06-765-010PLUMBING GENERAL NOTES
A. GENERAL
1. THE ENGINEER SHALL BE IMMEDIATELY BE NOTIFIED OF ANY AND ALL EXISTING FIELD CONDITIONS WHICH DEVIATE FROM WHAT
IS SHOWN ON THE PLANS. CONTRACTOR IS RESPONSIBLE TO PROVIDE PRICING FOR A COMPLETE INSTALLATION INCLUDING ANY
COSTS ASSOCIATED WITH FIELD CONDITIONS AT THE TIME OF BIDDING. -
2. IT SHALL BE THE RESPONSIBILITY OF THE PLUMBING CONTRACTOR FOR THE ADVANCED ORDERING OF LONG LEAD ITEMS SO
DELIVERY WILL NOT INTERFERE WITH THE PRODUCTION OF OTHER TRADES RESULTING IN ANY DOWN OR LAG TIME.
3. IT SHALL BE THE RESPONSIBILITY OF THE PLUMBING CONTRACTOR TO PROVIDE ALL LABOR, MATERIALS. AND SUPERVISION
NECESSARY TO ACCOMPLISH THE WORK SHOWN AND /OR NOTED ON THE DRAWINGS. THE PLUMBING CONTRACTOR SHALL INSTALL ALL
NECESSARY OFFSETS, BENDS, AND TRANSITIONS AS REQUIRED TO PROVIDE A COMPLETE AND FULLY OPERATIVE SYSTEM.
4. CONTRACTOR SHALL PAY FOR ALL PERMITS, FEES, INSPECTIONS, TESTS, AND ALL REQUIRED INSURANCE FOR PROTECTION
AGAINST PUBLIC LIABILITY AND PROPERTY DAMAGE FOR THE DURATION OF THE WORK.
5. AFTER BID SELECTION AND PRIOR TO COMMENCEMENT OF WORK, THE PLUMBING CONTRACTOR SHALL SUBMIT SIX (6) COPIES OF
MANUFACTURERS SPECIFICATIONS, PRESENTED IN NOTEBOOK OR A SIMILARLY BOUND FASHION, FOR ALL FIXTURES, PIPING,
EQUIPMENT AND MATERIALS, AS STATED ON THE SCHEDULES AND /OR THE DRAWINGS. THE RESPONSIBILITY TO ACCEPT OR
REJECT ANY PROPOSED SUBSTITUTION REMAINS WITH THE PROJECT ARCHITECT/ENGINEER. THE CONTRACTOR MAY AT HIS
JUDGMENT USE ANY ARTICLE, DEVICE, PRODUCT OR MATERIALS, WHICH IN THE JUDGMENT OF THE PROJECT ENGINEER AS
SPECIFICALLY EXPRESSED IN WRITING, IS EQUAL TO THE ARTICLE, DEVICE, PRODUCT OR MATERIAL SPECIFIED.
6. IT SHALL NOT BE THE INTENT OF THESE DRAWINGS TO SHOW EVERY MINOR DETAIL OF CONSTRUCTION OR RENOVATION. PIPING
RUNS HEREIN ARE SHOWN DIAGRAMMATICALY; DO NOT SCALE DRAWINGS FOR LOCATIONS. EXACT ROUTING SHALL BE DETERMINED
IN THE FIELD, UNLESS OTHERWISE NOTED. LOCATION OF PLUMBING FIXTURES MAY CHANGE. VERIFY EXACT LOCATION WITH
ARCHITECT/ENGINEER PRIOR TO INSTALLATION.
B. WORKMANSHIP
7. ALL WORK SHALL BE PERFORMED BY A LICENSED PLUMBING CONTRACTOR IN A FIRST CLASS WORKMANSHIP LIKE MANNER. SAID
CONTRACTOR SHALL MEET ALL REQUIREMENTS SET FORTH BY LOCAL ORDINANCE AND /OR GOVERNING AUTHORITIES. ALL LABOR
PERFORMED AND MATERIALS USED SHALL BE IN STRICT ACCORDANCE WITH APPLICABLE NATIONAL, STATE, LOCAL CODES AND
ORDINANCES.
8. THE PLUMBING CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR TO ORIGINAL CONDITION ANY AND ALL DAMAGES TO BUILDING
SURFACES, BUILDING SLABS, EQUIPMENT, UTILITIES, AND FURNISHINGS CAUSED BY THE CONTRACTOR DURING THE PERFORMANCE
OF WORK. CORRECTION OF ANY DEFECTS SHALL BE COMPLETED WITHOUT ADDITIONAL CHARGE AND SHALL INCLUDE REPLACEMENT
OR REPAIR OF ANY OTHER PHASE OF THE INSTALLATION WHICH MAY HAVE BEEN DAMAGED THEREBY.
C. PIPING
9. UNLESS OTHERWISE NOTED, ALL POTABLE WATER. RELIEF, DRIP, AND CONDENSATE RISER PIPING SHALL BE TYPE "L" OR
TYPE "K" COPPER WITH WROUGHT COPPER OR BRASS FITTINGS. THE PLUMBING CONTRACTOR SHALL RUN BUILDING CONDENSATE
RISER WITH STUB -OUTS AT THE AIR CONDITIONING UNITS. THE MECHANICAL CONTRACTOR IS RESPONSIBLE TO CONNECT HIS
EQUIPMENT TO THOSE BUILDING CONDENSATE DRAINS.
MATERIALS FOR COMPRESSED GAS AND /OR COMBUSTABLE GAS PIPING AND SLEEVING WILL APPEAR ON PROJECT DRAWINGS.
10. THE COLD WATER PIPE FOR THE PURPOSE OF GROUNDING ELECTRICAL EQUIPMENT SHALL NOT BE A DEAD END CAP BUT SHALL
HAVE A LOOP FORMED WITH A TEE FITTING. THERE SHALL BE NO VALVE INSTALLED ALONG THAT LINE BETWEEN THE MAIN
SERVICE SHUTOFF VALVE AND THE END LOOP.
11. ANY BUILDING HOT WATER SERVICE HAVING MORE THAN 30 LINEAR FEET OF PIPING AS MEASURED FROM THE OUTLET OF THE
WATER HEATER AND ANY HOT WATER RECIRCULATION RETURN LINE SHALL BE INSULATED WITH MINIMUM 1" NOMINAL WALL
THICKNESS CLOSED CELL "IMCOA" INSULATION WITH A MINIMUM DENSITY OF 1.5 LBICU.FT.. INTERIOR CONDENSATE DRAIN
PIPING RUNNING HORIZONTALLY SHALL BE INSULATED WITH MINIMUM 5/8" THICK IMCOA" INSULATION. ALL EXPOSED
PIPING OF ALL HANDICAPPED ACCESSIBLE LAVATORIES SHALL BE INSULATED WITH "TRUEBRO" FASTENING SYSTEM INSULATION;
INSTALLATION USING TAPE AND /OR WIRE IS NOT ACCEPTABLE.
12. UNLESS OTHERWISE NOTED, ALL BUILDING DRAINS, DRAINS. WASTE, VENT, DISCHARGE, RAINWATER AND /OR STORM DRAIN
LEADERS AND /OR CONDUCTORS SHALL BE NO-HUB SERVICE WEIGHT CAST IRON.
13. COMBUSTIBLE PIPING WILL NOT BE PERMITTED IN EXPOSED AREAS, IN RETURN AIR PLENUMS OR CEILING SPACES
USED AS RETURN AIR PLENUMS.
D. INSTALLATION
14. ALL WORK SHALL BE COORDINATED WITH OTHER TRADES TO AVOID ANY CONFLICTS IN LOCATIONS FOR DUCTSWORK, DIFFUSERS,
GRILLES, REGISTERS, PIPING, CONDUIT, EQUIPMENT, ETC., AND NOT TO CAUSE ANY INTERFERENCE WITH THE PROGRESS OF
CONSTRUCTION.
15. WHERE DISSIMILAR METALS ARE TO BE JOINED, APPROVED INSULATING DIELECTRIC UNIONS SHALL BE USED.
16. WHERE CORE DRILLING OF STRUCTURAL SLABS, WALLS OR PARTITIONS IS REQUIRED THE CONTRACTOR SHALL SEAL OPENINGS
WATERTIGHT AFTER PIPING HAS BEEN INSTALLED. LOCATION OF CORED HOLES SHALL BE COORDINATED WITH THE OWNER. AND
WITH THE LOCATION OF EQUIPMENT IN A MANNER TO BE CLEAN AND FUNCTIONAL THE CONTRACTOR SHALL INSTALL ONLY ONE
PIPE PER HOLE AND SEAL THE OPENING AROUND THE PIPE AS SPECIFIED.
E. EQUIPMENT AND MATERIALS
17. UNLESS NOTED AS EXISTING, ALL EQUIPMENT INCLUDING FIXTURES, PUMPS, TANKS, PIPING, FITTINGS, VALVES, METERING
DEVICES AND GAUGES SHALL BE NEW AND SHALL BEAR U.L. F.M. OR OTHER APPLICABLE TESTING LABORATORY LABEL
18. THE PLUMBING CONTRACTOR SHALL PROVIDE FLEXIBLE, WIRE BRAIDED, SPIRAL REINFORCED HOSE CONNECTIONS TO ALL PUMPS
AND MECHANICAL EQUIPMENT.
19. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL WATER METERS AND ENCLOSURES UNLESS OTHERWISE NOTED.
20. THE CONTRACTOR SHALL FURNISH AND INSTALL ANY REQUIRED BACKFLOW PREVENTERS ON MAIN WATER SUPPLY.
21. THE CONTRACTOR SHALL FURNISH AND INSTALL READILY ACCESSIBLE SHUTOFF VALVES IN ALL BRANCH WATER LINES SERVING
ANY ROOM HAVING PLUMBING FIXTURES. SHUTOFF VALVES SHALL BE CAST BRONZE, 3 PIECE BALL TYPE VALVE WITH PTFE
SEATS. ALL FIXTURES SHALL BE PROVIDED WITH READILY ACCESSIBLE STOP VALVES.
GAS VALVES SHALL HAVE TEFLON DISK AND PACKING, AND SHALL BE A.G.A. LABORATORIES CERTIFIED.
GATE VALVES, PLUG VALVES AND STEEL BODY VALVES ARE NOT PERMITTED FOR USE WITH GAS.
22. THE CONTRACTOR SHALL FURNISH AND INSTALL WATER HAMMER ARRESTERS AT EACH PLUMBING FIXTURE WITH A QUICK CLOSING
VALVE ACCORDING TO THE 2004 FBC PLUMBING CODE SECTION 604.9 AND STANDARD P.D.I. WH -201. ALL THREADED WATER OUTLETS
EXCEPT FOR AUTOMATIC CLOTHES AND AUTOMATIC DISH WASHERS SHALL BE FURNISHED WITH APPROVED VACUUM BREAKERS.
F. SAFETY
24. PROVIDE FIRE RETARDANT U.L APPROVED SEALANT ON ALL PENETRATIONS OF FIRE RATED STRUCTURAL SLABS, WALLS AND
PARTITIONS. IT SHALL BE THE RESPONSIBILITY OF THE PLUMBING CONTRACTOR TO VERIFY, PRIOR TO SUBMITTING BID,
LOCATIONS OF ALL SUCH FIRE RATED STRUCTURAL SLABS, WALLS AND PARTITIONS.
25. THE PLUMBING CONTRACTOR SHALL KEEP ALL AREAS IN WHICH WORK IS BEING PERFORMED, FREE FROM DEBRIS AT ALL TIMES
AND SAID AREAS SHALL BE LEFT BROOM CLEAN AT THE END OF EACH WORKING DAY.
G. COMPLETION
26. THE PLUMBING CONTRACTOR SHALL PROVIDE A COMPLETE SET OF AS BUILT DRAWINGS TO THE ENGINEER UPON COMPLETION OF
INSTALLATION. IF FIELD CHANGES ARE MADE WHICH DEVIATE FROM ENGINEERING DRAWINGS TO THE EXTENT THAT THE
BUILDING DEPARTMENT REQUIRES THESE CHANGES BE INCORPORATED PRIOR TO INSPECTION, THE CONTRACTOR SHALL PROVIDE
SKETCHES TO THE ENGINEER FOR INCORPORATION INTO THE BUILDING PLANS. ENGINEERING EXPENSES THAT ARE INCURRED DUE
TO REVISIONS OR SUBSTITUTIONS REQUESTED BY THE CONTRACTOR SHALL BE PAID FOR BY THAT CONTRACTOR.
27. PLUMBING CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORKMANSHIP TO BE FREE FROM DEFECTS FOR A PERIOD OF NOT
LESS THAN ONE (1) YEAR FROM DATE OF ACCEPTANCE, AND ALL GUARANTEES AND WARRANTIES SHALL BE DELIVERED TO THE
OWNER.
H. GENERAL CONDITIONS FOR RENOVATIONS
28. IF THE NATURE OF THIS CONTRACT INVOLVES EXTENSIVE REMODELING OF EXISTING FACILITIES, THE PLUMBING CONTRACTOR
SHALL VISIT THE JOB SITE PRIOR TO BID AND VERIFY ALL CONDITIONS, LOCATIONS. DIMENSIONS. MATERIALS. ELEVATIONS
AND COUNTS AS SHOWN AND /OR NOTED ON THE DRAWINGS AND INCLUDE IN THE BID ANY AND ALL FABRICATION REQUIRED PRIOR
TO INSTALLATION. THE CONTRACTOR SHALL VERIFY SIZE, ELEVATION, AND PRESENT STATE OF ALL EXISTING UTILITIES, AND
SHALL NOTIFY ENGINEER IF PIPE SIZE CHANGES ARE REQUIRED BECAUSE OF EXISTING CONDITIONS.
29. THE PLUMBING CONTRACTOR SHALL DETERMINE THE EXTENT TO WHICH EXISTING PIPING WILL HAVE TO BE REROUTED,
RELOCATED. OR RECONNECTED, AND THE AMOUNT OF ADDITIONAL WORK WHICH MAY BE REQUIRED DUE TO THE PHYSICAL
CONDITIONS OF THE PIPING SHALL BE PERFORMED UNDER THIS CONTRACT WITHOUT ADDITIONAL CHARGES TO THE OWNER
30. THE CONTRACTOR SHALL COORDINATE HIS WORK WITH THE ACTUAL DIMENSIONS AND ROUGH -IN LOCATIONS FOR THE EQUIPMENT
BEING REUSED.
31. PLUMBING EQUIPMENT THAT IS TO REMAIN IN AREAS WHERE THE INSTALLATION WILL INTERFERE WITH THE INSTALLATION OF
NEW EQUIPMENT OR NEW ARCHITECTURAL CHANGES, SHALL BE REMOVED. RELOCATED, OR RE- ROUTED TO PERMIT COMPLETION OF
SUCH WORK.
32. SALVAGED MATERIALS, EQUIPMENT, AND PLUMBING FIXTURES SHALL BE DELIVERED TO THE OWNER AT HIS PROPERTY AND STORED
WITHIN THE BUILDING WHERE DIRECTED. ANY REMOVED MATERIALS OR EQUIPMENT WHICH THE OWNER DOES NOT WISH TO KEEP
SHALL BE DISPOSED OF BY THE CONTRACTOR, WITHOUT ADDITIONAL COST TO THE OWNER.
33. ALL PRESENT PIPING IN EXISTING AREAS TO BE ALTERED. WHICH WILL HAVE NO USE UPON COMPLETION OF THE ALTERATIONS
SHALL BE REMOVED. PIPING WHICH IS OR WILL BECOME EXPOSED TO VIEW, OR WILL INTERFERE WITH THE INSTALLATION AND
COMPLETION OF THE WORK REQUIRED, SHALL BE RELOCATED. PIPING SHALL NOT BE RUN EXPOSED THROUGH EXISTING OR NEW
FINISHED SPACE UNLESS WRITTEN PERMISSION IS GRANTED BY THE OWNER.
34. INTERRUPTION OF EXISTING FACULTIES OR SERVICES SHALL BE KEPT TO A MINIMUM AND THE CONTRACTOR SHALL FURNISH ALL
MATERIALS AND LABOR REQUIRED WHENEVER TEMPORARY CONDITIONS ARE NECESSARY TO MAINTAIN CONTINUITY OF SERVICE.
INTERRUPTION OF SERVICES, THE INSTALLATION OF TEMPORARY FACILITIES, AND THE WORK OF MAKING FINAL CONNECTIONS TO
NEW WORK SHALL BE DONE ONLY AT SUCH TIMES AS PERMITTED AND SCHEDULED BY THE OWNER WITHOUT ADDITIONAL COST.
THE PLUMBING CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE THE SERVICE INTERRUPTIONS WITH THE OWNER AND GENERAL
CONTRACTOR.
I
PLUMBING FIXTURE SCHEDULE
SYM
DESCRIPTION
MANUFACTURER
MODEL #
NAME
COLOR/FINISH
VALVE/FAUCET
ACCESSORIES/REMARKS
LV2
LAVATORY
AMERICAN STD.
0355.012
LUCERNE
WHITE
MONTERREY /6531.1
BELOW GRADE
SKI
HAND SINK
AMERICAN STD.
0355.012
LUCERNE
WHITE
MONTERREY /6531.1
BLACK STEEL PIPE
WC2
TOILET
AMERICAN STD.
2998.012
CADET
WHITE
CI
SEAT MODEL #95SS
GM
GAS WATER HEATER
A.O. SMITH
BTH199
RD
ROOF DRAIN
CU
100 GALLON TANK GAS FIRED WATER HEATER
FD1
FLOOR DRAIN
ZURN
ZN- 415 -P -Y
SF
CAST IRON
TPV Z -1022
5B NICKEL BRONZE STRAINER. SEDIMENT BUCKET & TRAP PRIMER CON
FS1
FLOOR SINK W /BUCKET
JOSAM
JPFS -PVC
SK
SINK
TPV Z -1022
INTERNAL DOME STRAINER TRAP PRIMER CONN.
FFD
FUNNEL DRAIN
ID
INSIDE DIAMETER
URN
URINAL
IE
INVERT ELEVATION
WC
WATER CLOSET
NOTES:
1. FIXTURES LISTED ON THIS SCHEDULE COMPLY WITH FLORIDA BUILDING CODE (PLUMBING) 2004 EDITION,TABLE 604.4.
2. CONTRACTOR PROVIDED FIXTURES SHALL COMPLY WITH FLORIDA BUILDING CODE (PLUMBING), 2004 EDITION, TABLE 604.4.
3. TESTING OF THE SANITARY DRAINAGE & VENT SYSTEM SHALL BE IN ACCORDANCE WITH FBC (PLUMBING) 2004 EDITION, SECTION 312.
4. TESTING OF STI ATE YS HA I RDANCE WITH FBC (PLUMBING) 2004 EDITION, SECTION 312.
5. DISIN OF THE POTABLE WATER SHALL BE IN ACCORDA E WITH FBC (PLUMBING) 2004 EDITION, SECTION 610.
6. ALL FLOOR DRAINS SHALL BE RESEALED.
ASME T & P RI
GLASS LINED -
STORAGE TANK
GALVANIZED SAFETY
PAN WITH DRAIN
GWH
WELDED STEEL SUPPORT \A
STAND PAINTED TO
MATCH HEATER.
2" DISCHARGE BI
FLOOR
SAFEWASTE INTO
SINK DISCHARGE
GAS FIRE[
WATER HE
ANTI- SIPHON
VACUUM BREAKER
ALL VALVE (TYP)
WATER THERMAL
EXPANSION TANK
OT WATER CIRCULATOR
NION (TYP)
OT WATER RETURN
1 ` -COLD WATER SUPPLY
OT WATER SERVICE
�4" RELIEF PIPE DISCHARGE INTO
HUB DRAIN WITH 2" AIR CAP
WHICH IS CONNECTED TO JANITORS
SINK DISCHARGE WITH SAFEWASTE
BELOW GRADE.
1" SAFETY PAN DRAIN
DISCHARGE INTO JANITOR SINK
C ., 3" HUB DRAIN ABOVE
GRADE ADJACENT TO WALL
14 11 i ADJACENT JANITOR SINK
WATER HEATER DETAIL
WITH EXPANSION TANK
NO
ROOF
NTAKE VENT
(SIZE ACCORDING TO
MANUFACTURER'S
SPECIFICATIONS)
AUST VENT.
ACCORDING TO
JUFACTURER'S
;CIFICATIONS.
MINATION OF EXHAUST
IT SHALL BE A MINIMUM
10' AWAY FROM ANY
)F- MOUNTED 0/A INTAKE.
GAS WATER HEATER
VENT DETAIL
NO SCALE
PLUMBING SYMBOL LEGEND
SYMBOL DESCRIPTION ABBREV.
LIGHT LINE DENOTES EXISTING PIPING; HEAVY LINE DENOTES NEW PIPING
140
F -
RWL
SD
CD
RW-
AW-
GW-
IW
----- TPL -----
----- A - - - --
----- 0 - - - --
-----HV-----
----- LV - - - --
LP
G
FOS
FOR
----- AV - - - --
-----FOV-----
0
Lei
e0
(.1
Ly
T
0
WCO
FCO
Q AC
'19--
JIL
E.T.R.
DOMESTIC OR POTABLE COLD WATER
DOMESTIC HOT WATER ( 110' f )
DOMESTIC HOT WATER RETURN
HOT WATER ( 140• f )
FIRE PROTECTION WATER LINE
RAIN WATER LEADER
RAINWATER OR STORM DRAIN
CONDENSATE DRAIN LINE
RECLAIMED OR GRAY WATER
ACID WASTE
GREASE WASTE
INDIRECT OR SAFE WASTE
SANITARY, SOIL OR WASTE
TRAP PRIMER LINE
COMPRESSED AIR
OXYGEN
MEDICAL VACUUM
LABORATORY VACUUM LINE
LIQUID PROPANE
NATURAL GAS LOW PRESSURE
FUEL OIL SUPPLY
FUEL OIL RETURN
ACID VENT
FUEL OIL VENT
VENT LINE - SANITARY /WASTE
RISER DOWN (ELBOW)
RISER UP (ELBOW)
RISE OR DROP
CW
HW
HWR
140
F
RWL
SD
CD
RW
AW
GW
SW
SAN
TPL
AIR
OX
HV
LV
LP
G
FOS
FOR
HV
FOV
V
GATE OR BALL SHUT -OFF VALVE AS REQ'D GV
(STOP VALVES NOT SHOWN ON PLANS)
BALL VALVE BV
GLOBE VALVE GLV
REDUCER
PRESSURE & TEMP. RELIEF VALVE
SWING CHECK VALVE
BALANCING VALVE
UNION
FLANGE
VALVED AND CAPPED END
CAPPED END
HOSE BIBB WITH VACUUM BREAKER
PRESSURE REDUCING (SPECIFY TYPE)
PRESSURE GAUGE
THERMOMETER
FLOOR DRAIN TRAP PRIMED
FLOOR DRAIN ( RISER )
WATER CLOSET (RISER)
ROOF DRAIN
WALL CLEAN -OUT ( RISER )
FLOOR OR GRADE CLEAN -OUT
AIR CHAMBER
OR SHOCK ABSORBER
POINT OF CONNECTION BETWEEN
NEW & EXISITING SYSTEM OR WORK
VENT THROUGH ROOF
EXISTING TO REMAIN
P &T
CHV
BLV
HB
PR
PG
T
FD/TP
FD
WC
RD
CO
F /GCO
ILp
Ulm
NOTE: THESE ARE STANDARD SYMBOLS AND ALL MAY NOT APPEAR ON PROJECT
DRAWINGS; WHEREVER THE SYMBOL ON THE PROJECT DRAWING OCCURS
THE ITEM SHALL BE PROVIDED AND INSTALLED.
.';\;•,•` � mac'`: •.� ����
327.
G AT CF
•
•.� 1�l••.L - • ,t a
Architects
Engineers
Planners
901 Ponce de Leon Blvd., Suite 900
Coral Gables, Florida 33134
Vacs 305.445.2900 Fat 305.445.3366
AAC002142 EB0005022
ABBREVIATIONS
W
AG
ABOVE GRADE
LV
LAVATORY
AL
ALUMINUM
LW
LIQUID WASTE
BFP
BACK FLOW PREVENTOR
MH
MANHOLE
BG
BELOW GRADE
MS
MOP SINK
BR
BRONZE
NB
NICKEL BRONZE
BSP
BLACK STEEL PIPE
OD
OUTSIDE DIAMETER
CB
CATCH BASIN
RB
ROUGH BRASS
CI
CASTIRON
RC
ROUGH CHROME
CP
CHROME PLATED
RD
ROOF DRAIN
CU
COPPER
RE
RIM ELEVATION
EWC
ELECTRIC WATER COOLER
SF
SQUARE FEET
EWH
ELECTRIC WATER HEATER
SH
SHOWER
GA
GALVANIZED
SK
SINK
GPM
GALLONS PER MINUTE
SS
STAINLESS STEEL
ID
INSIDE DIAMETER
URN
URINAL
IE
INVERT ELEVATION
WC
WATER CLOSET
PLUMBING SYMBOL LEGEND
SYMBOL DESCRIPTION ABBREV.
LIGHT LINE DENOTES EXISTING PIPING; HEAVY LINE DENOTES NEW PIPING
140
F -
RWL
SD
CD
RW-
AW-
GW-
IW
----- TPL -----
----- A - - - --
----- 0 - - - --
-----HV-----
----- LV - - - --
LP
G
FOS
FOR
----- AV - - - --
-----FOV-----
0
Lei
e0
(.1
Ly
T
0
WCO
FCO
Q AC
'19--
JIL
E.T.R.
DOMESTIC OR POTABLE COLD WATER
DOMESTIC HOT WATER ( 110' f )
DOMESTIC HOT WATER RETURN
HOT WATER ( 140• f )
FIRE PROTECTION WATER LINE
RAIN WATER LEADER
RAINWATER OR STORM DRAIN
CONDENSATE DRAIN LINE
RECLAIMED OR GRAY WATER
ACID WASTE
GREASE WASTE
INDIRECT OR SAFE WASTE
SANITARY, SOIL OR WASTE
TRAP PRIMER LINE
COMPRESSED AIR
OXYGEN
MEDICAL VACUUM
LABORATORY VACUUM LINE
LIQUID PROPANE
NATURAL GAS LOW PRESSURE
FUEL OIL SUPPLY
FUEL OIL RETURN
ACID VENT
FUEL OIL VENT
VENT LINE - SANITARY /WASTE
RISER DOWN (ELBOW)
RISER UP (ELBOW)
RISE OR DROP
CW
HW
HWR
140
F
RWL
SD
CD
RW
AW
GW
SW
SAN
TPL
AIR
OX
HV
LV
LP
G
FOS
FOR
HV
FOV
V
GATE OR BALL SHUT -OFF VALVE AS REQ'D GV
(STOP VALVES NOT SHOWN ON PLANS)
BALL VALVE BV
GLOBE VALVE GLV
REDUCER
PRESSURE & TEMP. RELIEF VALVE
SWING CHECK VALVE
BALANCING VALVE
UNION
FLANGE
VALVED AND CAPPED END
CAPPED END
HOSE BIBB WITH VACUUM BREAKER
PRESSURE REDUCING (SPECIFY TYPE)
PRESSURE GAUGE
THERMOMETER
FLOOR DRAIN TRAP PRIMED
FLOOR DRAIN ( RISER )
WATER CLOSET (RISER)
ROOF DRAIN
WALL CLEAN -OUT ( RISER )
FLOOR OR GRADE CLEAN -OUT
AIR CHAMBER
OR SHOCK ABSORBER
POINT OF CONNECTION BETWEEN
NEW & EXISITING SYSTEM OR WORK
VENT THROUGH ROOF
EXISTING TO REMAIN
P &T
CHV
BLV
HB
PR
PG
T
FD/TP
FD
WC
RD
CO
F /GCO
ILp
Ulm
NOTE: THESE ARE STANDARD SYMBOLS AND ALL MAY NOT APPEAR ON PROJECT
DRAWINGS; WHEREVER THE SYMBOL ON THE PROJECT DRAWING OCCURS
THE ITEM SHALL BE PROVIDED AND INSTALLED.
.';\;•,•` � mac'`: •.� ����
327.
G AT CF
•
•.� 1�l••.L - • ,t a
Architects
Engineers
Planners
901 Ponce de Leon Blvd., Suite 900
Coral Gables, Florida 33134
Vacs 305.445.2900 Fat 305.445.3366
AAC002142 EB0005022
J 0 B N U M B E R
01702.01
FILE No.
DRAWN
REVIEWED:
CHECKED
OED ENGINEERlIG.INC.
CONSULTING ENGINEERS
1318 S.E. 2nd AVE.
Certificate No. EB0005720
FtLauderdole, Florida 33316
Ph 954 -761 -7117 Fx 954- 761 -7915
QED Job 26007
TO W BM OF OUR IaLONLEDCE MM PLANS AID
SPEIW ATIONS AS 91BYflED NO E IM COMPLY VIM
THE DOS= N1E394ETAI0N5 AND PRONSKM OF Ilf
APPLJCABLE BLUM CODES 7HS DRANNB 5 THE
SOLE PROPERTY OP• OED DIOME W NC.' AND IS AN
NSRUMOU OF SEWAGE NOT 70 BE REPRODUCED N
NHOIE OR N PART WRIOUT W DRESS MM
PEIMMSSION OF GO DKIAMMILB NC.
DATE : 02/23/06
1 S S U E
R E V I S 1 0 N S
1 15.15.061BLDG DPT.
2 15.30.061BLDG DPT.
S H E E T T I T L E
PLUMBING
NOTES
SHEET NU MBE R
P -3
W
0
�
0
LL
W
E
O
U
w
W
-C
m
�-
4-)
Q6�
O
0
Z 0
W LL_
H
cy
''nn
u J
V rrnn )
J 0 B N U M B E R
01702.01
FILE No.
DRAWN
REVIEWED:
CHECKED
OED ENGINEERlIG.INC.
CONSULTING ENGINEERS
1318 S.E. 2nd AVE.
Certificate No. EB0005720
FtLauderdole, Florida 33316
Ph 954 -761 -7117 Fx 954- 761 -7915
QED Job 26007
TO W BM OF OUR IaLONLEDCE MM PLANS AID
SPEIW ATIONS AS 91BYflED NO E IM COMPLY VIM
THE DOS= N1E394ETAI0N5 AND PRONSKM OF Ilf
APPLJCABLE BLUM CODES 7HS DRANNB 5 THE
SOLE PROPERTY OP• OED DIOME W NC.' AND IS AN
NSRUMOU OF SEWAGE NOT 70 BE REPRODUCED N
NHOIE OR N PART WRIOUT W DRESS MM
PEIMMSSION OF GO DKIAMMILB NC.
DATE : 02/23/06
1 S S U E
R E V I S 1 0 N S
1 15.15.061BLDG DPT.
2 15.30.061BLDG DPT.
S H E E T T I T L E
PLUMBING
NOTES
SHEET NU MBE R
P -3