Loading...
PINCREST 3 001Bid Form Pinecrest Villas Neighborhood Traffic Calming Phase 11 THIS BID IS SUBMITTED Td: Dr. Hector Mirabile City Manager City of South Miami 6130 Sunset Drive South Miami, FL 33143 The undersigned BIDDER proposes and agrees, that if this Bid is accepted, to enter into a Contract with the City of South Miami in the form included in the Contract Documents which are part of this Bid Package to perform and furnish all work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated therein and in accordance with the other terms and conditions of the Contract Documents which include those prepared by Ribbeck Engineering, Inc. BIDDER accepts all of the terms and conditions of the Advertisement or Invitation to Bid and Instructions to BIDDERS, including without limitation those dealing with the disposition of Bid Bond /Security. This Bid will remain subject to acceptance for 90 days after the day of the Bid opening. BIDDER agrees to sign and submit the Contract with the Bonds, Insurance Certificate and other documents required by the Bidding requirements within ten (10) calendar days after the date of the City's Notice of Award. 2. In submitting this Bid, BIDDER represents, as more fully set forth in the Contract, that: a. BIDDER has examined copies of all the Bidding Documents and of the following Addenda (receipt of all which is hereby acknowledged.) Addendum No. Addendum No. Addendum No. Addendum No. Dated: �� { Dated: Dated: Dated: b. BIDDER has familiarized himself with the nature and extent of the Contract Documents, the proposed work, site, locality, and all local conditions and laws and regulations that in any manner may affect cost, progress, performance or furnishing of the Work. c. BIDDER has studied carefully all reports and drawings of subsurface conditions and drawings of physical conditions. d. BIDDER has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests and studies in addition to or to supplement those referred to in (c) above which pertain to the subsurface or physical conditions at the site or otherwise may affect the cost, progress, performance, or the furnishing of the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents. The BIDDER hereby acknowledges that no additional examinations, ©thomasfpepe- 09 -28 -II (Updated 05 -16 -2012) Page 8