Agenda Item No.: 6 June 6,2017
A Resolution authorizing the City Manager to pay EAC Consulting Inc., for
the engineering services of design and preparation of construction
documents for the Pedestrian, Bike Path and Roadway Improvement
along SW 58 th Avenue from South Dixie Highway (US#l) to just south of
SW 71 st Street.
The current condition of SW 58 th Avenue between South Dixie Highway
(US#l) to just south of SW 71 st Street is not bicycle and pedestrian
friendly. To alleviate these conditions, the City is requesting requisite
professional engineering services to develop the design of infrastructure
improvements and prepare necessary construction documents.
EAC Consulting, Inc ., is one of four firms selected by Resolution No. 060-
17-14861, to provide professional service agreement for engineering
services on as needed basis in accordance with Florida Statute 287.055,
"Consultants Competitive Negotiation Act".
A proposal was provided on May 24, 2017 that is comprehensive and cost
effective for the services requested.
PROPOSAL AMOUNT: Please refer to the consultant contract and fee schedules.
FUND & ACCOUNT: Expenditures related to this contract shall be charged to the Capital
Improvement Fund Account for an amount not to exceed $29,165 .62.
ATTACHMENTS:
The expenditure shall be charged $29,165.62 to the People
Transportation Tax Fund Account number 124-1730-541-6490 which has a
balance of $1,346,682.88 before this request was made .
Resolution
Resolution #060 -17-14861
Professional Services Agreement
EAC Consulting Inc., proposal letter dated May 30,2017
1 RESOLUTION NO: _____ _
2 A Resolution authorizing the City Manager to pay EAC Consulting Inc., for the
3 engineering services of design and preparation of construction documents for the
4 Pedestrian, Bike Path and Roadway Improvement along SW 58th Avenue from South
5 Dixie Highway (US#1) to just south of SW 71st Street.
6 WHEREAS, the Mayor and City Commission wish to provide roadway improvements to
7 SW 58 th Avenue from South Dixie Highway (US#1) to SW 71 st Street; and
8 WHEREAS, EAC Consulting, Inc., is one of four firms selected by Resolution No. 060-17-
9 14861, to provide professional service agreement for engineering services on as needed basis in
10 accordance with Florida Statute 287.055, "Consultants Competitive Negotiation Act;" and
11 WHEREAS, EAC Consulting, Inc., submitted a proposal for professional engineering
12 services; and
13 WHEREAS, the scope of services, staff allocation and man-hours were negotiated; and
14 WHEREAS, the amount of $29,165.62 was found to be comprehensive and cost effective
15 in its design approach; and
16 WHEREAS, the Mayor and City Commission desires to authorize the City Manager to
17 execute a professional service work order with EAC Consulting, Inc., for roadway improvements
18 to SW 58 th Avenue from South Dixie Highway (US#1) to SW n st Street.
19 NOW THEREFORE BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE
20 CITY OF SOUTH MIAMI, FLORIDA;
21 Section 1. The City Manager is hereby authorized to pay EAC Consulting, Inc., to provide
22 drainage design and construction documents for an amount not to exceed $29,165.62. The
23 expenditure shall be charged $29,165.62 to the People Transportation Tax Fund Account
24 number 124-1730-541-6490 which has a balance of $1,346,682.88 before this request was
25 made.
26 Section 2. Severability. If any section, clause, sentence, or phrase of this resolution is
27 for any reason held invalid or unconstitutional by a court of competent jurisdiction, this holding
28 shall not affect the validity of the remaining portions ofthis resolution.
29 Section 3. Effective Date: This resolution shall take effect immediately upon adoption.
30
Page 1 of 2
31 PASSED AND ADOPTED this _dayof ,2017.
32
33 ATTEST: APPROVED:
34
35
36
37 CITY CLERK MAYOR
38
39
40 COMMISSION VOTE:
41 READ AND APPROVED AS TO FORM,
42 LANGUAGE, LEGALITY AND EXECUTION Mayor Stoddard:
43 EXECUTION THEREOF Vice Mayor Welsh:
44 Commissioner Harris:
45 Commissioner Liebman:
46 CITY ATTORN EY Commissioner Edmond:
Page 2 of 2
RESOLUTION NO: 060-1:7-14861
A Resolution authorizing the City Manager to enter Into a multi-year contract
with EAC Consulting, Inc., Marlin Engineering, Inc., SRS Engineering, Inc., and
Stantec for general engineering services on an as needed basis.
WHEREAS, the City solicited a Request for Qualifications (RFQ) to retain qualified
consultants to provide various professional and general engineering and architectural
services on an as needed basis; and
WHEREAS, the professional services are required on an as needed basis and on a
rotation basis in accordance with Florida Statute 287.055, "Consultants Competitive
Negotiation Acti" and
WHEREAS, a Selection Committee comprised of City staff, reviewed the
proposals received and identified a short list of respondents for further review; and
WHEREAS, the short list of respondents were Interviewed by the Selection
Committee and subsequently scored and ranked; and
WHEREAS, according to the terms and scope of services in the RFQ, the City
intends to retain a maximum of four (4) qualified firms under four (4) separate but
similar agreements to fulfill the City's needs and meet the requirements for quick
response and specialized servicesi and
WHEREAS, the Mayor and City Commission desires to authorize the City
Manager to execute the professional service agreements.
WHEREAS, the Professional Service Agreement with the firms shall be for a term
of three (3) years and an option to renew, at the discretion of the City Manager, for one
(1) two (2) year renewal for a maximum term of five (5) consecutive years.
NOW THEREFORE BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF
THE CITY OF SOUTH MIAMI, FLORIDA;
Section 1. The City Manager Is authorized to enter into non-exclusive
multi-year contracts with the firms for professional and general engineering services on
an as needed and on a rotation basis in accordance with Florida Statute 287.055,
"Consultants Competitive Negotiation Act ll and shall be for a term of three (3) years and
an option to renew, at the discretion of the City Manager, for one (1) two (2) year
renewal for a maximum term of five (5) consecutive years. A copy of the contract is
attached.
Section 2. Severability. If any section, clause, sentence, or phrase of this
resolution is for any reason held invalid or unconstitutional by a court of competent
Page 10f2
Res. No. 060-17-1486"
jurisdiction, this holding shall not affect the validity of the remaining portions of this
resolution.
Section 3. Effective Date: This resolution shall take effect immediately upon
enactment.
PASSED AND ADOPTED this 21 dayof March, 2017.
ATIEST: APPROVED:
~ flil'l~
COMMISSlON VOTE: 5-0
Mayor Stoddard: Yea
Vice Mayor Welsh: Yea
Commissioner Harris: Yea
Commissioner Liebman: Yea
Commissioner Edmond: Yea
Page 2of2
E ~".4 -....
EAC Consulting, Inc.
May 30, 2017
Mr. Aurelio Carmenates, P.E
Capital Improvement Project Manager
City of South Miami Public Works Engineering & Construction Division
4795 SW 75 th Avenue
Miami, FL 33155
Re: Professional General Engineering and Architectural Services Agreement RFQ PW2016-22
SW 58th Avenue Improvements
EAC Consulting, Inc. respectfully submits this engineering services fee proposal based on our initial assessment of the scope,
extent of improvements required along SW 58 th Avenue and a previous field visit. Our services on this project will be
supplemented by one sub-consultant responsible for important data retrieval that will be needed for engineering design.
The firm proposed to work with our engineering staff on this assignment is:
• Hadonne Corp -Surveying & Mapping, Subsurface Utility Engineering
We understand that the intent of the project is provide design documents for the milling and resurfacing along SW 58 th
Avenue from south of US 1 to just south of SW 71 5t Street. The existing one-way roadway will also need additional signage
and new pavement markings such as sharrows .
The City is requesting professional engineering ' services to develop the design of the above improvements and prepare
necessary construction documents. Accordingly, EAC shall undertake a topographic survey. In our preliminary discussion
with the City, we determined there will be no reconstruction of the roadway or the existing landscape median .
We are recommending to not include the dedicated south bound bike lane from US-l since it is against the flow of traffic
and poses a safety concern. Instead, only the sharrow in the north bound direction will be included north of the intersection
with SW 71 5t Street.
The proposed design will be done in accordance with the established guidelines and procedures utilized by the City of South
Miami Public Works Department, the Miami -Dade County Department of Transportation and Public and FDOT Greenbook.
EAC shall provide professional technical services in accordance with our Professional Service Agreement for Professional
General Engineering and Architectural Services with the City of South Miami.
A sketch of our work is outlined in "Exhibit A" attached to this professional engineering services fee proposal. In summary,
our anticipated scope of services is itemized as follows:
i. Site Investigation and Reconnaissance.
ii. Data Collection and Verification of As-builtConditions .
iii. Site Layout Plan and Geometry with tie-ins to established vertical and horizontal datum and monuments.
iv . Signing and Pavement Markings
v. Paving plans (Milling and resurfacing)
vi . SWPPP Notes and Applicable Details
vii. Technical Specifications
viii. Probable Cost Estimates
ix . Permitting/Approvals with Federal and local jurisdictional authorities such as FDEP and Miami-Dade DTPW .
x. Bid and Award Support Services
815 NW 57 Avenue, Suite 402 I Miami, FL 33126 I Phone: 305-264-2557 I Fax: 305-264-8363 I www.eacconsult.com I CA# 7011
Scope of services that are excluded are itemized as follows:
i. Geotechnical services. Instead request as-builts from the City to obtain original pavement design.
ii. Roadway reconstruction design such as widening and/or configuring the dimensions of the existing landscape
median.
iii. Improvements to SW 71 st Street
iv. Landscaping
COMPENSATION:
Our lump sum fee proposal breakdown covers the surveying & mapping, engineering design, the development of
construction documents and jurisdictional permitting. The fees for professional services was developed in accordance with
the billing established for EAC Consulting and the City of South Miami as described in the Professional Service Agreement.
Our fee proposal summary is provided below. A breakdown of our staff hours and corresponding lump sum fee proposal
for the project is also provided in "Exhibit B" also attached to this professional engineering services fee proposal.
~'~::~=~~~nd proTe~c:mrnon~asks ~ .. _-= _=-~=~f~~fl}==F=~~~ ~~~-=1
rcJ\vaY!'Ians .. ~.-.------... --____ .~. ___ ._ .. _~____ ____ .. _ $9,818. 7~ ______ J _______ ~~r1'lP Sum --J
~~i~~~;g~~ ~;~~e~f~i~i~~~~~0ft~:~ O_~:l~=--~~~=~~=~ ~--..... ~}~~~·:~~-····---·-~t=-~~~=-··~~.~~ ... ~~.~-====~~
S!~ning..& £avemerl!_M~rking ~Iarls __ _ __ _ __ __ _ __ _ $10!~.60 I . _Lu~pS .. u~ . ~
.. ____________ ?ue!e!a..' =-Profe.ssjon(!!Jee.~_-L:J~i[~~e~~c:~_ ___ ..J.2~J~~.56 ---f---~~..r1'lP-~~rt1-----j
~i~~~~~S~~; ;~;~C:~:rd Support-Services ----------------t------$1:500~00 ----i"-HoUrIY-Rate~NTE-"-1
~L~l!~9 .. _~~~~tr~~!i~rl..~i~l .. n-sp~i:TI()~.~_J$~~g.7I~l1~~ou~~[==~~=~=-__ -="_--=$~g?~]~ __ ..... -... ~~I "-H()~rIY~~I~,=~iI •.•.. · •.. _;
,Construction Certifications & Closeout -Optional Service i N/ A ... ~_ N/ A I
lAlTowa-ncefur-MiScellillleo-us-~pen-se-~=OptionaTS;rVice "--r .. _-. ·"-·N/i."---. -----Nli. ... r ~ -----------------. . .. -----.. -------1 j --
i
lf
, =--.. -~ .. ~_=~-_~ ~Sub!ota_'-=-iiOj~~ionET Fie!;_ -_poi-pe.iiQnJecv;ceyj _-.. $],$?..?: 76 ....... _~_ .8..~~rly~a..!~:~~fL .. :
I _~_ i t~..c:b_nlc~1?uj>P9r:!...?~~~~~ ___ _____ __ ....... .
l~~u~~ a!Y~~~I()p()~i3P'21t?~r~~y_~ r\ll~ P~0g_
----. -------
$2,179.30
-+-
$29,165.62
Page 2
PROPOSED SCHEDULE
EAC Consulting is aware that the City would like to have a Contractor selected in September 2017 . It is anticipated that the
City will require 30 calendar days for procurement and award of Construction contract . Therefore, we have developed a
very aggressive schedule of 104 calendar days to meet your proposed deadline. The proposed schedu le for this effort is
provided below:
Design Services:
Data Collection
Boundary and Topography Survey & Mapping
Construction Documents (100% Submittal)
Permitting and Approvals
Post-Design Services:
Limited Bid and Award Support Services
Duration to Construction Contract Award
Total Duration
1 -Concurrent
Calendar Days
14 calendar daysl
14 calendar daysl
30 calendar days
30 calendar days
30 calendar days
104 calendar days
Please note that in order to meet your proposed deadline of September 2017, NTP must be provided by June 8,2017
EAC Consulting cannot provide a construction cost estimate until we review the various aspects of the project. An Engineers
Opinion of Probable Cost will be provided with the 100% Construction Documents Submittal.
This proposal is based on our understanding of the requirements for engineering services as itemized under the anticipated
tasks listed above . Accordingly, we reserve the right to modify th is proposal due to any changes in scope . If the above fee
proposal and the terms above are acceptable to you , please provide us with a work authorization so we may begin work .
The following information will be required for us to commence the work .
1. Signed approval of this proposal or written authorization to proceed with services .
We look forward to our continued services to the City of South Miami .
Senior Vice President
cc: Huntley Higgins, P.E.; Contracts File
Page 3
EXHIBIT "A" -EXHIBIT OF WORK
Figure 26:
Exist. sidewalk to remain 5' S IDEVVALK -----------
EXISTING CURB AND GUTTER ---------
SPECIALT Y PAVlt~e CROS3Vu'AU< ---------:
SW 58th street Improvements 11' LANE ------....,
5' CONTRA-BIKE LANE ----
Exist. curb & gutter to remain TYPE "F" CURB AND GUTTER
Exist. sidewalk to remain 6' £IDEVV/\U< Landscaping excluded
1t-----v'\~)lJroximate project limits
~
NORTH
o 15 30 60
! 1 1,.........-----11
EXHIBIT liB" -LUMP SUM FEE PROPOSAL BREAKDOWN
ESTIMATE OF WORK EFFORT AND COST· PRI ME CONSULTANT
Name of Project:
County:
FPN:
FAP N ,.--" n .....
Staff Classification
3. Project General and Project Common Tasks
. Roadway Analysis
S. Roadway Plans
~a. Drainage Analysis
~b . Dra inage Plans
7 . Utilities
8. Environmental Permits , Compliance & Clearances
9. Structures -MISC. T asks, DlNQs , N o ~Tech.
10. Structures -B ridge Development Report
11. Structures -T emporary Bridge
12. Structures -Short S pan Concrete Bridge
13. Structures -M ed ium Span Concrete B rid ge
14. Structures -Structural Steel Bridge
15. Structures -Segmental Concrete Bridge
16. Structures -Movable Span
17. Structures -Reta ining Wals
18. Structures -M isceRa neo us --19. Signing & Pave ment Marking Analysis
~O. Signing & Pavement Marking Plans --
2 1. Signa~zatio n Analysis
22. Signalization Plans
23. Lighting Analysis
24. Lighting Pla ns
25. Landscape A rchitecture Analysis
26. landscape A rchitecture Plans
27. Survey (Fiekt & Office Support)
28. Photogrammetry
29. Mapping
30 . Terrestrial Mobile Li DAR
31 . Architecture Development
32. Noise Barriers Impact Design Assessment
33. Inteligent T rans po rtatio n Systems A nalysis
34 . Inte ni gent Transportatio n Sys tems P lans
35. Geotechnical
Total Staff Hours
Total Staff Cost
SW 58th Aven ue
Mi am i-Dade
N/A
N/A
T otal Staff
Hours From
·SH
Principal
Summary -
FirmM $181 .46
16 2
84 0
96 0
0 0
9 0
0 0
0 0
a a
0 a
0 a
a 0
0 0
0 0
0 O'
0 0
0 0
a 0
13 a
1 1 0
a a
a 0
0 a
a 0
0 0
0 a
a 0
a a
a a
a a
a 0
a a
a a
a 0
a a
229 2
S362.92
Notes:
Project Proje ct Designer Manager Engineer
$179.66 $107 .80 $85.34
10 4 0
8 38 29
10 38 29
a 0 a
1 4 3
a 0 0
a 0 0
a 0 0
a 0 a
a 0 a
a 0 a
a 0 a
0 0 0
a a 0
a 0 a
a 0 0
a 0 0
1 6 5
1 4 3
a a a
a 0 a
a 0 a
0 0 a
0 0 0
a a a
a 0 a
a a a
a a a
a a a
a 0 0
a a 0
a a 0
a a 0
a 0 a
31 94 6 9
55,569.46 5 10,133.20 $5.888.46
1. This sheet to be used by Prime Consultant to ca lcula te the G ra nd T otal fee.
CAD Staff Class i-Staff Classi-
Technic ian fi catton 6
$76.36 $0.00
sections fo r 0
8 0
19 0
a 0
2 a
0 a
a a
a a
a a
a a
a a
a 0
a 0
a a
a 0
0 a
a a
1 a
2 a
a a
a a
a 0
0 0
0 0
0 a
0 a
a a
a 0
a 0
0 0
0 0
0 0
a 0
a a
32 a
52 ,443.52 $0.00
Survey Field Days by S ubco ns ultant
4 -Perso n C rew:
ftc ation7
$0.00
0
0
0
0
a
0
0
0
a
0
a
0
0
0
0
0
a
0
a
a
0
a
0
0
a
0
a
a
a
0
a
0
0
a
a
$0.00
2 . Manually enter fee from each subconsulta nt. Unused subconsultant rows may be hidden.
RoadBridgeSHEst_SW 58 Avenue_2017-05-30
Fee Sheet -Prime Page 1 of 12
Staff Class i-
fication a
$0.00
0
0
0
a
a
a
a
0
a
a
a
a
a
0
0
a
a
a
a
a
a
a
a
0
a
a
a
a
a
0
0
0
0
a
0
$0.00
Con su ltant Name : EAC Consult ing , In c .
Consu ltant No.: N/A
Staff Classi-Staff Ciassi-Staff Classi-
ficatton 9 fication 10 ftcation11
$0.00 $0.00
0 0
0 0
0 0
0 0
a 0
0 0
0 0
0 0
a a
a 0
0 a
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 a
0 0
a a
0 0
0 0
a 0
a 0
0 0
a a
a 0
50 .00 $0.00
SA LARY RELATED COS TS:
OVER HEA D:
OPERATI NG MARGIN:
FCCM (Facilities Capital Cost Money):
EX PE NS ES :
Survey (Fie ld -if by P rime)
SUBTOTAL ESTIMATED FEE:
Subconsultant : Hadonne
S ubconsultant : S ub 2
Subconsulta nt: Sub 3
SUBTOTAL ESTIMATED FEE :
Geotech n ical Field and Lab Testing
SUBTOTAL ESTIMATED FEE :
Li mited Bid and Award S upport Services
Limited Constructio n S ite Inpsections
GRAND TOTAL ESTIMATED FEE :
$0.00
0
0
0
0
a
a
0
a
a
a
a
0
0
0
0
a
a
a
0
a
a
a
0
0
0
a
a
a
a
a
0
0
0
a
a
$0.00
Date: 5/30/2017
Estim ator: NlA _ ... ._ .. ...
StaffClassi-SH Salary
ficatio n 12
By Cost By
$0.00 Activity Activity
0 16 $2,590.72
0 83 58.619.42
0 96 59.818.70
a a $0
0 10 $1 .019.60
0 0 $0
0 0 $0
a 0 $0
0 a so
a a $0
a a so
a 0 50
0 a $0
0 0 $0
a 0 $0
a 0 $0
a a $0
0 13 $1.329.52
a 10 SI .019.60
a 0 $0
a a $0
0 0 $0
0 0 $0
a a $0
0 a SO
a a $0
a a SO
0 a $0
0 a $0
0 a $0
0 0 $0
0 a 50
0 0 SO
0 a $0
a 228
$0.00 $24,397.56
Check = $24 ,397.56
0.00%
0.00%
0.000%
0.00%
4-man crew
days@ I day
5/3012017
Average
Rate Pe r
Tas k
$161.92
$103.85
5102.28
#DIV/O!
5101.96
#OIV/O!
#DIV/O!
#DIV/O!
#DIV/O!
#DIVlO !
#DIV/O!
#DIV/O!
#DIV/OI
#DIV/O I
#DIV/OI
#DIV/O!
#DIV/O!
$102.27
$101.96
#DIV/O!
#DIV/O!
#Dr V/O!
#DIV/O!
#D IV/O!
#DIV/O!
#DI V/O!
#DIV/OI
#DIV/O!
#DI V/O!
#DIV/O!
#DI V/O I
#DIV/o1
#DIV/O!
#DI V/o !
$107.01
S24 .397.56
$0.00
$0.00
$0.00
50.00
$0.00
$24,397.56
S2,179.30
$0.00
$0.00
$26,576.86
$0.00
$26,576.86
$1 ,500.00
$1.088.76
$29,165.62
Estimator:
Representlng
City of South Miami
EAC Consutling, Inc.
NOTE: Signature Block is optional, per District preference
TlSk Task No.
3.1 Public Involvement
3.1.1 Community Awareness Plan
3 .1.2 Notifications
3.1.3 Prepare Mailing Lists
3.1.4 Median Modification Letters
3.1.5 Driveway Modification Le tters
3.1.6 Newsletters
3.1.7 Renderings and Fly Throughs
3.1.8 PowerPoint Presentation
3.1.9 Public Meeting Preparations
3.1.10 Public Meeting Attendance/Foliowup
3.1.11 Other Agency Meeti ngs
3.1.12 Web Site
3.2 Joint Project Agreements
3.3 Specifications Package Preparation
3.4 Contract Maintenance and EDMS
3.5 Value Engineering (Multi-Discipline Team) Review
3.6 Prime ConSU ltant Project Manager Meetings
3.7 Pla ns Update
RoadBridgeSHEst_SW 58 Avenue_2017-Q5-30
3. Project General Tasks
---_._-.-
Prolect Activity 3: General Tasks
PrlntNlme Slgnlture I Dlte
Units No of Units Hoursl Unit Totsl Comments Hours
'1I~' "uv .. o V"'" "V'
Typ. Sec. 1: One way travel lanes with a sharrow and bike lane
LS 1 0 0
LS 1 0 0
LS 1 0 0
LS 1 0 0
LS 1 0 0
LS 1 0 0
LS 1 0 0
LS 1 0 0
LS 1 0 0
LS 1 0 0
LS 1 4 4 Meetings with Miami-Dade DTPW. They're the AHJ for S&PM.
LS 1 0 0
3.1 Public Involvement Subtotsl 4
EA 0 0 0
LS 1 12 12
LS 1 0 0
LS 1 0 0
LS 1 0 0
LS 1 0 0
-
Page 2 of 12
SW 58th Avenue
N/A
5/30/2017
Prolect Activity 3: Genera l Tasks
Task Task Units No of Units Houral Unit Totsl Comments No. Houra
3.8 Post Design Services LS 1 0 0
3.9 Dig ita l Delivery LS 1 0 0
3.10 Risk Assessment Workshop LS 1 0 0
3.11 Railroad , Transit, and/or Airport Coordination LS 1 0 0
3.12 Other Project General Tasks LS 1 0 0
3. Project Common and Project General Taska Totsl 11
3.8 -U.t of Project Manager Meeting. Units No or Units
Roadway Analysis EA 0
Drainage EA 0
Utilities EA 0
Envi ronmental EA 0
Structures EA 0
Signi ng & Pavement Marking EA 2
Signa lization EA 0
Lig hting EA 0
Landscape A rchitect.ure EA 0
Survey EA 0
Photogrammetry EA 0
ROW & Mapping EA 0
Terrestrial Mobi le LiDAR EA 0
Architecture EA 0
Noise Barriers EA 0
ITS Analysis EA 0
Geotechnical EA 0
Progress Meetings EA 0
Phase Reviews EA 0
Field Reviews EA 0
Totsl Project Manager Meetings 2 , ...
Notes :
1. If the hours per meeting vary In length (hours) enter the average In the hourlunlt column.
2. Do not double count agency meetings between permitting agenci es.
RoadBridgeSHEst_SW 58 Avenue_2017-Q5-30
3. Project General Tasks
Houral Unit Totel Hours Comments
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 Total PM Meeting Hours carries to Task 3.6 above
Page 3 of 12
i
5/30/2017
RoadBridgeSHEsCSW 58 Avenue_2017-05-30
3. Project General Tasks
Prolect Activity 3: General Tasks
Page 4 of 12
Comments
5/30/2017
Project Activity 4: Roadway Analys is
Estimator: Rodney Devera
Representing Print Name
City of South Miami
EAC Consu~in9, Inc.
NOTE: Signature Block is optional, per District preference
Task Task Units No of Units Hoursl Unit Total Hours No.
4.1 Typical Section Pa ckage LS 1 12 12
4.2 Pavement Type Selection Report LS 1 0 0
4.3 Pavement Design Pa ckage LS 1 4 4
4.4 Cross-Slope Correction LS 1 4 4
4.5 Horizontal Nertical Master Design Files LS 1 0 0
4.6 Access Management LS 1 0 0
4.7 Roundabout Eva lua tion LS 1 0 0
4.8 Roundabout Final Des ign Analysis LS 1 0 0
4.9 Cross Section Design Files LS 1 0 0
4.10 Traffic Control Analysis LS 1 12 12
4.11 Master TCP Design Files LS 1 0 0
4.12 Design Variations and Exceptions LS 1 0 0
4.13 Desi gn Report LS 1 0 0
4.14 Quantities LS 1 12 12
4.15 Cost Estimate LS 1 11 11
4.16 Technical Specia l Provi sions LS 1 0 0
4.1 7 Other Roadway Analyses LS 1 4 4
Roadway AnalysiS Technical Subtotal 59
----
RoadBridgeSHEsCSW 58 Avenue_2 017-05-30
4. Roadway Ana lys iS Page 5 of 12
SW 58th Avenue
N/A
Signature' Date
Comments
3 typical sections for SW 58th Avenue
Typ. Sec. 1: One way travel lanes with a sharrow and bike lane
Typ . Sec. 2: Two-way travel lanes , med ia n and sh arrow
Typ. Sec. 3: Two-way travel lanes with sharrow (south of SW 71 st Street)
Analyze existing pavement. Assume as-builts will be provided by the City.
Analyze suvey data of exsting cross slopes
I
I
Level l
100% and Bid Set
2 cost estim ates (100% and Final plans)
Includes Roadway , Erosion Control and S&PM
Review connectivity of proposed bicyclists to other roadways
_.
5/3012 017
Task Task No.
4.18 Field Reviews
4.19 Monitor Existing Structures
4.20 Technical Meetings
4.21 Quality Assurance/Quality Control
4.22 Independent Peer Review
4.23 Superv ision
4.24 Coordination
Technical Meetings
Typical Section
Pavement
Access Management
15% Line and Grade
Driveways
Loca l Gov ernments (cities, counties , MPO)
Work Zone Traffic Control
100% Comment Rev iew Meetings
Other Meetings
Subtotal Technical Meetings
Prog ress Meetings (if required by the City)
Phase Review Meetings
Total Meetings
RoadBridgeSH Esl_SW 58 Av enue_2017-05-30
4. Roadway Ana lysis
Project Activity 4: Roadway Analysis
Units No of Units Hoursl Unit Total Hours Comments
LS 2 4 8 2 field reviews x 2 people x 2 hours
Includes field reviews for Roadway and S&PM
LS 1 0 0
LS 1 0 6 Meetings are listed below
LS % 10% 6
LS % 0% 0
LS % 5% 3
Roadway Analysis Nontllc:hnlcal Subtotal 23
LS % 3% 2
4. Roadway Analysis Total 84
Units No of Units Hoursl Unit Total Hours PM Attendance at Meeting Required? Number
EA 0 0 0 0
EA 0 0 0 0
EA 0 0 0 0
EA 0 0 0 0
EA 0 0 0 0
EA 2 2 4 yes 0
EA 0 0 0 0
EA 1 2 2 0
EA 0 0 0 0
S Subtotal Project Manager Meetings 0
EA 0 a 0 PM attendance at Progress Meetings is manually entered on General Task 3 --
EA 0 0 0 PM attendance at Phase Review Meetings is manually entered on General Task 3 --
S Total Project Manager Meetings (carries to Tab 3) 0_
C.rriesto4.17 Cllmc:s to Tnb3
Page 6 of 12 5/30/2017
Estimator: Rodney Devera
Representing
City of South Miami
EAC Consulting, Inc.
NOTE: Signature Block is optional, per District preference
Task
No. Task
5.1 Key Sheet
5.2 Summary of Pay Items Including Quantity Input
5.3 Typical Section Sheets
5.3.1 Typical Sections
5.3.2 Typical Section Details
5.4 General Notes/Pay Item Notes
5.5 Summary of Quantities Sheets
5.6 Project Layout
5.7 Plan/Profile Sheet
5.8 Profile Sheet
5.9 Plan Sheet
5.10 Special Profile
5.11 Back·of-Sidewalk Profile Sheet
5.1 2 Interchange Layout Sheet
5.13 Ramp Terminal Details (Plan View)
5.14 Intersection Layout Details
5.15 Special Details
5.16 Cross-Section Pattem Sheet(s)
RoadBridgeSHEsl_SW 58 Avenue_2017 ·05-30
5. Roadway Plans
Scale Units
Sheet
Sheet
EA
EA
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
Sheet
EA
Sheet
Project Activity 5: Roadway Plans
Print Name
No. of Houral Unit Total Units or orSheat Hours Sheet
'11
1 4 sections for
1 16 16
2 4 8
2 4 8
1 2 2
0 0 0
1 3 3
0 0 0
0 0 0
2 15 30
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Page 7 of 12
Signature I Date
Comments
Includes Roadway and S&PM
SW 58th Avenue
N/A
513012017
Task
No. Taak
5.17 Roadway Soil Survey Sh eet(s)
5.1 8 Cross Sections
5.19 Temporary Traffic Control Plan Sheets
5.20 Temporary Traffic Control Cross Section Sheets
5.21 Temporary Traffic Control Detail Sheets
5.22 Utility Adjustment Sheets
5.23 Selective Clearing and Grubbing Sheet(s)
5.24 Project Network Control Sheet(s)
5.25 Environmental Deta il Sheets
5.26 Utility Verification Sheet(s) (SUE Data)
5.27 Quality Assurance/Quality Control
5.28 Supervision
Ro ad Bri dgeS HEst_SW 58 Avenue_20 17-0 5-30
5 . Roadway Pl ans
Scala
Project Activity 5: Roadway Plans
No. of Hours! Unit Total Units Units or or Sheet Hours Commants
Sheet
Sheet 0 0 0
EA 0 0 0
Sheet 0 0 0
EA 0 0 0
Sheet 0 0 0
Sheet 1 8 8 Contact 811 , obtain Design Ticket and show exi sting utilities based on as-bums on plans
Sheet 0 0 0
Sheet 1 1 1 To be provided by the surveyor
Sheet 0 0 0
Sheet 1 8 8 Contact 811 and show ex isting utilities based on as-buiHs
SUE is excluded from the
RoadWlY Plana Technical Subtotal 14
LS % 10% 8
LS % 5% 4 Includes Roadway and S&PM
s. Roadway Plana Total 96
Page B of 12 5/30/2017
Estimator: Herman Tirado
Repreaentlng
City of South Miami
EAC Consulting , Inc.
NOTE: Signature Block is optional, per District preference
Taak Taak No.
6b.1 Drainage Map (Including Interchanges)
6b.2 Bridge Hydraulics Recommendation Sheets
6b.3 Summary of Drainage Structures
6bA Optional Pipe/Culvert Material
6b.5 Drainage Structure Sheet(s) (Per Structure)
6b.6 Miscellaneous Drainage Detail Sheets
6b.7 Lateral Ditch Plan /Profile
6b.8 Lateral Ditch Cross Sections
6b.9 Retention/Detention Ponds Detai l Sheet(s)
6b.10 Retention Pond Cross Sections
6b .11 Erosion Control Plan Sheet(s)
6b .12 SWPPP Sheet(s)
6b.13 Quality Assurance/Quality Control
6b.14 Supervision
RoadBridgeSHEst_SW 58 Avenue_201 7-05-30
6b . Drainage Plans
Scale
6b. Drainage Plans
Print Name
Units No. of Units HouraJ Unit Total Houre orShHt orShHt
v 'Y~'~'
Sheet 0 0 sections for
e-, '<0'
Sheet 0 0 0
Sheet 0 0 0
Sheet 0 0 0
EA 0 0 0
Sheet 0 0 0
Sheet 0 0 0
EA 0 0 0
Sheet 0 0 0
EA 0 0 0
Sheet 2 2 4
Sheet 2 2 4
Drelnage Piana Technical Subtotal a
LS % 10% 1
LS % 0% 0
•• Drainage Plana Total •
Page 9 of 12
..
Signature I Date
Comments
SW 58th Avenue
N/A
5/30/2017
Project Activity 19: Signing and Pavement Marking Analysis
Estimator:
Representing Print Name
Las Olas Ma ri na
EAC Consulting , Inc.
NOTE: Signature Block is optional, per District preference
Task Task Units No. of Houl'8l
No. Units Units
19 .1 Traffic Data Analysis LS 1 2
19.2 No Passing Zone Study LS 1 0
19.3 Reference and Master Design File LS 1 8
19.4 MuHi-Post Sign Support Calculat ions EA 1 0
19 .5 Sign Panel De sign Analysis EA 1 0
19 .6 Sign Lighting /Electrical Calculations EA 1 0
19.7 Quantities LS 1 0
19.8 Cost Estimate LS 1 0
19 .9 Technical Special Provisions LS 1 0
19.10 Other Signing and Pavement Marking LS 1 0
Signing and Pavement Marking Analysis Technical Subtota
19 .11 Field Reviews LS 1 0
19 .12 Technical Meetings LS 1 0
19 .13 Quality Assurance/Quality Control LS % 10%
19 .14 Independent Peer Review LS % 0%
19 .15 Supervision LS % 0%
Signing and Pavement Marking Analysis Nontechnical 8ubtota
19 .16 Coord ination
RoadBri dg eS HEsl _SW 58 Avenue_2 0 17-05-30
19. Si gni ng & Marking Anal ysis
LS % 0%
19. Signing and Pavement Marking Analysis Total
Signature I Date ,
Total Comments Hours
"Y!"'='" """'" """'" -.;:c v~" ,~"w~
2 Typ . Sec. 1: One way travel lanes with a sharrow and bike lane
I~-~ . ~. .
0
8
0
0
0
0 Included with Roadway task
0 Included with Roadway task
0
0
10
0 0
2 Meetings are listed below (Coordination with Miami-Dade County for loops and S&PM
1
0
0
3
0
13
Pa ge 10 of 12
SW 58th Avenue
N/A
I
I
5 /30/2017
Task I
No. Task
Technical Meetings
Sign Panel Design
Queue Length Analysis
Local Govemments (c~ies, counties)
Other Meetings
Subtotal Technical Meetings
Progress Meetings (if required by FOOT)
Phase Review Meetings
Total Meetings
----
RoadBridgeSHEst_SW 58 Ave nue_20 17-05-30
19 . Signing & Marking Analysi s
Units
Units
EA
EA
EA
EA
EA
EA
Project Activity 19: Signing and Pavement Marking AnalYsis
No. of Houl'lll Total Comments Units Units Hours
No of Units Houl'lll Unit Total PM Attendance at Meeting Required? Number Hours
0 0 0 0
0 0 0 0
1 2 2 yes 2
0 0 0 0
2 Subtotal Project Manager Meetings 2
0 0 0 PM attendance at Progress Meetings is manually entered on General Task 3 --
0 0 0 PM attendance at Phase Review Meetings is manually entered on General Task 3 --
2
---Total Project Manager Meetings (carrie. to Tab 3) 2
Cames to 1912 Carnes to Tab 3
Page11of12 5/30/2017
Project Activitv 20 : Signing and Pavement Marking Plans
Estimator:
Representing Print Name
La s Ota s Marina
EAC ConsuUing
NOTE: Signature Block is optional, per District preference
Task Task No.
20.1 Key Sheet
20.2 Sum ma ry of Pay Items
20 .3 Tabulation of Quantities
20.4 General Notes/Pay Item Notes
20 .5 Project La yout
20.6 Plan Sheet
20 .7 Typical Detai ls
20 .8 Guide Sign Worksheet(s)
20 .9 T raffic Monitoring Site
20.10 C ros s Sections
20 .11 Specia l Service Point Details
20 .12 Specia l Details
20.13 Interim Standards
20 .14 Qua li ty Ass urance /Quality Contro l
20.15 Su pervision
RoadBridgeSHEst_SW 58 Avenue_2017-05-30
20. Signing & Marking Plans
Scale Unite No of Unite Hourel Unit No. of Totel Houre ShHte
Sheet 0 0 sections for 0
LS 1 0 0
Sheet 1 8 1 8 Per Miami-Dade County
Sheet 1 2 1 2 Per Miami-Dade County
Sheet 0 0 0 0
Sheet 0 0 0 0 Included with Roadway task
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 0 0 0
EA 0 0 0
LS 1 0 0
LS 1 0 0
Signing and Pavement Marking Plana Technical Subtotsl 2 10
LS % 10% 1
LS % 0% 0
20. Signing and Pavement Marking Plana Total 2 11
Page 12 of 12
Signature I Date
Comments
SW 58t h A venue
N/A
5/3012017
I
BOUNDARY AND TOPOGRAPHY SURVEY & MAPPING
HADONNE
Land Su rveyors and Mappers
Land Development Consultants
Subsurface Utility Designates
PROPOSAL/AGREEMENT
Thursday, April 20, 2017 SENT VIA: dgrace@eacconsult .com
Submitted to:
Donn a Grace , P .E .
EAC Consulting, Inc.
815 NW 57th Avenue , Suite 402
Miami , FL 33 1 26
In reference to:
Surveying Services for t h e project known as "South Miami -SW 58th Avenue Improvements"
l ocated South of US -l alon g SW 58 t h Avenu e , South Miami , FL.
Dear Ms. Grace :
Pursuant to your request regarding a fee estimate for s u rveying and mapping services for
the above referenced pro j ect . HADONNE (HC) is pleased to submit the fol l owing proposal for
your consideration:
Scope of Services:
Perform a Topographic Survey of the area outlined in the attached Exhibit "Au
a) Perform a Topographic Survey and Property lines and/or Right of Way location
b) Take Elevations shots along the crown of the road at 50-foot intervals
c) Take elevations cross sections at 50 -foot intervals
d) Take elevation shoot 5 feet into the adjacent properties
e) Take Invert Information of the existing inlets within the project area
Deliverables:
Five signed and sealed copies of the resulting Map of Boundary and Topographic Survey
along with the resulting CAD files (DWG format) and PDF .
Time of Completion:
We h ave estimated two calendar weeks to submit a preliminary survey a n d three weeks for
the final submittal of the Topographic Survey.
Project area, length, Size and location:
See attached (Exhibit "A")
Schedule of Fees:
T h e fee complete phases a) of this project shall be a lump sum of $2,189.30
Year 2017 hourly Rates (loaded hourly rates):
Surveying Services Rates
Three Person Survey Party
Office Computer Drafter
Office Survey Technician
Professional Surveyor in charge (Project Surveyor)
EM Locating Crew
Two Man GPR and Locating Crew
$130 .00
$65 .00
$80 .00
$120.00
$120 .00
$200 .00
per Hour
per Hour
per Hour
per Hour
per Hour
per Hour
HADONN E I 1985 NW 88th Court · Suite 201 • Doral , FL. 33172 • P: +1(305) 266-1188 • F: +1(305) 207-6845 • www.hadonne .com·LB7097 1/3
Qualifications: County and / or Municipality Fees are not included in this Proposal and are
the Client 's responsibility . Rule of Law : All field and office efforts in connection with
this project will be performed in strict accordance with the applicable provisions of the
"Minimum Standards of Practice for Land Surveying in the State of Florida", pursuant to
Rule 5J17 -05 Florida Administrative Code . Requests for service not specifically enumerated
in this Proposal wil l be addressed via separate response if so required and an additional
charge will apply per HC 's hourly rates for calendar year 2017 , which are set forth in the
"Year 2015 h ourly Rates " section of this Proposa l. Our ability to perform is and wi l l be
completely influenced by the Client 's ability to make the site available and to eliminate
any and all conditions that may interfere with HC 's ability to furnish services , and weather
conditions . HC will require a 48 hour , prior written notice before field work can be
performed . This notice should be sent via facsimile or email to HC . SUBSURFACE UTILITY
ENGINEERING: Client shall be aware that GPR Technology is not 100% accurate. Depending on
factors such as and not limited to : soil type , soi l moisture , size of underground utility ,
type of underground ut ility , depth of underground utilities ; some utilities may not be
detected by GPR . GPR will detect the presence of the utility but not the type . HC will do
its best to identify the type of utility b u t it may occur that some detected uti l ity remains
unidentified . Area to be located with GPR should be clean without mayor vegetation , debris
or a n y struct u re that may prevent t h e use of the equipme n t . Cleaning , removing of debris or
vegetation is not included in this proposal .
Payments Terms: Payment is due for HC 's comp l etion of each task UPON RECEIPT of HC 's
Invoices . It is understood that this Proposal is entered into between HC and the Client .
HC 's failure to strictly enforce a n y provision in this Pr oposa l shall NOT be constru ed as
a modification or amendment of the Proposal 's terms , specifically these payment terms ,
unless otherwise agreed to in writing by HC . HC 's receipt of this Proposal , signed by
Client , constitutes Client 's acceptance of these terms , and HC 's Standard Terms and
Conditions (collectively the "Contract "), which is attach ed and incorporated by reference
as if f u lly set forth here . The Client 's signature shall also constitute a notice for HC to
proceed with its Scope of Services. In the event HC is required to enforce any terms of the
Contrac t, Clie n t agrees to pay to HC all reasonable attorneys ' fees and costs incurred ,
whether suit is filed or not , including attorneys ' fees on appeal. Past due payments under
this Proposal are subj ect to a 1.5 % interest per month . For special consideration , the
Client agrees that HC 's liability for this Project , irrespective of the cause , shall be
l imited to the amount of the Professional Fees Client actually pays to Client . Both HC and
the Client may terminate this Proposal after ten (10) days written notice , and upon Client 's
payment to HC of all outstanding fees and expenses incurred by HC through the date of such
written notice .
By signing below , I APPROVE AND ACCEPT this letter as a legal contract and read and agree
to the payment terms as set forth above .
By: Date:
(Autho ri zed S i g natur e )
Title :
(Typed o r printed name)
I thank you for this opportunity to present this proposal for your consideration and
look forward to your favorab l e response. In the interim, if there is anything we can do to
be of service in this or any other matter , please do not hesitate to call me directly at
+1(305) 266 -1188 .
~spectfu t:~
/ President
HADONN E I 1985 NW 88th Court· Suite 201 • Doral , FL. 33172 • P: +1(305) 266-1188· F: +1(305) 207 -6845· www.hadonne .com·LB709 7 2/3
EXHIBIT "A"
Figure 26:
SW 58th street ImlJrovements
5' SIDEWALK ------------,
EXISTI NG CURBANDGUTTER ----------
SPECIALTY PAVI NG CROSSWALK --------
11' LAN E -------,
S' CONT RA-BIKE LAN E ----,
SW 58th Avenue Plan
HADONNE 1 1985 NW 88th Court· Suite 201 • Doral , FL. 33172· P: +1(305) 266-1188· F: +1(305) 207-6845 • www.hadonne .com·LB7097 3/3
PROP _TOPO_SW58AV_04-20-17 .DOCX
PROPOSED TREE
• NORTH
o 15 30 60
~ !