07-1196-012J
0 I I FLOOK FIN 15H PLAN
3/1 G 1 1 -0
i r
• • f • • i � • � p 4 Y • r •
• Y •i•t+` • • • •Y•• f Y
•1•
i • • i
Y • • 4 4 • • • Y • ` • " • r
FLOOK FIN 15H PLAN NOTES
i...
o•••• ••• ••rte
I . REFER TO A201 FOR DIMENSIONS NOT SHOWN. REFER TO SHEET AngI FOR fIN15H
MATERIAL SCHEDULE. • • •• • •
2. REFER TO KITCHEN DRAWINGS FOR EXACT FLOOR SINK LOCATION5.•'"u ` ` "• °rte• r
3. G.C. TO COORDINATE ALL KITCHEN FLOOR SINKS (F.S.) AND FLOOR DRAINS (F.D.) WITH
KITCHEN EQUIPMENT PRIOR TO PLACEMENT.
4. ALL MATERIAL TRANSITIONS TO MEET A.D.A. REQUIREMENTS.
5. COORDINATE WITH KITCHEN EQUIP. FOR CONCRETE CURBS.
G. G. PROVIDE CONTINUOUS 12" HIGH 12" WIDE "LATICRETE" WATERPROOF MEMBRANE
FLASHING ALONG WALL BASE AT Rf=5TROOM5, PREP AREA, COOK LINE AND
WAREWASHING AND BAR - TYPICAL AT ALL QUARRY TILE.
7. ALL QUARRY TILE FLOOR AREAS ARE TO BE FLOODED WITH WATER PRIOR TO
INSTALLATION OF TILE. SKIN PATCH A5 REQUIRED TO ELIMINATE WATER PONDING AND
ANY UNDE5IRABLE.
b. P051TIVE SLOPE FLOOR TO DRAINS 114" IN 20' OR PORTION THEREOF TO RESPECTIVE
DRAI N5.
9. REFER TO PLUMBING DRAWINGS FOR FLOOR DRAIN INFORMATION - COORDINATE WITH
STRUCTURAL.
10. GENERAL CONTRACTOR TO REVIEW ALL EX5TING STRUCTURAL DOCUMENTS AND FIELD
VERIFY CONDITIONS
f
f
RA SUSHI CORPORATION
SCOTTSDALE, AZ
DAVID A. UDKOW ARCHITECT
1 1881 N. 1 13TH STREET
SCOTTSDALE, AZ 85259
T: 480.G 14.3385
F: 445Q�,G 4.4..8209
E: dav��t�r I�r�uC'�?rrC'�x� net
Y�
rj v • `F
e !ww�
rm
0
J
LJ_
1
Q
L
■ REVISIONS
❑ I ST LANDLORD
SU BM_ITTAL _ .
�
❑ 1sl City Submittal
8.20.07
El
❑ 12 -22 -OG
El
5829 SW 73RD ST
SOUTH MIAMI, FL
0704