL WITH ALLOWANCE FOR DUCT —LINER THICKNESS. DUCT WITHIN BE PAINTED FLAT BLACK PAINT OR INTERNALLY LINED WITH APPROVED CONCEALED SPACES WHICH HAS BEEN INDICATED WITH (L) SHALL BE TYPE BLACK FACED DUCT — LINER, (CONTRACTOR'S OPTION) LINED WITH 1" THICK, 3/4 LBS. DENSITY FIBERGLASS DUCT —LINER (4) FLEXIBLE DUCT: FACED WITH BLACK FIRE — RESISTANT COATING MEETING REQUIREMENTS OF N.F.P.A. 90A AND INSTALLED AS PER MANUFACTURER'S (A) MATERIAL: PRE — INSULATED FLEXIBLE FIBERGLASS AIR RECOMMENDATIONS DUCT, ENCASED IN A VAPOR BARRIER JACKET, K FACTOR (2) DUCT WRAP: ALL SUPPLY AIR AND RETURN AIR OF 0.24 AT 75 DEG. F, MEET REQUIREMENTS OF N.F.P.A. 90A FOR DUCTWORK INSTALLED IN CONCEALED SPACES SHALL BE AIR DUCTS, SPIN —IN TYPE WITH MANUAL VOLUME DAMPER. WRAPPED WITH 1" THICK ULTRALIGHT 3/4 POUND DENSITY WITH (B) INSTALLATION: INSTALL IN FULLY EXTENDED POSITION FOIL FACE VAPOR BARRIER. (OSA & RELIEF AIR DUCTWORK USING ONLY MINIMUM LENGTH REQUIRED TO MAKE THE SHALL ALSO BE WRAPPED) CONNECTIONS WITH 1/2" WIDE POSITIVE LOCKING STEEL (3) MINIMUM STANDARD OF INSTALLATION: END JOINTS ARE STRAPS OR APPROVED EQUAL. SUPPORT DUCT AT 36" O.C. CLOSED WITH 2" OVERLAPPING VAPOR BARRIER FLAP AND 2" OR AS PER LOCAL CODES., (72` LONG MAXIMUM LENGTH JOINT FLAP IS FORMED OVER LONGITUDINAL JOINT. ALLOWED PER BRANCH RUN) OVERLAPPING FLAPS ARE STAPLED AND SEALED WITH PRESSURE (5) MANUAL VOLUME DAMPERS: SENSITIVE TAPE OR PLAIN TAPE APPLIED WITH MASTIC. (A) DAMPERS WITH LOCKING AND INDICATING QUADRANTS TO C. CONTROL SYSTEMS I BE INSTALLED N EACH BRANCH OF ALL DUCTS AS INDICATED ON THE DRAWINGS IN ADDITION TO ANY () 1 HONEYWELL T7350 THERMOSTATS INTERNALLY PREWIRED WITHIN VOLUME CONTROL AT OUTLETS. A UL LISTED CONTROL PANEL FURNISHED BY THE AIR CONDITIONING CONTRACTOR AND INSTALLED BY THE ELECTRICAL CONTRACTOR, (B) AFTER FINAL ADJUSTMENT OF SYSTEM, LOCK QUADRANTS COMPLETE WITH REMOTE SENSORS FOR ZONE CONTROL OF HP- 1 /FC -1 AND MARK CLEARLY SHOWING DAMPER POSITION, OPEN THRU HP- 3 /FC -3 AND SHUT POSITIONS. D. BALANCING (C) DAMPERS IN ROUND DUCTS SHALL BE OF THE SINGLE BLADE TYPE. 1 THE AIR CONDITIONG CONTRACTOR SHALL BALANCE, ADJUST AND TEST ( ) ALL AIR MOVING EQUIPMENT, AIR DISTRIBUTION, HEATING SYSTEMS, EXHAUST DAMPERS IN RECTANGULAR DUCTS: AND MAKE —UP AIR SYSTEMS AS SPECIFIED AND AS INDICATED ON — DUCTS 11" IN HEIGHT OR LESS SHALL BE OF THE DRAWINGS. SINGLE BLADE TYPE. (2) BALANCING AND TESTING SHALL NOT BEGIN UNTIL ALL SYSTEMS -- DUCTS 12" IN HEIGHT OR HIGHER SHALL BE OF THE ARE COMPLETED AND IN FULL WORKING ORDER. OPPOSED BLADE TYPE. (6) FIRE DAMPERS: (3) CHANGES IN FILTERS, DRIVES AND DAMPERS OR THE ADDITION OF DAMPERS, CONTROL DEVICES OR GAUGES REQUIRED TO WHERE REQUIRED BY LOCAL CODES SHALL BE OF PROPER RATING, CORRECT BALANCE AS REQUIRED SHALL BE MADE AT NO FURNISHED AND INSTALLED BY THE AIR CONDITIONING CONTRACTOR ADDITIONAL COST TO OWNER. PER MANUFACTURES SPECIFICATIONS AND INSTALLATION INSTRUCTIONS. ALL FIRE DAMPERS SHALL BE APPROVED BY CITY OF SOUTH MIAMI FIRE MARSHALL (4) ALL EQUIPMENT AND SYSTEMS SHALL BE RUN THROUGH THEIR CYCLE TO CHECK FOR CORRECT WIRING AND SEQUENCING. (5) ALL INSTRUMENTS, FORMS AND PROCEDURES SHALL MEET THE REQUIREMENTS SET FORTH BY THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (N.E.B.B.). (6) COPY OF BALANCE REPORT SHALL BE SENT TO THE ARCHITECT OR OWNER. F. EQUIPMENT — AS SPECIFIED ON THE PLANS G. AIR DISTRIBUTION — AS SPECIFIED ON THE PLANS H. WARRANTY (1) THE ENTIRE AIR CONDITONING AND VENTILATION SYSTEM TO BE FREE OF DEFECTIVE WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FROM DATE OF START --UP. (2) EQUIPMENT FURNISHED AND INSTALLED BY THE AIR CONDITIONING CONTRACTOR SHALL CARRY MANUFACTURERS REPLACEMENT PART WARRANTY FOR A PERIOD OF ONE YEAR FROM THE DATE OF START —UP. (3) ALL AIR CONDITIONING COMPRESSORS FURNISHED AND INSTALLED WILL CARRY AN ADDITIONAL FOUR YEAR MANUFACTURERS REPLACEMENT WARRANTY AT EXPIRATION OF ORIGINAL ONE —YEAR WARRANTY. (4) THE EQUIPMENT WARRANTIES ARE BASED UPON PROPER AND NORMAL MAINTENANCE OF THE EQUIPMENT DURING THE WARRANTY PERIOD BY A QUALIFIED, LICENSED AIR CONDITIONING COMPANY, REGULARLY ENGAGED IN THE SERVICE AND MAINTENANCE OF AIR CONDITIONING EQUIPMENT. I. SUBMITTALS AND SUBSTITUTIONS (1) THE AIR CONDITIONING CONTRACTOR SHALL FURNISH SIX (6) SETS OF COMPLETE PROJECT SUBMITTALS TO THE ARCHITECT FOR APPROVAL, (FULLY BOUND AND INDEXED ONLY, PARTIAL AND / OR "LOOSE — LEAF" WILL BE REJECTED & DISCARDED WITHOUT REVIEW) (2) SUBMITTALS SHALL CLEARLY INDENTIFY ALL MAKE AND MODEL NUMBERS OF ALL HVAC RELATED EQUIPMENT, COMPONENTS, MATERIALS AND ACCESSORIES TO BE INSTALLED ON THE PROJECT. (3) ALL ALTERNATE EQUIPMENT, COMPONENTS OR MATERIALS SHALL BE INDENTIFIED AS "SUBSTITUTION ". ONLY APPROVED SUBSTITUTIONS SHALL BE PERMITTED. APPROVED SUBSTITUTIONS WHICH RESULT IN ADDITIONAL EXPENSE TO OTHER TRADES SHALL BE AT THE EXPENSE OF THE AIR CONDITIONING CONTRACTOR DUCT TO TERti EXTERIOR WALI WEATHER BROI S.S. SCREEN i E 6" HIGH LEVEI HOUSE KEEPIN REQUIRED 4_ H a 2-11; EXTERIOR WALT Oa Oet-o"M r-Zs viaay teVi !N $UYIY DOt IIEI atY7k t-aw yaJiicNy WOO JIAAIMNMY S-us vo#*Y W O N 61ZYLW U04P3 V66L a Iealurgaayy Y -avi iopoo i3AAfWAAY l��RiSiy = m euellewnlu ""f uo� ; eolue as W-Z6-LLV#Y3w � NVAJN � m I I .l P3t65L 1 W P! leu g3lmseildwoo 1411m W-xs-LMV3VY `94wi? S 3 sepdwoo yl!m wildwoD QUsa;te1 0 d 0 O '8 t9!m S*ildwoC) el ue "I /i X Iz /G t x "%L L _. poi Ja uau Jejewalp .1/e 'ulW 9 VI19AO IeUIPnI! uol !E 9 elaano Mlawlie „I~ b ulpueg E A ElluowlepA Z GaM lonCl ,IalseVywy Sie gel OWL L aN3J31 9 •sllelap alaldwoo jol apinb u011ellelsul 10 0L•g 46noi(41 L'9 uolloeS aaS :010N N011OnsHlSNOO �neusnsmo Ol 30Nb'UV310 083Z `31nNIIN OC (INV 3AUVNIH3171`d lJVHS an0H Z U0 L LN31SAS Iona 3SV380 Q831SWOUld � 3unei_� m SEE PLAN FOR APPLICATION LOCATION z ll jkz� 1 j ail slnu Uum aalawe!p i /4 Z L sppa papeajyi .col seoep lops L I. se pa lea ul wnulwnIV UL s !15 paa S 6 elmo , L dejM Iona aolseWaalH B leIJ8A0 ,, I. dSJM lonq a9lseW5j!H L eaM IOn(3 aalsieW9ji -I 9 _ peplann — suld uollrInsul 9 a ne 9L - asnpo sappy 17 spoa Peaa41 lie aalawelp .,% E IOnp of peplam owed ssaaay z 01014 aOOa l C1NE103 1 N0l V ll"t lSNl 3mnSO -'l0N3 uma ss3oov Iona 35w3mu ! f i• f• f Ei • f• Y r s f f A ii• N • • i • r • • • i u ELEVATION ' 2ND EF�l FLOOR NITS ORO EG'ERTG GROUP, INC. 18652 Florida Street, Suite 150 Huntington Beach, CA 92648 P {714 }847 -7100 F 714 841 -6004 { • • • 11 f u • U • • N V• Y/ Y Ali N N 1414 �{ F,A SUSHI COPPOPATION SCOTTSDALE, AZ 140 s0!t `- H 0 III 12 -22 -OG 1., a { ,a ip 1 k 0 REVISIONS C) O Ll_ Q l�. f rO V J ❑ 06. 15.07 15t LANDLORD SUBMITTAL 08.21-07 15t CITY SUBMITTAL ❑ 02.07.08 2nd CITY SUBMITTAL ❑ DATE C/ 5829 5W 73RD ST SOUTH MIAMI, FL RM3.0 MECHANICAL NOTES DETAIL