Loading...
1THE CITY OF PLEASANT LIVING To: FROM: DATE: SUBJECT: BACKGROUND: CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM The Honorable Mayor & Members of the City Commission Steven Alexander, City Manager Agenda Item No.:l May 2,2017 A Resolution authorizing the City Manager to execute a professional service work order to Stantec Consulting Services Inc., for the Design of Roadway Resurfacing and Reconstruction Improvement Projects. The roadways listed below exhibit a depression along the length of the road and longitudinal and perpendicular cracks throughout. Public Works Department has asked Stantec Consulting Services to provide design services and construction documents for the Roadway Resurfacing and Reconstruction at the following locations: 1. SW 82 nd StJ;eet from SW 60th to 62 nd Avenue 2. SW 63 rd Avenue from SW 78 th to 80th Street 3. SW 79 th Street from Canal to SW 59 th Avenue 4. SW 61 st Avenue from SW 83 rd to SW 84 th Street Stantec Consulting Services, Inc is one of four firms selected by Resolution No. 060-17-14861, to provide professional service agreement for engineering services on as needed basis in accordance with Florida Statute 287.055, "Consultants Competitive Negotiation Act". PROPOSAL AMOUNT: $26,210 FUND & ACCOUNT: Expenditures related to this contract shall be charged to the People's Transportation Tax Fund Account for an amount not to exceed $26,210 Account number 124-1730-541-6490 which has a balance of $1,372,892.88 before this request was made. AnACHMENTS: Resolution Resolution #060-17-14861 Professional Services Agreement Stantec Consulting Services Inc., proposal letter dated April 20, 2017 1 RESOLUTION NO: _____ _ 2 A Resolution authorizing the City Manager to execute a professional service work 3 order for Stantec Consulting Services Inc., for the Roadway Resurfacing and 4 Reconstruction Improvement Project. 5 WHEREAS, the Mayor and City Commission wish to Resurface and Reconstruct various 6 roadways within the City of South Miami; and 7 WHEREAS, Stantec Consulting Services, Inc., is one of four firms selected by Resolution 8 No. 060-17-14861, to provide professional service agreement for engineering services on as 9 needed basis in accordance with Florida Statute 287.055, "Consultants Competitive Negotiation 10 Act;" and 11 WHEREAS, Stantec Consulting Services, Inc., submitted a proposal for professional 12 engineering services; and 13 WHEREAS, the scope of services, staff allocation and man-hours were negotiated; and 14 WHEREAS, the amount of $26,210 was found to be comprehensive and cost effective in 15 its design approach; and 16 WHEREAS, the Mayor and City Commission desires to authorize the City Manager to 17 execute a professional service work order with Stantec Consulting Services, Inc., for various 18 Roadway Resurfacing and Reconstruction. 19 NOW THEREFORE BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE 20 CITY OF SOUTH MIAMI, FLORIDA; 21 Section 1. The City Manager is hereby authorized to execute a professional service work 22 order for Stantec Consulting Services, Inc., to provide Construction Documents for the Roadway 23 Resurfacing and Reconstruction Project for an amount not to exceed $26,210. The expenditure 24 is to be charged to the People's Transportation Tax Fund Account Number 124-1730-541-6490 25 with an account balance of $1,372,892.88 before this request was made. 26 Section 2. Severability. If any section, clause, sentence, or phrase of this resolution is 27 for any reason held invalid or unconstitutional by a court of competent jurisdiction, this holding 28 shall not affect the validity of the remaining portions of this resolution. 29 Section 3. Effective Date: This resolution shall take effect immediately upon 30 enactment. 31 Page 1 of 2 32 PASSED AND ADOPTED this _ day of ,2017. 33 34 ATTEST: APPROVED: 35 36 37 38 CITY CLERK MAYOR 39 40 41 COMMISSION VOTE: 42 READ AND APPROVED AS TO FORM, 43 LANGUAGE, LEGALITY AND EXECUTION Mayor Stoddard: 44 EXECUTION THEREOF Vice Mayor Welsh: 45 Commissioner Harris: 46 Commissioner Liebman: 47 CITY ATTORNEY Commissioner Edmond: Page 2 of 2 RESOLUTION NO: 060-1:7-14861 A Resolution authorizing the City Manager to enter Into a multi-year contract with EAC Consulting, Inc., Marlin Engineering, Inc., SRS Engineering, Inc., and Stantec for general engineering services on an as needed basis. WHEREAS, the City solicited a Request for Qualifications (RFQ) to retain qualified consultants to provide various professional and general engineering and architectural services on an as needed basis; and WHEREAS, the professional services are required on an as needed basis and on a rotation basis in accordance with Florida Statute 287.055, "Consultants Competitive Negotiation Act;" and WHEREAS, a Selection Committee comprised of City staff, reviewed the proposals received and identified a short list of respondents for further review; and WHEREAS, the short list of respondents were interviewed by the Selection Committee and subsequently scored and ranked; and WHEREAS, according to the terms and scope of services in the RFQ, the City intends to retain a maximum of four (4) qualified firms under four (4) separate but similar agreements to fulfill the City's needs and meet the requirements for quick response and specialized services; and WHEREAS, the Mayor and City Commission desires to authorize the City Manager to execute the professional service agreements. WHEREAS, the Professional Service Agreement with the firms shall be for a term of three (3) years and an option to renew, at the discretion of the City Manager, for one (1) two (2) year renewal for a maximum term of five (5) consecutive years. NOW THEREFORE BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA; Section 1. The City Manager is authorized to enter into non-exclusive multi-year contracts with the firms for professional and general engineering services on an as needed and on a rotation basis in accordance with Florida Statute 287.055, "Consultants Competitive Negotiation Act" and shall be for a term of three (3) years and an option to renew, at the discretion of the City Manager, for one (1) two (2) year renewal for a maximum term of five (5) tonsecutive years. A copy of the contract is attached. Section 2. Severability. If any section, clause, sentence, or phrase of this resolution is for any reason held invalid or unconstitutional by a court of competent Page 10f2 Res. No. 060-17-14861' jurisdiction, this holding shall not affect the validity of the remaining portions of this resolution. Section 3. Effective Date: This resolution shall take effect immediately upon enactment. PASSED AND ADOPTED this l!. day of March 12017. ATIEST: APPROVED: ~ (l!ll~f!rxl4.jJ Page 2of2 COMMISSION VOTE: 5-0 Mayor Stoddard: Yea Vice Mayor Welsh: Yea Commissioner Harris: Yea Commissioner Liebman: Yea Commissioner Edmond: Yea Stantec April 20, 2017 City of South Miami Ponce de Leon Boulevard, SuHe 900 Coral Gables, Florida 33134 Tel: (305) 445-2900 Public Works Engineering & Construction Division 4795 SW 75th Avenue Miami, FL 33155 Main: (305) 403-2063 Attention: Mr. Aurelio Carmenates, P.E. Capital Improvement Project Manager Reference: Road Resurfacing & Reconstruction -4 Locations City of South Miami, Florida Dear Mr. Carmenates: We are pleased to present this proposal for professional engineering services .. We understand that the City would like to complete road resurfacing and reconstruction at several local roads as shown in the attached aerials. Some areas of the road, notably the centerline, exhibit various levels of deterioration. The damaged areas will require repairs to be detailed on the plans. It is the City's desire to have construction completed in August 2017. SCOPE OF SERVICES: Design Phase Our scope will include a field assessment of existing conditions including photos, recommendation of the required scope of work including milling and necessary asphalt repairs, resurfacing plans on recent aerials, and striping plans on aerials to match existing conditions. We will include a bid form for City's use during the bidding process and an estimate of probable cost. The intersecting streets will be resurfaced up to the adjacent point of curvature or end of double yellow striping, whichever is greater. Work will not extend onto SW 80th Street as this is a County Road. Work limits up to SW 59th Avenue will not include the intersection as this road will receive future improvements. One bid form and bid package will be prepared with separate lump sum line items for each location. ADA ramp upgrades are not included in our scope . We will send out utility notifications to applicable utility companies but will not obtain as-builts or input utility information into the plans. Construction Assistance Phase During this phase, we will prepare for and attend one preconstruction meeting, review contractor's submittals, coordinate the work and work schedule, perform construction observations during paving activities Oimited to 120 hours), review contractor's payment requisitions, conduct punch list inspection, and complete project closeout. Exclusions Survey, geotechnical testing, asphalt cores, permit assistance, bid phase assistance are not included in our scope. Design with community in mind THE CIT Y OF I'LEASi\NT LI VIN G CAPITAL IMPROVEMENT PROGRAM S-YEAR PLAN EstImated PROJECT DESCRIPTION SOURCE FY16 Expenses FY17 FY18 FY19 FY20 FY21 FY16 TRAFFIC CALMING Pinecrest Villas/ Snapper Creek Traffic Calming -Construction (Between SW 62 AVE, SW 80 ST & US 1; Between SW 80 ST to SW 87 PTP 150,000 150,000 ST, From SW 57 AVE to SW 62 AVE) Twin Lakes/Bird Estates Traffic Calming -Construction (Between 61 AVE & 64 AVE, From SW 40 ST to SW 44 ST; Between SW 56 ST to SW PTP 175,000 175,000 64 5T, From SW 62 AVE to SW 67 AVE) 60 AVE Traffic Calming Devices (SW 56 ST to SW 61 ST) CIP 35,000 a Miscellaneous Traffic Calming CIP 50,000 ROADWAY & DRAINAGE IMPROVEMENTS SWDTF 100,000 100,000 60,000 150,000 150,000 150,000 150,000 Citywide Drainage Improvements LOGT 20,000 LOG T 100,000 100,000 Twin Lak es Roadway & Drainage Improvements -Construction PTP 60,000 60,000 Citywide Roadway & Drainage Phase 6 -Construction LOGT 45,000 45,000 Part 1: SW 74 TER (58 AVE to 59 AVE) PTP 155,000 155,000 PTP 320,000 Citywide Roadway & Drainage Pha se 6 -Construction Part 2: SW 59 LOGT 40,000 AVE SWDTF 40,000 SWDTF 15,000 SW 68 ST & SW 65 AVE -Design and Construction LOGT 85,000 LOGT 75,000 SW 60 ST & SW 65 AVE -Design and Construction SWDTF 10,000 ROAD INFRASTRUCTURE South Miami Inte rmodal Transportation Plan -Contingency/ Ped-xing PTP 225,000 a 100,000 75,000 75,000 75,000 75,000 SW 64 ST Bike Lane and Road Improvements (SW 62 AVE to SW 57 CDBG 336,000 a 336,000 AVE) PTP 84,000 84,000 61 AVE Roadway Improvement (Betwee n 40 & 44 ST) PTP 95,000 41,750 62 AVE Design and Roadway Reconstruction (85 ST to 70 ST), including TAP 480,000 480,000 Sidewalk improvement between SW 78 ST to SW 80 ST PTP 120,000 120,000 120,000 Citywide Sidewalk Repairs PTP 80,000 80,000 40,000 40,000 40,000 40,000 40,000 PTP 30,000 Citywide Street Improvements LOGT 50,000 50,000 10,000 25,000 25,000 25,000 25,000 LOGT 40,000 40,000 60,000 60,000 60,000 60,000 Citywide Street Resurfacing Program (Various loca tions) PTP 20,000 20,000 60,000 Road Re surfacing -SW 58 ST (62 PL to 62 AVE) PTP 42,000 18,750 Road Re surfacing -SW 66 AVE & SW 50 TR (51 TR to 67 AVE) PTP 53,000 18,750 Road Re su rfacing -SW 78 ST ( 62 AVE to 63 AVE) PTP 52,000 30,000 Road Resurfaci ng & Reconstruction -SW 81 ST (62 AVE to 60 AVE) PTP 47,000 28,750 Road Resurfacing -SW 59 PL (74 ST to 76 ST) LOGT 50,000 Road Resurfacing -SW 68 AVE (72 ST to 76 TR) PTP 40,000 Road Re surfacing -SW 76 TR (69 AVE to 67 AVE) PTP 85,000 PTP 35,000 Ro ad Resu rfacing & Reconstruction -SW 82 ST (62 AVE to 60 AVE) LOGT 35,000 Road Resurfacing -SW 61 ST (62 PL to 62 AVE) PTP 40,000 Ro ad Resurfacing -SW 66 ST (67 AVE to 66 CT) PTP 50,000 Ro ad Re su rfacing & Reco nst ruction -SW 63 AVE (78 ST t o 80 ST) PTP 40,000 Ro ad Resurf aci ng & Reco nstruction -SW 79 ST (C ana l to 59 AVE) PTP 150,000 SW 58 AVE Intersection at US 1-Design a nd Construction PTP 60,000 SW 64 ST Bike Lan e and Roadway Wid e ning (SW 62 AVE t o SW 69 PTP 50,000 AVE) CIP 200,000 Citywide Neighborhood Gre enways Sharrows PTP 50,000 50,000 50,000 SW 73 ST Sidewalk Extension CIP 15,000 PARKS Citywide Parks Improve ment -Miscellaneous CIP 100,000 100,000 50,000 50,000 50,000 50,000 50,000 Citywide Parks Master Plan -Improvem e nts CIP 250,000 144,000 300,000 300,000 300,000 300,000 300,000 CITY OF SOUTH MIAMI BUDGET FY 2016-2017 107 April 20, 2017 Page 2 of 2 Anticipated Schedule We assume the work will be authorized by May 1st 2017 in order to meet the schedule outlined below: • Plans & Bid Package • Bidding • Award • Construction Terms and Conditions: 4 weeks 4 weeks 4 weeks 4 Weeks Complete May 26th 2017 Bids Open June 23rd 2017 Notice to Proceed July 21st 2017 Complete August 25th 2017 All terms and conditions shall be per our Professional Service Agreement for Professional General Engineering and Architectural Services as authorized by Resolution 060-17-14861. Our fees shall be as follows. Design Phase (Lump Sum) ............................................................ $12,610 Construction Phase (Hourly not to exceed) .................................. $13,600 TOTAL: $26,210 We are ready to begin working on this assignment upon your authorization to proceed. If acceptable to you, we will accept a signed copy of this form as your written authorization to proceed. Thank you, Stantec Consulting Services Inc. 9H;?C~ Sean Compel, P.E., LEED AP Senior Associate Tel: 305-445-2900 sean.compel@stantec.com City of South Miami Approved by: Signature Print Name V: \2156 \bus in es s_ deve lopm ent\21s680266 \south mi am i \street res urfaci ng\south _mi ami _roa dway _proposal.docx Des ign with communit y in mind Date Stantec Consulting Services Inc. DATE: PROJECT: . Desip J»hase Project coordination and project investigation Project kick-off meeting Site visit and photo log Cover sheet, Key Sheet & notes Typjcal Sections & Details Resurfacing and reQ.airplan on aerials Limited Utility Investigation Quantities & Cost Estimate Specifications Pavement Marking Plan Provide Plans for PW Permit Sub-Total Hours FEE WORKSHEET April 20, 2017 Road Resurfacing & Reconstruction -4 Locations 2 1 1 2 2 2 4 1 1 2 2 1 2 2 21 0 Billing Rate $ 180.00 $ 170.00 $ 145·00 $ Labor Cost $3,570 $0 Fee Worksheet -Page 1 Clerical 2 1 1 8 4 2 6 4 8 8 24 2 1 2 4 2 8 1 6 1 3 2 51 12 95·00 $ 100.00 $ 45·00 $3,040 $5,100 $540 Design Phase Sub-Total: $12610 Total Fee: $26,210