Loading...
ARCPlayground Demolition & New Installation at Four (4) City Parks RFP NO.: PR2015-04 ORIGINAL Toll Free: 866-957-2355'Y Fax: 866-957-2356 www.AP,CFlorlda,com 01-zffivxi. MM Playground Demolition & New Installation at Four (4) City Parks RFP NO.: PR2015 -04 o Everything else meets or exceeds your 2 -5 bid requirements • Dante Fascell Park o 2 -5 year olds playground: 30' x 30' playground area o 5 -12 year olds playground: 40'x 48' playground area ■ We're removing and demolishing 2 existing playground structures & 2 swing set structures. They'll be disposed of off -site. ■ We're furnishing and installing a new 2 -5 playground structure and a new 5 -12 playground structure ■ Age Appropriate Signage included for both structures. ■ The playground structures are made up of both steel (w /powder coating) and composite materials, as specified. ■ Play Elements = 50 total (18 Elevated & 32 Ground)(Includes Swings) • Bid required a minimum of 24 total play elements o Proposed 2 -5 unit = 21 (6 Elevated & 15 Ground) o Proposed 542 unit = 29 (12 Elevated & 17 Ground) ■ Child Capacity is 152 (Per manufacturer) (which includes swings) • 2 -5 playground structure = 51 (Includes Swings) ■ 5 -12 playground structure = 101 (Includes Swings) ■ We've included a new Single Post Swing Set, 2 -Bay; with 2 Belt Seats & 2 Full Bucket Seats. This meets your bid requirements. ■ The Lightning Balance Beam is our Independent Play item which is play functionally linked by Tri Pads to the structure, to better utilize space. ■ Playgrounds are Wheelchair Accessible (Includes Transfer Stations) & Meets All Current ADA Requirements, as noted on drawings, per manufacturer. ■ We're providing Certified Blow -In Wood Mulch (ADA Certified ASTIVI F1951) at a 12" depth for each play area. ■ No Geotextile Fabric is necessary as the ground is very firm. ■ No Roofs or Shade were called for at this park, per the Bid Docs ■ We'll be removing & disposing of the existing wood borders and replacing / installing new composite borders, as called for in Bid Docs. ■ The 2 -5 playground structure, when including % the swings, includes 11 of the 12 recognized types of play. ■ The 542 playground structure, when including % the swings, includes 12 of the 12 recognized types of play. ■ Everything else meets or exceeds your 2 -5 & 5 -12 bid requirements • Fuchs Park Playground Demolition & New Installation at Four (4) City Parks RFP NO.: PR2015 -04 o We're removing and demolishing the existing Playground structure, Frisbee Golf Receptacle, Rubber Surface, Swing Set structure, and Wood Borders. They'll be disposed of off -site. o We're Furnishing and Installing a new 5 -12 year olds playground: 40'x 48' playground area (This design meets your bid requirement) o Age Appropriate Sign is Included (required in bid) o The playground structure is made up of both steel (w /powder coating) & composite materials, as specified. o We've included a new Single Post Swing Set, 2 -Bay; with 2 Belt Seats & 2 Full Bucket Seats. This meets your bid requirements. o Play Elements = 29 total (13 Elevated & 16 Ground)(Includes Swings) ■ Bid required a minimum of 15 total play elements o Child Capacity is 129 (Per manufacturer) (Includes Swings) o We've included two (2) Integrated 12' Hex Shade Canopies (144 sq. ft. ea. = 288 total Sq. Ft.) using Commercial 95 Shade Fabric. Meets bid requirement o We've included an ADA Compliant Concrete Walkway from parking lot to playground o The Playground is Wheelchair Accessible (Includes Transfer Station) & Meets All Current ADA Requirements, as noted on each drawing, per manufacturer. o We're providing Certified Blow -In Wood Mulch (ADA Certified ASTM F1951) at a 12" depth. o We're providing Composite Borders to complete the playground area, and to go around the Swing area as well. o Geotextile Fabric has been added at this park only, as it must go over existing sand & under the 12" of ADA Wood Mulch, Without Geotextile Fabric wood mulch would become integrated & contaminated with sand, which would ruin the safety component of wood mulch. That would defeat the reason for wood mulch. Additionally, we've included geotextile fabric under the swings as well. o The 5 -12 playground structure, when including the swings, includes 12 of the 12 recognized types of play. o Everything else meets or exceeds your 5 -12 bid requirements • Murray Park o We're removing and demolishing the existing Playground structure & Swing Set structure. They'll be disposed of off -site. o We're Furnishing and Installing a new 5 -12 year olds playground 45' x 55' within the existing playground area (This design meets your bid requirement) o We're providing a Sand Box area within the concrete borders in an area that would otherwise be unusable because of its restrictive dimensions o Age Appropriate Sign is Included (required in bid) P ound De ,, �xrj -! "M vxwe _41t xc"" • 7 . RM, ,qWL RFP NO.: •. 0I We hope this summary is • assistance to you as you evaluate our Bid. Given that we've worked together before, you know we can and will adjust designs and layouts to meet your needs & budgetary constraints. Thank you in advance for this opportunity. Hopefully we'll be working together on these four Parks playgrounds. Allen Cooke, Senior Recreation Consultant Adv Mcla"Ifil This checklist indicates the forms and documents required to be submitted for this solicitation and to be presented by the deadline set for within the solicitation. Fulfillment of all solicitation requirements listed is mandatory for consideration of response to the solicitation. Additional documents may be required und, if so, they will be identified in an addendum tothis RFP The response shall include the following items: X Bid Form '-'' ProppmaVB|dBpnd N/A X *Performance Bond (As a Condition of Award; Not Required With the Submittal) % Respondents Qualification Statement X Nun'[w||uyionAffidavit X Public Entity Crimes and Conflicts of Interest X Drug Free Workplace X Acknowledgement mf Conformance with OSHA Standards X List ofProposed Subcontractors and Principal Suppliers X Related Party Transaction Verification Form X Indemnification and Insurance Documents X Proposal Analysis Exhibit X Signed Contract Documents (All —including General Conditions and Supplementary Conditions) Exhibit * Performance Bond: Required as a Condition of Award and Prior to the Contractor Receiving a Notice to Proceed. Not Required with Submittal. Submit this checklist along with your proposal indicating the completion and submission of each required forms and/or documents. Thomas F. Pepe m THIS PROPOSAL IS SUBMITTED TO: Steven Alexander City Manager City of South Miami 6|]O Sunset Drive South Miami, FL33|43 |. K this Proposal b accepted, the undersigned Respondent agrees ov enter into a Conti-act with the City of South Miami in the form included in this RFP Package, and to perform and furnish all work as specified or indicated in this RFP for the Proposed Price, within the Contract Time and in accordance with the other terms and conditions of the RFP Package. 2. Respondent accepts all of the terms and conditions of the RFP, Invitation for Proposals and Instructions to Respondents. including without limitation those dealing with the disposition ofPrnpom|/8id Bond. This Proposal will remain subject to acceptance for 180 calendar days after the day of the Proposal Opening. Respondent agrees to sign and submit the [ontract, if not already submitted, the Bonds, required insurance documents, and other documents required by the RFP, within ten (|O) calendar days after the date of the City's Notice pfAward. 3. In submitting this Proposa|. Respondent represents that: a. Respondent has examined copies of all the RFP Documents and of the following Addenda, if any (receipt of all which is hereby acknmw|edgedj Addendum No. Dated: Addendum No. ' Dated: Addendum No. Dated: Addendum No. Dated: Addendum No. Dated: Addendum No. Dated: b. Respondent has familiarized himself with the nature and extent of the Contract Dmcuments, the proposed work, site, locality, and all local conditions and laws and regulations that inany manner may affect cost, progress, performance or furnishing oF the Work. c. Subsurface conditions: |f applicable uz this RFp the Respondent represents that: i. Respondent has studied carefully all reports and d,p*ings, if app|icab|e, of subsurface conditions and drawings of physical conditions. ii. Respondent has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such exnminations, invesdgadonx, exp|uraduns, tests and studies in addition to or to supplement those referred to in this paragraph which pertain to the subsurface or physical conditions at the site or otherwise may affect the rost, pru#ress, performance, or the furnishing o[ the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents. The Respondent hereby acknowledges that no additional cxuminabons, invesdgadons, cxp|orationo, tonta, reports or similar information or data are, or vviU. be required by Respondent for any reason in connection with the Proposal. The failure of the Respondent to request a pre-bid marking of the construction site by any or all utility companies shall Thomas F. Pepe create an irrefutable presumption that the Respondent's bid, or proposal price, has taken into consideration all possible underground conditions and Respondent, if awarded the contrac, shall not be entitled to a change order for any such condition discovered thereafter. iii. Respondent has correlated the results of all such observations, examinations, |nvesdgationx, exp|oradons, te»tn, reports and studies with the terms and conditions of the Contract Documents. iv. Respondent has reviewed and checked all information and data shown or indicated in the RFP Package or in the Contract Documents with respect to existing Underground Facilities or conditions at or contiguous on the site and assumes responsibility for the accurate location of all Underground Facilities and conditions that may affect the Work. No additional examinations, investigations, explorations, tests, reports or similar information or data in respect to any Underground Facilities or conditions arc. or will be, required by Respondent in order to perform and furnish the Work at the Contract Prico, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents unless the Proposal specifically states that the contract price is subject to adjustment for future discovery of underground facilities and/or conditions that affect the cost of the Work and unless the respondent makes x written request to the City for additional information prior to submitting the bid or proposal as required in subsection ii above, d Respondent has given the City written notice of all conflicts, mnno or discrepancies that it has discovered in the Contract Documents and. if any conMicts, errors or discrepancies have been found and notice given, the Respondent represents, by submitting its proposal to the City, that the Respondent has received sufficient notice of the resolution thereof from the Ci4', that such resolution is acceptable to Respondent and that the Respondent waives any claim regarding the conflicts, errors or discrepancies, c This Proposal is genuine and not made in the interest of or on behalf cfany undisclosed person, firm or corporation and is not submitted pursuant to any agreement or rules of any Xroup, 0000dabon, organization, or corporation; Respondent has not directly or indirectly induced or solicited any other Respondent to submit a false orsham Proposal; Respondent has not solicited or induced any person, firm mr corporation to refrain from responding; and Respondent has not sought by collusion or otherwise to obtain for itself any advantage over any other Respondent or over the CITY. Respondent understands and agrees that the Contract Price is the amount that it needs to furnish and install all of the Work complete and in place. The Schedule of Values, if reqoired, is provided for the purpose of Proposal Evaluation and when initiated by the CITY, it shall form the basis for calculating the pricing of change orders. The Contract Price shall not he adjusted in any *ay yo as to result in a deviation from the Schedule of Values, except to the extent that the CITY changes the scope of the Work after the Contract Date. As such, the Respondent shall furnish all |xbor, mcteria|s, oquipment, too|s, superintendence and services necessary to provide cump|ete, in p|oca. Project for the Proposal Price of: LUMP SUM BASE PRICE: dollars and Alternates: #1 #2 G-31 rhomapPep 12 #4 #8 A fee breakdown, if applicable, for each task must be completed in the table shown above. Failure to complete this information shall render the proposal non-nspomive. 5. The ENTIRE WORK shall be completed, in full, within l2H days from the date stipulated in the NOTICE TO PROCEED. Failure tncomplete the entire work during the described time period shall result inthe assessment of liquidated damages ax set forth in the Contract. 6. Communications concerning this Proposal shall be addressed to: Telephone: Facsimile: 7 The terms used in this Proposal which are defined in the Contract ohd| have the same meaning as is nyd8nad to them in the Contract Ducuments, unless specifically defined in this RFPPuckugc. 8. By submitting this proposal, 1, on behalf of the business that I represent, hereby agrees to the terms of the form of contract contained in the RFP package and | agree to be bound by those termu, with any appropriate blank bnxea, if any, checked and any blank lines filled in with the appropriate information contained in the Solicitation Documents and this Proposa|, or such information that the City and | have agreed upon in the course of contract negotiations and which have been confirmed by the City in writing, including any e-mail confirmation, if any. SUBMITTED TH8 DAYOF ic PROPOSAL SUBMITTED BY: Thomas F. Pepe 13 Email Address DETAILED SCOPE OF WORK FOR CITY OF SOUTH MIAMI - RFP #PR2015 -04: "PLAYGROUND DEMOLITION AND NEW INSTALLATION AT FOUR (4) CITY PARKS" • Brewer Park o Get Playground Shop Drawings o Submit Permit to City o Call in for underground Utilities Check o Site Meeting with Parks Staff and our Construction Team o Fence off Construction areas with Orange Construction Fencing o Remove and demolish the existing playground structure, swing set structure and independent slide, and dispose of off -site. o Expand playground to a 30' x 30' o Supply, deliver & install: ■ New 2 -5 Playground Structure with Integrated Sail Shade ■ New Age appropriate signage ■ New Swing Set ■ New Additional Composite Borders ■ ADA Wood Mulch o Cleanup Site • Dante Fascell Park o Get Playground Shop Drawings for both structures o Submit Permit to City o Call in for underground Utilities Check o Site Meeting with Parks Staff and our Construction Team o Fence off Construction areas with Orange Construction Fencing o Remove and demolish: both existing playground structures; both swing set structures; and dispose of off -site. o Excavate 200 sq. ft. fill adjacent to the 5 -12 structure to expand area. Use excavated fill around 2 -5 structure, outside of borders. o Supply, deliver & install: ■ New 2 -5 Playground Structure ■ New 5 -12 Playground Structure ■ New Composite Borders around both playground areas & swings ■ New Age appropriate signage for both playground areas ■ New Swing Set structure ■ ADA Wood Mulch in both playgrounds & swing areas o Cleanup Site •• • • Murray Park ~ ^ Prepared For Steven P. Kulick Organization City of South Miami - City Hall Prepared By s13n Sunset Drive, 1st Floor Payment Terms South Miami, B33143-5U93 Customer Phone (305)663-633g Customer Fax FOUR PARKS BID County Miami Dade Ship To Advanced Recreational Concepts, LLC Melbourne, FL 32934 Date 4/14/2015 Quotation # 16653 Prepared By Allen Cooke 'ox Payment Terms Net 30 Prices Valid Until 6/17/3025 Project Name FOUR PARKS BID ProductlD Description Qty Price Total BREWER PARK 0.00 6300 SW 56th St. South Miami, FL 33143 R3HD74BDB Playcraft Systems Custom Round 3.5" Hybrid Play System - 2-5 Unit 1 21,867.00 21,867.00T 1305 Playcraft Systems 2-5 Age Appropriate Sign - Rotomolded 1 210.00 210.00T PC-2181 Playcraft Systems Single Post Swing - 8' Height - Two Positions/One 1 1,034.00 1,034.00T Bay with (2) Belt Seats PC-2181-AB Playcraft Systems Single Post Swing Add-A-Bay - 8' Height - Two 1 799.00 799.00T Positions/One Bay with (2) Belt Seats 31101-U2 Playcraft Systems Full Bucket Seat Upgrade per Bay - (2) Seats 1 196.00 196.00T Shop Playground Shop Drawings - Free of Charge I O.00T Drawings FTB-00001 Childforms 12" High Funtimber and Spike 6 39.95 239.70T 200-00001 Childforms Spike for 12" High Funtimber 1 10.00 10100T Installation Site Preparation to Include: 1 9,600.00 9,600.00T - Removal and Disposal of Existing 2-5 Playground Structure, Two Bay Swings and One Independent Slide - Clear Grass from the Expanded Playground Area Totaling 116 sq. ft. SITE AMENITIES ARE TO REMAIN - BENCHES, PICNIC TABLES AND TRASH RECEPTACLES Installation of Above Noted Play Structures to Include Concrete Footers and Border System Signature Print Name/Title Subtotal Sales Tax (0.D%) Total Upon acceptance of this proposal please sign abo�e pd initial the 'ARC Site Preparation Check List' an,i the 'ARC General Terms and Conditions' exhib ts attached. Please return initialed copies to ARC. ,!�. "I �fltkiN Prepared For Steven P. Kulick Organization OtyofSouthK«iamni - CbyMaU Prepared By e13O Sunset Drive, 1st Floor Payment Terms South Miami, Fc33143`5V93 Customer Phone (3O5) 663-6339 Customer Fax FOUR PARKS BID County Miami Dade Ship To 1305 Melbourne, FL 32934 Date 4/14/20I5 Quotation # I5652 Prepared By AUencooko - ZK Payment Terms Net 30 Prices Valid Until 6/17/2015 Project Name FOUR PARKS BID Product ID Description -Supply of ADA Wood Mulch to Cover Multiple Areas Totaling 70 cu. 32.50 2,275.00T ycls. at a Depth of 12" Installation of ADA Wood Mulch to Cover Multiple Areas Totaling 70 17.50 1,225.00T cu. ycls. at a Depth of 12" QANTE FASCE4PAR% 0.00 87OO Red Road South Miami, pL33t43 R3H8A682B Playcraft Systems Custom Round 3.5" Hybrid Play System - 5-12 Unit 1 32,506.00 32,506.00T R3H63DC8B Maycmft Systems Custom Round 3.5" Hybrid Play System -2-5Unit 1 17,578.00 27,678.00T 1306 Hayc,sft Systems 5-12 Age Appropriate Sign -Rrtmmo|ded 1 210.00 210.ODT 1305 Maycraft Systems 2-5 Age Appropriate Sign -Rotomo|ded 1 210.00 210.00T PC-2181 P|aycmft Systems Single Post Swing -8' Height - Two Positions/One 2 1,$34.00 1,034.O0T Bay with (2)Belt Seats PC-2181-A8 Maycra|t Systems Single Post Swing Add-A'Ba«-8' Height -Two 1 799.00 799.0OT Positions/One Bay with (2) Belt Seats 31101-V2 P|oycraft Systems Full Bucket Seat Upgrade per Bay -(2)Seats 1 196.00 196OUT PC-2475 P|aycmft Systems Stand N Spin I 957.00 9S7.OnT Shop Playground Shop Drawings - Free ofCharge I V.VDT Drawings FT8-00001 Chi|dforms12" High Funbmber and Spike 112 39.95 4,474.40T Signature Primmame/Tm Date Subtotal Sales Tax (0.0%) Total Tpon acceptance of this proposal please sign aboffe 99d initial the'ARC Site Preparation Check List'and jag the 'ARC General Terms and Conditions' exhib ts attached. Please return initialed copies to ARC. Prepared For Steven P, Kulkk Organization City of South Miami ' City Hall Prepared By 6130 Sunset Drive, 1st Floor Payment Terms South Miami, FL33143-SVg3 Customer Phone (305) 663-6339 Customer Fax FOUR PARKS BID County Miami Dade Ship To Melbourne, FL 32934 Proposal Date 4d4/2015 Quotation # 16652 Prepared By Allen Cooke 'Zx Payment Terms Net 30 Prices Valid Until 6/17/2015 Project Name FOUR PARKS BID Product ID Description Price Total Installation Site Preparation to Include; 19,250.00 19,250.00T - Removal and Disposal of Existing 2-5 and 5-12 Wood Playground Structures, Two (2) Bay Swings and 282 LF of Wood Borders - Excavation of (2) Areas at a Depth of 6" Totaling 200 sq. ft. to Enlarge Both Playground Areas - Spoils to be Used to Level Out Swings Area SITE AMENITIES ARE TO REMAIN - BENCHES, PICNIC TABLES AND TRASH RECEPTACLES Installation of Above Noted Play Structures to Include Concrete Footers and Border System Countersunk 6" Around Playground P=dmeter - TrenchA|readyPmsent with Wood Border Removal) Wood Mulch Supply mfADA Wood Mulch to Cover Multiple Areas Totaling %25cu. 125 32.50 4,062.50T ycls. at a Depth of 12" Installation Installation ADA Wood Mulch tn Cover Multiple Areas Totaling 12Scu. 125 17.50 3,187.50T ycls. at a Depth of 12" FUCHSPARK 6445 SVV81ut St. South Miami, Fi33143 R3M2A9108 Playcraft Systems Custom Round 3.5" Hybrid Play System '5-12Unit 1 39,154.00 39,154.VOT 1306 P|aycraft Systems 5-12 AgeAppropdateS@m - Rutnmo|ded 1 210.00 210.O0T PC-2181 P|ayrmft Systems Single Post Swing -0' Height - Two Positions/One 1 1,034.00 1,034.VnT Bay with (2) Belt Seats PC-2181-AB Maycraft Systems Single Post Swing Add-A-Bay-8' Height -Two 1 799.00 799.VVT Positions/One Bay with (2) Belt Seats 31101-U2 P|aymraft Systems Full Bucket Seat Upgrade per Bay -(2)Seats 1 196.00 195.Oor PC-2475 |P|aycmft Systems Stand NSpin | 1 | 957.00 | 957.00T| Signature mmName/Tm Subtotal Sales Tax (U.0%) Total oote- puw OPP, Proposal Prepared For Steven P. Kulick Organization City of South Miami - City Hall Prepared By 6130 Sunset Drive, 1st Floor Payment Terms South Miami, FL 33143-5093 Customer Phone (305) 663-6339 Customer Fax FOUR PARKS BID County Miami Dade Ship To Melbourne, FL 32934 Date 4/14/2015 Quotation # 16652 Prepared By Allen Cooke - ZK Payment Terms Net 30 Prices Valid Until 6/17/2015 Project Name FOUR PARKS BID Product ID Description Qty Price Total Shop Playground Shop Drawings - Free of Charge Drawings FTB-00001 Childforms 12" High Funtimber and Spike 54 39.951 2,157.30T 200-00001 Childforms Spike for 12" High Funtimber 2 10.001 20.00T ADJ-00001 Childforms 12" Adjustable End Kit 1 150.001 150.00T Installation Site Preparation to Include: 1 12,500.00 12,500.00T - Removal and Disposal of Existing Playground Structures to Include Swings, Panels and Three Spring Riders - Removal of Existing Plastic Borders - To be Used in New Layout - Removal of One Frisbee Golf Receptacle North of Playground - Removal of Existing EPDM over Stone - Approx. 1052 sq. ft. - Level Out and Grade Area Using Existing Sand - 56 LF of Wood Borders SITE AMENITIES ARE TO REMAIN - BENCHES AND TRASH RECEPTACLES Installation of Above Noted Play Structures to Include Concrete Footers and Border System Concrete Supply, Delivery and Installation of a Concrete Walkway Covering 288 1 1 1,325.001 1,325.00T I sq. ft. - 6' Wide x 48' Length Filter Fabric Supply, Delivery and Installation of Filter Fabric to Cover Two Areas 1 1,300.00 1,300.00T Totaling 3232 sq. ft. - 2080 sq. ft. for Playground Area -1152 sq. ft. for Swings Area Wood Mulch Supply of ADA Wood Mulch to Cover Multiple Areas Totaling 150 cu. 150 1 32.501 4,875.00T I 1 yds. at a Depth of 12" Signature Print Name/Title Date Subtotal Sales Tax (0.0%) Total P.O. # BEE= Prepared For Steven P.%ulic Organization City of South Miami ' City Hall Prepared By s13O Sunset Drive, 1st Floor Payment Terms South Miami, R33143-5093 Customer Phone (3V5)663-6339 Customer Fax FOUR PARKS BID County Miami Dade Ship To Advanced Recreational Concepts, LLC Melbourne, FL 32934 Date 4/14/2015 Quutotion# 16652 Prepared By AUenCooke - ZK Payment Terms Net 30 Prices Valid Until 6/17/2015 Project Name FOUR PARKS BID Product ID Description QtY Price Total Installation Installation of ADA Wood Mulch to Cover Multiple Areas Totaling 150 150 17.50 2,625.00T cu. ycls. at a Depth of 12" MURRAY PARK 0.00 5800 SW 66th St. South Miami, FL 33143 R3HB2F1FB Playcraft Systems Custom Round 3.5" Hybrid Play System - 5-12 Unit 1 38,929.00 38,929.00T 1306 Playcraft Systems 5-12 Age Appropriate Sign - Rotomolded 1 210.00 210.00T PC-2181 Playcraft Systems Single Post Swing - 8' Height - Two Positions/One 1 1,034.00 1,034.00T Bay with (2) Belt Seats PC-2181-AB Playcraft Systems Single Post Swing Add-A-Bay - 8' Height - Two 1 799.00 799.00T Positions/One Bay with (2) Belt Seats 31101-1.12 Playcraft Systems Full Bucket Seat Upgrade per Bay - (2) Seats 1 196.00 196.00T PC-2475 Playcraft Systems Stand N Spin 1 957.00 957.00T PC-1380 Playcraft Systems Dual Motorcycle Spring Rider HDPE 1 1,348.00 1,348.00T Shop Playground Shop Drawings - Free of Charge I Drawings O.00T FTB-00001 Childforms 12" High Funtimber and Spike 31 39.95 1,238.45T S u btota | Sales Tax (0.O%) Total Signature Print Name/Title Date — P.O. # - AVn -i Upon acceptance of this proposal please sign aboffe gi�d initial the 'ARC Site Preparation Check LList'a the 'ARC General Terms and Conditions' exhib ts attached. Please return initialed copies to ARC. Prepared For Steven P.Ku|kk Organization City of Snuthxxiami - CityHaU Prepared By e130 Sunset Drive, %suHoor Payment Terms South Miami, FL33143- V93 Customer Phone (3D5)663-633g Customer Fax FOUR PARKS BID County Miami Dade Ship To Melbourne, Fl. 32934 Proposai Date 4/14/2015 Quotation # 16652 Prepared By oUenCooke - ZK Payment Terms Net 30 Prices Valid Until 6/17/2015 Project Name FOUR PARKS BID Product ID Description — Qty Price— Total Installation Site Preparation to Include (10' Section of Wrought Iron Fence will 23,600.00 23,600.00T need to be Removed and Re-installed at Completion): - Removal and Disposal of Existing Playground Structure, Two Bay Swings and Independent Play Components - Excavation and Disposal of an Area Covering 3150 sq. ft. at an Average Depth of 6" - Excavation and Disposal of an Area Covering 1152 sq. ft. at an Average Depth of 10" - Swings Area SITE AMENITIES ARE TO REMAIN - BENCHES, PICNIC TABLES AND TRASH RECEPTACLES Installation of Above Noted Play Structures to Include Concrete Footers and Border System up Include 450 sq. ft. of Sand ataDepth of 12" to Create a Sand Box Area Wood Mulch Supply ofADA Wood Mulch to Cover Multiple Areas Totaling 175 cu. 175 32.50 5,687.50T ycls. atm Depth of%2" Installation Installation nfADA Wood Mulch to Cover Multiple Areas TotaUng175 175 17.50 3,062.50T cu. ycls. at a Depth of 12" TOTAL QUOTE COST COVERAGE I I 1 0.00 PLAYCRAFT SYSTEMS FREIGHT O/m Freight Freight Charges 1 12,500.00 12,500.00 THIS |5AN ESTIMATE ONLY. Due ux the volatile nature nfthe 0.00 O,OUT |transportation industry, freight charges may be re-quoted at the time | | | of order. Freight Signature CH|LoRORMSR{E|GHT Freight Charges Print Name/Title Subtotal Sales Tax (0.0%) Total oate— po.w ELI "M ag the'ARC General Terms and Conditions' exhibits attached. Please return initialed copies to ARC. Prepared For Steven p.KuUck Organization City ofSouth Miami ' City Hall Prepared By 6130 Sunset Drive 1st Floor Payment Terms South Miami, Fl. 33143'5V93 Customer Phone (305) 663-6339 Customer Fax FOUR PARKS BID County Miami Dade Ship To Melbourne, FL 32934 TnUFree - Free Fax -I-866-9S7-2356 Proposal Date 4/14/2015 Qvotation# 16652 Prepared By AUenCnohe - ZK Payment Terms Net 30 Prices Valid Until 6/17/2015 Project Name FOUR PARKS BID Product ID Description Qty Price Total THIS IS AN ESTIMATE ONLY, Due to the volatile nature of the 0.00 O.00T transportation industry, freight charges may be re-quoted at the time of order. WOOD MULCH FREIGHT Freight Freight Charges l 2,500.00 2,500.00 THIS |SAN ESTIMATE ONLY. Due %o the volatile nature ofthe 0.00 O.0OT |transportation industry, freight charges may be re-quoted at the time | | | of order. Permitting Permitdngandadm|nistration - Wotethatthisindudeayubmissionmf 1 750.00 750.00 documentation either specified and included in this proposal, such as engineered drawings or provided by the owner - should any additional testingsor documentation be required ' such as soil bearings, site drawings or surveys and sm forth, costs associated with them will be the responsibility of the owner. PERMIT FEES TODG WAIVED 8Y CITY - CHARGES ARE FOR ADMINISTRATION FEES 'DISCOUNT TOTAL DISCOUNT ON BID PROPOSAL 1 -15,144.85 -15,144.85T PAYMENT AND PERFORMANCE BOND 0.00 Bond 1V0% Payment and Performance Bond Based upon Award of Project ' 1 6,550.00 6,550.O0T �$Z75,0V0.00 Include Payment and Performance Bond Cost Signature Print Name/Title Upon acceitance of this r Date Subtotal $274,589.00 Sales Tax (O.0%) $0.00 Total $274/589.00 Qualifications of designing the play structure: For over 20 years, Krauss Craft, Inc. manufacturer of Playcraft Systems has strived to produce the finest playground equipment in the industry, Our design team is led by NPSI certified playground designers who are well versed in the latest playground trends, safety standards, and accessibility guidelines, Advanced Recreational Concepts and Play Space Services have been,providing playground and park solutions for over eight years now and have worked closely with the priva ' te and public sector to provide quality play systems at a reasonable price with quality installation and superior customer service. Our installers and design team are also led by NPSI certified team members, We take the ideas of our customers and turn them into an ideal playground for kids to visit for many years to come, Philosophy of play: At Advanced Recreational Concepts and Play Space Services, with the help of Krauss Craft, Inc., we believe in providing the highest quality playground equipment possible, Our designs incorporate features intended to fuel the imagination, encourage cooperative and social play, develop motor skills and coordination, and, most importantly, provide hours of funl We know the importance of encouraging exercise, health, and fitness for our children and our designs blend recreational play with physically challenging activities, I 'be COMPletedo TVs 0" 11 00 S, Approx. $216 million M ± The response to this questionnaire shall be utilized as part of the CITY'S overall Proposal Evaluation and RESPONDENT selection. I. Number of similar construction projects completed, a) In the past 5 years In the past 5 years On Schedule b) In the past 10 years In the past 10 years On Schedule 2. List the last three (3) completed similar projects. Thomas F. Pepe 12-5-14 a) Project Name: Owner Name: Owner Address: Owner Telephone: 20 Thomas F. Pepe 12-5-14 Owner Telephone: Original Conti-act Completion Time (Days): Original Contract Completion Date: I" �_ Actual Final Contract Price 21 ]. Current workload 4. The following information shall be attached to the proposal. a) RESPONDENTu home office organization chart. b) RESPONDENT's proposed project organizational chart. d Resumes nf proposed key project personnel, including on-site Superintendent. 5. List and describe any: a) Bankruptcy petitions filed byoragainst the Respondent or any predecessor organizations, W Any arbitration or civil or criminal proceedings, or Suspension of contracts ordebarring from Bidding nr Responding by any public agency brought c> against the Respondent in the last five (S) years 6. Government References: List other Government Agencies or Quasi-government Agencies for which you have done business within the past fie(5)years. Name of Agency: Thomas F. Pepe 22 Name of Agency: Address: Telephone No.: Contact Person: Type of Project: Name of Agency: Address: Telephone No.: Contact Person: Type of Project: AiNk Thomas F. Pepe 12-5-14 w Payne Park Playground Location — 579 Payne Parkway, Sarasota, FL 34237 Contract Amount - $613,417.15 Owner — City of Sarasota Architect — DWJA Landscape Architects General Contractor —Advanced Recreational Concepts Contact — Neil Gaines, City of Sarasota Phone Number - (941) 365 -2200 x 6309 Informal Bid with other Playground Manufacturers bidding — Circus Themed Playground to include prefabricated shelters, site amenities, musical equipment, poured in place rubber surfacing and synthetic turf surfacing Job Completed — August 2012 Charleston Park Location - 2541 Charleston Park Dr., Alva, FL 33920 Contract Amount - $63,400.00 Owner — Lee County Parks and Recreation General Contractor — Advanced Recreational Concepts Contact — Kathy Ball Phone Number — (239) 229 -4134 Playground installation to include site work (demolition of existing structure) and wood mulch surfacing Job Completed — April 2014 Buckingham Community Park Location — 9800 Buckingham Road Fort Myers, FL 33905 Contract Amount - $52,500.00 Owner —Lee County Parks and Recreation General Contractor — Play Space Services (sister company) Contact - Deb Honnen Phone Number— (239) 229 -0642 Playground installation to include plastic border system and loose fill rubber mulch surfacing Job Completed —June 2014 Duval County Public Schools — Over (30) Playgrounds Completed with (2) under Contract Most Recent Job Completed — Pickett Elementary School Location — 6305 Old Kings Road North, Jacksonville, FL 32254 Contract Amount - $94,000.00 Owner — Duval County Public Schools General Contractor — Play Space Services (sister company) Contact — Cheryl Thompson Phone Number — (904) 390 -2532 Playground installation to include plastic border system and wood mulch surfacing Job Completed — December 2014 Taylor Morrison Homes — Sarasota Division — (7) Community Playgrounds Completed with (2) under Contract Most Recent Job Completed — Arbor Lakes at Palmer Ranch Location — 5807 Palmer Ranch Parkway, Sarasota, FL 34238 Contract Amount - $67,665.00 Owner — Taylor Morrison Homes General Contractor — Play Space Services (sister company) Contact —Giovanni DeCastro Phone Number — (941) 313 -5131 Playground installation to include plastic borders systems and wood mulch surfacing Job Completed — August 2014 Under Construction with an Estimated Finish Date of February 2015 Siesta Beach Park Location — 948 Beach Rd., Sarasota, FL 34242 Contract Amount - $246,754.10 Owner — Sarasota County Parks and Recreation General Contractor —Jon F. Swift, Inc. Contact — Ross Russo Phone Number— (941) 951 -6100 Custom Beach Themed Playground (Sand Castle and Lifeguard Station) to Include Galvanized Post Shades over Playground, Site Work, Concrete Curbs and Poured In Place Rubber Surfacing STATE OF FLORIDA [D He/She/0eyis/are fully informed concerning the preparation and contents of the attached Proposal and cf all pertinent circumstances concerning such Proposal; (]) Such Proposal ix genuine and is not a collusive orsham Proposal; (4) Neither the said Respondent nor any of its officeo, purtners, o~ners, agentx, rapresentadves, employees or parties in interest, including thisaffiant. have in any way colluded, conspired, connived or agreed, directly or indirecdy, with any other Respondent, 0rm, or person to submit acollusive or sham Proposal in connection with the Work for which the attached Proposal has been submitted; or to refrain from Bidding or proposing in connection with such Work; or have in any manner, directly or indirecdy, sought by agreement or cu||usion, or cmmmunicctiun, or conference with any Respondent, Arm, or person to 8x any uverhead, p,oGt, or cost elements of the Proposal or of any other Raxpondent, or to fix any overheod, pro6t, or cost elements of the Proposal Price or the Proposal Price of any other Reopondent, or to secure through any co||udon, conspiracy, connivance, or unlawful agreement any advantage against (Recipient), or any person interested in the proposed Work; (5) The price or prices quoted in the attached Proposal are fair and proper and are not tainted by any collusion, conspiracy, connivance, or unlawful agreement on the part of the Respondent or any other of its agents, representatives, owners, employees or parties of interest, includingtfo?affiant. Thomas F. Pepe 26 ACKNOWLEDGEMENT STATE OF FLORIDA On this the \"� day ofl 20\� before me, the undersigned Notary Public of the State of Florida, personally appeared Name(s) of individual(s) who appeared before notary) and whose name(s) is/are Subscribed to the within instrument, and he/she/they acknowledge that he/she/4 executed it. Thomas F. Pepe 12-5-14 27 Type of Identification Produced Did take an oath, or Did Not take an oath. Pursuant to the provisions of Paragraph (2) (a) of Section 287.|33.Florida State Statutes – 'A person oraffiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a Proposal or bid on a Contract to provide any goods or services to a public entity, may not submit a Bid or proposal for a Contract with a public entity for the construction of repair o/a public building or public work, may not submit bids orproposals on leases or real property uzo public endty, may not ba awarded to perform Work as a RESPONDENT, Sub-contractor, supplier, Sub-consultant, or Consultant under a Contract with any public endq/, and may not transact business with any public entity in excess of the threshold amount Category Two of Section 287.017, Florida Statutes, for thirty six (36) months from the date o( being placed on the convicted vendor Uxt" The award of any contract hereunder is subject to the provisions of Chapter 112, Florida State Statutes. Respondents must disclose with their Proposals, the name of any officer, director, partner, associate or agent who is also an officer or employee n/ the City of South Miami or its agencies. THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATWS. [print name of the public entity] by =ft — fo E nam an4d I rprint name of entity sub mitting l | understand that "public entity chme' as defined in Paragraph I87133 (|)(g), Florida Statutes, means u violation of any state or federal law by n person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or of the United States, including, but not limited to , any bid, proposal or contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state or of the United States and involving antitrust, fraud, theft, hribery, co||uuion, racketeering, conxpirxcy, or material misrepresentation. 3. | understand that ''cnnvicted" or "conviction" as defined in Paragraph I87.133 (|) (b). Florida Statu*ea, means a finding of guilt or x conviction of public entity crime, with or without an adjudication of gui|t, in any federal or state trial court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, non-jury trial, or entry of a plea of guilty or no|ocontendere. 4. } understand that an^affi|iate''ao defined in Paragraph 28D33(|)(a). means: (� Apredecesororsucceoorofaper�`nconvctedofapub|ic' ��--------- crime; or (N An entity under the control of any natural person who is active in entity management ofd`e entity and who has been convicted of public entity crime. The term "affiliate" includes those officers, Thomas F. Pepe 28 directors, executives, pxrmers, shareholders, employees, members, and agents who are active in the management o/an affiliate. The ownership hy one person o/ shares constituting acontrolling interest in any perxon, or pooling of equipment or income among persons when not for fair market value under an arm's length agreement, shall be a prima facie case that one person controls another person. A person who knowingly enters into u joint venture with u person who has been convicted of public andq/ crime in Florida during the preceding 36 months shall be considered anaffiliate. | understand that a "person" as defined in Paragraph 287.133 (|) (e)` Florida Statutes, means any natural person or entity organized under the laws of any o, or of the United States with the legal power to enter into a binding contract and which bids or proposal or applies to bid or proposal on contracts for the provision of goods or services |+t by a public entity, or which otherwise transacts or applies on transact business with a public entity. The term "person" includes those officem, dimc*o,s, execvdns, partners, shareholders, employees, membeo, and agents who are active in management of an entity. 6 Based on information and belief, the statement which | have marked below in true in relation to thp entity submitting this sworn statement. [indicate which statement applies,] /\1^ Neither the entity submitting this sworn statement, nor any cfits oNcem, diez»om, executives, partncm, sharehoNem, cmp|oyees, membem, or agents who are active in the management of the entity, nor any affiliate of the entity has been charged with and convicted of public entity crime subsequent to July 1, 1989. ____The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, emp�yees, membem, orogems who are acdveiv the man�ementof the end–` oranaffi|iueof the endtyhas been charged v�t6and convicted ofa public cudt7chmesubsequent oo July —" ___ The entity submitting this sworn statement, pr one or more of its officers, directors, executives, partners, shxrehcJdco, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent of July |. 1989. However, there has been a subsequent proceeding before a Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer determined that it was not in the public interest on place the entity submitting this sworn statement on the convicted vendor list. [attach a copy of the final order] I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TD THE CONTRACTING OFFICER-FOR INDENTIFIED IN PARAGRAPH I (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY, N , AT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILEWD.. UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO �ENTERING INT ONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287,017, FLORIDA STA ,,F6R CATEGORY TWO OF ANY CHANGE IN THE INFORMATION CONTAINED IN THIS FORK`-, Sworn onand subscribed before methis day Personally known OR Produced identification (Type of identification) Form PUR 7068 (Rev.06/11/92) ThomaF.pepe re] —u�~ �'Notary Public – State of My commission expires 01 (Printed, typed or stamped c �is ioned name of notary public) LAW NotarY public State of Florida ,pp 11 �'�Z'o "' Fv­" P' Tamara L Ortiz M To y Commission FF 153273 Ole �xpirea 0910912018 �Pjra 91091 29 Whenever two or more Bids or Proposals which are equal with respect to price, quality and service are received by the State or by any political subdivisions for the procurement of commodities or contractual services, a Bid or Proposal received from n business that certifies that it has implemented a drug-free workplace program shall be given preference in the award process. Established procedures for processing tie Bids or Proposals shall be followed if none of the tied vendors have u drug-free workplace program. |n order to have a drug-free workplace program, a business shall: |) Publish a statement notifying employees that the unlawful manufacture, distribution, dispensing, possession, or use of a controlled substance is prohibited in the workplace and specifying the actions that shall be taken against employees for violations of such prohibition. l) Inform employees about the dangers of drug abuse in the workplace, the business' policy cf maintaining a drug-free workplace, any available drug counseling, rehu6i|itation, and employee assistance prog,^mn, and the penalties that may be imposed upon employees for drug abuse violations. 3) Give each employee engaged in providing the commodities or contractual services that are under Bid n copy nf the statement specified in Subsection (|). 4) In the statement specified in Subsection (1), notify the employees, that, as a condition of working of the commodities or contractual services that are under Bid, he employee shall abide by the terms of the statement and shall notify the employee of any conviction of, or plea of guilty or nolo contendere to, any violation of Chapter 893 or of any controlled substance law of the United States or any state, for aviolation occurring in the workplace no later than five (S) business days after such conviction, S) Impose a sanction on, or require the satisfactory participation in a drug abuse assistance or rehabilitation program, if such is available in the employee's community, by any employee who is so convicted. 6) Make a good faith effort to continue to maintain a drug-free workplace through implementation of this section. As the person authorized to sign the statement,, !c�tiFythat this firm complies fully with the above requirements. Print Name: L(kZito c\\,-M^�� Thomas *pen 1E TO THE CITY OF SOUTH MIAMI (Name of[ONTRAC3D0. hereby acknowledge and agree that as CONTRACTOR for the "Playground Demolition and New Installation at Four W0City Parks" project as specified have the sole responsibility for compliance with all the requirements of the Federal Occupational Safety and Health Act of 1970, and all State and local safety and health regulations, and agree to indemnify and hold harmless the City of South Miami and N/A (Consultant) against any and all liability, claims, damages, losses and expenses they may incur due to the failure of(Gub'co^tmctor'onamau): to comply with such act or regulation, Thomas F. Pepe 31 Thomas F. Pepe 12 -5 -14 25 h� . individually and on behalf nf ("Firm")have Name of Representative CompanylVendorlEntity read the City of South Miami ('Cin/)'s Code ofEthics, Section &A-|cf the City's Code of Ordinances and |hereby certify, under penalty of perjury that to the best ofmy knowledge, information and belief. (}) neither | nor the Firm have any conflict of interest (as defined in section 8A,|) with regard to the contract or business that |. and/or the Firm, am(are)about to perform for, orto transact with, the City, and (2) neither I nor any employees, officers, directors of the Firm, nor anyone who has a financial interest greater than 5% in the Firm, has any relative(s), as defined in section 8A- 1, who is an employee of the City or who is(are) an appointed or elected official of the City, or who is(are) a member of any public body created by the City Commission, i.e., a board or committee of the City, [while the ethics code still applies, if the person executing this form is doing so on behalf of a firm whose stock is publicly traded, the statement in this section (2) shall be based solely on the signatory's personal knowledge and he/she is not required to make an independent investigation as to the relationship of employees or those who have a financial interest in the Firm.]; and (3) neither | nor the Firm, nor anyone who has nfinancial interest greater than 5% in the Firm, nor any member of those persons' immediate family (i.e, spnuxe, parentn, chi|drcv, brothers and sisters) has transacted or entered into anycontract(s) with the City or has oHnancia| interest, director indirect, in any business being transacted with the i with any person or agency acting for h e city, other than follows: _(use (if necess ryv, use a separate sheet to supply additional information that will not fit on this line; however, you must make reference, on the above line, to the additional sheet and the additional sheet must be signed under oath). [while the ethics code still applies, if the person executing this form is doing so on behalf of a firm whose stock is publicly traded, the statement in this section (3) shall be based solely on the signatory's personal knowledge and he/she is not required to make an independent investigation as to the relationship of those who have a financial interest in the Firm.]; and (4) no elected and/or appointed official or employee of the City of South Miami, or any of their immediate family members (i.e.' spouse, parcnto, chi|dren, brothers and sisters) has aMnanda| interest, directly orindirectly, in the contract between you and/or Firm d h C h h h following forth following their use a separate names: (' necessary, use " separate sheet `" supply ^"".""v^. information that will not fit on this line; however, you must make refe,ence, on the above line, ~o the additional sheet and the additional sheet must be signed under oa h), The names of all City employees and that of all elected and/or appointed city officials or board members, who own, directly or indirectly, an interest of five percent (5%) or more of the total assets of capital stock in the firm are as follows: (if necessary, use a separate sheet to su ly additional information that will not fit on this line; however, you must make reference, on the above line, to the additional sheet and the additional sheet must be signed under oath). [while the ethics code still applies, if the person executing this form is doing so on behalf of a firm whose stock is publicly traded, the statement in this section (4) shall be based solely on the signatory's personal knowledge and he/she is not required to make an independent investigation as to the financial interest in the Firm of city employees, appointed officials or the immediate family members of elected and/or appointed official or employee.] (5)| and the Firm further agree not oo use mattempt to use any knowledge, property ur resource which may come to us through our position of trust, or through our performance of our duties under the terms of the contract with the City, to secure a special privilege, benefit, or exemption for ourselves, or others. We agree that we may not disclose or use information, not available to members of the general public, for our personal gain or benefit or for the personal gain or benefit of any other person or business entity, outside of the normal gain or benefit anticipated through the performance of the contract. Thomas F, Pepe 32 xV | and the Rnn hereby acknowledge that we have not contracted or transacted any business with the City or any person or agency acting for the City, and that *e have not appeared in representation of any third party 'issi n or agency of the City within the past two years other than as '"" necessary, use a separate sheet to supply additional information that will not fit on this line; however, you must make reference, on the above line, to the additional sheet and the additional sheet must be signed under oath), X:\Purchasing\Vendor Registration\ 12.28.12 RELATED PARTY TRANSACTION VERIFICATION FORM [3].docx (7) Neither | nor any employees, officers, or directors of the Firm, nor any of their immediate family (i.�asa spouse, son, daughter, parent, brother or sister) is related by blood or marriage to: (i) any member of the City Commission; (ii) any city employee; or (iii) any member of any board or agency of the City other than as follows: M(if necessary, use a separate sheet to supply additional information Nthat will not fit on this line; however, you must make reference, on the above line, to the additional sheet and the additional sheet must be signed under oath). [while the ethics code still applies, if the person executing this form is doing so on behalf of a firm whose stock is publicly traded, the statement in this section (7) shall be based solely on the signatory's personal knowledge and he/she is not required to make an independent investigation as to the relationship by blood or marriage of employees, officers, or directors of the Firm, or of any of their immediate family to any appointed or elected officials of the City, or to their immediate family members]. (0)No Other Firm, nor any officers or directors ofthat Other Firm or anyone who has u financial interest greater than 5% in that Other Firm, nor any member of those persons' immediate family (i.e., spouse, parents, children, brothers and sisters) nor any of my immediate family members (hereinafter referred to as "Related Parties") has responded to a solicitation by the City in which I or the Firm that I represent or anyone who has a financial interest greater than 5% in the Firm, or any member of those persons' immediate family (i.e. spouse, parents, children, brothers necessary, use a sepa ate sheet to supply additional information that will not fit on this line; however, you must (if make reference, on the above line, to the additional sheet and the additional sheet must be signed under oath), [while the ethics code still applies, if the person executing this form is doing so on behalf of a firm whose stock is publicly traded, the statement in this section (8) shall be based solely on the signatory's personal knowledge and he/she is not required to make an independent investigation into the Other Firm, or the Firm he/she represents, as to their officers, directors or anyone having a financial interest in those Firms or any of their any member of those persons' immediate farnilyJ (9)| and the Firm agree that we are obligated tosupplement this Verification Form and inform the City ufany change in circumstances that would change our answers to this document. Specifically, after the opening ofany responses toxsolicitation, | and the Firm have ao obligation tosupplement this Verification Form with the name of all Related Parties who have also responded to the same solicitation and to disclose the relationship of those parties to mc and the Firm. (|0A violation of the City's Ethics Code, the giving of any false information or the failure uz supplement this Verification Form, may subject me or the Firm to immediate termination of any agreement with the City, and the imposition of the maximum 'n a 'or any penalties allowed by law. Additionally, violations may be considered by 'xV v ti� and subject to action by t . I i-Dade County Commission on Ethics. Under penalty of perjury, I declare that I have made a diligent /effr nvestigate the matters to which I am attesting hereinabove and that the statements made hereinab r u /andcor��-the best of my knowledge, information and belief. d Thomas F. Pepe 33 0411" ft oath THE CITY OF PLEASANT LIVING W a] P34 k, I bill z W' Project Name: Playground Demolition & New Installation at Four (4) City Parks Date: April 9, 2015 Sent: Fax/E-mail/webpage This addendum submission is issued to clarify, supplement and/or modify the previously issued Solicitation, and is hereby made part of the Documents. All requirements of the Documents not modified herein shall remain in full force and effect as originally set forth. It shall be the sole responsibility of the bidder to secure Addendums that may be issued for a specific solicitation. Is there a budget for this project? Answer to Question #11: There is no line item budget for this project listed in the City's Adopted FY 2014 — 2015 Budget. However for planning purposes, Respondents may use a range between $200K to $275K. Question #2: Is a concrete or asphalt sidewalk from playground to parking lot for Fuchs Park required? Answer to Ouestion #2: The City has re-evaluated this requirement and has determined the concrete sidewalk from playground to parking lot for Fuchs Park will remain as written, with no changes, to the Scope of Services. Question #3: Is the City interested or open to a single post shade structure? Answer to Question #3• No, the City is not open to a single post shade structure. Pagel of Does the City desire one (1)or two (D integrated quad-sail ? As per the Scope of Work, the City expects the Contractor to furnish and install two CU integrated quad-sail canopies at Fuchs Park and Murray Park. Each quad-sail canopy shall be a minimum of 144 sq. |sa Performance Bond required for this Yes a Performance and Payment Bond is required as u "condition of award," but is not required with the Respondents submittal. Regarding RFP#PR2O|5-U4 titled "Playground Demo|itionnndNevv|nnta|ladonu1Four(4) {]tvPurkx" please advise if commercial aluminum metal posts and composite material is an acceptable a|Lernudwa to steel posts for this project. Please refer to Exhibit |, "Scope of Services" in the KFP: structure shall be made upofboth steel hwlpowder and composite material," After the pre bid several of the individuals were talking about how they had access how everyone was scored on the initial bid. Not the price but the actual rating for the different designs. | would like to see these ratings. This will give those individuals unfair advantage to have this information and not provide it to everyone. Answer to Question #7: The information you are referring to is posted on the City'svvubxite` Bids 8 RFP's page. A link tothe page and the previous RFPis below. See "Related Documents:" Page 2 of 2 WIM, Sout 1 iami THE CITY OF PLEASANT LIVING - 0 0 0 Project Name: Playground Demolition & New Installation at Four (4) City Parks UTAM 90917MI 1 Date: April 10, 2015 Sent: Fax/E-mail/webpage This addendum submission is issued to clarify, supplement and/or modify the previously issued Solicitation, and is hereby made part of the Documents. All requirements of the Documents not modified herein shall remain in full force and effect as originally set forth. It shall be the sole responsibility of the bidder to secure Addenclums that may be issued for a specific solicitation. Please advise if the same persons in the previous bid selection committee will be the same or if a new selection committee will be formed. I A - 0 The Selection Committee for this RFP has not been formed at this time. However, this or any members from past Selection Committees can serve as evaluators for the upcoming playground project. Can the same bidder present several bids and designs? No. Respondents shall submit one (1) design for each park site, in accordance with Exhibit 1, Scope of Services, and submit a lump sum base price all four (4) City parks. Page 1 of 2 Question #3: Evaluation on page 24 does not relate to Exhibit 3 page 61 proposal analysis as there are not the same line items on page 24 not on Exhibit 31 Answer to Question #30 The Proposal Analysis was never intended to directly correspond with the Evaluation Criteria on page 24, but only to provide important information for the evaluators. Question #4: Please advise how you would rate 20 points on durability and warranty. Warranty is pretty much the same for all manufacturers. How do you contemplate on evaluate on durability. Would it be based on site visits to playgrounds over five years old? Answer to Question #4: Durability can be evaluated on several factors, such as wind calculations and load capacity per manufacturer and specifications, structural design based on ASTMA and ANSI, etc. Warranty will be evaluated based on manufacturer specifications provided in the submittals; warranties vary from manufacturer to manufacturer. Question #5: Depending upon reply additional time for RFI should be granted. Answer to Ouestion #5: The Submittal Due Date will not be extended at this time. IT SHALL BE THE SOLE RESPONSIBILITY OF THE BIDDER TO SECURE ADDENDUMS THAT MAY BE ISSUED FOR A SPECIFIC SOLICITATION. Page 2 of 2 PLAYS -1 OP ID: MS CERTIFICATE OF LIABILITY INSURANCE DA 01 /23 /2015Y) 01123/2015 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER Insurance and Risk Management of Florida, LLC 220 Crown Oak Centre Drive Longwood, FL 32750 David C Moss INSURED Playspace Services, Inc. & Advanced Recreational Concepts LLC 3125 Skyway Circle Melbourne, FL 32934 -7334 COVERAGES rFRTIPIrATC Kit IaaDCO. David C Moss mQvncnla/ MrryrcyllVV �UVLKAUt NAIC # INSURER A : Great American E &S Ins Co _ 37532 INSURER B :Old Dominion Insurance Company 40231 wsURERC:Bridgefield Employers Ins. Co. 10701 INSURER D: INSURER E - ----- --..— .-- ... —�••. THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO mr.VI01UN NUMbLK: THE INSURED NAMED ABOVE FOR INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT THE POLICY OR OTHER DOCUMENT WITH RESPECT TO PERIOD WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADDL UBR POLICY :1 LTR TYPE OF INSURANCE 1NSD �WVD POLICY NUMBER MM/DD /YYYY POLICY EXP MM/DD/Y LIMITS A X COMMERCIAL GENERAL (ABILITY FXU EACH OCCURRENCE $ 11000,00 CLAIMS -MADE OCCUR X jPL443469601 01/27/20141 01/27/201$ DAMAGE TO RENTED PREMISES 509000 (Ea occurrence , $ MED EXP (Any one person) $ 5100 PERSONAL & ADV INJURY $ 11000,00 GEN'L AGGREGATE LIMIT APPLIES PER: n PRO-I� 'GENERAL AGGREGATE I$ 29000,00 POLICY ECT LOC 1 PRODUCTS COMP /OP AGG ' $ 22000,00 OTHER: $ AUTOMOBILE LIABILITY :COMBINED SINGLE LIMIT Ea ! $ 1,000,000 B X accident BODILY INJURY (Per person) $ ANY AUTO BlGO956H 02/03/2014 1 02/03/2015 ALL OWNED X SCHEDULED BODILY INJURY (Per accident)! $ AUTOS AUTOS X HIRED AUTOS X AUTOS PROPERTY DAMAGE (Per accident) J $ $ X UMBRELLA LIAB X 1 OCCUR A EXCESS LIAB —� 1 EACH OCCURRENCE g 13000,00 AGGREGATE $ 1,000 00 CLAIMS -MADE 1UM443469701 01/27120141 01/27/2015 DED FX RETENTION $ 10,0001 WORKERS COMPENSATION $ C AND EMPLOYERS' LIABILITY YIN 1830 X STATUTE EORH _ E.L. EACH ACCIDENT $ 1,000,00 ANY PROPRIETOR /PARTNER /EXECUTIVE EXCLUDED? N❑ N/A -34$12 07/24/2014 ' 07/24/2015 (Mandatory in NH) Mandatory in I If yes, describe under and E.L. DISEASE - EA EMPLOYE 1 $ 19000900 DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT '', $ 110001000 I DESCRIPTION OF OPERATIONS I LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) Pro'ect: Playground Equipment for Brewer Park, Dante Fascell Park, Fuchs Par & Murray Park - City of South Miami is included as additional insured as respects general liability coverage per written contract, rooTlrlrero unl nor, SOUTHMM City of South Miami 6125 SW 68th Street South Miami, FL 33143 VMI \VLLLFI I IU14 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE I acts -tu'14 ACORD CORPORATION. All rights reserved. ACORD 25 (2014/01) The ACORD name and logo are registered marks of ACORD 2 \ f «! ƒ � # / \. 4 t ?± \� \\} 0 LLI w FM LL Z C i TF :i a f'- a LL O J 0 ui H a LL z a a LML LLJa a J LLJ H ca C &e LLI N a O Q LLI V W Z LLI 2 LLJ J W a J a LL J a O Imm H N Z D omQ� J m u v u - N +0 wo U. 40 An LL um ui L LL d w w rl LL N W N LL d c LL mo N x C ct V d H t s .N. Go � O CC N Or Cr +: c 0 (n -vv z L W W `F In � In N Go In C v r 0% � N a% N m O Q V W W x o► N O V) F- ^ v• °_ Z Z ^ S o }O Q m o w L Z Z L 3 O t N N I}o p �E ~ Q =v� 3 %w E v o ~ o o _ N V V V N N d J Z of rn rn rn v, or _1 rn a N 2 3 N 7 3 N: 3 N? 3 D 3 ~ 0 O c vI c to c to N c (-- J v v v v v W a o 0 W > CL a a V U V H H H X X T d d �� �� J ix CC ot N N Q Q Q } O 4 d 0 0 d a d O 0 N i N i •K � m .� m J a a Q N N N J J J Q Q Q N N 0 . V v v v v v LO N lO ~ N �Ny ui CM N J LO y J J ILA Q V V J od a Q N a w NZ LL tq Q O d ot D Z j Z m p Q W I co 40 CL IIZ L3 C (3 07 ti cog u u -11 S '.,%. n "I m a Al, 41 LIL, tY I -I a m tO I I ce m 0 att Q'I I \ \^ m I I J111 a I ƒ ƒf. a. I 9 m E dui FPFS I • • • M 0 ce z 0 Ul a z 0 v I I �E t < 21-5 o ol\ < � �\ -1 x N z di 0 N U-i V) a 14 CPO r-) 2 z < 0 U U U / -1 Ln U -j C� 0 < U w — L < �j 0 cr V) 0- n lu Lf) LU < \ \ \ \ \ \\ o Z \0 { }) \ } } \ } \\ LAJ z va I 10 a z 0 v I I �E t < 21-5 o ol\ < � �\ -1 x N z di 0 N U-i V) a 14 CPO r-) 2 z < 0 U U U / -1 Ln U -j C� 0 < U w — L < �j 0 cr V) 0- n z 0 Qv O z Z u Q�-"] MR 6 7 o E > rk ra r--i ry) X to rn 6i z 0 N LU V) 2 A. < co u ,-, co N u co LU Ln U- U 0� LU cr U C2 0 cc: < V) a- 0 O LL o 0 "o o 0 t (ij 0 z 0 0 LL, Z u Q�-"] MR 6 7 o E > rk ra r--i ry) X to rn 6i z 0 N LU V) 2 A. < co u ,-, co N u co LU Ln U- U 0� LU cr U C2 0 cc: < V) a- 0 'I LA 75 0 Ln UJ 0 - t 'D 0� < 0 E Z 0 z o L;.2 EE, 5 2 o 0 2 Z a uj 3: -a E 0 ry ii z 0 I 2 v E E 2 E o 2 4: 0 2 2 r5 0 -2 2Z LU 0 No �V, All tznww �5 w z (o 0 rn rn x fV z 0 N uj U) ti I I Q N O w i3c-1 CL N V C Q t.i R i R V CL LU w d } Q a e� a a CL ME 3 N } m co Q Z V 0 v T Lf) — ce W o W w Q uj > u w W 2 :D — UJ W F- Q 0 � � N w CLI H v V i 0 V C 0 t$ L it +f V w yj Cd CL s ivy a t� Y } m C) Z u ® co V k Q �N W LU Lu > rte- v v Gi 6i r m o (A V) 8REVVERPAKK Allen Cooke Pnoject#AR[lRB[B[A Litem Description Quantity R3HD748D8 3 GG-8135 Dome Cap, K3.5 4 S IO09'K35-09ft Post, O9ftR3.5 l S-10102'RY5 Pnst(IO2in) l 5-1010-R35-10ft Post I0ftK3.5 l S-10I1-R35-11ft Post IIftR].S 2 S-10132-KV5 Post(I32in) 3 S-1014-R35-14ft Post I4ftR3.5 4 S ll0l'R35 Square Deck l S-1IO2-K35 Tri-Deck l S-1185-R35 Half Deck 2 S IlO9-LRG-R95'5PN Spinner Deck l S-1109-R35'T Balcony Deck w/Telescope l S-12012-RV Slide, 24in(Curved Steps) l S-1209-24'R35 Transfer Station, 36in R l S-1229-3R35 Climber, Cross Loop 3V-36in l S-I603'R35 Bubble Panel I I-I625-R35 Driver Panel l 5-1639-R35 Clubhouse l S-1664-R95 Panel Pa|'Tic'Tac-Toe l S-1666-K35 Panel Pal, Spinner I 5-1710-4R35-R Slide, Twister 48in(K) l S-18027-12-K35 Shade Sail, l2ft l S'1910'R35 Talk Tube (Post Mounted, Left) I 5-I910-RV (U) Talk Tube l S-1930-R35 Chinning Bar 1 Page 1 of 2 Bill of Materials PLAYCRAFT (continued) S-1959-2RV Ti-Ring Hub (2Section) S'1961-RV ThPad FREP[l305 A2-I305 P[ I305 Safety Sign (2-5. Rouo) FR[P[218I+A8 A2-2I81-213 P[Zl8l-80t Single Post Swing (2B) A2-2181-2FB-AB PC2l8l-80t Single Post Swing (Right-3ide2FB) ti 00 CD CD > cr CD 0 ('D 00 CL CD --j tTl U USG 1:0 O tTl CD t,J say Sy 1-h CO rj Or i4 ti 00 CD CD > cr CD 0 ('D 00 CL CD --j tTl U USG 1:0 O tTl CD t,J say Sy Im it O d: SE ar > cr CA 0 00 0� (01 C, rs O rn cp qq 0 �l Cn I'D Cl) wz CD tz� > Cr CD C! am IM cr Iwo m it O d: SE ar > cr CA 0 00 0� (01 rs O rn cp qq 0 Cn I'D Cl) wz CD tz� > Cr CD C! n Ln 00 ppC.�4� CHs C4 0 CD CD CD 4Q, (jq CD cr CD > ID 0- Vi yy.qq On _10 > 00 r-L C —9 tt ID > 17� U'l 24 �-t cL CA to rt aYWe ry Ln 00 ppC.�4� CHs C4 0 CD CD CD 4Q, (jq CD cr CD > ID 0- Vi yy.qq On _10 > 00 r-L C —9 tt ID > 17� U'l 24 �-t cL CA E3 0 0 43, CD CD 17' CIO V) cn cu L'O cr z z C C 02 02 to tTl 0 0 43, CD CD 17' C7 Dante Fascell 5-12 and Park Playground • • Renderings and Parts LAW Lu o LL 210 -2 -j i 73 ' 0 , �O 2 =0 CO3 Z , � v— � 0 0 E El --& 5 , Lij 'E z s= E W0 uj 0 < 0 Z § a w 2 LD 0 z 0 CL LL < ca V EL —I Wis .0 r= z I M rn LL x cy W z 0 a! N LU Ul) :D Al L) E Z S aj r % 0 Ca a LU Z CL 0. L. 4.1 Q. 0 rn M ppyy 0 m ,41 a m M M < Ln LL. 4; 0) Lft U Q� LU => F- b4 0 ui < C:) uj r. C: C! cr zCL:2.- > WE s U CL 0 Lu < C) R )�3 I 7i \)7 \ } \( \(\. . LU � �\ ;T r-4 x ;T z L�j 0 N Ul) Lij :D ■ I-P ca z Ln I u < CY-' LU 0 : Lu Q LU j \_ o LL, �® uj to ' C- . E �:a= -l- )�3 I 7i \)7 \ } \( \(\. . LU � �\ ;T r-4 x ;T z L�j 0 N Ul) Lij :D ■ I-P ca z Ln I u < CY-' LU 0 V) Lu \ \ \. o 0 U- Z -j Fu Lu j= IN Z 2 M E LU ,2 :2 -7. 2E2.1 a z 0 0 Z T \)7} } \ / { }j. z E E F w � \\ I. m ro ,-i rn 0� �H u r- CL < ui Ln U - < ui U Lu U 0 un CL r-i x N 6i z N LU V) D m z C) Ln C) �-1 I IVII it p hd ce CL uj V LL LU id 51. z CD co rn rn < 'D < r, 00 < rn U') T -i Of < C:) :D Lu — 6i 0 Cc < V) CL 0 E Ltl a� = rn < Lr) -i " cr u CC, LLJ U u uj ::) 0 — C2 Cf (A D- MCI A DANTE FASCELL PARK Allen Cooke Pxoject#4RClSA73378 Item Description Quantity RH3BA692O 3 A2-2400 Balance Beam (Lighming) l GG-8135 Dome Cap, K3.5 20 5'1809-R3S-09ft Post, O9ftR3.S l 5-1010-K95'10ft Post I0ftR3.5 3 S-1011-R35-11ft Post 11ftR3.5 9 S-10I20-KV5 Post(I20in) l S-1012-R35-12ft Post 12ftR3.5 7 5-I0132'RV5 Post(l32in) 2 S-I0I38-RV5 Post(I3Oin) 1 J-1I01-R35 Square Deck I 5-I102-R35 Th-Deck 9 S-1183-R35 Hex Deck Half (S Post) I S-I209-I2-R35 Transfer Station, 24in-R l S-I210-48R35 Climber, Vertical Ladder 42-48in l S-1211'R35 Filler, Step -Z4in,R9.5 l S-1213-5R35 Climber, Fiepo|eS4-0Oin l S-1223-5R35 Climber, Spira|54-b0in l 5-I279-KV5 Climber, Angled Puzzle (Post Mount) 1 S-1283-R95 Climber, Matrix Rope Net Wall I S-1309-R35_11- Half Walls <Sing|e, Left) l S'1435-IRH35 Arch Loop (lMount) l S-l5O0-21-57459R35 Crawl Tube, Inclined 12in <2-Section' 57AS9in> l S-1514R3S Bridge, Inclined Arch I S-I682-R35 Bubble Panel l S-1604 -R35 Chime Panel 1 Page 1 of 2 Bill of Materials PLAYCRAFT (continued) Item Description Quantity S-1615-R35G Store Panel S-1658'05 Drum Panel l S-1679-R35 Bell Panel S-I680I-R35G Crawl Tube Panel S-1702-4K35 Slide, Wave 48in(Doub|e) l S-1705-R35 Slide, Quarter Turn 36in l S-1710-5R35-LL Slide, Twister 6Oin<LZ> l S-IO2-R35 Driver Wheel (Post Mounted) l S-19I7-RVLL Climber, Glide-N-Twist (Leh Handle, Leh Bend) l S-I930-RV Chinning Bar I S-I948-K35 Surf Rider I S-1959-3RV-1 Th-Ring Hub (]Section, lK4ount) l S-1961-RV ThPad 3 S-I966-R35 GymPodSpinner l FREP[l3O6 A2-1306 P[ l]O8 Safety Sign (5-12, Roto) l FREP[2475 S-I949 PC2475Smnd-n-Spin l "2 z 4 z oc u (4: 0 ; C/) CID V) z 72 bA E4 7� 4-- > O d. acs cn as m -=. 0 Q to Im. L) 00 (4� 0 Nr rA 0 u z z 4 z oc u 00000"'00c"), C/) CID V) z El I 1!9 z > > > El I 1!9 Im [a 1!9 > cn 4. th- vie M > -C) oo 4'. 0 r,-: 7:1 Q � an 4m. 0 W ca 0 0 r0 00 Q Im [a 1!9 > C4 C4 r-4 u t4 > Z� = M- c) CD 6 Im [a 1!9 '2 C3 m CD 1-4 7j � 00 aQ) m -ot O Q, tR t7 Cd w chi e� X00. F- I try W UP I;Q IL C4 rA cn W C4 >1 >1 0 C4 ce P4 �14 Ic, cq C4 O C> "t — N 0 t 0 :t — 00 V,) 72 ev 'q '4 Ta 42 "Z; 2 rq tides - cl t4o o 22 _0 'o bb VD z u 40. C) Q u 31EUE um F 9 LTJ 01 " W a W cr,' r-4 ce. c4 c4 c4 c4 r-4 04 04 um F 9 I CIS .0 4 3 c4 0 > E 0. > %5 o 0 U — a) os 7:1 $��� moo tn u -g t)b sn. o cA 4M. 0 00 I yll: Ill rm rig CL z 0 a i*l z Z psY En rrTTll 117-1 nr yll: Ill rm rig z 9 0 cc z 0 v z u c) ol z 3 ui (D F- < 0 —5 2 LL -G —i 75 gf 5 0 e L j \ — z {;:# / \j /) LAJ { 0 z 0 CA \ \3 \ / \, \�\ 2 Z E 0 2 L 0 Ln (Y) LU cm, 4� U- uj F- u :D V) x N z 6i 0 N LU Z) V) (Y) U') \ \ LU 0 z 0 Z 0 QO u r. z 5 �z 0 LE t —0 -0 to -0 E n 9 E 90 2 5 2 MM bid CLl 00 V CL U-j ti LU cr- D F- u V) w (Y) x �o rl) 6i Z 0 N LIJ (A :D 24 00 �z �2 CO z < r- (Y) (Y) rr Lf) 11 Lf) U -I cr C) < :4� W 0 elf CL LLJ uj 4 -m Q¢ LL 0 L'i Z 1,2 2 LLJ -iE .1 r. z 5 �z 0 LE t —0 -0 to -0 E n 9 E 90 2 5 2 MM bid CLl 00 V CL U-j ti LU cr- D F- u V) w (Y) x �o rl) 6i Z 0 N LIJ (A :D 24 00 �z �2 CO z < r- (Y) (Y) rr Lf) 11 Lf) U -I cr C) < :4� W 0 elf CL Cd 0 Z O O Z w 1D O i pk w ti 12 B E a E D2 N, LL z to LI) lJ 0 af CL ri (Y) X to z 0 N LU V) D z C) Ln 4� 6i I-- ti o- 2 2 L.0 UJ q c EL E E c E o < 0 0 ZO LL K E 2 f- LAJ z a.2 E -E t5 L,j 2 -a E 2 2 Cd 0 Z O O Z w 1D O i pk w ti 12 B E a E D2 N, LL z to LI) lJ 0 af CL ri (Y) X to z 0 N LU V) D z C) Ln 4� 6i I-- ti IE �W� IA Lr) cs ,-q --777 CL < ui ro l0 Q LL (Y) Ln LU z Wra LIJ U U Lu D V1 Fin Lr) cs ,-q 11 4 1 111 Avi III DANTE FASCELL PARK Allen Cooke Project# ARC15A7337A Litem � K0 Talk Tube l Description Chinning Bar l Quantity RH963D[D8 S-1901-KV 3 GG-813S Dome Cap, R3.5 8 S-1009-R3S-09ft Post, U9ftRlS I S-10102-KV5 Post(lO2in) l S-I010-R35'10ft Post, l0ftK3.5 I S l0ll-K3S-llft Post 11ftR3j b S-18132-KV5 Post(132in) 3 S-I101-R35 Square Deck l S-1102-R35 Tri Deck l S-I105'R35 Half Deck Z S Il09-LRG R35-SPN Spinner Deck I S-I109-R35-T Balcony Deck wyTelescope I S-12012-RV Slide, 24in(Curved Steps) l S-1209-24-R35 Transfer Station, 36in-R l S-1229-3R35 Climber, Cross Loop 3O-36|n l S-1602-R35 Bubble Panel I 5-1625-K35 Driver Panel l S-1639-R35 Clubhouse l S-I664-R35 Panel Pa|.Tic-Tac-Toe 1 S-I666-K35 Panel Pal, Spinner l 5-1710'4R35-K Slide, Twister 48in(R) I S-1910-R35 Talk Tube (Post Mounted, Left) I S-1910-RV � K0 Talk Tube l 3-2930-R3S Chinning Bar l S-1959-2RV Th'Ring Hub (2Section) I S-1901-KV ThPad 5 Page 1 of 2 Bill of Materials PLAYCRAFT (continued) FREP[I3O5 A2-1305 PC 1305 Safety Sign (2-5, Roto) FREPC2181+A8 A2-2181-213 PC2I8I-80t Single Post Swing (2B) A2-210-2FB-AB P[2l81-D0t Single Post Swing (0ght-Side,2FB) M. CL C) n fvo wo L� tr) If U M- U rn rn rn � 0x r-4 rn ------------- E ea .0 np E cn > 72 E .-To 72 'a In 77! COD 0-0 )- i E A ' I I will it'll, im np E tf) u IL m C� u P- u >1 >1 4� 0 >1 0> 'S! 0. m ids p® C4 C4 C// c?. r-4 P4 ce P4 A ' I I will it'll, im al, u o o DO 7° > 4 to >, M to x 0 CA U M > E 0 to cn > u7 ;3, sa� o U CJ cn 40. cr cri 0.0 — al, MF u o C4 3 C-5 C/) C-) "D 1-- 6 0 a, MF u Fuchs Park Playground Plans, Renderings and Parts List