Loading...
4THE CITY OF PLEASANT LIVING To: FROM: DATE: SUBJECT: BACKGROUND: FUND & ACCOUNT: ATTACHMENTS: CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM The Honorable Mayor & Members of the City Commission Steven Alexander, City Manager Agenda Item NO.:.!:::l June 6, 2017 A Resolution authorizing the City Manager to pay Marlin Engineering, for the engineering services of design and preparation of required documents for the installation of Citywide Sharrows as identified in the South Miami Intermodal Transportation Plan. The City desires to provide people with sustainable, safe and effective alternatives to personal motorized vehicles. To improve mobility and encourage safer driver's behaviors, the City is requesting professional engineering services to develop a design and prepare necessary construction documents for the installation of Citywide Neighborhood Greenway and Sharrows as identified in the South Miami Intermodal Transportation Plan Marlin Engineering, is one of four firms selected by Resolution No. 060- 17-14861, to provide professional service agreement for engineering services on as needed basis in accordance with Florida Statute 287.055, "Consultants Competitive Negotiation Act. A proposal was provided on May 22,2017 that is comprehensive and cost effective for the services requested. Expenditures related to this contract shall be charged to the Capital Improvement Fund Account for an amount not to exceed $18,455. The expenditure shall be charged to the People Transportation Tax Fund Account number 124-1730-541-6490 which has a balance of $1,346,682.88 before this request was made. Resolution Resol ution #060-17-14861 Professional Services Agreement Marlin Engineering proposal letter dated May 22, 2017 1 2 3 4 5 6 7 8 9 10 11 RESOLUTION NO: _____ _ A Resolution authorizing the City Manager to pay Marlin Engineering, for the engineering services of design and preparation of required documents for the installation of Citywide Neighborhood Greenway and Sharrows as identified in the • f South Miami Intermodal Transportation Plan. • WHEREAS, the Mayor and City Commission wish to provide people with sustainable, safe and effective alternatives to personal motorized vehicles; and WHEREAS, the pavement marking symbols alert motorists to the expected lateral placement of bicyclist within the shared lane and encourage safer passing behaviors; and WHEREAS, this project was approved by Commission in the South Miami Intermodal Transportation Plan; and 12 WHEREAS, Commission budget for this project in the Capital Improvement Program; 13 and 14 WHEREAS, Marlin Engineering, is one of four firms selected by Resolution No. 060-17- 15 14861, to provide professional service agreement for engineering services on as needed basis in 16 accordance with Florida Statute 287.055, "Consultants Competitive Negotiation Act;" and 17 WHEREAS, Marlin Engineering submitted a proposal for professional engineering 18 services; and 19 WHERIEAS, the scope of services, staff allocation and man-hours were negotiated; and 20 WHIEREAS, the amount of $18,455 was found to be comprehensive and cost effective in 21 its design approach; and 22 WHEREAS, the Mayor and City Commission desires to authorize the City Manager to 23 execute a professional service work order with Marlin Engineering, for the engineering 24 services of design and preparation of construction documents for the installation of 25 Citywide Neighborhood Greenway and Sharrows as identified in the South Miami 26 Intermodal Transportation Plan. 27 NOW THEREFORE BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE 28 CITY OF SOUTH MIAMI, FLORIDA; 29 Section 1. The City Manager is hereby authorized to pay Marling Engineering, to 30 provide design and Construction Documents for the engineering services of design and 31 preparation of construction documents for the installation of Citywide Neighborhood 32 Greenway and Sharrows as identified in the South Miami Intermodal Transportation Plan for an 33 amount not to exceed $18,455. The expenditure shall be charged $18,455 to the Capital Page 1 of 2 34 Improvement Program Fund number 124-1730-541-6490 which has a balance of $1,346,682.88 35 before this request was made. 36 Section 2. Severability. If any section, clause, sentence, or phrase of this resolution is 37 for any reason held invalid or unconstitutional by a court of competent jurisdiction, this holding 38 shall not affect the validity of the remaining portions ofthis resolution. 39 Section 3. Effective Date: This resolution shall take effect immediately upon adoption. 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 PASSED AND ADOPTED this _ day of ____ " 2017. ATTEST: CITY CLERK READ AND APPROVED AS TO FORM, LANGUAGE, LEGALITY AND EXECUTION EXECUTION THEREOF CITY ATTORN EY Page 2 of 2 APPROVED: MAYOR COMMISSION VOTE: Mayor Stoddard: Vice Mayor Welsh: Commissioner Harris: Commissioner Liebman: Commissioner Edmond: RESOLUTION NO: 060-1:7-14861 A Resolution authorizing the City Manager to enter into a multi-year contract with EAC Consulting, Inc., Marlin Engineering, Inc., SRS Engineering, Inc., and Stantec for general engineering services on an as needed basis. WHEREAS, the City solicited a Requ~st for Qualifications (RFQ) to retain qualified consultants to providevsrious professional and general engineering and architectural services on an as needed basisj and WHEREAS, the professional services are requited on an as needed basis and on a rotation basis in accordance with Florida Statute 287.055, "Consultants Competitive Negotiation Act;" and WHEREAS, a Selection Committee comprised of City staff, reviewed the proposals received and identified a short list of respondents for further review; and WHEREAS, the short list of respondents were interviewed by the Selection Committee and subsequently scored and ranked; and WHEREAS, according to the terms and scope of services in the RFQ. the City intends to retain a maximum of four (4) qualified firms under four (4) separate but similar agreements to fulfill the City's needs and meet the requirements for quick response and specialized services; and WHEREAS, the Mayor and City Commission desires to authorize the City Manager to execute the professional serVice agreements. WHEREAS, the Professional Service Agreement with the firms shall be for a term of three (3) years and an option to renew, atthe discretion of the City Manager, for one (1) two (2) year renewal for a maximum term of five (5) consecutive years. NOW THEREFORE BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA; Section 1. The City Manager is authorized to enter into non·exclusive multi-year contracts with the firms for profeSSional and generaL engineering services on an as needed and on a rotation basis in accordance with Florida Statute 287.055, "Consultants Competitive Negotiation Act'l and shall be for a term of three (3) years and an option to renew, at the discretion of the City Manager, for one (1) two (2) year renewal for a maximum term of five (5) consecutive years. A copy of the contract is attached. Section 2. Severability. If any section, clause, sentence, or phrase of this resolution is for any reason held Invalid or unconstitutional by a court of competent Page 10f2 Res. No. 060-17-14861' jurisdiction, this holding shall not affect the validity of the remaining portions of this resolution. Section 3. Effective Date: This resolution shall take effect immediately upon enactment. PASSED AND ADOPTED this n day of March J 2017. ATTEST: APPROVED: ~ iJ!itfY4.iJ CITY CLERK . MAY R . Page 2of2 COMMISSION VOTE: 5-0 Mayor Stoddard: Yea Vice Mayor Welsh: Yea Commissioner Harris: Yea Commissioner Liebman: Yea Commissioner Edmond: Yea I Consultant Project Proposal Date: May 22,2017 Dear Mr. Cannenates: Marlin Engineering, Inc. proposes to provide the services identified below for the project entitled "Citywide Greenway Sharrows", pursuant to the Professional Services Agreement provided by the City of South Miami for Civil Engineering Services. I. General The project will primarily consist of the 1) Design of signing and pavement markings for the implementation of Citywide Greenway Sharrows. The scope of work outlines the effort required for the production of the construction documents. Scope of Work 1) Plans Production Activities include: A. Project Management B. Roadway (MOT) Plans/Analysis C. Signing and Pavement Plans/Analysis D. Permitting· n. Schedule of Work -Time of Performance The anticipated length of service shall be continuous commencing after the Notice to Proceed. 50% Submittal to the City of South Miami prior to submittal to Miami-Dade County for their review. III. Schedule of Work -Time of Performance Consultant shall perform the work detailed in this Proposal for a Total fee of$18,455 and 00 cents (100). The City shall not be liable for any fee, cost, expense or reimbursable expense or other compensation beyond this amount unless approved in a supplemental Work Order. IV. Additional Services The City of South Miami may establish an allowance for additional services requested by the City and for unforeseen circumstances, which shall be utilized at the sole discretion of the City. 1700 NW 66 th Avenue, Suite 106, Plantation, FL 33313 • 954.870.5070 • www.marlinengineering.com I V. Data Provided by the City of South Miami The following infonnation or documents are to be provided by the City of South Miami, if available: As~built infonnation'inc1uding survey and geotechnical infonnation. VI. Project Manager Consultant's Project Manager for this Project will be Raul Dominguez, P.E. Submitted by: Reviewed and approval in concept recommended by: Department Director Procurement Manager City Manager 1700 NW 66 th Avenue, Suite 106, Plantation, FL 33313 • 954.870.5070 • www.marlinengineering.com CITY OF SOUTH MIAMI Consultant Name: Martin Engineering, Inc. Consultant Fee Proposal Worksheet Contract No.: Project: Citywide Greenway Sharrows Project No.: Description: .====== .... ::: .... :::: .... ::: .... ::: .... ::: .... ::: ..... :: ... ::: .... ::: .... :::. ===========:::.::: .... ::: .... ::: .... :: .... = .... :: .... = .... ::: .... ::: ..... = ..... ::: ... :: ..... ::: ... :: ... =========== Date: 512212017 Work Order No' 2 Project General Task 3 4 Roadway Analysis Jo Task Assigned Staff Approved Rate STAFF CLASSIFICATION ::::~ "m"Se'ni'o-r:Engineer Engineer Ifael Lagos Rox Matamoros Raul Dominguez Elias Oiaz $150.00 Rate: $125.00 Rate: $90.00 Rate: $75.00 j Man Man Man LCoSU Task hours CasU Task hours CosU Task hours CasU T -,---__ I 5150 3 $375 4 $350 1 $525 5 $450 20 51,500 Sr. Canst. Insp hn Blankenship Miguel Soria Cons' German Sanchez Staff Hours: te: $75.00 Rate: $90.00! Rate: $ 75.0 By an Man , --<- 15 $1.125 sUTask Man hours CasU Task Task 8 50 Salary Average Cost By Rate Per Task Task $885 5110.53 54,450 I $89.00 15 51.125 --,- 5 Roadway Plans $375 4 $350 15 51,125 40 ~85.88 10 11 Signing and Pavement Markings Plans $375 4 $350 15 51,125 12 13 Permitting 1 14 15 15 17 18 19 20 21 22 23 24 25 25 27 -j- 15 $1,125 15 51,125 r I 40 12 T--l I 54,450 i $89.00 I I $85.88 5150.00 I Total Staff Hours 29 19 22 70 50 200 I I Total Staff Cost 54.350.00 . $2,375.00 51,980.00 i $5.250.00 i $4,500.00 j j! $18,455.00! $92.28 .. , ........ " .... """', ...... , ............ "' .. , .. , .... , ..... ,',........ ....... ......... .. ...... , .. ;,....................... .. .......................................................... " ................ , ,.,! , ...... ,"'" ..... , ............. "' .................................. " , ........ "'; .......... ,. .. .......... ! ,...... .. ..... ;'" Total % of Work by Position 14.5% 9.5% 11.0% 35.0% 30.0% Note: Fee for the Principal(s) of the firm are nol to be included above as the multiplier is not applicable to their hours. The fee is to be shown below and entered as a separa 1 .. SUBTOTAL ESTIMATED FEE: multiplier 1.00 Notes Estimate of Principal's Fee Total hours I hour '1. Th!S sheet is to be used by Pnme Consultant to calculate the Grand Tota! Fee and one is to be used for each Subconsultant 2. Manually enter fee frorn each subconsultar1t. UnLised subconsultant rows may be hidden 3. Where applicable the basis for work activity descriptions shall be the FleE/FOOT Standard Scope and Staff Hour Estimation Handbook. 4. Enter the multiplier value in the field after the word "multiplier" Maximum of 2 decimal points. additional Services (Aile Subconsultant: Subconsultant: Subconsultant Principal's Fee Sub3 Sub4 Ramon Soria 2 .. SUBTOTAL ESTIMATED FEE: Geotechnical FieldiLab Testing Survey Fee (or Survey Crew Fee) Other Misc. Fee: Enter Fee Description 3 .. SUBTOTAL ESTIMATED FEE: Additional Services (Allowance) Reimbursables (Allowance) GRAND TOTAL ESTIMATED FEE: "J1}i:~~j)0, 518,455.00 $18,455.00 $.18,455.00