Loading...
07-1196-056SPECTICATIONS � I A. - DUCTWORK x B. INSULATION (1) GAUGE AND CONSTRUCTION: GALVANIZED SHEET METAL IN (1) DUCT LINING: ALL SUPPLY AIR AND RETURN AIR DUCTWORK S ACCORDANCE WITH RECOMMENDATIONS OF S.MAC.N.A. FOR AND PLENUMS EXPOSED ON ROOF AND EXTENDED BELOW ROOF utpuee LOW VELOCITY DUCTWORK, LATEST EDITION AND TO COMPLY LINE TO BE LINED WITH 1 112" THICK, 1 1/2 LBS. DENSITY FIBERGLASS z WITH ALL NATIONAL AND LOCAL CODE REQUIREMENTS. DUCT -LINER FACED WITH BLACK FIRE - RESISTANT COATING (2) GREASE EXHAUST DUCTWORK: SHALL BE WELDED GALVANIZED MEETING REQUIREMENTS OF N.F.PA 90A AND INSTALLED AS PER IF SHEET METAL GAUGE AS INDICATED ON THE DRAWINGS AND MANUFACTURER'S RECOMMENDATIONS. DUCT DIMENSIONS lonp of poplem awed SSeaay INSTALLED PER N.F.P.A. 96., (16 GA MINIMUM) SHOWN ON THE DRAWINGS BY (L) ARE FULL SHEET METAL SIZE (3) PAINTING: ALL DUCTWORK VISIBLE THROUGH OPENINGS SHALL WITH ALLOWANCE FOR DUCT -LINER THICKNESS. DUCT WITHIN BE PAINTED FLAT BLACK PAINT OR INTERNALLY LINED WITH APPROVED CONCEALED SPACES WHICH HAS BEEN INDICATED WITH (L) SHALL BE TYPE BLACK FACED DUCT - LINER, (CONTRACTOR'S OPTION) LINED WITH 1" THICK, 3/4 LBS. DENSITY FIBERGLASS DUCT -LINER (4) FLEXIBLE DUCT: FACED WITH BLACK FIRE - RESISTANT COATING MEETING REQUIREMENTS OF N.F.PA 90A AND INSTALLED AS PER MANUFACTURER'S (A) MATERIAL: PRE - INSULATED FLEXIBLE FIBERGLASS AIR RECOMMENDATIONS DUCT, ENCASED IN A VAPOR BARRIER JACKET, K FACTOR (2) DUCT WRAP: ALL SUPPLY AIR AND RETURN AIR OF 0.24 AT 75 DEG. F, MEET REQUIREMENTS OF N.F.P.A. 90A FOR DUCTWORK INSTALLED IN CONCEALED SPACES SHALL BE AIR DUCTS, SPIN -IN TYPE WITH MANUAL VOLUME DAMPER. WRAPPED WITH 1 • THICK ULTRALIGHT 3/4 POUND DENSITY WITH (B) INSTALLATION: INSTALL IN FULLY EXTENDED POSITION FOIL FACE VAPOR BARRIER. (OSA be RELIEF AIR DUCTWORK USING ONLY MINIMUM LENGTH REQUIRED TO MAKE THE SHALL ALSO BE WRAPPED) CONNECTIONS WITH 112" WIDE POSITIVE LOCKING STEEL (3) MINIMUM STANDARD OF INSTALLATION: END JOINTS ARE STRAPS OR APPROVED EQUAL. SUPPORT DUCT AT 36" O.C. CLOSED WITH 2 OVERLAPPING VAPOR BARRIER FLAP AND 2 " OR AS PER LOCAL CODES., (72" LONG MAXIMUM LENGTH JOINT FLAP IS FORMED OVER LONGITUDINAL JOINT. ALLOWED PER BRANCH RUN) OVERLAPPING FLAPS ARE STAPLED AND SEALED WITH PRESSURE (5) MANUAL VOLUME DAMPERS: SENSITIVE TAPE OR PLAIN TAPE APPLIED WITH MASTIC. (A) DAMPERS WITH LOCKING AND INDICATING QUADRANTS TO C. CONTROL SYSTEMS BE INSTALLED IN EACH BRANCH OF ALL DUCTS AS INDICATED ON THE DRAWINGS IN ADDITION TO ANY () 1 HONEYWELL T7350 THERMOSTATS INTERNALLY PREWIRED WITHIN VOLUME CONTROL AT OUTLETS, A UL LISTED CONTROL PANEL FURNISHED BY THE AIR CONDITIONING CONTRACTOR AND INSTALLED BY THE ELECTRICAL CONTRACTOR, (B) AFTER FINAL ADJUSTMENT OF SYSTEM, LOCK QUADRANTS COMPLETE WITH REMOTE SENSORS FOR ZONE CONTROL OF HP- 1 /FC -1 AND MARK CLEARLY SHOWING DAMPER POSITION, OPEN THRU HP- 3 /FC -3 AND SHUT POSITIONS. D. BALANCING (C) DAMPERS IN ROUND DUCTS SHALL BE OF THE SINGLE BLADE TYPE (1) THE AIR CONDITIONG CONTRACTOR SHALL BALANCE, ADJUST AND TEST DAMPERS IN RECTANGULAR DUCTS: ALL AIR MOVING EQUIPMENT, AIR DISTRIBUTION, HEATING SYSTEMS, EXHAUST AND MAKE -UP AIR SYSTEMS AS SPECIFIED AND AS INDICATED ON - DUCTS 11 " IN HEIGHT OR LESS SHALL BE OF THE DRAWINGS. SINGLE BLADE TYPE. (2) BALANCING AND TESTING SHALL NOT BEGIN UNTIL ALL SYSTEMS - DUCTS 12' IN HEIGHT OR HIGHER SHALL BE OF THE ARE COMPLETED AND IN FULL WORKING ORDER. OPPOSED BLADE TYPE. (6) FIRE DAMPERS: (3) CHANGES IN FILTERS, DRIVES AND DAMPERS OR THE ADDITION OF DAMPERS, CONTROL DEVICES OR GAUGES REQUIRED TO WHERE REQUIRED BY LOCAL CODES SHALL BE OF PROPER RATING, CORRECT BALANCE AS REQUIRED SHALL BE MADE AT NO FURNISHED AND INSTALLED BY THE AIR CONDITIONING CONTRACTOR ADDITIONAL COST TO OWNER. PER MANUFACTURES SPECIFICATIONS AND INSTALLATION INSTRUCTIONS. ALL FIRE DAMPERS SHALL BE APPROVED BY CITY OF SOUTH MIAMI FIRE MA SHALL 1 flOt ;G„�E4-E!'t�t t Q1i3 S-�i�+w�Y rz:�oH �ttL y w•xey 9903 13AA11M!l9W N_ 1 (4) ALL EQUIPMENT AND SYSTEMS SHALL BE RUN THROUGH THEIR CYCLE TO CHECK FOR CORRECT WIRING AND SEQUENCING. (5) ALL INSTRUMENTS, FORMS AND PROCEDURES SHALL MEET THE REQUIREMENTS SET FORTH BY THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (N.E.B.B.). (6) COPY OF BALANCE REPORT SHALL BE SENT TO THE ARCHITECT OR OWNER. F. EQUIPMENT - AS SPECIFIED ON THE PLANS G. AIR DISTRIBUTION -- AS SPECIFIED ON THE PLANS H. WARRANTY (1) THE ENTIRE AIR CONDITONING AND VENTILATION SYSTEM TO BE FREE OF DEFECTIVE WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FROM DATE OF START -UP. (2) EQUIPMENT FURNISHED AND INSTALLED BY THE AIR CONDITIONING CONTRACTOR SHALL CARRY MANUFACTURERS REPLACEMENT PART WARRANT( FOR A PERIOD OF ONE YEAR FROM THE DATE OF START -UP. (3) ALL AIR CONDITIONING COMPRESSORS FURNISHED AND INSTALLED WILL CARRY AN ADDITIONAL FOUR YEAR MANUFACTURERS REPLACEMENT WARRANTY AT EXPIRATION OF ORIGINAL ONE -YEAR WARRANTY. (4) THE EQUIPMENT WARRANTIES ARE BASED UPON PROPER AND NORMAL MAINTENANCE OF THE EQUIPMENT DURING THE WARRANTY PERIOD BY A QUALIFIED, LICENSED AIR CONDITIONING COMPANY, REGULARLY ENGAGED IN THE SERVICE AND MAINTENANCE OF AIR CONDITIONING EQUIPMENT. I. SUBMITTALS AND SUBSTITUTIONS (1) THE AIR CONDITIONING CONTRACTOR SHALL FURNISH SIX (6) SETS OF COMPLETE PROJECT SUBMITTALS TO THE ARCHITECT FOR APPROVAL, (FULLY BOUND AND INDEXED ONLY, PARTIAL AND / OR "LOOSE -LEAF" WILL BE REJECTED & DISCARDED WITHOUT REVIEW) (2) SUBMITTALS SHALL CLEARLY INDENTIFY ALL MAKE AND MODEL NUMBERS OF ALL HVAC RELATED EQUIPMENT, COMPONENTS, MATERIALS AND ACCESSORIES TO BE INSTALLED ON THE PROJECT. (3) ALL ALTERNATE EQUIPMENT, COMPONENTS OR MATERIALS SHALL BE INDENTIFIED AS "SUBSTITUTION ". ONLY APPROVED SUBSTITUTIONS SHALL BE PERMITTED. APPROVED SUBSTITUTIONS WHICH RESULT IN ADDITIONAL EXPENSE TO OTHER TRADES SHALL BE AT THE EXPENSE OF THE AIR CONDITIONING CONTRACTOR 0041P3 Mt � � � l•orulfti"w W-UlIt# v3W 'M WAN lruopruaolui 4►1MsegduAo V 3 Q 8 t111rn f � W- zC -Llt v3W S011dwoo 01 ue .% x .z/LL x .%t 1 p0a Je UO1y .lalawttp A/c -UIV4 9 el.laA0 leulpnit uol X S lrpano .lalampa „ g t' utpuee £ earl juswuly z ejM ton(] .lalsslNealj sia 'I otnl L aN3J31 g I •splap ejeldwoo jol apinB uoilelleisui jo 0 L -9 usnojgl L -9 uoiloaS 99S MON NOuona1SN00 319usn8W00 Ol 30NVUV3-10 0832 '31NNIUV OC (INV 3AIIVNH311V 13aHS mn0H Z a0 l [ 3unou z1 it .i D DUCT TO TERMINATE AT EXTERIOR WALL VIA 45' ANGLE WEATHER BROW WITH 1 "X1' S.S. SCREEN AT OPENING 6' HIGH LEVEL CONCRETE HOUSE KEEPING PAD IF . REQUIRED 2ND FLOOR EXTERIOR WALL 001I9EG-©"M £ -Zf V"*w V9" 6.ON G ZKv y�c•s•y _ ?Ieoo LaA mmv '9t WAN ) : leuogeuMul 4wm "Idwoo V 0 O 8 41Z s.11dwoo s1nu f5up aelawelp . , ZL Spoa pepLOW41 J01 seoetcl loo S L L Se pa lei el wnuiwnfV _Ilo d L s paa S 6 tpoAo • L deiM pnQ jalsa yejt j Q upeno . L aM lon(3 jelsulNeii W 1 eaM lanQ a9lsLVy5.li3 S peplam — Sup u01lelnsul g 915nub 9l. - aenoo sseooV IF spoa peaitil lie Jejewetp lonp of poplem awed SSeaay a 9104J00(] Ir CIN3031 rvoEtV-11d1s►vi aanso1aNa A aooa ss3oov iana asdaao FIREMAt''TER INS"TALLATI00"N DETAILS SEE PLAN FOR APPL1CA110N LOCATION S.S. DISCHARGE DUCT lax ODOR /FAN DECTION FILTER SECTION L II ! ! I I{ .. { I #{ ! III{ IL _J 11 IL- -- -J 1I1 l IENN SPAVE 7 33'x1o' is GA wauEo TO GREASE HOODS W 1/4' PER UNEAR FOOT DOWNWARD SLOPE • W • • V ••• • r •••• • o••• M • u u' • V W V V • • s w • • • w • . • w 1901 EF -1 ELEVATION AT 2ND FLOOR T CITY OP SOUTfl tFMF+MI BUILDING Dr:PT. MECHANICAL S5GT1CN APPROVED BY: C O ENGINEERING OUP, IEN . 18552 Florida Street, Suite 150 Huntington Beach, CA 92648 P �7714)847-71 00 F 14)841 -6000 r v W V VVWVV V V W •v� j • Y • c • w • u • • • • • l ,.. • r � �Anp4 w RA SUSHI CORPORATION 5COTTSDALE, AZ 0 12 -22 -OG K_ now X REVI51ON5 ❑ OG. 15.07 1St LANDLORD 5UI3MITTAL 08.21.07 15t CITY SUBMITTAL ❑ 02.07.08 2nd CITY SUBMITTAL. 0 DATE 5829 5W 73RD 5T SOUTH MIAMI, FL RM3.0 MECHANICAL NOTES � DETAIL