Loading...
3T H E CITY O F PLEASAN T LI V I NG To: FROM: DATE: SUBJECT: BACKGROUND: FUND & ACCOUNT: ATTACHMENTS: CITY OF SOUTH MIAMI OFFICE OF THE CITY MANAGER INTER-OFFICE MEMORANDUM The Honorable Mayor & Members of the City Commission Steven Alexander, City Manager Agenda Item NO.:~ June 6, 2017 A Resolution authorizing the City Manager to pay SRS Engineering Inc., to complete construction documents for roadway and drainage improvements of SW 65 th Avenue and SW 60 th Street and SW 65 th Avenue and SW 68th Street. There are existing flooding at SW 65 th Avenue and SW 60 th Street and SW 65 th Avenue and SW 68 th Street. To improve these conditions, the City is requesting professional engineering services and necessary construction documents to develop a design that will alleviate the flooding conditions at these locations. SRS Engineering, Inc., is one of four firms selected by Resolution No. 060 - 17-14861, to provide professional service agreement for engineering services on as needed basis in accordance with Florida Statute 287.055, "Consultants Competitive Negotiation Act". Professional Services were requested for the above improvements and a proposal was provided on May 23, 2017 that is comprehensive and cost effective for the services requested. Expenditures related to this contract shall be charged to the Capital Improvement Fund Account for an amount not to exceed $24,995. The expenditure shall be charged $24,995 to the Storm Water Drain Trust Fund Account number 111-1730-541-6490 which has a balance of $78,660 before this request was made. Resolution Resolution #060-17-14861 Professional Services Agreement SRS Engineering Inc. Proposal letter dated May 23, 2017 1 RESOLUTION NO: _____ _ 2 A Resolution authorizing the City Manager to pay SRS Engineering Inc., to complete 3 construction documents for the Roadway and Drainage Improvements of SW 65 th 4 Avenue and SW 60th Street and SW 65th Avenue and SW 68th Street. 5 WHEREAS, the Mayor and City Commission wish to improve the roadway and drainage 6 conditions of SW 65 th Avenue and SW 60th Street and SW 65th Avenue and SW 68th Street; and 7 WHEREAS, City Commission budgeted for these projects in the Capital Improvement 8 Plan; and 9 WHEREAS, SRS Engineering, Inc., is one of four firms selected by Resolution No. 060-17- 10 14861, to provide professional service agreement for engineering services on as needed basis in 11 accordance with Florida Statute 287.055, "Consultants Competitive Negotiation Act;" and 12 WHEREAS, SRS Engineering Inc., submitted a proposal for professional engineering 13 services; and 14 WHEREAS, the scope of services, staff allocation and man-hours were negotiated; and 15 WHEREAS, the amount of $24,995 was found to be comprehensive and cost effective in 16 its design approach; and 17 WHEREAS, the Mayor and City Commission desires to authorize the City Manager to 18 execute a professional service work order with SRS Engineering Inc., for the roadway and 19 drainage improvements of SW 65 th Avenue and SW 60th Street and SW 65 th Avenue and SW 68 th 20 Street. 21 NOW THEREFORE BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE 22 CITY OF SOUTH MIAMI, FLORIDA; 23 Section 1. The City Manager is hereby authorized to pay SRS Engineering, Inc., to 24 complete construction documents for the roadway and drainage improvements of SW 65 th 25 Avenue and SW 60th Street and SW 65 th Avenue and SW 68th Street for an amount not to 26 exceed $24,995. The expenditure shall be charged $24,995 to the Storm Water Drain Trust 27 Fund Account number 111-1730-541-6490 which has a balance of $78,660 before this request 28 was made. 29 Section 2. Severability. If any section, clause, sentence, or phrase of this resolution is 30 for any reason held invalid or unconstitutional by a court of competent jurisdiction, this holding 31 shall not affect the validity of the remaining portions ofthis resolution. 32 Section 3.. Effective Date: This resolution shall take effect immediately upon adoption. Page 1 of 1 33 PASSED AND ADOPTED this _ day of ,2017. 34 35 ATTEST: APPROVED: 36 37 38 39 CITY CLERK MAYOR 40 41 42 COMMISSION VOTE: 43 READ AND APPROVED AS TO FORM, 44 LANGUAGE, LEGALITY AND EXECUTION Mayor Stoddard: 45 EXECUTION THEREOF Vice Mayor Welsh: 46 Commissioner Harris: 47 Commissioner Liebman: 48 CITY ATTORNEY Commissioner Edmond: Page 2 of 2 RESOLUTION NO: 060-1:7-14861 A Resolution authorizing the City Manager to enter Into a multi-year contract with EAC Consulting, Inc., Marlin Engineering, Inc., SRS Engineering, Inc., and Stantec for general engineering services on an as needed basis. WHEREAS, the City solicited a Request for Qualifications (RFQ) to retain qualified consultants to provide various professional and general engineering and architectural services on an as needed basisj and WHEREAS, the profeSSional services are required on an as needed basis and on a rotation basis in accordance with Florida Statute 287.055, "Consultants Competitive Negotiation Act;" and WHEREAS, a Selection Committee comprised of City staff, reviewed the proposals received and identified a short list of respondents for further review; and WHEREAS, the short list of respondents were Interviewed by the Selection Committee and subsequently scored and ranked; and WHEREAS, according to the terms and scope of services in the RFQ, the City intends to retain a maximum of four (4) qualified firms under four (4) separate but similar agreements to fulfill the City's needs and meet the requirements for quick response and specialized services; and WHEREAS, the Mayor and City Commission deSires to authorize the City Manager to execute the professional service agreements. WHEREAS, the Professional Service Agreement with the firms shall be for a term of three (3) years and an option to renew, at the discretion of the City Manager, for one (1) two (2) year renewal for a maximum term of five (5) consecutive years. NOW THEREFORE BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA; Section 1. The City Manager Is authorized to enter into non-exclusive multi-year contracts with the firms for professional and general engineering services on an as needed and on a rotation basis in accordance with Florida Statute 287.055, IIConsultants Competitive Negotiation Act" and shall be for a term of three (3) years and an option to renew, at the discretion of the City Manager, for one (1) two (2) year renewal for a maximum term of five (5) consecutive years. A copy of the contract Is attached. Section 2. Severability. If any section, clause, sentence, or phrase of this resolution is for any reason held invalid or unconstitutional by a court of competent Page 10f2 Res. No. 060-17-14861' jurisdiction, this holding shall not affect the validity of the remaining portions of this resolution. Section 3. Effective Date: This resolution shall take effect immediately upon enactment. PASSED AND ADOPTED this.ll.. day of March, 2017. ATTEST: APPROVED: ~ COMMISSION VOTE: 5-0 Mayor Stoddard: Yea Vice Mayor Welsh: Yea Commissioner Harris: Yea Commissioner Liebman: Yea Commissioner Edmond: Yea Page 2of2 May 23,2017 Mr. Aurelio J . Carmenates, P.E. Capital Improvement Project Manager City of South Miami Public Works Engineering & Construction Division 4795 SW 75th Avenue Miami, FL 33155 Re: City of South Miami " SW 65th Avenue and SW 68 th Street SW 65th Avenue and SW 60 th Street Roadway Drainage Investigation and Improvements Dear Mr. Carmenates, We appreciate this opportunity to prepare this Proposal for Professional Services for the referenced project. In accordance with our Professional Services Agreement for General Engineering and Architecture Services, we are submitting our understanding of the Scope of Work and Fee Proposal to provide Engineering Services in connection with the referenced project. The Scope of Work as we understand it at the present time will consist of civil engineering design, permitting, and construction phase services for the construction of roadway drainage improvements at two locations, at SW 65th Avenue and SW 68th Street; and SW 65th Avenue and SW 60th Street. It is suspected at both locations that the flooding issues are due to a collapse or obstruction within the pipelines. An initial video inspection/investigation of the pipelines shall be conduct to verify . The will consist of extending the sidewalk across the alley, reconstructing curb and gutter to drain to existing catch basin inlet, replace existing catch basin with new larger basin, remove and reconstruct concrete sidewalk and install tree grates along broken portions . All work shall be in accordance with the accepted practices and design standards of the City of South Miami, Miami -Dade County and local regulatory agencies. This work will include the following: Civil Engineering Design Services: 1. Provide Project Administration services, including attending meetings and coordination with City Staff, Envirowaste, and Surveyor to discuss project and City requirements 2. Envirowaste Services Group, Inc. to conduct a video inspection of the drainage systems to determine condition, location and size of existing underground piping, and to determine if the existing system is connected and discharge canal. Envirowaste will need to remove debris from existing catch basins and pipes in order to video system. Please see attached copy of Envirowaste's proposal for additional information. SRS staff shall be present during the videoing of the system to observe and coordinate work. May 23,2017 Page 2 3. Once all the initial information gathering is completed and we have a good understanding of the existing systems, SRS shall evaluate the existing drainage systems and prepare a written report and sketch with our findings and recommendations for each site's drainage improvements. 4. SRS shall meet with City's Project Manager to present report and discuss findings and recommendations . 5. Contract and coordinate with a surveyor to provide a topographical survey of the project area as needed for design. 6. Project data gathering including conducting search of existing utilities, site visits to observe existing site conditions and verify survey information 7 . Prepare Engineering Design Plans including a Site Paving , Grading & Drainage Plan, Typical Sections and Construction Details. a . Submittals to City shall be provided at 75% and 100% complete. b. General notes and technical specifications shall be provided on drawings. c . Preliminary list of drawings sheets i. C-1 Title Sheet ii. C-2 Location Plan, General Notes, and technical specifications iii. C-3 Geometry Plan and typical cross section iv. C-3 Paving, Grading and Drainage Plan v . C-4 & 5 Miscellaneous Details and Notes 8 . Preparation of preliminary engineer's estimate of probable construction cost. Plans Processing and Permitting Services: 9 . Submit and process completed permit applications, construction drawings and support documentation to City of South Miami for review and permit approval. (Since this project will not require any new drainage, but rather, just the replacement of an existing pipelines . It is assumed a RER drainage permit will not be required). Construction Phase Services: 10 . Bid Services -Provide bid support services including attending pre-bid meeting, responding to pre-bid request for information , and review of bids . 11 . Construction Administration -to complement the City's Inspection/CEI, assist and/or participate in pre-construction meeting, respond to Contractor's request for information (RFI's), review and approve shop drawings, and conduct Six (6) construction site visits to observe on-going construction and adherence to construction documents. Exclusions May 23,2017 Page 3 Expressly omitted from the services to be provided by SRS are the following . These services or fees shall be considered additional to this contract and would have to be renegotiated as additional services . • Civil design revisions resulting from site layout changes occasioned by others, including changes due to permitting agency preferences, not code compliance, which are caused beyond Engineer's control or authority. • Design of utilities which may be needed due to conflicts or to meet regulatory agency requirements. This may include, but is not limited to, water main extensions, drainage systems, force mains, gravity sewers, lift stations, etc. • Design of on-site/roadway lighting or irrigation. • Payment of impact, mitigation or regulatory agency review and permit fees. • Other professional engineering services as may be requested by the City. SUBCONSUL TANTS The following are professionals contracted be SRS Engineering, Inc. to assist in the preparation of the work outline above. • Envirowaste Services Group, Inc. (Videoing and cleaning of drainage systems) • Hadonne Corp. (Surveying and Mapping) SCHEDULE OF WORK -TIME OF PERFORMANCE Consultant shall submit the Deliverables and perform the Work as depicted in the tables below (Additional pages may be added as needed) SCHEDULE OF DELIVERABLES Task, Sub-Major Task, Sub-Task, Activity, or Duration Delivery Date* task, (specify weeks (cum ulative or Activity ID Deliverable or calendar weeks, or # days) calendar days) 2 System's Videoing 2 weeks NTP + 2 weeks 3 Preparation of Preliminary Report & 1 week NTP + 3 weeks Sketch 4 Present Report to City 1 week NTP + 4 weeks 5 Completion of Survey 2 weeks NTP + 6 weeks 6 Conduct Utility Search and Initial site visit 3 weeks NTP + 7 weeks 7 Preparation of Design Drawings 1 week NTP + 8 weeks 7a Submittal -75% Plans 1 week NTP + 9 weeks 7a 75% City Review 1 week NTP + 10 weeks 8 Prepare Const. Cost Estimate o week NTP + 10 weeks 7a Final Submittal -100% Contract Plans 1 week NTP + 11 weeks 7a Final Submittal -City Review 9 Permitting 10 Bid Phase Services 11 Construction Phase Services COMPENSATION 1 week 3 weeks 6 weeks TBO May 23,2017 Page 4 NTP + 12 weeks NTP + 15 weeks NTP + 21 weeks TBO Our Engineering Fees for the above described Basic Services will be a lump sum amount of TWENTY-FOUR THOUSAND NINE-HUNDRED and NINTY-FIVE DOLLARS ($24,995.00). Please see fee breakdown below. It does not include plan review or permitting fees. Payment will be based on monthly invoicing as a percentage of completion of work. Topographical Survey ................................................................................. $ 5,340.00 Envirowaste Services ................................................................................. $ 1,850.00 Completion of Written Report .................................................................... $ 5,270.00 Completion of Design Plans and Permits ................................................. $ 9,525.00 Bid and Construction Phase Services ...................................................... $ 2,765.00 Reimbursable Expenses ................................................................................ $ 245.00 TOTAL ......................................................................................................... $ 24,995.00 We would expect to commence our services promptly after receipt of your acceptance of this proposal and approval of the purchase order. This Proposal and our Agreement with the City represents the entire understanding between the City of South Miami and SRS Engineering, Inc. in respect to the Project and may only be modified in writing when signed by both of us. If the foregoing is agreeable to you, please execute the original of this Agreement where indicated below and return to our office. Very trul yours, C£i serralta1!~ Pres' ent I have read the foregoing Letter of Agreement and agree to all terms and conditions stated therein. Accepted this ___ day of ______ , 2017 City of South Miami By: ___________ ___ Title : ___________ ___ ACTIVITY PRINCIPAL BYSRS HRS RATE $180.00 General Project Management 3 $180.00 Video/Cleaning of Drainage Systems S180.00 Preparation of Preliminary Report $180.00 Present Report and Findings to City $180.00 Completion of Survey $180.00 Conduct Uti lity Search and Initial site visit $180 .00 Preparation of Design Drawings $180.00 Submittal -75% Plans $180.00 75% City Review $180.00 Prepare Const. Cost Estimate S180.00 Final Submittal -100% Contract Plans $180.00 Final Submittal -City Review $180 .00 Permitting S180 .00 Bid Phase Services $180.00 Construction Phase Services 1 $180.00 TOTAL 1 $180 .00 ACTIVITY I BY OTHERS Hadonne Corp . Envirowaste Serv ices, In c. ACTIVITIES BY SRS (Salaries) ACTIVITIES BY OT HERS ENGINEERING COST BREAKDOWN City of South Miami SW 58th Court Roadway and Drainage Improvements SR. PROJ. MGR SR. ENGINEER ENGINEER INSPECTOR HRS RATE HRS RATE HRS RATE HRS RATE S150.00 $125.00 $90.00 $75.00 2 $150.00 S125.00 $90.00 $75.00 1 $150.00 $125.00 16 S90.00 $75.00 1 $150.00 2 $125.00 16 $90.00 $75.00 2 S150.00 $125.00 $90.00 $75.00 $150.00 1 5125.00 4 $90.00 $75.00 $150.00 1 $125.00 4 $90.00 $75.00 $150.00 4 $125 .00 21 $90.00 $75.00 $150.00 1 $125.00 4 $90.00 $75.00 2 $150 .00 1 S125.00 S90.00 $75.00 $150.00 2 S125.00 6 $90 .00 $75.00 $150.00 1 $125.00 2 $90.00 $75.00 2 $150.00 1 $125.00 $90.00 $75.00 $150.00 1 $125.00 4 $90.00 $75.00 S150.00 1 $125.00 4 S9 0.00 $75 .00 3 $150.00 6 $125.00 S9 0 .00 12 $75.00 11 $150 .00 22 S125.00 81 $90.00 12 $75.00 DESCRIPTION TODooraDhical Survey Drainage Syslem Cleanino and Videoino SUMMARY S17 ,560 x ["iOOJ Estimated OUT OF POCKET EXPENSES including reproduction costs, etc, CAD TECH CLERICAL HRS RATE HRS RATE $65.00 $45.00 S65 .00 4 S45 .00 $65.00 $45.00 8 S65.00 $45 .00 S65.00 $45.00 4 S65 .00 $45 .00 8 $65.00 $45.00 32 $65.00 $45.00 4 565.00 $45 .00 $65.00 S45 .00 $65.00 S45.00 1 $65.00 $45.00 $65.00 $45.00 1 S65.00 $45.00 $65.00 S45.00 $65 .00 $45.00 58 $65.00 0 $45.00 TOTAL DATE : 5/24/2017 TOTAL HOURS 9 17 27 2 9 13 57 9 3 8 4 3 6 5 22 194 TOTAL COST $1,020.00 $1,590.00 $2,360.00 S30 0.00 $745.00 $1,005.00 $4,470.00 $745.00 S425 .00 5790.00 $370.00 S425.00 S550.00 S485.00 $2,280.00 $17,560.00 COST $5,340 .00 $1,850.00 $7 ,190.00 S17 ,560.00 S7 ,190.00 S245 .00 TOTAL THIS PROPOSAL " $24,995.00 -....;.,....;.--_ ... ENVIROWASTE SERVICES GROUP, INC. SPECIFIC WORK ORDER BETWEEN ENVIROWASTE SERVICES GROUP, INC . (THE "CONSULTANT") AND SRS Engineering, Inc Site: 501 Sw 74Th Court, Suite 201 Miami, Florida 33155 Att: Ignacio Serralta Phone: 305 970 5805 E-mail: Ignacio@srs-corp.com The parties to this Specific Work Order are parties to this Professional Services dated April 26, 2017, (the "Agreement"). The parties hereto agree that all of the terms and conditions set forth in the Agreement are in full force and effect and incorporated herein by reference . The terms and conditions of the Agreement shall govern and control over any inconsistent terms or conditions contained in this Specific Work Order except as to the scope of work to be performed and the fees for such work which are set forth herein and which shall control. Capitalized terms used in this Specific Work Order that are not otherwise defined herein shall have the meanings ascribed to them in the Agreement. RE: Proposal for CCTV and Clean 4 CB, 3 pipe Segment. and 1 Outfall of Storm Drain located at next intersections: Sw 68th St & Sw 65th Ave I Sw 65th Ave & Sw 60th St. -CCTV -Clean Vactor -Disposal at county owned facility Unit Price $175.00 per Hour Minimum 4Hours $200.00 per Hour Minimum 4Hours Total $700.00 $800.00 $350 .00 SERVICE CHARGE : IF ANY PAYMENT DUE HEREUNDER OR PURSUANT TO ANY SPECIFIC WORK ORDER IS NOT RECEIVED BY THE CONSULTANT WITHIN THIRTY (30) DAYS AFTER ITS DUE DATE , A SERVICE CHARGE IN THE AMOUNT OF ONE AND ONE- HALF PERCENT (1 .5%) OF THE UNPAID BALANCE WILL BE CHARGED TO THE CLIENT (THE "SERVICE CHARGE"). THE SERVICE CHARGE SHALL BE APPLIED MONTHLY AND ANY PREVIOUSLY UNPAID SERVICE CHARGE WILL BE ADDED TO THE UNPAID BALANCE . The Client hereby authorizes the Consultant to commence the work (commencement date) required under this Specific Work Order on . IN WITNESS WHEREOF, the parties have duly executed this Specific Work Order as of the day and year first above written . The fees, cost or prices for the work proposed shall expire thirty (30) days from the date first above written. "CLIENT" BY TITLE DATED "CONSULTANT" ENVIROWASTE SERVICES GROUP, INC, A Florida Corporation Alain Delgado EnviroWaste Services Group, Inc Operations Manager TITLE 04/26/2017 DATED Headquarters: 18001 Old Cutler Rd Suite 554, Miami, FL 33157 * (877) 637-9665 * F (305) 637-9659 * Offices: Miami, FL * Orlando, FL * Sarasota, FL * Naples, FL * Tampa, FL www.envirowastesg.com * Email: alain.delgado @e nvirowastesg.com Ignaclo Serra Ita From: Abraham Hadad, PSM <ahadad@hadonne.com> Sent: Fr iday, Apri l 28, 201 7 6:32 PM To: Ignacio Ser ra Ita Subject: Re: New So uth Miami Projects. Ignacio Please find below the fee breakdown as pro mised Dante Fascial Park 3 Man Survey Crew Daly Rate Surveyor / Mapper Survey Technician CADD Technician Principal SW 60th Street 3 Man Survey Crew Daly Rate Surveyor / Mapper Survey Technician CADD Technician Principal SW 65th Avenue 3 Man Survey Crew Daly Rate Surveyor / Mapper Survey Technician CADD Technician Principal Thank you Abr ah a m H adad , PSM President E: ahadad@hadonne.com T: + 1 (305) 266 -1188 F: + 1 (305) 207 -6845 16.00 2.00 4.00 16 .00 0.50 10.00 2.00 2.00 16.00 0 .50 10.00 2 .00 2 .00 16 .00 0.50 Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours Hours @ 125.00 Per @ 85.00 Per @ 60.00 Per @ 65.00 Per @ 180.00 Per @ 125 .00 Per @ 85.00 Per @ 60.00 Per @ 65.00 Per @ 180.00 Per @ 125.00 Per @ 85.00 Per @ 60.00 Per @ 65.00 Per @ 180.00 Per HADONN E I 1985 NW 88 th Co urt , Suite 201 I Dora l, Flor ida 33 172 I www.hadonne.com Land Surveyors and Mappers I Subsurf ace Utility Engineering I Land Developm ent Consultants Fr o m : Ignacio Serra Ita <ignacio@ srs-corp.co m> Sent: Friday, April 28, 2017 10 :08:54 AM To: Abraham Hadad, PSM Subject: New South Miami Projects. Abraham , Need proposals on these project ASAP . 1 Hour 2,000 .00 Hour 170.00 Hour 240.00 Hour 1,040.00 Hour 90.00 $3,540.00 Hour 1,250.00 Hour 170.00 Hour 120.00 Hour 1,040.00 Hour 90.00 $2,670.00 Hour 1,250.00 Hour 170.00 Hour 120.00 Hour 1,040.00 Hour 90 .00 $2,670 .00 --.", SW 60 ST 7 -35 ·"""7 """"-3"""'6.----1--- 6005 ,1LJJ.L-.2.:.l;Jt .... ~1 7 -33 o Q. 1------.,..,,,1--.,--,.-,,1 PQ PI) -19 7 -56 --t--+---t----. ....... -+I~ 6050 SW 6 11 ST i2 TER o 0.. ........ ___ ~ 00 ~ III , 5 ET 10 -29 o w Ct: co o l ~----~----~----_4--- Q. 6(:-9L m -l J \ » ~ 1 '\ I-------l \ O£-9 I n ~\ j-------\--J--;l \ ,~ Ir-.... -...;.--~ I £: L ad 1I1 \ ~ ) (£3 v . -. m -l ~ 0\. I J ad ~ Lv -9 L m V1 -l ~ OJ ::0 \' m :E (:17 -9 l m ::0 () m » \ -l Z » r I r lJ') :E 0\ 1 0\ » \ < m l, \ H -9 l • ~ ;; H:J N3tll l -U . a -3tEll\OJ • . ... _--,8 Vl S ~-=:::--4 I, II '-------