Loading...
5THE CITY OF PLEASANT LIVING To: FROM: DATE: SUBJECT: BACKGROUND: VENDORS & CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM The Honorable Mayor & Members of the City Commission Steven Alexander, City Manager Agenda Item No.: 5 May 16, 2017 A Resolution authorizing the City Manager to execute a professional service work order to Marlin Engineering, for the professional engineering services of bicycle lanes in each direction along SW 64th Street from SW 69th Ave to SW 57th Avenue. The City desires to enhance the existing transportation system and mobility choices available to residents, workers, and visitor to the City. To improve mobility, the City is requesting professional engineering services to develop a design and prepare necessary construction documents for the installation of bicycle lanes with separation from the travel lanes in each direction along SW 64th Street from SW 62 nd to SW 57th Avenue and bike lanes along SW 64th Avenue from SW 62 nd Avenue to SW 69 th Avenue. Construction will be funded thru the Community Development Block Grant (CDBG) and People Transportation Plan (PTP). Marlin Engineering, is one of four firms selected by Resolution No. 060- 17-14861, to provide professional service agreement for engineering services on as needed basis in accordance with Florida Statute 287.055, "Consultants Competitive Negotiation Act. Professional Services were requested for the Drainage Improvement Project and a proposal was provided on May 10, 2017 that is comprehensive and cost effective for the services requested. PROPOSAL AMOUNT: Please refer to the consultant contract and fee schedules. FUND & ACCOUNT: Expenditures related to this contract shall be charged to the Capital Improvement Fund Account for an amount not to exceed $199,235. AnACHMENTS: The expenditure shall be charged $199,235 to the Capital Improvement Program Fund Account number 301-1790-519-6450 which has a balance of $995,000 before this request was made. Resolution Resolution #060-17-14861 Professional Services Agreement Marlin Engineering proposal letter dated May 10, 2017 1 RESOLUTION NO: _____ _ 2 A Resolution authorizing the City Manager to execute a professional service work 3 order for Marlin Engineering, for the professional engineering services of bicycle lanes 4 in each direction along SW 64th Street from SW 69th Ave to SW 57th Avenue. 5 WHEREAS, the Mayor and City Commission wish to enhance the existing transportation 6 system and mobility choices available to residents, workers, and visitor to the City; and 7 WHEREAS, Marlin Engineering, is one of four firms selected by Resolution No. 060-17- 8 14861, to provide professional service agreement for engineering services on as needed basis in 9 accordance with Florida Statute 287.055, "Consultants Competitive Negotiation Act;" and 10 WHEREAS, Marlin Engineering submitted a proposal for professional engineering 11 services; and 12 WHEREAS, the scope of services, staff allocation and man-hours were negotiated; and 13 WHEREAS, the amount of $199,325 was found to be comprehensive and cost effective 14 in its design approach; and 15 WHEREAS, the Mayor and City Commission desires to authorize the City Manager to 16 execute a professional service work order with Marlin Engineering, for the installation of 17 bicycle lanes with separation from the travel lanes in each direction along SW 64th Street from 18 SW 62nd to SW 57th Avenue and bike lanes along SW 64th Avenue from SW 62nd Avenue to 19 SW 69th Avenue. 20 NOW THEREFORE BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE 21 CITY OF SOUTH MIAMI, FLORIDA; 22 Section 1. The City Manager is hereby authorized to execute a professional service work 23 order for Marling Engineering, to provide design and Construction Documents for the 24 installation of bicycle lanes with separation from the travel lanes in each direction along SW 25 64th Street from SW 62nd to SW 57th Avenue and bike lanes along SW 64th Avenue from SW 26 62nd Avenue to SW 69th Avenue for an amount not to exceed $199,325. The expenditure shall 27 be charged $199,325 to the Capital Improvement Program Fund number 301-1790-519-6450 28 which has a balance of $995,000 before this request was made. 29 Section 2. Severability. Ifany section, clause, sentence, or phrase of this resolution is 30 for any reason held invalid or unconstitutional by a court of competent jurisdiction, this holding 31 shall not affect the validity of the remaining portions of this resolution. 32 Section 3. Effective Date: This resolution shall take effect immediately upon 33 enactment. Page 1 of 2 34 35 PASSED AND ADOPTED this _dayof ,2017. 36 37 ATTEST: APPROVED: 38 39 40 41 CITY CLERK MAYOR 42 43 44 COMMISSION VOTE: 45 READ AND APPROVED AS TO FORM, 46 LANGUAGE, LEGALITY AND EXECUTION Mayor Stoddard: 47 EXECUTION THEREOF Vice Mayor Welsh: 48 Commissioner Harris: 49 Commissioner Liebman: 50 CITY ATTORNEY Commissioner Edmond: Page 2 of 2 ~~$pLt.ttiONXNo~,·. P6tl;-o;~r'l ... 1~fa 61 Arlesoluttcm ,authorizlh.theClty:Mana.erto:enterinto;8 l't1ultl:'y •• r·~ql'\tta~ .wltfj:E4t.qOn$"'I.lnl!,ln~.tMarlin:E.,.~neerlo".lnc.~:{SR$;En'ftteertnlt'n~,:attd S.· ""teCfOr.S8",.,:" Trine." ,.;..(c "'0 ,i' '" l •. edt a'b .. ,.'.. '.' '. ,.'" ..... ,),,;I'.ee ~:nte .. selwe$ .nan,asne .eas $. lWHE~EA$~l~~CltyJ$Q.lle,lte~,.~:l\~q~'~t"t~~.~u~.'ffi~a';Qt1s'~(RfQ),to.reij1tn.qtlcJlifi~~ ton.$ultants;t().::prQ~ide'var{~~$ pr()fe$~10'n·~I·~nd.8,~,er~l·eitgi~~~riN8~1'I~,·.r~tiJteqQ,f~i servlcesonanas,neededbastsrand WH.Rij\SitheptofesSlohafs~rvi~es:/are;requited,o.,. anas·neededbaslsa.,tJ.ol'la 'rotation ". basis :in acc:ardancew1th Florida Statute: 281 .()S5;'"Cdnsuftant~· 'CQtnpetiti\iQ Ne,olf$t;po;Acfig,:and> ' ' .. ., WH.~.AS~ . ·.~$el·e~torr )Cbm~ittee .. comprised 'of .City· .. ·staff; '. re\ll~wed.the piopb$als re¢elvectand<id~nti6ed:a~h'on·UstoftE!$PQhd~ht$fQt'.fYdh~r·reyi~W;\an:d w"eRW~ theshcIt11l$tofresp,ondents wereinterYlewed b~the SeltidlQO . 'CQ61m.ttee_na;sqb$~quen(lys~()redi'~n~:rilijk«di:,aod'·' .~WHI.I\_$; .. ·.~~QriUri8to the~t~rmsand$~Q~ •. QfsetVl~~~ln,·tij~,."rQ,·th.:GJtY ln~~~~s'~Qr~t~i":am~lSt...,ij.mr,)f·f9tJr.(4:) ·.qu.~llfl~cf firms: Qij~~f fq\it .:,(4) ..• ~eP~:~l~'ijqt $iJ!lll.ar,gr4!,em,J.O~$'(1f~1~~I.'1he;C~~y~ ~e:eds ~fld .. 1l1.e~~ '1~e' 'r.q-"lr~tfl~n~~ f br4ui¢1( te~p~~$4!;.~nd~Petiall~eds.e~tCJs,t~nd . YVIi~,~~,··tijeM~Ydt~F1~·¢.!tY,Comm,ls$Jpo;ctes,irestC))~qtIl9~i~e,tftei€:i!'/. M.nagertC);ex~jt~ute:thePtofe$$i()nJ'service"agreemeot$. .. . . . ',>, ~ .. " (. ,", • -:~ ~,' " " "<.,'". ""';,' .": '.~ "'" ~> "-, w~,~eA5i~h~,p(Pfesslona.j:S~rvl¢eASteernentwlth. the.ftrn..s:shalfbef&r.a . term .ofthtee (3) Yfars and,anopti~n; tClrrenew,·,at;the.dlscretton oftheCity Man~8eri for .one (~)two(21vearr*lr)ewalfora.·ma>,(imumterm,'offl\!e .. (~):coo.sec::utbleyea.rs~ . NOVlTfl'EREfOREBE:rtREsOLVEb'8Y''OIe,MAYOR AND CrrtiC:OMMISSIO,fOF' 1HE,(fTY·OF:SOIJ1HMIAMt~ FLORIDA; ,.CVan';:, •.. 'lhe:Clty'M~na8erJ~authQdz~d :to .eriter:lnto: •. no".e~tl"slve·. m,qlfl;yij~r'~6ti"~~:'Wlth:th~firl1l$:'Qr,:pr;of~$too@liln(J'g~"~;ra.lirigir!eeriftg·.$e~lce~q" _" )1.~:,"~.(J~d; ~"d6rl·a.rot~tIQn, ~tlS'J 1r't'ia~qtd~l1~eWltt.(Flbt:l~a.St~t9~'2.~7~Q~~t i;qq"sYIJ.o~,C~mpEttitl.Ve'rtegQti.tIQ"'l(qr';'~l1dlh:~JI~efqr'.tetmQft~re.,(~)·Y'~t$~l1d ilfl()ptJ~n; ~Q te:n~Wi.t the:~I$~t,~I~t(~fijhe c.w M~~~gert'fQr'OI1;' (~)'tWo. (Z»y.~r tel'lewal .. fbrsima)Cimurttterm of ZflVe(S)tonsec::utlveyears. A<copyofthe:col'ltraetls attached. ., ,~. . 'Secdon,'2.sevefablllty •• If:anV$ectlon",ctause~ s'ntence/or'phrase .of this re$oluliotl ,i$fofaoy re~$ort held ItlValld,:or tincQo~ttY~I.c#lat:bVi·a¢ourto'ftQm"ete"t R~~,io;;t!g. :O~Q ... ll;";14:8~1' 19r1s~ld:l(),n,this h6ldlhg$hall nplaffe~thevaltdltypfth,e remafnfngpo,rtlons pi this rj~olyt{Qo. " ;SettrC)nl.:E.ffeal~i tl,t:,i: tn'$'r~$Qllft'pn sh,,11 t'a~e, effe~' lmm,e~l~t~'y \lPQll ~n,~'~..ner.~, """'«< , ., ' ,APPI{QVEP;; r\llARLIN Consultant Project Proposal Date: May 10,2017 Dear Mr. Carmenates: Marlin Engineering, Inc. proposes to provide the services identified below for the project entitled "SW 64th Street from SW 69 th Ave to SW 57th Ave.", pursuant to the Professional Services Agreement provided by the City of South Miami for Civil Engineering Services. I. General The project will primarily consist of the 1) Installation of bicycle lanes with separation from the travel lanes in each direction along SW 64th Street from SW 62 nd Avenue to SW 57 th Avenue (Segment 1) 2) Installation of shoulders (designated bicycle lane) adjacent to the main travel lanes in each direction along SW 64th Street from SW 69th Ave to SW 57th Ave (Segment 2) The scope of work outlines the effort required for the production of the construction documents. Scope of Work 1) Survey Activities include: Develop Topographic Survey and DTM points at specific locations. Project Baseline and RlW maps as per Miami-Dade County Maps and City of South Miami. (See attachment for additional details.) 2) Plans Production/Analysis and Utility Coordination Activities include: A. Project Management B. Roadway Plans/Analysis C. Drainage Plans/Analysis D. Utility Clearance E. Signing and Pavement Plans/Analysis F. Permitting 1700 NW 66 th Avenue, Suite 106, Plantation, FL 33313' 954.870.5070 • www.marlinengineering.com r\llARLIN 3) Post Design Services/Construction Administration and Inspection Post Design Activities include: A. Attendance at the pre-construction meeting B. Responses to requests for information C. Review of Shop Drawings D. Design Revisions E. Field Meetings Construction Administration Activities include: A. Monitor Contractor Implementation and compliance with MOT plans along the project. B. Monitor roadway construction and widening/milling and resurfacing by Contractor based on design plans. C. Monitor the signing and pavement markings installation by Contractor. D. Monitor the regrading of the swale by Contractor. Assuming that the construction schedule will be 8 months; The Construction Project Engineer will perform a site visit 1.5 hours per week and the Construction Senior Inspector will perform a site visit 6 hours per week. Deliverables include a weekly project progress summary. II. Schedule of Work -Time of Performance The anticipated length of service shall be four (4) months for Segment 1 and six (6) months for Segment 2 commencing after the Notice to Proceed. 50% Submittal to the City of South Miami prior to submittal to Miami-Dade County for their review. III. Sched ule of Work -Time of Performance Consultant shall perform the work detailed in this Proposal for a Total fee of $199, 235 and 00 cents (100). The City shall not be liable for any fee, cost, expense or reimbursable expense or other compensation beyond this amount unless approved in a supplemental Work Order. 1700 NW 66 th Avenue, Suite 106, Plantation, FL 33313 • 954.870.5070 • www.marlinengineering.com IV. Additional Services The City of South Miami may establish an allowance for additional services requested by the City and for unforeseen circumstances, which shall be utilized at the sole discretion of the City. v. Data Provided by the City of South Miami The following infonnation or documents are to be provided by the City of South Miami, if available: As-built infoImation including survey and geotechnical information. VI. Project Manager Consultant's Project Manager for this Project will be Rafael Lagos, P.E. Submitted by: Reviewed and approval in concept recommended by: Depaitirient DireCtor· Procurement Man.ager· City Manager 1700 NW 66 th Avenue, Suite 106, Plantation, FL 33313' 954.870.5070' www.marlinengineering.com CITY OF SOUTH MIAMI Consultallt Fee Proposal Worksheet Project: SW 64th Street from SW 69th Avenue to SW 57th Avenue Project No' Description' STAFF CLASSIFICATION Job Classification Sr. Project Mngr Senior Engineer Engineer Engineer Intern Senior Draftman Assigned Staff Rafael Lagos Rox Matamoros Raul Dominguez Elias Diaz John Blankenship Approved Rate Rate: $150.00 Rate: $125.00 Rate: $90.00 Rate: $75.00 Rate: $75.00 Task Man Cost/Task Man Cost/Task Man Cost/.Task Man Cost/TasK Man Cost/Task hours hours hours hours hours 1 2 Project General Task 6 $900 6 $750 10 $900 10 5750 3 4 Roadway Analysis 66 $9,900 99 $12,375 296 $26,640 165 $12,375 33 $2.475 5 6 Roadway Plans 15 $2,250 15 $1,875 58 $5,220 29 52.175 29 52,175 7 9 Drainage Analysis 16 $2.400 24 $3,000 73 $6,570 41 $3,075 8 $600 10 11 Drainage Plans 1 5150 1 $125 6 5540 2 $150 2 5150 12 13 Utilities 8 $1,200 8 $1.000 11 $990 34 $2,550 15 $1,125 14 Permitting 4 $600 4 5500 16 $1,440 8 5600 8 $600 15 Signing and Pavement Marking Analysis 7 $1,050 11 $1,375 32 $2,880 18 51,350 4 5300 16 17 Signing and Pavement Marking Plans 11 $1,650 11 $1,375 45 $4,050 22 S1,650 22 $1,650 18 19 Post DesigniCA 20 21 22 23 24 25 26 27 ~ Total Staff Hours 134 179 547 329 121 Total Staff Cost $20,100.00 $22,375.00 $49,230.00 $24,675.00 59,075.00 Total % of Work by Position 9.2% 12.3% 37.5% 22.5% 8.3% Note: Fee for the Principal(s) of the firm are not to be included above as the multiplier is not applicable to their hours. The fee is to be shown below and entered as a separa Notes: Estimate of Principal's Fee Total hours _____ 1 hour 1. This sheet is 10 be used by Prime Consultant to calculate the Grand Total Fee and one is to be used for each Subconsultant 2. Manually enter fee from each subconsultant. Unused subconsultant rows may be hidden 3. Where applicable the basis for work activity descriptions shall be the FICE/FDOT Standard Scope and Staff Hour Estimation Handbook, 4. Enter the multiplier value in the field after the word "multiplier" Maximum of 2 decimal paints, ConSUltant Name: Marlin Engineering, Inc. Contract No.: Date: 5/10/2017 Work Order No: 2 Sr. Canst. Insp Canst-Insp. Miguel SOria German Sanchez Rate: $90.00 Rate: $ 75.00 Man Cost/Task Man Cost/Task hours hours 30 52,700 120 $9,000 30 120 52,700.00 S9,OOO.00 2.1% 8.2% Staff Hou,.,; By Task 32 659 146 162 12 76 40 72 111 150 1.460 Salary Cost By Task $3,300 563,765 $13,695 $15,645 $1,115 $6,865 $3,740 $6,955 $10,375 $11,700 $137,155.00 1 -SUBTOTAL ESTIMATED FEE: multiplier 1.00 additional Services (Aile Marlin Engineering -Survey Seg 1 Subconsultant: Marlin Engineering -Survey Seg 2 Subconsultant: Sub 3 Subconsultant: Sub 4 PrinCipal's Fee Ramon Soria 2 -SUBTOTAL ESTIMATED FEE: Geotechnical Field/lab Testing: Survey Fee (or Survey Crew Fee): Other Misc. Fee: Enter Fee Description 3 -SUBTOTAL ESTIMATED FEE: Additional Services (Allowance) Reimbursables (Allowance) GRAND TOTAL ESTIMATED FEE: Average Rate Per Task $103.13 596.76 $93.80 $96.57 S92,92 590.33 593,50 596.60 $93.47 $78.00 $93.94 r-$'137,155.00 i i $23,960.00 I $38,120.00 i I I i i ! $ -I $199,235.00 I I i ! I I U199,235.00 I I ------, j : I I i $199,235.00 I . Name of Project: County: Staff Classification 3. Project General and Project Common Tasks 4. Roadway Analysis 5. Roadway Plans 6a. Drainage Analysis 6b. Drainage Plans 7. Utilities 8. Environmental Permits, Compliance & Clearances 9. structures-Misc. Tasks, Dwgs. Non-Tech. 10. Structures -Bridge Development Report 11. Structures -Temporary Bridge 12. structures -Short Span Concrete Bridge 13. Structures -Medium Span Concrete Bridge 14. structures -Structural Steel Bridge 15. Structures -Segmental Concrete Bridge 16. Structures -Movable Span 17. structures -Retaining Walls 18. Structures -Miscellaneous 19. Signing & Pavement Marking Analysis 20. Signing & Pavement Marking Plans 21. Signalization Analysis 22. Signalization Plans 23. Lighting Analysis 24. Lighting Plans 25. Landscape ArchitectUre AnalysiS 26. Landscape Architecture Plans 27. Survey (Field & Office Support) ~8. Photogrammetry 29. Mapping 30. Terrestrial Mobile LiDAR 31. Architecture Development 32. Noise Barriers Impact Design Assessment 33. Intelligent Transportation Systems Analysis 34. Intelligent Transportation Systems Plans 35. Geotechnical Total Staff Hours Total Staff Cost Fee ProposaLSW 64th St_05-10-2017.xlsx Fee Sheet -Prime ESTIMATE OF WORK EFFORT AND COST· PRIME CONSULTANT sw 64th SI. from SW 69th Ave. to SW 57th Ave. Miami-Dade Total staff Sr.Proj. Senior Engineer Hours From Manager Engineer "SH SUmmruY-$"150.00 $125.00 590.00 32 6 6 10 659 56 99 296 145 15 15 58 153 15 24 73 12 1 1 5 75 8 8 11 40 4 4 15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 73 7 11 32 112 11 11 45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,313 134 179 547 $20.100.00 $22,375.00 $49.230.00 Notes: Engineer Intern $75.00 10 165 29 41 2 34 8 0 0 0 0 0 0 0 0 0 0 18 22 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 329 $24.675.00 1. This sheet to be used by Prime Consultant to calculate the Grand Total fee. Sr. Cadd Staff Classi-Staff Classi- Tec:hnician fication 6 $75.00 $0.00 0 0 33 0 29 0 8 0 2 0 15 0 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 22 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 121 0 $9,075.00 $0.00 Survey Field Days by Subconsultant 4 -Person Crew: fication 7 $0,00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0.00 2. Manually enter fee from each subconsultant. Unused subconsuJtant roV'lS may be hidden. Page 18of3 StaffClassl- fication 8 So.CO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0.00 Con.uttan! Name: Martin Engineering, Inc. Consultant No.: Staff Class!. Staff Classi-StaffClassi· fication 9 fication 10 ficatlon11 $0.00 SO.DC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0.00 $0.00 SALARY RELATED COSTS: OVERHEAD: OPERATING MARGIN: FCCM (Facilities Capital Cost Money): EXPENSES: Survey (Field -if by Prime) SUBTOTAL ESTIMATED FEE: Subconsultant: SubconsuJtant Subconsultant Marlin Survey Subconsultant Sub 4 Subconsultanl Sub 5 Subconsultant: Sub 6 Subconsultant Sub 7 Subconsultant: Sub 8 Subconsultant: Sub 9 Subconsultant: Sub 10 Subconsultant Sub 11 Subconsultant: Sub 12 SUBTOTAL ESTIMATED FEE: Geotechnical Field and Lab Testing SUBTOTAL ESTIMATED FEE: Optional Services GRAND TOTAL ESTIMATED FEE: $0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0.00 Date: 5/10/2017 t:sumalor; StaffClassi. ficatlon 12 SC.Co 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0.00 0.00% 0.00% 0.000% 0.00% 4-mancrew days@ Karael LClQOS. t"~ SH Salary By Cost By 'Activitv ActI~ 32 $3,300 659 $63,765 146 $13,695 162 $15,645 12 $1.115 76 $6,865 40 $3,740 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 72 $5,955 111 $10,375 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 0 $0 1,310 $125,455.00 Check = $125,455.00 ./day Average Rate Per Task $103.13 $96.75 $93.80 $96.57 $92.92 $90.33 $93.50 #DIVlO! #DIVlO! #DIVIOI #DIVIO! #DIVIOI #DIVIDI #DIVIO.t #DIVIO! #DIV)O! #DIVIO! $96.60 $93.47 #DIVIOI #DIVlO! #DIVIO! #DIVlO) #DIVIO! #DIVIO! #DIVlO! #DIVIO! #DIVIO! #D1VlO! #DIVIO! #DIVlO! #DIVIO! #DIVIOI #D1V/0.t $95.77 $125,455.00 $0.00 $0.00 $0.00 $0.00 $0.00 $125,455.00 $0.00 So.OO SO.OO SO.oO SO.OO $0.00 $0.00 $0.00 $125,455.00 $0.00 $125,455.00 $0.00 $125,455.00 511012017 12:58 PM I I Notes: Field Survey Estimate: __ "'---__ 4-man crew days I FIRM TOTAL I 1,310 I 1,441 I 1. This worksheet provides the distribution of a firm's total staff hours for a project. 2. Percentages for staff hour distribution by classification are entered below in roV't5 63 to 96 of this sheel 3. Total Staff Hours (column 0) may not match staff hours from Summary worksheet (column B) due to rounding. Staff hours calculated for employee classifications are to be adjusted so totals in columns Band 0 match. 4. Formulas under "Total Staff Hours Range" (columns 0 & P) may be adjusted to provide desired range. ESTIMATE OF WORK EFFORT FOR TECHNICAL PROPOSALS -FIRM TOTAL Financial Project Number: FAP Number: 3. Project General and Project Common Tasks 4. Roadway Analysis 5. Roadway Plans 6a. Drainage Analysis 6b. Drainage Plans 7. Utilities 8. Environmental Permits, Compliance & Clearances 9. Structures -Misc. Tasks, Dwgs, Non-Tech. 10. Structures -Bridge Development Report 11. Structures-Temporary Bridge 12. Structures -Short Span Concrete Bridge 13. Structures -Medium Span Concrete Bridge 14. Structures -Structural Steel Bridge 15. Structures -Segmental Concrete Bridge 16. Structures -Movable Span 17. Structures -Retaining Walls 18. Structures -Miscellaneous 19. Signing & Pavement Marking Analysis 20. Signing & Pavement Marking Plans 21. Signalization Analysis 22. Signalization Plans 23. Lighting Analysis 24. Lighting Plans 25. Landscape Architecture Analysis 26. Landscape Architecture Plans 27. Survey (Field & Office Support) 28. Photogrammetry 29. Mapping 30. Terresliial Mobile LiDAR 31. Architecture Development 32. Noise Barriers Impact Design Assessment 33. Intelligent Transportation Systems Analysis 34. Intelligent Transportation Systems Plans 35. Geotechnical Fee ProposaLSVV64th SUIS.1o.2017;dsJ( stefl'Ho!A"SI.mIl"IIilfY·Flrm 1/0/1900 Hours from HSummary"sheet FirmTataI 32 659 146 163 12 76 40 a a 73 112 a a a Sr, Proj, Manager 20.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 10,0% 10.01110 0.0% 0.0% 0.0% 0.0% 0.0% 0.01% 0.0% O.Q% 0.0% 0.0% O.O~"o 0.0% 0.0% 0.0% 0.0% Senior Engineer 20.0% 15.0% 10.0% 15.0% 10.0% 10.0% 10.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0~'!l 15.0% 10.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0,0% Project NamE SW 64th SI. from SW 69th Ave. to SW 5', Date: 5/1012017 Name of Consultant: Martin Engineering, Inc. Staff Hour Distribution Percent~s -Firm Total Engineer 30,0% 45.0% 40.0% 45.0% 40,0% 15.0% 40.0% 0.0% 0.0% 0,0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 45.0% 40.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.00/0 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Engineer Intern 30.0% 25.0% 20.0% 25.0% 20.0% 45.0'Vo 20.0% 0.0->/11 0.0% 0.0% 0.0% 0.0"/" 0.0% 0.0% 0.0% 0.0% 0.0% 25.0% 20.0% 0.0% 0,0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% Sr. Cadd Technician 0.0% 5.0% 20.0% 5.0% 20.0% 20.0% 20.0% 0.0% 0.0% 0,0% 0.0% 0.0% 0.0% 0.0%" 0.0% 0.0% 0.0% 5.0% 20.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0,0% 0.0% 0.0% 0.0% 0.0% 0.0% Staff Classi-I Staff Class i-I Staff Classi-I Staff Classi-I Staff Class i-I Staff Class i-I Staff Classi- fication 6 fication 7 fication 8 fication 9 fication 10 fication 11 fication 12 0.0% 0.0% 0.0% O.OIlIe 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.00(,;, 0.0% 0.0% 0.0% 0.09/9" 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% o,oc/c 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% O.O~:!;I 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0.% 0.0'% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% O.OU/o 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%, 0.0% 0.0% 0.0% 0.0% 0.0"/0 0.0% 0.0% 0,0% 0.0% 0.0% 0.0% O.O~'!l 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0,0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% O.O:!/c 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%" 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%" 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% D.O% 0.0% 0.0%' 0.0% P8ge2of18 Totat 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 100.00% 100.00% 0.00% 0.00% 0.00% ' 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Estimator. Rafael Lagos, P.E. Awareness Plan Fee ProposaLSW 64th St_05-10-2017.xlsx 3. Project General Tasks I LS 1 LS 1 LS 1 LS 1 LS 1 LS 1 LS 1 LS 1 LS LS LS LS Project Activity 3: General Tasks 0 I 0 0 I 0 0 0 0 0 0 0 0 0 0 0 0 Not part of Scope of Services 0 0 Not part of Scop' 0 0 Not part of Scope of Services o o 32 32 o o Page 4 of 18 SW 64th SI. from SW 69th Ave. to SW 57th Ave. o 5/10/2017 Project Activity 3: General Tasks Notes: 1. If the hours per meeting vary in length (hours) enter the average in the hour/unit column. 2. Do not double count agency meetings between permitting agencies. 3. Project manager meetings are calculated in each discipline sheet and brought forward to Column 0, except for Photogrammetry. Fee ProposaLSW 64th SI_05·1D-2017.xlsx 3. Project General Tasks Page 5 of 18 5/10/2017 Estimator: Rafael Lagos, P.E. Correction Master Design Files Evaluation 4.8 I Roundabout Final Design Analysis 4.9 I Cross Section Design Files 4.10 ITraffiC Control Analysis 4.11 IMasterTCP Design Files 4.12 Design Variations and Exceptions 4.13 Design Report 4.14 Quantities 4.15 Cost Estimate 4.16 Technical Special Provisions 4.17 Other Roadwav Analvses Fee ProposaLSW 64th SL05-10-2017.xlsx 4. Roadway Analysis LS 1 LS 1 LS 1 LS 1 LS 1 LS 1 LS 1 LS 1 LS 1 LS 1 LS 1 LS 1 LS 1 LS 1 LS 1 LS 1 Project Activity 4: Roadway Analysis 0 0 0 360 0 0 0 80 16 0 0 0 24 20 0 0 0 0 0 360 0 0 0 80 16 a 0 0 24 20 a a I' SW 64th SI. from SW 69th Ave. to SW 57th Ave. o I Low Range: (320 hrs/miles x 0.5 miles = 160) + (400 hrs/mile x 0.5 miles = 200 miles Cross Sections for Shoulders/Swales Referencing FOOT Standards Only N/A N/A N/A 2 Cost Estimates Required: Original Cost Estimate (16 hrs) + 1 update (4 hrs) = 20 hrs N/A N/A Page 6 of 18 5/10/2017 Fee ProposaLSW 64th SL05-10-2017.xlsx 4. Roadway Analysis Project Activity 4: Roadway Analysis --Carrie~to4.17 Page 7 of 18 Carrie, to Tab 3 5/10/2017 Estimator: Rafael Lagos, P.E. of Pay Items Including Quantity Input Sheets 5.4 IGeneral Notes/Pay Item Notes 5.5 I Summary of Quantities Sheets 5.6 I Project Layout 5.7 Plan/Profile Sheet 5.8 Profile Sheet 5.9 Plan Sheet 5.10 I Special Profile 5.11 Back-of-Sidewalk Profile Sheet 5.12 Interchange Layout Sheet 5.13 IRamp Terminal Details (Plan View) 5.14 Iintersection Layout Details 5.15 I Special Details 5.16 ICross-Section Pattern Sheet(s) Fee ProposaLSW 64th SI_05-10-2017.xlsx 5. Roadway Plans I I Sheet I EA EA Sheet 1 Sheet I Sheet I Sheet I Sheet Sheet Sheet Sheet Sheet Sheet Sheet EA Sheet Project Activity 5: Roadway Plans 1 I 8 I 3 6 0 0 1 1 8 1 1 I 0 I 0 I 0 I 0 I 0 I 0 0 12 8 0 0 0 0 0 0 0 0 0 0 4 0 0 Page 8 of 18 8 18 0 8 0 0 0 0 96 0 0 0 0 0 4 0 SW 64th SI. from SW 69th Ave. to SW 57th Ave. o 3 Typical sections to be provided -SW 62nd Ave to SW 59th PI. and SW 59th PI. to SW 57th Ave/62nd Avenue to 69th Ave 11 sheet of general notes included IN/A IN/A IN/A N/A 12 sheet required (scale 1" = 40') N/A IN/A 1 Special Detail Sheet expected N/A 5/10/2017 Traffic Control Plan Sheets Traffic Control Cross Section Sheets Traffic Control Detail Sheets Fee ProposaLSW 64th St_05-10-2017.xlsx 5. Roadway Plans EA Sheet EA Sheet I Sheet Sheet Sheet Sheet Project Activity 5: Roadway Plans 0 0 0 N/A 0 0 0 N/A 0 0 0 N/A 1 I 0 I 0 IN/A 1 0 0 0 0 0 1 0 0 0 0 0 Page 9 of 18 5/10/2017 Estimator: Rafael Lagos. P.E. 6a.21Base Clearance Report 6a.3 I Pond Siting Analysis and Report 6a.4 I Design of Cross Drains 6a.5 1 Design of Ditches 6 6 ~w."" u. V'U"""~'U' Management Facility (Off site or a. Infield Pond) 6a.7 Design of Storm water Management Facility (Roadside Ditch as Linear Pond) 6a.8 Desiqn of Floodplain Compensation 6a.9 IDesiqn of Storm Drains 6a.11 1 French Drain Systems 6a.12lDrainage Wells 6a.131 Drainage Design Documentation Report 6a.141 Bridge Hydraulic Report Fee ProposaL SW 64th St_ 05-1 0-2017 .xlsx 6a. Drainage Analysis I Per Location Per Basin EA Per Ditch I Mile EA I PerCell Per Floodplain Basin EA EA PerCell EA LS EA Project Activity Sa: Drainage Analysis Jose Santiago, P.E. 0 0 0 0 0 0 1 I 80 0 I 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 I 0 I 0 I 0 I 80 I 0 0 0 0 0 0 J 0 I 0 I 0 100118 IN/A SW 64th St. from SW 69th Ave. to SW 57th Ave. o IDesign of new swales -calculations to ensure water quality and quantity per DRER and SFWMD req. IN/A N/A N/A Not included in the Scope of Services 5/10/2017 Meetings IFnvironmF!nt,,1 Look-Around (ELA) Meeting Assurance/Quality Control Fee ProposaLSW64th St_05-10-2017.xlsx 6a. Drainage Analysis LS LS LS LS LS % LS % Project Activity 6a: Drainage Analvsis o o o o 4 4 Meetings are listed below o o N/A 3% 4 0% o C,lIries to 6.19 Carries to Tab 3 110118 5/10/2017 Estimator: Rafael Lagos, P.E. of Drainage Structures Structure Sheet(s) (Per Structure) Drainage Detail Sheets 6b.8 I Lateral Ditch Cross Sections 6b.9 IRetention/Detention Ponds Detail Sheet(s) 6b.1ojRetentiOn Pond Cross Sections 6b.11 I Erosion Control Plan Sheet(s) 6b.121 SWPPP Sheet(s) Fee ProposaLSW64th St_05-10-2017.x1sx 6b. Drainage Plans J I Jose Santiago, P.E. Sheet 0 Sheet 0 Sheet 1 EA 0 Sheet 0 Sheet 0 EA 0 Sheet 0 EA 0 Sheet 0 Sheet 3 6b. Drainage Plans 0 0 I 0 0 I Not included in the Scope of Services 0 0 0 I 0 I Not included in the Scope of Services 0 I 0 IN/A 0 I 0 IN/A 0 I 0 IN/A 0 I 0 IN/A 0 I 0 0 I 0 4 I 12 Page 12 of 18 SW 64th Sl from SW 69th Ave. to SW 57th Ave. o 5/10/2017 Estimator: Rafael Lagos, P.E. 7.2 I Identify Existing Utility Agency Owners (UAO(s» 7.3 IMake Utility Contacts 7.4 IException Processing 7.5 I Preliminary Utility Meeting 7.6 IIndividual/Field Meetings and Review Plans and Data from UAO(s) of Easements Coordination Utility Services ng Utility Work by Highway Contractor (UWHC) Fee ProposaLSW 64th St_05-10-2017.xlsx 7. Utilities LS 1 LS 1 LS 1 LS 1 LS 1 LS 1 LS 1 LS 1 LS 1 LS 1 LS 1 LS LS LS LS 8 16 0 0 4 8 0 0 12 12 0 0 0 8 8 Project Activity 7: Utilities 8 16 11 hr/contact x 2 contacts x 8 utilities/contact = 16 hrs 0 0 4 8 1 hr/review x 1 review/utility x 8 utilities = 8 hrs 0 N/A 0 N/A 12 1.5 hrs x 8 utilities = 12 hrs 12 8 utilities x 1.5 (com plexity) x 1 h r/utility = 12 0 0 I 0 I 8 8 Page 13 of 18 SW 64th St. from SW 69th Ave. to SW 57th Ave. o 5/10/2017 Fee ProposaLSW 64th SL05-10-2017.xlsx 7. Utilities Project Activity 7: Utilities Page 14 of 18 5/10/2017 · . I-. i' 11 I' I, 1'1'1(:: I I l II I i Id III j "' ~ I-I ~ E 13131 ~ r:~ , 1'1' 1'1' 1'1' I, I, Ii ! f If 1~r;r:I:1 ~ ~I. Is· 1,1, 1'1' I--[- I J I. I i 1-1-I- 1,1,1,1,1,1'1,1, 1'1'1' I' --i _ ++++++HH-IlII Estimator: Rafael Lagos, P.E. Sign Support Calculations Lighting/Electrical Calculations Special Provisions ITQl"'h"i~1 Meetings Fee ProposaLSW 64th SL05-10-2017.xlsx 19. Signing & Marking Analysis LS LS I EA EA I EA LS LS LS LS LS LS Project Activity 19: Signing and Pavement Marking Analysis 1 0 0 1 56 56 Low Range: 16 hrs (set up) + 40 hrs/mile X 1.0 miles = 56 hrs 1 0 0 N/A 1 0 0 N/A 1 0 0 N/A 1 12 12 12 plan sheets (scale 1"=40') X 2 hrs/sheet = 12 hrs 0 0 Iinciuded in the roadway component 0 0 IN/A o o % 3% 2 % 0% o Page 16 of 18 SW 64th St. from SW 69th Ave. to SW 57th Ave. o 5/10/2017 Fee ProposaLSW 64th SL05-10-2017.xlsx 19. Signing & Marking Analysis Project Activity 19: Signing and Pavement Marking Analysis Carries to 19.12 Page 17 of 18 Carries to Tab 3 5/1012017 Estimator: Rafael Lagos, P.E. 20.1 Key Sheet 20.2 Summary of Pay Items Including TRNS'Port Input 20.3 Tabulation of Quantities 20.4 General NoteslPay Item Notes 20.5 Project Layout 20.6 Plan Sheet Fee ProposaLSW 64th St_05-10-2017.xlsx 20. Signing & Marking Plans Sheet -LS Sheet Sheet Sheet Sheet Project Activity 20: Signing and Pavement Marking Plans 0 0 0 0 0 1 0 1 1 6 I 1 I 0 0 I 0 I 12 8 I 12 I Page 18 of 18 0 0 0 6 0 96 SW 64th SI. from SW 69th Ave. to SW 57th Ave. o No Key Sheet required -Plans included in the Roadway Set of Plans Included in the roadway component NIA IN/A /12 sheet required (scale 1" = 40') 5/10/2017 June 20, 2016 Aurelio J. Carmenates, P.E Capital Improvement Project Manager Public Works Engineering & Construction Division City of South Miami Re: SW 64 Street from SW 57 th Ave to SW 62 nd Ave Dear Aurelio: Pursuant to your request and information that I have the following proposal for surveying related services in connection with the above captioned project is hereby proffered for your consideration: PROPOSED SCOPE OF SERVICES: Marlin Engineering Inc will perform Survey related services for the above captioned project SURVEY: Recognition field effort area Recovery NGS Base Control Points Establish control points in the area designated Establish State Plane Coordinates by Static GPS Conventional Traverse along the project Recovery NGVD 29 Bench Mark Establish elevation by differential level run along the project Topographic Survey Drainage Survey Recovery Property Corners along the Project Locates by Instrument the property corner monument founded Establish the Existing Right of Way by Existing Records SPECIFICATIONS: All field data with the exception of electronic data will be recorded in field books. This not a Boundary Survey All fees within this proposal are based on performing each task one time only. Additions or modifications to the scope, as well as resulting CAD and Project Management time, will be invoiced per attached hourly Rate Schedule, unless fees for said additions and modifications are requested All electronic data will be provided in a CD containing the AutoCAD drawing Zoning/Building setbacks, leases, and easements are information that the client has to provide to Marlin Engineering Inc by the Public Work Department All underground utilities are not locating. This Project shall be performed with reference to the following coordinate datum: Horizontal Datum: NAD83/90 Vertical Datum: NGVD 1929 Units: U.S. Survey foot www.marlinengineering.com QUALIFICATIONS: t-All Procedures in connection with this project will be performed in strict accordance with the applicable negotiation between City of South Miami and Marlin Engineering, Inc 2-As always, Marlin Engineering Inc is prepared to commence upon receipt of your written approved. 3-Date to summit without weather or other inconvenient should be July 31, 2017 4-This estimate is based on information provided by City of South Miami 5-This estimate is a lump sum price payment that will be based on actual work authorized. ESTIMATED FEE: Our estimated fee to perform the services as requested by the Department, subject to the Qualifications as stated herein, shall be a Lump Sum Amount, not to exceed $23,960.00 as base on the following attached rate schedule. 3 Man Survey Crew 14 days at $1,000.00 per day 4 Man Survey Crew 02 days at $1,080.00 per day Senior Project Manager 10 hrs at $150.00/hr Surveyor I Mapper 30 hrs at $85.00/hr Senior CADD Technician 50 hrs at $75.00/hr On behalf of MARLIN ENGINEERING Inc, I thank you again, for the opportunity to work with you on this important project. Sincerely, Marlin Engineering, Inc. Lazaro E. Fleitas, P.S.M. Survey Department Manager The above agreement is hereby acknowledged and Marlin Engineering, Inc. is authorized to proceed with the above requested services. Signed: ___________ Date: ________ _ Title: __________ _ www.marlinengineering.com Overhead 0.00% Operating Margin MARLIN ENGINEERING, INC SW 64 STREET. BIKE LANE IMPROVEMENT·DESIGN SOUTH MIAMIINTERMODAL TRANSPORTATION PLAN FINAL 0.00% FCCM 0.000% Direct Expense Wages O/H = aIM = FCCM= EXP= TOTAL = Multiplier Total Survey Services Total Direct Salary and Wages Total Expenses TOTAL TASK WORK ORDER C:IPMIESTIMATESICITY OF SOUTH MIAMIISW 64 ST. BIKE LANE IMPROVEMENT-DESIGNISW 64 ST FROM SW62 AVE TO SW 57 AVEIEstimate Form-1 0.00% $7,800.00 $0.00 $0.00 $0.00 $0.00 $7,800.00 $16,160.00 $7,800.00 $23,960.00 May 10, 2017 Aurelio J. Carmenates, P.E Capital Improvement Project Manager Public Works Engineering & Construction Division City of South Miami ~Re: SW 64 Street from SW 69th Ave to SW 62 nd Ave Dear Aurelio: Pursuant t.o your request and information that I have the following proposal for surveying related services in connection with the above captioned project is hereby proffered for your consideration: PROPOSED SCOPE OF SERVICES: Marlin Engineering Inc will perform Survey related services for the above captioned project SURVEY: Recognition field effort area Recovery NGS Base Control Points Establish control points in the area designated Establish State Plane Coordinates by Static GPS Conventional Traverse along the project Recovery NGVD 29 Bench Mark Establish elevation by differential level run along the project Topographic Survey DTM Drainage Survey Recovery Property Corners along the Project Locates by Instrument the property corner monument founded Establish the Existing Right of Way by Existing Records SPECIFICATIONS: All field data with the exception of electronic data will be recorded in field books. This not a Boundary Survey All fees within this proposal are based on performing each task one time only. Additions or modifications to the scope, as well as resulting CAD and Project Management time, will be invoiced per attached hourly Rate Schedule, unless fees for said additions and modifications are requested All electronic data will be provided in a CD containing the AutoCAD drawing Zoning/Building setbacks, leases, and easements are information that the client has to provide to Marlin Engineering Inc by the Public Work Department All underground utilities are not locating. This Project shall be performed with reference to the following coordinate datum: Horizontal Datum: NAD83/90 Vertical Datum: NGVD 1929 Units: U.S. Survey foot www.marlinengineering.com QUALIFICATIONS: 1-All Procedures in connection with this project will be performed in strict accordance with the applicable negotiation between City of South Miami and Marlin Engineering, Inc . 2-As always, Marlin Engineering Inc is prepared to commence upon receipt of your written approved. 3-Date to summit without weather or other inconvenient should be August 31, 2017 4-This estimate is based on information provided by City of South Miami 5-This estimate is a lump sum price payment that will be based on actual work authorized. ESTIMATED FEE: Our estimated fee to perform the services as requested by the Department, subject to the Qualifications as stated herein, shall be a Lump Sum Amount, not to exceed $38,120.00 as base on the following attached rate schedule. 3 Man Survey Crew 4 Man Survey Crew SENIOR PROJECT MANAGER SURVEYOR I MAPPER SENIOR CADD TECHNICIAN 20 days at 02 days at 20 hrs at 66 hrs at 98 hrs at $1,000.00 per day $1,080.00 per day $150.00 I hr $85.00 I hr $75.00 Ihr On behalf of MARLIN ENGINEERING Inc, I thank you again, for the opportunity to work with you on this important project. Sincerely, Ma r lin Eng i nee r i n g, Inc. Lazaro E. Fleitas, P.S.M. Survey Department Manager The above agreement is hereby acknowledged and Marlin Engineering, Inc. is authorized to proceed with the above requested services. Signed: ___________ Date: ________ _ Title: __________ _ www.marlinengineering.com Overhead 0.00% Operating Margin MARLIN ENGINEERING, INC SW 64 STREET FROM SW 69 AVE TO SW 62 AVE SOUTH MIAMIINTERMODAL TRANSPORTATION PLAN FINAL 0.00% FCCM 0.000% Direct Expense Wages O/H = aIM = FCCM = EXP= TOTAL = Multiplier Total Survey Services Total Direct Salary and Wages Total Expenses TOTAL TASK WORK ORDER C:IPMIESTIMATESICITY OF SOUTH MIAMIISW 64 ST. BIKE LANE IMPROVEMENT-DESIGNISW 64 ST FROM SW 69 AVE TO SW 62 AVEIEstimate Form-1 0.00% -- $15,960;00 $0.00 $0.00 $0.00 $0.00 $15,960.00 $22,160.00 $15,960.00 $38,120.00 -