Loading...
6TH E CITY OF PLEASANT LIVING To : FROM: DATE: SUBJECT: BACKGROUND: VENDORS & CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM The Honorable Mayor & Members of the City Commission Steven Alexander, City Manager Agenda Item No.: 6 June 6,2017 A Resolution authorizing the City Manager to pay EAC Consulting Inc., for the engineering services of design and preparation of construction documents for the Pedestrian, Bike Path and Roadway Improvement along SW 58 th Avenue from South Dixie Highway (US#l) to just south of SW 71 st Street. The current condition of SW 58 th Avenue between South Dixie Highway (US#l) to just south of SW 71 st Street is not bicycle and pedestrian friendly. To alleviate these conditions, the City is requesting requisite professional engineering services to develop the design of infrastructure improvements and prepare necessary construction documents. EAC Consulting, Inc ., is one of four firms selected by Resolution No. 060- 17-14861, to provide professional service agreement for engineering services on as needed basis in accordance with Florida Statute 287.055, "Consultants Competitive Negotiation Act". A proposal was provided on May 24, 2017 that is comprehensive and cost effective for the services requested. PROPOSAL AMOUNT: Please refer to the consultant contract and fee schedules. FUND & ACCOUNT: Expenditures related to this contract shall be charged to the Capital Improvement Fund Account for an amount not to exceed $29,165 .62. ATTACHMENTS: The expenditure shall be charged $29,165.62 to the People Transportation Tax Fund Account number 124-1730-541-6490 which has a balance of $1,346,682.88 before this request was made . Resolution Resolution #060 -17-14861 Professional Services Agreement EAC Consulting Inc., proposal letter dated May 30,2017 1 RESOLUTION NO: _____ _ 2 A Resolution authorizing the City Manager to pay EAC Consulting Inc., for the 3 engineering services of design and preparation of construction documents for the 4 Pedestrian, Bike Path and Roadway Improvement along SW 58th Avenue from South 5 Dixie Highway (US#1) to just south of SW 71st Street. 6 WHEREAS, the Mayor and City Commission wish to provide roadway improvements to 7 SW 58 th Avenue from South Dixie Highway (US#1) to SW 71 st Street; and 8 WHEREAS, EAC Consulting, Inc., is one of four firms selected by Resolution No. 060-17- 9 14861, to provide professional service agreement for engineering services on as needed basis in 10 accordance with Florida Statute 287.055, "Consultants Competitive Negotiation Act;" and 11 WHEREAS, EAC Consulting, Inc., submitted a proposal for professional engineering 12 services; and 13 WHEREAS, the scope of services, staff allocation and man-hours were negotiated; and 14 WHEREAS, the amount of $29,165.62 was found to be comprehensive and cost effective 15 in its design approach; and 16 WHEREAS, the Mayor and City Commission desires to authorize the City Manager to 17 execute a professional service work order with EAC Consulting, Inc., for roadway improvements 18 to SW 58 th Avenue from South Dixie Highway (US#1) to SW n st Street. 19 NOW THEREFORE BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE 20 CITY OF SOUTH MIAMI, FLORIDA; 21 Section 1. The City Manager is hereby authorized to pay EAC Consulting, Inc., to provide 22 drainage design and construction documents for an amount not to exceed $29,165.62. The 23 expenditure shall be charged $29,165.62 to the People Transportation Tax Fund Account 24 number 124-1730-541-6490 which has a balance of $1,346,682.88 before this request was 25 made. 26 Section 2. Severability. If any section, clause, sentence, or phrase of this resolution is 27 for any reason held invalid or unconstitutional by a court of competent jurisdiction, this holding 28 shall not affect the validity of the remaining portions ofthis resolution. 29 Section 3. Effective Date: This resolution shall take effect immediately upon adoption. 30 Page 1 of 2 31 PASSED AND ADOPTED this _dayof ,2017. 32 33 ATTEST: APPROVED: 34 35 36 37 CITY CLERK MAYOR 38 39 40 COMMISSION VOTE: 41 READ AND APPROVED AS TO FORM, 42 LANGUAGE, LEGALITY AND EXECUTION Mayor Stoddard: 43 EXECUTION THEREOF Vice Mayor Welsh: 44 Commissioner Harris: 45 Commissioner Liebman: 46 CITY ATTORN EY Commissioner Edmond: Page 2 of 2 RESOLUTION NO: 060-1:7-14861 A Resolution authorizing the City Manager to enter Into a multi-year contract with EAC Consulting, Inc., Marlin Engineering, Inc., SRS Engineering, Inc., and Stantec for general engineering services on an as needed basis. WHEREAS, the City solicited a Request for Qualifications (RFQ) to retain qualified consultants to provide various professional and general engineering and architectural services on an as needed basis; and WHEREAS, the professional services are required on an as needed basis and on a rotation basis in accordance with Florida Statute 287.055, "Consultants Competitive Negotiation Acti" and WHEREAS, a Selection Committee comprised of City staff, reviewed the proposals received and identified a short list of respondents for further review; and WHEREAS, the short list of respondents were Interviewed by the Selection Committee and subsequently scored and ranked; and WHEREAS, according to the terms and scope of services in the RFQ, the City intends to retain a maximum of four (4) qualified firms under four (4) separate but similar agreements to fulfill the City's needs and meet the requirements for quick response and specialized servicesi and WHEREAS, the Mayor and City Commission desires to authorize the City Manager to execute the professional service agreements. WHEREAS, the Professional Service Agreement with the firms shall be for a term of three (3) years and an option to renew, at the discretion of the City Manager, for one (1) two (2) year renewal for a maximum term of five (5) consecutive years. NOW THEREFORE BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA; Section 1. The City Manager Is authorized to enter into non-exclusive multi-year contracts with the firms for professional and general engineering services on an as needed and on a rotation basis in accordance with Florida Statute 287.055, "Consultants Competitive Negotiation Act ll and shall be for a term of three (3) years and an option to renew, at the discretion of the City Manager, for one (1) two (2) year renewal for a maximum term of five (5) consecutive years. A copy of the contract is attached. Section 2. Severability. If any section, clause, sentence, or phrase of this resolution is for any reason held invalid or unconstitutional by a court of competent Page 10f2 Res. No. 060-17-1486" jurisdiction, this holding shall not affect the validity of the remaining portions of this resolution. Section 3. Effective Date: This resolution shall take effect immediately upon enactment. PASSED AND ADOPTED this 21 dayof March, 2017. ATIEST: APPROVED: ~ flil'l~ COMMISSlON VOTE: 5-0 Mayor Stoddard: Yea Vice Mayor Welsh: Yea Commissioner Harris: Yea Commissioner Liebman: Yea Commissioner Edmond: Yea Page 2of2 E ~".4 -.... EAC Consulting, Inc. May 30, 2017 Mr. Aurelio Carmenates, P.E Capital Improvement Project Manager City of South Miami Public Works Engineering & Construction Division 4795 SW 75 th Avenue Miami, FL 33155 Re: Professional General Engineering and Architectural Services Agreement RFQ PW2016-22 SW 58th Avenue Improvements EAC Consulting, Inc. respectfully submits this engineering services fee proposal based on our initial assessment of the scope, extent of improvements required along SW 58 th Avenue and a previous field visit. Our services on this project will be supplemented by one sub-consultant responsible for important data retrieval that will be needed for engineering design. The firm proposed to work with our engineering staff on this assignment is: • Hadonne Corp -Surveying & Mapping, Subsurface Utility Engineering We understand that the intent of the project is provide design documents for the milling and resurfacing along SW 58 th Avenue from south of US 1 to just south of SW 71 5t Street. The existing one-way roadway will also need additional signage and new pavement markings such as sharrows . The City is requesting professional engineering ' services to develop the design of the above improvements and prepare necessary construction documents. Accordingly, EAC shall undertake a topographic survey. In our preliminary discussion with the City, we determined there will be no reconstruction of the roadway or the existing landscape median . We are recommending to not include the dedicated south bound bike lane from US-l since it is against the flow of traffic and poses a safety concern. Instead, only the sharrow in the north bound direction will be included north of the intersection with SW 71 5t Street. The proposed design will be done in accordance with the established guidelines and procedures utilized by the City of South Miami Public Works Department, the Miami -Dade County Department of Transportation and Public and FDOT Greenbook. EAC shall provide professional technical services in accordance with our Professional Service Agreement for Professional General Engineering and Architectural Services with the City of South Miami. A sketch of our work is outlined in "Exhibit A" attached to this professional engineering services fee proposal. In summary, our anticipated scope of services is itemized as follows: i. Site Investigation and Reconnaissance. ii. Data Collection and Verification of As-builtConditions . iii. Site Layout Plan and Geometry with tie-ins to established vertical and horizontal datum and monuments. iv . Signing and Pavement Markings v. Paving plans (Milling and resurfacing) vi . SWPPP Notes and Applicable Details vii. Technical Specifications viii. Probable Cost Estimates ix . Permitting/Approvals with Federal and local jurisdictional authorities such as FDEP and Miami-Dade DTPW . x. Bid and Award Support Services 815 NW 57 Avenue, Suite 402 I Miami, FL 33126 I Phone: 305-264-2557 I Fax: 305-264-8363 I www.eacconsult.com I CA# 7011 Scope of services that are excluded are itemized as follows: i. Geotechnical services. Instead request as-builts from the City to obtain original pavement design. ii. Roadway reconstruction design such as widening and/or configuring the dimensions of the existing landscape median. iii. Improvements to SW 71 st Street iv. Landscaping COMPENSATION: Our lump sum fee proposal breakdown covers the surveying & mapping, engineering design, the development of construction documents and jurisdictional permitting. The fees for professional services was developed in accordance with the billing established for EAC Consulting and the City of South Miami as described in the Professional Service Agreement. Our fee proposal summary is provided below. A breakdown of our staff hours and corresponding lump sum fee proposal for the project is also provided in "Exhibit B" also attached to this professional engineering services fee proposal. ~'~::~=~~~nd proTe~c:mrnon~asks ~ .. _-= _=-~=~f~~fl}==F=~~~ ~~~-=1 rcJ\vaY!'Ians .. ~.-.------... --____ .~. ___ ._ .. _~____ ____ .. _ $9,818. 7~ ______ J _______ ~~r1'lP Sum --J ~~i~~~;g~~ ~;~~e~f~i~i~~~~~0ft~:~ O_~:l~=--~~~=~~=~ ~--..... ~}~~~·:~~-····---·-~t=-~~~=-··~~.~~ ... ~~.~-====~~ S!~ning..& £avemerl!_M~rking ~Iarls __ _ __ _ __ __ _ __ _ $10!~.60 I . _Lu~pS .. u~ . ~ .. ____________ ?ue!e!a..' =-Profe.ssjon(!!Jee.~_-L:J~i[~~e~~c:~_ ___ ..J.2~J~~.56 ---f---~~..r1'lP-~~rt1-----j ~i~~~~~S~~; ;~;~C:~:rd Support-Services ----------------t------$1:500~00 ----i"-HoUrIY-Rate~NTE-"-1 ~L~l!~9 .. _~~~~tr~~!i~rl..~i~l .. n-sp~i:TI()~.~_J$~~g.7I~l1~~ou~~[==~~=~=-__ -="_--=$~g?~]~ __ ..... -... ~~I "-H()~rIY~~I~,=~iI •.•.. · •.. _; ,Construction Certifications & Closeout -Optional Service i N/ A ... ~_ N/ A I lAlTowa-ncefur-MiScellillleo-us-~pen-se-~=OptionaTS;rVice "--r .. _-. ·"-·N/i."---. -----Nli. ... r ~ -----------------. . .. -----.. -------1 j -- i lf , =--.. -~ .. ~_=~-_~ ~Sub!ota_'-=-iiOj~~ionET Fie!;_ -_poi-pe.iiQnJecv;ceyj _-.. $],$?..?: 76 ....... _~_ .8..~~rly~a..!~:~~fL .. : I _~_ i t~..c:b_nlc~1?uj>P9r:!...?~~~~~ ___ _____ __ ....... . l~~u~~ a!Y~~~I()p()~i3P'21t?~r~~y_~ r\ll~ P~0g_ ----. ------- $2,179.30 -+- $29,165.62 Page 2 PROPOSED SCHEDULE EAC Consulting is aware that the City would like to have a Contractor selected in September 2017 . It is anticipated that the City will require 30 calendar days for procurement and award of Construction contract . Therefore, we have developed a very aggressive schedule of 104 calendar days to meet your proposed deadline. The proposed schedu le for this effort is provided below: Design Services: Data Collection Boundary and Topography Survey & Mapping Construction Documents (100% Submittal) Permitting and Approvals Post-Design Services: Limited Bid and Award Support Services Duration to Construction Contract Award Total Duration 1 -Concurrent Calendar Days 14 calendar daysl 14 calendar daysl 30 calendar days 30 calendar days 30 calendar days 104 calendar days Please note that in order to meet your proposed deadline of September 2017, NTP must be provided by June 8,2017 EAC Consulting cannot provide a construction cost estimate until we review the various aspects of the project. An Engineers Opinion of Probable Cost will be provided with the 100% Construction Documents Submittal. This proposal is based on our understanding of the requirements for engineering services as itemized under the anticipated tasks listed above . Accordingly, we reserve the right to modify th is proposal due to any changes in scope . If the above fee proposal and the terms above are acceptable to you , please provide us with a work authorization so we may begin work . The following information will be required for us to commence the work . 1. Signed approval of this proposal or written authorization to proceed with services . We look forward to our continued services to the City of South Miami . Senior Vice President cc: Huntley Higgins, P.E.; Contracts File Page 3 EXHIBIT "A" -EXHIBIT OF WORK Figure 26: Exist. sidewalk to remain 5' S IDEVVALK ----------- EXISTING CURB AND GUTTER --------- SPECIALT Y PAVlt~e CROS3Vu'AU< ---------: SW 58th street Improvements 11' LANE ------...., 5' CONTRA-BIKE LANE ---- Exist. curb & gutter to remain TYPE "F" CURB AND GUTTER Exist. sidewalk to remain 6' £IDEVV/\U< Landscaping excluded 1t-----v'\~)lJroximate project limits ~ NORTH o 15 30 60 ! 1 1,.........-----11 EXHIBIT liB" -LUMP SUM FEE PROPOSAL BREAKDOWN ESTIMATE OF WORK EFFORT AND COST· PRI ME CONSULTANT Name of Project: County: FPN: FAP N ,.--" n ..... Staff Classification 3. Project General and Project Common Tasks . Roadway Analysis S. Roadway Plans ~a. Drainage Analysis ~b . Dra inage Plans 7 . Utilities 8. Environmental Permits , Compliance & Clearances 9. Structures -MISC. T asks, DlNQs , N o ~Tech. 10. Structures -B ridge Development Report 11. Structures -T emporary Bridge 12. Structures -Short S pan Concrete Bridge 13. Structures -M ed ium Span Concrete B rid ge 14. Structures -Structural Steel Bridge 15. Structures -Segmental Concrete Bridge 16. Structures -Movable Span 17. Structures -Reta ining Wals 18. Structures -M isceRa neo us --19. Signing & Pave ment Marking Analysis ~O. Signing & Pavement Marking Plans -- 2 1. Signa~zatio n Analysis 22. Signalization Plans 23. Lighting Analysis 24. Lighting Pla ns 25. Landscape A rchitecture Analysis 26. landscape A rchitecture Plans 27. Survey (Fiekt & Office Support) 28. Photogrammetry 29. Mapping 30 . Terrestrial Mobile Li DAR 31 . Architecture Development 32. Noise Barriers Impact Design Assessment 33. Inteligent T rans po rtatio n Systems A nalysis 34 . Inte ni gent Transportatio n Sys tems P lans 35. Geotechnical Total Staff Hours Total Staff Cost SW 58th Aven ue Mi am i-Dade N/A N/A T otal Staff Hours From ·SH Principal Summary - FirmM $181 .46 16 2 84 0 96 0 0 0 9 0 0 0 0 0 a a 0 a 0 a a 0 0 0 0 0 0 O' 0 0 0 0 a 0 13 a 1 1 0 a a a 0 0 a a 0 0 0 0 a a 0 a a a a a a a 0 a a a a a 0 a a 229 2 S362.92 Notes: Project Proje ct Designer Manager Engineer $179.66 $107 .80 $85.34 10 4 0 8 38 29 10 38 29 a 0 a 1 4 3 a 0 0 a 0 0 a 0 0 a 0 a a 0 a a 0 a a 0 a 0 0 0 a a 0 a 0 a a 0 0 a 0 0 1 6 5 1 4 3 a a a a 0 a a 0 a 0 0 a 0 0 0 a a a a 0 a a a a a a a a a a a 0 0 a a 0 a a 0 a a 0 a 0 a 31 94 6 9 55,569.46 5 10,133.20 $5.888.46 1. This sheet to be used by Prime Consultant to ca lcula te the G ra nd T otal fee. CAD Staff Class i-Staff Classi- Technic ian fi catton 6 $76.36 $0.00 sections fo r 0 8 0 19 0 a 0 2 a 0 a a a a a a a a a a a a 0 a 0 a a a 0 0 a a a 1 a 2 a a a a a a 0 0 0 0 0 0 a 0 a a a a 0 a 0 0 0 0 0 0 0 a 0 a a 32 a 52 ,443.52 $0.00 Survey Field Days by S ubco ns ultant 4 -Perso n C rew: ftc ation7 $0.00 0 0 0 0 a 0 0 0 a 0 a 0 0 0 0 0 a 0 a a 0 a 0 0 a 0 a a a 0 a 0 0 a a $0.00 2 . Manually enter fee from each subconsulta nt. Unused subconsultant rows may be hidden. RoadBridgeSHEst_SW 58 Avenue_2017-05-30 Fee Sheet -Prime Page 1 of 12 Staff Class i- fication a $0.00 0 0 0 a a a a 0 a a a a a 0 0 a a a a a a a a 0 a a a a a 0 0 0 0 a 0 $0.00 Con su ltant Name : EAC Consult ing , In c . Consu ltant No.: N/A Staff Classi-Staff Ciassi-Staff Classi- ficatton 9 fication 10 ftcation11 $0.00 $0.00 0 0 0 0 0 0 0 0 a 0 0 0 0 0 0 0 a a a 0 0 a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 0 0 a a 0 0 0 0 a 0 a 0 0 0 a a a 0 50 .00 $0.00 SA LARY RELATED COS TS: OVER HEA D: OPERATI NG MARGIN: FCCM (Facilities Capital Cost Money): EX PE NS ES : Survey (Fie ld -if by P rime) SUBTOTAL ESTIMATED FEE: Subconsultant : Hadonne S ubconsultant : S ub 2 Subconsulta nt: Sub 3 SUBTOTAL ESTIMATED FEE : Geotech n ical Field and Lab Testing SUBTOTAL ESTIMATED FEE : Li mited Bid and Award S upport Services Limited Constructio n S ite Inpsections GRAND TOTAL ESTIMATED FEE : $0.00 0 0 0 0 a a 0 a a a a 0 0 0 0 a a a 0 a a a 0 0 0 a a a a a 0 0 0 a a $0.00 Date: 5/30/2017 Estim ator: NlA _ ... ._ .. ... StaffClassi-SH Salary ficatio n 12 By Cost By $0.00 Activity Activity 0 16 $2,590.72 0 83 58.619.42 0 96 59.818.70 a a $0 0 10 $1 .019.60 0 0 $0 0 0 $0 a 0 $0 0 a so a a $0 a a so a 0 50 0 a $0 0 0 $0 a 0 $0 a 0 $0 a a $0 0 13 $1.329.52 a 10 SI .019.60 a 0 $0 a a $0 0 0 $0 0 0 $0 a a $0 0 a SO a a $0 a a SO 0 a $0 0 a $0 0 a $0 0 0 $0 0 a 50 0 0 SO 0 a $0 a 228 $0.00 $24,397.56 Check = $24 ,397.56 0.00% 0.00% 0.000% 0.00% 4-man crew days@ I day 5/3012017 Average Rate Pe r Tas k $161.92 $103.85 5102.28 #DIV/O! 5101.96 #OIV/O! #DIV/O! #DIV/O! #DIV/O! #DIVlO ! #DIV/O! #DIV/O! #DIV/OI #DIV/O I #DIV/OI #DIV/O! #DIV/O! $102.27 $101.96 #DIV/O! #DIV/O! #Dr V/O! #DIV/O! #D IV/O! #DIV/O! #DI V/O! #DIV/OI #DIV/O! #DI V/O! #DIV/O! #DI V/O I #DIV/o1 #DIV/O! #DI V/o ! $107.01 S24 .397.56 $0.00 $0.00 $0.00 50.00 $0.00 $24,397.56 S2,179.30 $0.00 $0.00 $26,576.86 $0.00 $26,576.86 $1 ,500.00 $1.088.76 $29,165.62 Estimator: Representlng City of South Miami EAC Consutling, Inc. NOTE: Signature Block is optional, per District preference TlSk Task No. 3.1 Public Involvement 3.1.1 Community Awareness Plan 3 .1.2 Notifications 3.1.3 Prepare Mailing Lists 3.1.4 Median Modification Letters 3.1.5 Driveway Modification Le tters 3.1.6 Newsletters 3.1.7 Renderings and Fly Throughs 3.1.8 PowerPoint Presentation 3.1.9 Public Meeting Preparations 3.1.10 Public Meeting Attendance/Foliowup 3.1.11 Other Agency Meeti ngs 3.1.12 Web Site 3.2 Joint Project Agreements 3.3 Specifications Package Preparation 3.4 Contract Maintenance and EDMS 3.5 Value Engineering (Multi-Discipline Team) Review 3.6 Prime ConSU ltant Project Manager Meetings 3.7 Pla ns Update RoadBridgeSHEst_SW 58 Avenue_2017-Q5-30 3. Project General Tasks ---_._-.- Prolect Activity 3: General Tasks PrlntNlme Slgnlture I Dlte Units No of Units Hoursl Unit Totsl Comments Hours '1I~' "uv .. o V"'" "V' Typ. Sec. 1: One way travel lanes with a sharrow and bike lane LS 1 0 0 LS 1 0 0 LS 1 0 0 LS 1 0 0 LS 1 0 0 LS 1 0 0 LS 1 0 0 LS 1 0 0 LS 1 0 0 LS 1 0 0 LS 1 4 4 Meetings with Miami-Dade DTPW. They're the AHJ for S&PM. LS 1 0 0 3.1 Public Involvement Subtotsl 4 EA 0 0 0 LS 1 12 12 LS 1 0 0 LS 1 0 0 LS 1 0 0 LS 1 0 0 - Page 2 of 12 SW 58th Avenue N/A 5/30/2017 Prolect Activity 3: Genera l Tasks Task Task Units No of Units Houral Unit Totsl Comments No. Houra 3.8 Post Design Services LS 1 0 0 3.9 Dig ita l Delivery LS 1 0 0 3.10 Risk Assessment Workshop LS 1 0 0 3.11 Railroad , Transit, and/or Airport Coordination LS 1 0 0 3.12 Other Project General Tasks LS 1 0 0 3. Project Common and Project General Taska Totsl 11 3.8 -U.t of Project Manager Meeting. Units No or Units Roadway Analysis EA 0 Drainage EA 0 Utilities EA 0 Envi ronmental EA 0 Structures EA 0 Signi ng & Pavement Marking EA 2 Signa lization EA 0 Lig hting EA 0 Landscape A rchitect.ure EA 0 Survey EA 0 Photogrammetry EA 0 ROW & Mapping EA 0 Terrestrial Mobi le LiDAR EA 0 Architecture EA 0 Noise Barriers EA 0 ITS Analysis EA 0 Geotechnical EA 0 Progress Meetings EA 0 Phase Reviews EA 0 Field Reviews EA 0 Totsl Project Manager Meetings 2 , ... Notes : 1. If the hours per meeting vary In length (hours) enter the average In the hourlunlt column. 2. Do not double count agency meetings between permitting agenci es. RoadBridgeSHEst_SW 58 Avenue_2017-Q5-30 3. Project General Tasks Houral Unit Totel Hours Comments 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total PM Meeting Hours carries to Task 3.6 above Page 3 of 12 i 5/30/2017 RoadBridgeSHEsCSW 58 Avenue_2017-05-30 3. Project General Tasks Prolect Activity 3: General Tasks Page 4 of 12 Comments 5/30/2017 Project Activity 4: Roadway Analys is Estimator: Rodney Devera Representing Print Name City of South Miami EAC Consu~in9, Inc. NOTE: Signature Block is optional, per District preference Task Task Units No of Units Hoursl Unit Total Hours No. 4.1 Typical Section Pa ckage LS 1 12 12 4.2 Pavement Type Selection Report LS 1 0 0 4.3 Pavement Design Pa ckage LS 1 4 4 4.4 Cross-Slope Correction LS 1 4 4 4.5 Horizontal Nertical Master Design Files LS 1 0 0 4.6 Access Management LS 1 0 0 4.7 Roundabout Eva lua tion LS 1 0 0 4.8 Roundabout Final Des ign Analysis LS 1 0 0 4.9 Cross Section Design Files LS 1 0 0 4.10 Traffic Control Analysis LS 1 12 12 4.11 Master TCP Design Files LS 1 0 0 4.12 Design Variations and Exceptions LS 1 0 0 4.13 Desi gn Report LS 1 0 0 4.14 Quantities LS 1 12 12 4.15 Cost Estimate LS 1 11 11 4.16 Technical Specia l Provi sions LS 1 0 0 4.1 7 Other Roadway Analyses LS 1 4 4 Roadway AnalysiS Technical Subtotal 59 ---- RoadBridgeSHEsCSW 58 Avenue_2 017-05-30 4. Roadway Ana lys iS Page 5 of 12 SW 58th Avenue N/A Signature' Date Comments 3 typical sections for SW 58th Avenue Typ. Sec. 1: One way travel lanes with a sharrow and bike lane Typ . Sec. 2: Two-way travel lanes , med ia n and sh arrow Typ. Sec. 3: Two-way travel lanes with sharrow (south of SW 71 st Street) Analyze existing pavement. Assume as-builts will be provided by the City. Analyze suvey data of exsting cross slopes I I Level l 100% and Bid Set 2 cost estim ates (100% and Final plans) Includes Roadway , Erosion Control and S&PM Review connectivity of proposed bicyclists to other roadways _. 5/3012 017 Task Task No. 4.18 Field Reviews 4.19 Monitor Existing Structures 4.20 Technical Meetings 4.21 Quality Assurance/Quality Control 4.22 Independent Peer Review 4.23 Superv ision 4.24 Coordination Technical Meetings Typical Section Pavement Access Management 15% Line and Grade Driveways Loca l Gov ernments (cities, counties , MPO) Work Zone Traffic Control 100% Comment Rev iew Meetings Other Meetings Subtotal Technical Meetings Prog ress Meetings (if required by the City) Phase Review Meetings Total Meetings RoadBridgeSH Esl_SW 58 Av enue_2017-05-30 4. Roadway Ana lysis Project Activity 4: Roadway Analysis Units No of Units Hoursl Unit Total Hours Comments LS 2 4 8 2 field reviews x 2 people x 2 hours Includes field reviews for Roadway and S&PM LS 1 0 0 LS 1 0 6 Meetings are listed below LS % 10% 6 LS % 0% 0 LS % 5% 3 Roadway Analysis Nontllc:hnlcal Subtotal 23 LS % 3% 2 4. Roadway Analysis Total 84 Units No of Units Hoursl Unit Total Hours PM Attendance at Meeting Required? Number EA 0 0 0 0 EA 0 0 0 0 EA 0 0 0 0 EA 0 0 0 0 EA 0 0 0 0 EA 2 2 4 yes 0 EA 0 0 0 0 EA 1 2 2 0 EA 0 0 0 0 S Subtotal Project Manager Meetings 0 EA 0 a 0 PM attendance at Progress Meetings is manually entered on General Task 3 -- EA 0 0 0 PM attendance at Phase Review Meetings is manually entered on General Task 3 -- S Total Project Manager Meetings (carries to Tab 3) 0_ C.rriesto4.17 Cllmc:s to Tnb3 Page 6 of 12 5/30/2017 Estimator: Rodney Devera Representing City of South Miami EAC Consulting, Inc. NOTE: Signature Block is optional, per District preference Task No. Task 5.1 Key Sheet 5.2 Summary of Pay Items Including Quantity Input 5.3 Typical Section Sheets 5.3.1 Typical Sections 5.3.2 Typical Section Details 5.4 General Notes/Pay Item Notes 5.5 Summary of Quantities Sheets 5.6 Project Layout 5.7 Plan/Profile Sheet 5.8 Profile Sheet 5.9 Plan Sheet 5.10 Special Profile 5.11 Back·of-Sidewalk Profile Sheet 5.1 2 Interchange Layout Sheet 5.13 Ramp Terminal Details (Plan View) 5.14 Intersection Layout Details 5.15 Special Details 5.16 Cross-Section Pattem Sheet(s) RoadBridgeSHEsl_SW 58 Avenue_2017 ·05-30 5. Roadway Plans Scale Units Sheet Sheet EA EA Sheet Sheet Sheet Sheet Sheet Sheet Sheet Sheet Sheet Sheet Sheet EA Sheet Project Activity 5: Roadway Plans Print Name No. of Houral Unit Total Units or orSheat Hours Sheet '11 1 4 sections for 1 16 16 2 4 8 2 4 8 1 2 2 0 0 0 1 3 3 0 0 0 0 0 0 2 15 30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Page 7 of 12 Signature I Date Comments Includes Roadway and S&PM SW 58th Avenue N/A 513012017 Task No. Taak 5.17 Roadway Soil Survey Sh eet(s) 5.1 8 Cross Sections 5.19 Temporary Traffic Control Plan Sheets 5.20 Temporary Traffic Control Cross Section Sheets 5.21 Temporary Traffic Control Detail Sheets 5.22 Utility Adjustment Sheets 5.23 Selective Clearing and Grubbing Sheet(s) 5.24 Project Network Control Sheet(s) 5.25 Environmental Deta il Sheets 5.26 Utility Verification Sheet(s) (SUE Data) 5.27 Quality Assurance/Quality Control 5.28 Supervision Ro ad Bri dgeS HEst_SW 58 Avenue_20 17-0 5-30 5 . Roadway Pl ans Scala Project Activity 5: Roadway Plans No. of Hours! Unit Total Units Units or or Sheet Hours Commants Sheet Sheet 0 0 0 EA 0 0 0 Sheet 0 0 0 EA 0 0 0 Sheet 0 0 0 Sheet 1 8 8 Contact 811 , obtain Design Ticket and show exi sting utilities based on as-bums on plans Sheet 0 0 0 Sheet 1 1 1 To be provided by the surveyor Sheet 0 0 0 Sheet 1 8 8 Contact 811 and show ex isting utilities based on as-buiHs SUE is excluded from the RoadWlY Plana Technical Subtotal 14 LS % 10% 8 LS % 5% 4 Includes Roadway and S&PM s. Roadway Plana Total 96 Page B of 12 5/30/2017 Estimator: Herman Tirado Repreaentlng City of South Miami EAC Consulting , Inc. NOTE: Signature Block is optional, per District preference Taak Taak No. 6b.1 Drainage Map (Including Interchanges) 6b.2 Bridge Hydraulics Recommendation Sheets 6b.3 Summary of Drainage Structures 6bA Optional Pipe/Culvert Material 6b.5 Drainage Structure Sheet(s) (Per Structure) 6b.6 Miscellaneous Drainage Detail Sheets 6b.7 Lateral Ditch Plan /Profile 6b.8 Lateral Ditch Cross Sections 6b.9 Retention/Detention Ponds Detai l Sheet(s) 6b.10 Retention Pond Cross Sections 6b .11 Erosion Control Plan Sheet(s) 6b .12 SWPPP Sheet(s) 6b.13 Quality Assurance/Quality Control 6b.14 Supervision RoadBridgeSHEst_SW 58 Avenue_201 7-05-30 6b . Drainage Plans Scale 6b. Drainage Plans Print Name Units No. of Units HouraJ Unit Total Houre orShHt orShHt v 'Y~'~' Sheet 0 0 sections for e-, '<0' Sheet 0 0 0 Sheet 0 0 0 Sheet 0 0 0 EA 0 0 0 Sheet 0 0 0 Sheet 0 0 0 EA 0 0 0 Sheet 0 0 0 EA 0 0 0 Sheet 2 2 4 Sheet 2 2 4 Drelnage Piana Technical Subtotal a LS % 10% 1 LS % 0% 0 •• Drainage Plana Total • Page 9 of 12 .. Signature I Date Comments SW 58th Avenue N/A 5/30/2017 Project Activity 19: Signing and Pavement Marking Analysis Estimator: Representing Print Name Las Olas Ma ri na EAC Consulting , Inc. NOTE: Signature Block is optional, per District preference Task Task Units No. of Houl'8l No. Units Units 19 .1 Traffic Data Analysis LS 1 2 19.2 No Passing Zone Study LS 1 0 19.3 Reference and Master Design File LS 1 8 19.4 MuHi-Post Sign Support Calculat ions EA 1 0 19 .5 Sign Panel De sign Analysis EA 1 0 19 .6 Sign Lighting /Electrical Calculations EA 1 0 19.7 Quantities LS 1 0 19.8 Cost Estimate LS 1 0 19 .9 Technical Special Provisions LS 1 0 19.10 Other Signing and Pavement Marking LS 1 0 Signing and Pavement Marking Analysis Technical Subtota 19 .11 Field Reviews LS 1 0 19 .12 Technical Meetings LS 1 0 19 .13 Quality Assurance/Quality Control LS % 10% 19 .14 Independent Peer Review LS % 0% 19 .15 Supervision LS % 0% Signing and Pavement Marking Analysis Nontechnical 8ubtota 19 .16 Coord ination RoadBri dg eS HEsl _SW 58 Avenue_2 0 17-05-30 19. Si gni ng & Marking Anal ysis LS % 0% 19. Signing and Pavement Marking Analysis Total Signature I Date , Total Comments Hours "Y!"'='" """'" """'" -.;:c v~" ,~"w~ 2 Typ . Sec. 1: One way travel lanes with a sharrow and bike lane I~-~ . ~. . 0 8 0 0 0 0 Included with Roadway task 0 Included with Roadway task 0 0 10 0 0 2 Meetings are listed below (Coordination with Miami-Dade County for loops and S&PM 1 0 0 3 0 13 Pa ge 10 of 12 SW 58th Avenue N/A I I 5 /30/2017 Task I No. Task Technical Meetings Sign Panel Design Queue Length Analysis Local Govemments (c~ies, counties) Other Meetings Subtotal Technical Meetings Progress Meetings (if required by FOOT) Phase Review Meetings Total Meetings ---- RoadBridgeSHEst_SW 58 Ave nue_20 17-05-30 19 . Signing & Marking Analysi s Units Units EA EA EA EA EA EA Project Activity 19: Signing and Pavement Marking AnalYsis No. of Houl'lll Total Comments Units Units Hours No of Units Houl'lll Unit Total PM Attendance at Meeting Required? Number Hours 0 0 0 0 0 0 0 0 1 2 2 yes 2 0 0 0 0 2 Subtotal Project Manager Meetings 2 0 0 0 PM attendance at Progress Meetings is manually entered on General Task 3 -- 0 0 0 PM attendance at Phase Review Meetings is manually entered on General Task 3 -- 2 ---Total Project Manager Meetings (carrie. to Tab 3) 2 Cames to 1912 Carnes to Tab 3 Page11of12 5/30/2017 Project Activitv 20 : Signing and Pavement Marking Plans Estimator: Representing Print Name La s Ota s Marina EAC ConsuUing NOTE: Signature Block is optional, per District preference Task Task No. 20.1 Key Sheet 20.2 Sum ma ry of Pay Items 20 .3 Tabulation of Quantities 20.4 General Notes/Pay Item Notes 20 .5 Project La yout 20.6 Plan Sheet 20 .7 Typical Detai ls 20 .8 Guide Sign Worksheet(s) 20 .9 T raffic Monitoring Site 20.10 C ros s Sections 20 .11 Specia l Service Point Details 20 .12 Specia l Details 20.13 Interim Standards 20 .14 Qua li ty Ass urance /Quality Contro l 20.15 Su pervision RoadBridgeSHEst_SW 58 Avenue_2017-05-30 20. Signing & Marking Plans Scale Unite No of Unite Hourel Unit No. of Totel Houre ShHte Sheet 0 0 sections for 0 LS 1 0 0 Sheet 1 8 1 8 Per Miami-Dade County Sheet 1 2 1 2 Per Miami-Dade County Sheet 0 0 0 0 Sheet 0 0 0 0 Included with Roadway task EA 0 0 0 EA 0 0 0 EA 0 0 0 EA 0 0 0 EA 0 0 0 LS 1 0 0 LS 1 0 0 Signing and Pavement Marking Plana Technical Subtotsl 2 10 LS % 10% 1 LS % 0% 0 20. Signing and Pavement Marking Plana Total 2 11 Page 12 of 12 Signature I Date Comments SW 58t h A venue N/A 5/3012017 I BOUNDARY AND TOPOGRAPHY SURVEY & MAPPING HADONNE Land Su rveyors and Mappers Land Development Consultants Subsurface Utility Designates PROPOSAL/AGREEMENT Thursday, April 20, 2017 SENT VIA: dgrace@eacconsult .com Submitted to: Donn a Grace , P .E . EAC Consulting, Inc. 815 NW 57th Avenue , Suite 402 Miami , FL 33 1 26 In reference to: Surveying Services for t h e project known as "South Miami -SW 58th Avenue Improvements" l ocated South of US -l alon g SW 58 t h Avenu e , South Miami , FL. Dear Ms. Grace : Pursuant to your request regarding a fee estimate for s u rveying and mapping services for the above referenced pro j ect . HADONNE (HC) is pleased to submit the fol l owing proposal for your consideration: Scope of Services: Perform a Topographic Survey of the area outlined in the attached Exhibit "Au a) Perform a Topographic Survey and Property lines and/or Right of Way location b) Take Elevations shots along the crown of the road at 50-foot intervals c) Take elevations cross sections at 50 -foot intervals d) Take elevation shoot 5 feet into the adjacent properties e) Take Invert Information of the existing inlets within the project area Deliverables: Five signed and sealed copies of the resulting Map of Boundary and Topographic Survey along with the resulting CAD files (DWG format) and PDF . Time of Completion: We h ave estimated two calendar weeks to submit a preliminary survey a n d three weeks for the final submittal of the Topographic Survey. Project area, length, Size and location: See attached (Exhibit "A") Schedule of Fees: T h e fee complete phases a) of this project shall be a lump sum of $2,189.30 Year 2017 hourly Rates (loaded hourly rates): Surveying Services Rates Three Person Survey Party Office Computer Drafter Office Survey Technician Professional Surveyor in charge (Project Surveyor) EM Locating Crew Two Man GPR and Locating Crew $130 .00 $65 .00 $80 .00 $120.00 $120 .00 $200 .00 per Hour per Hour per Hour per Hour per Hour per Hour HADONN E I 1985 NW 88th Court · Suite 201 • Doral , FL. 33172 • P: +1(305) 266-1188 • F: +1(305) 207-6845 • www.hadonne .com·LB7097 1/3 Qualifications: County and / or Municipality Fees are not included in this Proposal and are the Client 's responsibility . Rule of Law : All field and office efforts in connection with this project will be performed in strict accordance with the applicable provisions of the "Minimum Standards of Practice for Land Surveying in the State of Florida", pursuant to Rule 5J17 -05 Florida Administrative Code . Requests for service not specifically enumerated in this Proposal wil l be addressed via separate response if so required and an additional charge will apply per HC 's hourly rates for calendar year 2017 , which are set forth in the "Year 2015 h ourly Rates " section of this Proposa l. Our ability to perform is and wi l l be completely influenced by the Client 's ability to make the site available and to eliminate any and all conditions that may interfere with HC 's ability to furnish services , and weather conditions . HC will require a 48 hour , prior written notice before field work can be performed . This notice should be sent via facsimile or email to HC . SUBSURFACE UTILITY ENGINEERING: Client shall be aware that GPR Technology is not 100% accurate. Depending on factors such as and not limited to : soil type , soi l moisture , size of underground utility , type of underground ut ility , depth of underground utilities ; some utilities may not be detected by GPR . GPR will detect the presence of the utility but not the type . HC will do its best to identify the type of utility b u t it may occur that some detected uti l ity remains unidentified . Area to be located with GPR should be clean without mayor vegetation , debris or a n y struct u re that may prevent t h e use of the equipme n t . Cleaning , removing of debris or vegetation is not included in this proposal . Payments Terms: Payment is due for HC 's comp l etion of each task UPON RECEIPT of HC 's Invoices . It is understood that this Proposal is entered into between HC and the Client . HC 's failure to strictly enforce a n y provision in this Pr oposa l shall NOT be constru ed as a modification or amendment of the Proposal 's terms , specifically these payment terms , unless otherwise agreed to in writing by HC . HC 's receipt of this Proposal , signed by Client , constitutes Client 's acceptance of these terms , and HC 's Standard Terms and Conditions (collectively the "Contract "), which is attach ed and incorporated by reference as if f u lly set forth here . The Client 's signature shall also constitute a notice for HC to proceed with its Scope of Services. In the event HC is required to enforce any terms of the Contrac t, Clie n t agrees to pay to HC all reasonable attorneys ' fees and costs incurred , whether suit is filed or not , including attorneys ' fees on appeal. Past due payments under this Proposal are subj ect to a 1.5 % interest per month . For special consideration , the Client agrees that HC 's liability for this Project , irrespective of the cause , shall be l imited to the amount of the Professional Fees Client actually pays to Client . Both HC and the Client may terminate this Proposal after ten (10) days written notice , and upon Client 's payment to HC of all outstanding fees and expenses incurred by HC through the date of such written notice . By signing below , I APPROVE AND ACCEPT this letter as a legal contract and read and agree to the payment terms as set forth above . By: Date: (Autho ri zed S i g natur e ) Title : (Typed o r printed name) I thank you for this opportunity to present this proposal for your consideration and look forward to your favorab l e response. In the interim, if there is anything we can do to be of service in this or any other matter , please do not hesitate to call me directly at +1(305) 266 -1188 . ~spectfu t:~ / President HADONN E I 1985 NW 88th Court· Suite 201 • Doral , FL. 33172 • P: +1(305) 266-1188· F: +1(305) 207 -6845· www.hadonne .com·LB709 7 2/3 EXHIBIT "A" Figure 26: SW 58th street ImlJrovements 5' SIDEWALK ------------, EXISTI NG CURBANDGUTTER ---------- SPECIALTY PAVI NG CROSSWALK -------- 11' LAN E -------, S' CONT RA-BIKE LAN E ----, SW 58th Avenue Plan HADONNE 1 1985 NW 88th Court· Suite 201 • Doral , FL. 33172· P: +1(305) 266-1188· F: +1(305) 207-6845 • www.hadonne .com·LB7097 3/3 PROP _TOPO_SW58AV_04-20-17 .DOCX PROPOSED TREE • NORTH o 15 30 60 ~ !