Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Maggolc Inc-Bid Pinecrest Villas Neighborhood Traffic Calming Improvements-Phase II
s CITE' OF SOUTH MIAMI PINECREST VILLAS NEIGHBORHOtJD TRAFFIC CALMING ;IMPROVEMENTS PHASE -1 The City of South Miami, Florida, hereinafter referred to as "City ", is hereby soliciting sealed proposals.` The submittal, consisting of one (1) original unbound proposal, three'(3) additional copies to the Office of the City Clerk, South Miami City Hall, 6130 Sunset Drive, ;South Miami, Florida 33143: Sealed Proposals must be received by the City Clerk, either by mail or hand delivery, no later than 3:00 P.M. local time on Tuesday, July 17 2012. A public opening will takeplace at 3:00 P.M. in the City' Commission Chambers located at City Hall on the same date. Any Proposals received after 3 :00 P.M. local time on said date will not be accepted under any circumstances. Any uncertainty regarding the time a Proposal is. received will be resolved against the Bidders. The Project is generally described as: i` Installation of speed tables and improvements 'include the installation of one drainage inlet and associated exfiltration system and restoration. Based on SMCRA funded survey work, associated drainage and percolation study and input . provided by the 'SMCRA Members "and local business owners, the designer completed the j design portion of the Pinecrest Villas Traffic Calming Project including the completion of the full set of construction drawings of the project. At this time,, scheduled improvements include the installation of one drainage inlet and associatedz exfiltration system and restoration. In accordance with Section 17 -6 of the 'City Ordinance, a Performance and Payment Bond is required for the full amount of the project. The work involved with the project shall include, but may not be limited;to, the furnishing of all labor, materials, tools, equipment, .machinery, superintendence and services necessary for the complete in place construction of the project. A Mandatory Pre -bid Meeting will be conducted at City Chambers at 1'1 :00 AM located at 6130 Sunset Drive, South Miami 33143. Pre -Bid Meeting shall be held at the site on Monday, July 9, 2012. The conference :shall be held regardless of weather conditions. Proposals are subject to the attached Standard Terms and Conditions contained in the complete bid package. Interested Bidders who wish to bid on this RFP can obtain the complete bid package at City,s website I at cityofsouthmiami. net /index.php?src= gendocs &ref= BidPosting2iOI0 &category= FtFPs- and -Bids' City y g y ; P.M. or at the Ci Clerk's office Monday through Friday from 9.00' A.M. to 4.00, The City of South Miami reserves the right to award the bid to the lowest; most responsive, responsible bidder, as determined by the City Commission, subject to the right of the City to'reject any and all bids; to waive any irregularity, in the :bids or bidding procedure and subject also to the right of the City to award bid and contract to bidders other than the low bidder: i.endez, CMC mi City Clerk' i Pinecrest Villas Neighborhood Traffic Calming Phase II THIS BID IS SUBMITTED TO: Dr. Hector Mirabile City Manager. City of South Miami 6130 Sunset Drive South Miami, FL 33143 The undersigned BIDDER proposes and agrees, 'that if this Bid is accepted, to enter into a Contract with the City of South Miami in the form included in the Contract Documents which are part of this Bid :Package to perform and furnish all work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated therein and in accordance with the other terms and conditions of the Contract Documents which include those prepared by;Ribbeck Engineering, Inc. k I. BIDDER accepts all of the terms and conditions of the Advertisement or Invitation to Bid and Instructions to BIDDERS, including; without limitation those dealing with the disposition of Bid Bond /Security. This Bid will remain subject to'acceptance, for 90 days after the day of the Bid opening. BIDDER agrees to sign and submit the Contract with the Bonds, Insurance. Certificate and other documents required by the Bidding requirements within ten (14) calendar days after the date of the City's Notice of Award. 2. In submitting this Bid, BIDDER represents, as more fully set forth in the Contract, that: a. BIDDER has examined copies of all the Bidding Documents;and of the following Addenda (receipt of all which is hereby acknowledged.) Addendum No. Dated: ho Addendum No. ? ` Dated: Addendum No Dated: Addendum No. Dated: b: BIDDER has familiarized himself with the nature and extent of the Contract Documents; the proposed work, site, ,locality, and all focal :conditions and laws and regulations that in any manner may affect cost, progress, performance or furnishing of the Work. c. BIDDER has studied carefully all reports and drawings of subsurface conditions and drawings of physical conditions. d'. BIDDER has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests and studies in addition to or to supplement those referred to in (c) #above which pertain to the subsurface or physical conditions at the site or otherwise may affect the cost, progress, performance, or the furnishing of the Work at the Contract Price; within the Contract Time and in accordance with the other terms and ;conditions of the Contract Documents. The .BIDDER hereby acknowledges that � no additional examinations, OO thomasfpepe- 09 -28 -1 I (Updated 05 -16 -2012) Page investigations, explorations, tests, reports or similar information or data are, or will, be required by BIDDER for any reason in connection with the Bid. e. BIDDER has correlated the results of all such observations, examinations, investigations, explorations, tests, reports and studies with the terms and conditions of the Contract Documents. f. BIDDER has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing Underground Facilities at or contiguous to the site and assumes responsibility for the accurate location of all Underground Facilities. No additional examinations, investigations, explorations, tests, reports or, similar information or data in respect to any Underground Facilities are, or will be required, by BIDDER in order to perform and furnish the Work at the Contract Price; within the'Contract Time and in accordance with the other terms and conditions of the Contract, Documents. g. BIDDER has given written notice of all conflicts, errors; or discrepancies that it has discovered` in the Contract Documents and, if any conflicts;' errors or discrepancies have been found and notice given, the BIDDER represents, by submitting its bid to the City, that the BIDDER: has received sufficient notice of the resolution thereof by Consultant, that such resolution is acceptable to BIDDER and the BID15ER waives any claim regarding the conflicts, errors or discrepancies. s h. This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement I or rules of any group; association, organization, or corporation; BIDDER has not "directly or indirectly induced or solicited any other BIDDER to submit a false or sham Bid; BIDDER has not solicited or induced any person, firm or corporation to refrain from Bidding; and BIDDER has not sought by collusion or otherwise to obtain for itself any advantage over any other BIDDER or over the CITY. 3. BIDDER understands and agrees that the Contract Price is the lump -sum that it needs to furnish and install all of the Work complete and in place. The Schedule of Values is provided for the purpose of Bid Evaluation and when initiated by the CITY, it shall form the basis for calculating the pricing of change orders, The Contract Price shall not be adjusted in any way , so as to result in a deviation from the Schedule of Values, except to the extent that the CITY changes the scope of the Work after the Contract Date. As such, the Contractor shall furnish all labor, materials, equipment, tools., superintendence and services necessary to provide a complete, in place Project for the Bid l Price of. E LUMP SUM BASE BID:G/ ZG dollars and / cents f Alternates: #1 ##5 --- #2 #6 _ #3 #7 a. #4 #8 O thomasfpepe- 09 -28 -1 I '(Updated 05- 16 -201 2) Page- 9 A fee breakdown for each task must be completed in the table shown above. Failure to complete this information shall render the proposal non - responsive. 4. The ENTIRE WORK :"shall be completed, in full, within 60 Calendar Days ° from the date stipulated in the NOTICE TO PROCEED: Failure to complete the entire work during the described time period shall result in the assessment of liquidated damages as set forth in Paragraph 6 of the Contract. 5, Communications concerning this Bid shall be addressed to: BIDDER: 16t A 6 604' C, .�` Address: / 16100 Telephona, v� Facsimile: iL — 4 4 Attention:, 6. The terms used in this Bid which are defined in the General Conditions of the Contract shall have the same meaning as is assigned to them in the General Conditions. SUBMITTED THIS DAY OF 24 E BID SUBMITTED BY: lzq/ 2949" Company Telephone Number 14c, P-to C70,<) ZaA e Z' -'4 2- 6 93 Na 'e of erso horized to Submit Bid Fax Number j Sign4tury Email AWMss i Title FAILURE TO COMPLETE. SIGN. & RETURN THIS FORM MAY DISQUALIFY YOUR RESPONSE O thomasfpepe- 04 -28 -1 I (Updated 05 -16 -2412) Page. 1. City of South Miami Public Works & Engineering Department Capital Improvement Program Pinecrest Villas Neighborhood Traffic Calming Improvements ` Phase; I' Schedule of Values Company: IV " 9 �.. 01 WRR�!E Mobilization LS 1 OCAS, n2 Maintenance of Traffic LS 1 / V, Regular Excavation CY 20 2C,t, Regular Fill CY 23L Milling -1" Average depth SY 222 Type S -1 Asphaltic Concrete TN 6$ Concrete Curb Type D LF Performance Turf/ Sod SY 51 Single Post Sign- Less than 12 SF AS 20 Bi- Directional (Yellow- Yellow) EA 92 Bi- Directional (White - Red) EA 52 Traffic Stripe Solid; 12" White LF 578 1z $ 9 ®. Traffic Stripe Solid 6" Yellow NM 0.587 S57�0. Z2 '. Performance Bond Permits and Insurance Total: O thamasfpepe -09 28 -1 I (Updated 05 -1b- 2012) ' Page PAY ITEM DESCRIPTiON • Mobilization and Dust Control- This item shall inclu operations, in mobilizing for beginning work on the projec those operations necessary for the movement of person incidentals to the project site. Payment will be based on a Maintenance of Traffic — This item < shall include the Lu necessary traffic control including but not limited to flag lighting, flags, and other control devices for directing traffic aides for the duration of the project. Included in this bid duty law enforcement officer to control and direct traffic. sum, payment will be in accordance 'with the cost br Consultant and measured as required by and satisfactory devices require, d must conform to applicable standards. • Regular Excavation — This item is the unit price for. Excavation within the limits defined by Details on the Plan The price bid shall be full' compensation, as to ,each cubic offsite, for furnishing all necessary labor, materials, t performing; all work required for excavation, widening excavation, including but not limited to the loading, trans the removed materials. Payment will be paid for based o removed, and disposed of offsite, times the unit bid price f Milling Existing Asphalt Pavement, I" Average Dep price for each Square Yard that is milled from, the existin (approximately I -inch average depth) within the limits defin and the FDOT Specifications. Greater widths and depths t Specifications, and removal of unauthorized work as req Contractor's sole; expense unless the Contractor has a wr work. The price bid shall be full compensation for furnishin materials, tools, and equipment and for performing all wor existing asphaltic concrete surface, including the cost of re material from the project site. Type i Asphaltic Concrete This item is the unit price item shall, include the furnishing ,. and installing Type S -1 Asp paving repairs within the limits defined by details on. the -F and /or the Standard Details and the map or drawing des must be placed in a manner that maintains the existing c widths and depths than are defined by the Plan and S unauthorized work as required by the City, are at the cor for the installation, or for removal of unauthorized work a the Contractor has a written change order for such v compensation for furnishing all that is necessary for a comp course installation including but not limited to supplying equipment and for performing all work required for_prepa tack cost application, placing, compacting, and testing. R number of square yards of Type S -1 asphaltic concre contracted work.: The area to be asphalted shall be the sar map or drawing of the area to be milled and any areas not D thomasfpepe- 04 -28 -1 I (Updated 05 -16 -2012) de the preparatory work and t including, but not limited to riel, equipment, supplies, and ump sum for mobilization. mp sum price for furnishing all persons, cones, markers, signs, and maintain safety, and other. item is the payment of an off- Since this item is bid as a lump eakdown as approved by the to the Consultant. All MDT each Cubic Yard for Regular Plans the FDOT Specifications. yard removed and: disposed of cols, and equipment and for ,and other required :general porting, and proper disposal of rr the number of Cubic Yards o "r Regular Excavation, th — This item is the unit gI asphalt pavement ed by the Details on the Plans han are defined by the Plan and wired by the City, are at the itten change order for such g all necessary labor, k,required for milling of the moval and disposal of milled for each Square Yard. This altic concrete for permanent ins, the FDOT specifications: nation. Placement of asphalt own and the grade. Greater ecifications, and removal of ractor's sole expense, either required by the City, unless irk. The price shall be full ate asphaltic concrete surface, I labor, materials, tools, and ng and transporting mixture, anent will be based on the required to perform the e as the area designated on a so designated and milled that Page 12 are asphalted, and the removal of unauthorized work as required by the City, shall all be' at the contractor's sole expense, i Concrete Curbs — This item is the 'unit price for each Linear foot needed to, install concrete curb as required by the plans, the FDOT Specifications and /or, Miami Dade County Standard Details or the quantity identified on thex plans and as directed by the City. The Price bid shall be full compensation for furnishing all necessary labor, materials, tools, and equipment and for performing all work required for preparing and transporting mixture, formwork, placing for a complete concrete ° curb for each foot authorized and installed. Payment will be based; on the number of linear feet of concrete curb and gutter times the unit bid price:; All linear feet of concrete curb 'shall be authorized in writing signed by the City Manager or his designee. Performance Turf, Sod— This item is the unit price for each Square Yard for sodding within the limits defined by Details on the Plans and Specifications and the FDOT specifications. The price bid shall be full compensation for furnishing all necessary labor, materials, tools, and equipment and for performing all workrequired for sodding of new swales and any other grassy areas disturbed during construction, including the loading, transporting, and proper disposal of the removed materials for each square yard authorized and installed. Payment will be based on the number of square yards of authorized and installed times the unit bid price. All square 'yards, shall be authorized in writing signed by the City Manager or his designee. Single Post Sign, Less Than 12 SF — This item is the unit price for furnishing and installing Single Post Signs (Less than 12 square feet) within the limits defined by Details on the Plans, the Specifications, and the FDOT Specifications. The price bid shall be full - compensation for furnishing, all necessary labor materials, `tools and equipment and for performing all work required for the complete installation of a single post signage, ready for - service and all other similar items as required or necessary, to original locations and to equal or better than original : conditions; and all other appurtenant and miscellaneous items and work. Included in the unit cost are all survey, submittals, and shop drawing work; all loading, unloading, and transport costs to installation location and any other cost or thing necessary to complete the work. Payment will be based on the number of authorized and installed Single Post Signs (Less than 12 square feet) times the unit bid price. The;signs to be installed, and their location, shall be designated and authorized in a writing signed by the City Manager. Painted Pavement Marking,; Standard, White, Solid,, 12" - This item is the unit price for each Lineal Foot of Solid Painted Pavement Marking (White, 12 -inch) furnished and installed within the limits defined by Details on the Plans, the Specifications,, and the FDOT Specifications. The price bid shall be full compensation for furnishing all necessary labor, materials, tools, and equipment and for performing all work required for the complete installation of solid traffic stripe (white, 1,2- inch), ready for service, and shall . include temporary paving, pavement marking, pedestrian crossings :markings and all other similar items as required or necessary, at the original locations and to equal or better than original conditions; and all other appurtenant and miscellaneous items and work necessary to provide a complete job. Included in the unit Cost are all survey, submittals, and shop drawing work; all loading, unloading, and transport costs to installation location and any other cost or thing necessary to complete the work. Payment will be based on the number of authorized linear feet of Solid Painted Pavement Marking (white, 12 -inch) installed times the unit bid price. All Lineal feet shall be authorized in writing signed by the City Manager or his designee. © thomasfpepe- 09 -28 -1 I (Updated 05- 16.2012) Page` 13 I • Painted Pavement Marking,, Standard,_ Yellow, Solid, 6" This item is the unit price for each Net Mile required for the furnishing and installing of Solid Painted Pavement Marking (Yellow, 6 -inch) within the limits defined by Details on the Plans, the Specifications, and the FD ©T Specifications. The price bid shall be full compensation for furnishing all necessary labor, materials, tools, and equipment and for performing all work required for the complete installation of solid traffic stripe (yellow, 6- inch), ready for service, and shall include temporary ,paving, pavement marking, pedestrian crossings markings and all other similar items as required or necessary, to original locations and to equal `or better than original conditions, and all other appurtenant and miscellaneous items and work. Included in the unit cost are all survey, submittals, and shop drawing work; all loading, unloading, and transport casts to installation location , and any other cost or, thing necessary to complete the work. Payment w11 be based on the authorized and installed net mile of Solid Painted Pavement Marking (yellow, b- inch) times the unit bid price. All net miles shall be authorized in writing signed by the City Manager or his designee. • Performance and Payment Bond - -This item shall include the lump sum price for the cost of bonds. • Permits and Insurance — This item shall :include a lump Burn for' all permits and any required insurance.. 7 thomasfpepe- 09 -28 -1 I (Updated 05- 16- 2412). Page 14 ADDENDUM No. I Project Name: Pinecrest Villas Neighborhood Traffic. Calming RFP NO; Not Applicable Date: July 16, 2012 Sent: Fax/E'- mail /webpage 1-Q This addendum submission is issued to clarify, supplement and /or modify the previously issued Request for Proposals. (RFP-) Documents, and is hereby made part of the Documents. All requirements of the Documents not modified herein shall remain in full force and effect as originally set forth. It shall be the sole responsibility of the bidderlto secure Addendums that may be issued for a specific solicitation. • Proposal submittals shall include an electronic copy, either CD or flash drive, in addition to one original hard copy and three copies. Stickers will be provided by the City and will be affixed by the contractor to the back of all traffic signs associated with this project. Stickers will identify the City of South Miami and a phone number. • Bid Bond is Waived. • Performance and Payment Bond is required in accordance with. Sec. 17 -6; of the City's Ordinance. Estimated project cost $25,000 to $32,000. Any requests for additional information or clarification should be submitted in writing by 3:00 PM. local time on` Friday my 13, 2012 to the attention of Steven Kulick C.P.M. Purchasing Manager at skulick@southmiamifl.gov ors via facsimile at (305) 667; 7806. IT SHALL BE THE SOLE RESPONSIBILITY OF THE BIDDER TO SECURE ADDENDUMS THAT MAY ISSUED FOR A SPECIFIC SOLICITATION. urlglnai <.ontract 1— ompletion 1 ime (ways);; Original Contract Completion Dated Actual Final Contract- Completion Date: Original Contract Price: Actual Final Contract Prices b)i Project - Harries Owner: Name; Owner Address: Owner Telephone: Original Contract Completion Time (Days): Original Contract Completion Date: Actual Final Contract Completion Date: Original Contract Price: Actual Final Contract Price: C) Project Name: Owner Name: Owner Address; Owner Telephone: Original Contract Completion Time (Days): O thomas#pepe- d9 -28 -11 (Updated 05 -16- 2012). page 17 ENGINEERING CONTRACTOR -- LIC: E- 251302, 11020 SW 55 ST., MIAMI, FL 33165 PHONE: 786- 291 2948 FAX 796- 472-8831 mac igolcfvahooxom CONTRACTS PERFORMED BY MAGGOLC INC. 1- Drainage Improvement for NW 22 CT from NW 107 ST to NW 112 ST, ($,318,000) (Miami -Dade County Public Works Dept., Completed Dec. 2007). (Alberto Estevez 786 -256 2627). (estevai�miamidade;gov) 2- Various Park Parking Lot Re- striping & Wheel Stop Replace. ($24,500) (Miami -Dade Park and Recreation Dept. Completed March 2008). (305 -596 4460) 3 -Seal Coat and Re- striping of Station 131 Logistics Parking Area, ($19,000) (Miami -Dade Fire Rescue Dept. Completed July 2008). (786-3314529) 4- Norman and Jean Reach Park/Foul ball Netting: ($25,000) (Miami -Dade Park and Recreation Dept., Completed June 2008): (305 -596 4460) 5-,Olympic Park Concrete Sidewalk Construction. ($184,000) (Miami -'Dade Park and Recreation Dept., Completed July 2008). (Dan, Crawford 305 - 5964460) (dc93 @miamidade,gov); 6- Dolphin Archaelogical Site Concrete Sidewalk Construction., ($114,084) (Miami -Dade Park and Recreation Dept., Completed July 2008). (Dan Crawford 305 - 596 4460) (dc93 @miamidade.gov) 7-',Countywide Repair of Existing ;Asphalt Pavement. (Milling & Resurfacing) ($949,990) (Florida Department of Transportation, Dist. Six, Executed the year 2008 and renewed for to year 2009 and 2010, Completed June 2011). (Janice Corn 305- 256 6359) (,lan ice. corn @dot.state.fl. us) , 8- Countywide Intersections Improvement, Roadway and Drainage. ($443,637) (Miami -Dade County Public Works Dept., Completed Dec. 2008). (Joaquin Rabassa 305 -299 9822) ora a Miamidade.gov) 9 -West Perrine Park Concrete Slabs, Sidewalks and Poured in Place'. ($34,000) (Miami -Dade Park and Recreation Dept., Completed January 2009). (305-596-4460) 10 -West Little River Asphalt Driveways Phase IV -13. ($68,000) (Miami -Dade County Office of Community and Economic Development, Completed January 2009). (Mario Berrios.786 -469 2112) (mberr @rniamidade.gov) 11- Brentwood Pool Park New Asphalt Walkways. ($34,000) (City of Miami Gardens, Completed April 2009). (305- 622 8000) Oallen @miamigardens- fl.gov) 12- Country Club of Miami Parcel 1169 & 1168 -E New Asphalt Walkways; ($178,000) (Miami -Dade Park and Recreation Dept., Completed July 2009). (Dan Crawford 305 -596 4460) (dc930miamidade.gov) 13- Country Club of, Miami Grading, Sitework °& Greens. ($107,000) (Miami - Dade Park and Recreation Dept_, Completed August 2009). (305 - 596 >4460) 114-SR 907 (Alton Rd) at Allison Dr. for Drainage and Retention Improvements. ($134,000) (FDOT, Completed December 2009) (Anthony Sabbag 305 -256 6380); ( anthany,sabbag @dot.state.fl.us) 1`5- West Little River Asphalt Driveways Phase IV -D. ($35,000) (Miami -Dade County Office of Community and Economic Development, Completed December 2009). (Mario Berrios 786 - 469 2112) (mberr @miamidade.gov) 16- District 2- Sidewalk Repair Project II ($75,300) (Public Works Dep. City of Miami, Completed March 2090)i (Fabiola Dubuisson 305 -416 1755 & 305 -801 7816) (fdubuisson @miamgov.com) 17 -Blue Road Roundabouts Re -Bid ($146,000) (Public Works Dep. City,of Coral Gables, Completed March 2010) ( 305 -460 5018) (epino @coralgables.com) 18- Harbor Drive Lighting and Resurfacing Improvement ($270,000) (Public Works Dep. Village of Key Biscayne April 2010) (786 -255 6765) (anunez @keybiscayne.fl.gov) { 19- District 1- Sidewalk Repair Project II ($95,990) (Public Works Dep. City of Miami, Completed September 2010) (Fabiola Dubuisson 305 - 418;`1755 &'305 -801 7816) (fdubuisson @miamigov.com) 20- Goiden Shore Park Pavers Sidewalk ($23,895.00) (Public Works -Dep. City of Sunny Isles Beach, November 2010) ( 305 -947 0606) (gbatsta @sibfl.net)' 2.1 -AD Barnes Park Asphalt Walkways ($86;615.00) (Miami -Dade Park and Recreation Dept., Completed December 2010) (305 -755 7985) (rttolon @miamidade.gov) 22- Installation of Sidewalks and Ramps along NE 12 Ave ($123:750.00) (Public Works Dep. City of North Miami, Completed December 2010) (Gerardo Hernandez 305 7893 6511) (ghernandez @northmiamiflgov) 23- Intersection Realignment SW 139 Terr & SW 140 Dr. and l=ast Guava ;Street One Way Street Conversion ($36,775) (Public Works Dep., Village of Palmetto Bay, Completed December 2010) (305 -969 5011) (dcasals @palmettobay4l.gov) 24- District #3 Citywide ADA Sidewalk Improvements, ($107,414) (Public Works Dep. City of Miami, Completed February 2011) (Fabiola Dubuisson 305 4161755 & 305 -801 7816) (fdubuisson @miamigov.com) 25- District #1 Citywide ADA Sidewalk Improvements, ($155,523) (Public Works Dep. City of Miami, Completed May 2011) (Fabiola Dubuisson 305 416 1755 & 305-8017816), (fdubuisson @miamigov.com) 26- MIA Building 3050 Parking Lot Drainage &;Asphalt Improvement ($103,000) (Aviation Department Miami- bade County, Completed May 2019) (Greg Tai 305 -876 8444) (gtai @mikegconst.com) 27- MIA- NW 67 Ave & NW 36 Street Intersection' Improvements ($65,000), (concrete works) (Aviation, Department Miami Dade County, Complete July Z01 1) (John Peterson 305 -622 8000) Opet @mikegconst.com) 28- District #4 Citywide ADA Sidewalk Improvements, ($149,397) (Public Works Dep. City of Miami, Completed October 2011) (Fabiola Dubuisson 305 -416 1755'& 305 -801 7816) (fdubuiss6n @miami9 ov.com) 29- Tamiami Canal Miccosukee Linear Park, Tamiami Trail and SW 122 Ave. ($87,703) (Miami Dade Park & Recreation Department, Completed October 2011) (Ruben Teurbe Tolon 786 7586 8360) (rttolon @miamidade.gov) 30- SW 19 Terrace Roadway and Drainage Improvements '($184,585) (City of Miami, Capital Improvements Department, Completed October 2011) (Maurice Hardie 786 -229 5463) (mhardie@miamigov.com) 3:1- SR 909 (Alton : Road) at West 62 Street Drainage Improvement, ($138,000) (Florida Department of Transportation, Completed December 2011) (Roland Rodriguez 305 -34`5 0696) (rodriguez @pinnaelecei.com) 32- ,Suncrest Drive & Moss Ranch Road Stormwater`Improvements ($ 110,000) (Village of Pinecrest, Public Works Dep., Completed December 2011) (Daniel Moretti -305 -669 6916) (moretti @pinecrest- fl.gov) 33- Long Key State Park Roadway Improvements ($144,230) (Florida Department of Environmental Protection, Completed February 2012) (Fred Hand 850 -488 6322) (Fred. Hand@dep. state.fl. us) ■ ENGINEERING CONTRACTOR = LIC: E= 251802 4. The following information shall be provided for this project. a) Estimated total demolition man -hours a� Percent man -hours to be performed by Contractor's b) permanent staff 1'G�C� d Permanent man -hours to be performed by direct hired c) employees for this project• d) Percent man -hours to be performed by Subcontractors Q eA—e1 S. The following information shall be attached to the bid. a) Contractor's home office organization chart. Se.' b) Contractor's proposed project organizational chart. Cse e_ c) Resumes of proposed key project personnel, including on -site Superintendent. CS'w_ C 6. List and describe any: a) Bankruptcy petitions filed by or against the BIDDER or any predecessor organizations, /V b) Any arbitration or civil or criminal proceedings, or Suspension of contracts or debarring from Bidding by any public agency brought, - against the BIDDER in the last five (5) years. i i (updated OS- 16-2012) Page 19 V�C"wp• Engineering Contractor - Lic. E- 251302 11020 SW 55 ST., Miami, FL 33165 Phone: 786-291 -2949 Fax: 786-472-8831' maggoict&vahoo.com RESUME: MARIO GONZALEZ Superintendent of Maggolc Inc, Gonzalez is a Roadway Construction and Civil Engineer with over 24 years of progressive experience in the fields of highway and railway design, construction, maintenance, and operations. EDUCATION:, - Instituto Superior Politkcnico (Higher Polytechnic Institute) "Julio Antonio`, Melia", 'Santiago de Cuba, Cuba. Degree: INGENIERO VIAL (Roadway Construction Engineer), July 1988. This is equivalent to a Bachelor of Science in Civil 'Engineering (BSCE) from a regionally accredited institution of higher education in the United States, Universidad Central de Venezuela, Caracas, Venezuela. Degree: INGENIERO CIVIL (Civil Engineer), July 1997. CERTIFICATIONS: TROXLER Electronics Lab - Nuclear Gauge Safety Training, (2001 & 2004) FDOT — MUTCD/Maintenance of Traffic, Intermediate Level (2008) ASPHALT PAVING TECHNICIAN - Level 1(2004) EARTHWORK CONSTRUCTION INSPECTION — Level 1(2005) ACI, Concrete Field Testing Technician- Grade 1. (2005) FDOT Concrete Field Inspector Specifications. (2005) LICENSES (General Engineering Contractor, Miami -Dade County Public Works): -Plant Construction. (2005) - Paving Engineering. (2005) - - Excavation and Grading. (2005) - Structural. (2005) - Registered and Certificate State of Florida Undergraund Utilities Contractor: WORK EXPERIENCE; MAGGOLC INC., Miami, Florida, USA. (June 2005 to Present). Gonzalez is the owner and president of Maggolc Inc., this is an Engineering Contractor Company. Specialized in Drainage Systems, .Pavement and. Concrete. Work Executed:` Long Key State Park - Resurface Campground Road (Florida Dep. of Environmental' Protection) 2011 - 'Suncrest Dr. & Moss Ranch Rd. Stormwater Improvements (Village of Pinecrest) 201 L - SR 909 (Alton Road) at West 52 Street Drainage Improvements (FDOT District 6) 2011 SW 19 Terrace Roadway & Drainage Improvements (CIP, City of Miami)" 2011, - Tamiami Canal Miccosukee Linear Park (Miami -Dade County, Park & Recreation' Dep.) 2011. Citywide ADA Sidewalk Improvements (City of Miami) 2011 36 Street & 67 Ave Intersection Improvement (concrete ) I - District #3 Citywide ADA Sidewalk Improvements (Cir - Intersection Realignment. SW 139 Terr. & SW 140 Conversion, (Village of Palmetto Bay) 2010 (Aviation Department M -D •D County)' 2011 - Installation of Sidewalks and Ramps along NE 12 Ave. (City of North Miami) 2010. -AD Barnes Park Asphalt Walkways.. (M -D County Park & Recreation) 2010. - Golden Shore Park Pavers Sidewalks: (City of Sunny Isles). 2010 - District I, Sidewalks Repair. (City of Miami). 2010 -Crandon Park ADA Parking'Space Striping and Signs. (M -D County Park& Recreation) 2010. - District ll, Sidewalks Repair. (City of Miami). 2010 - Harbor Drive Lighting and Resurfacing Improv. (Village of Key Biscayne) 2010 -Blue Road Roundabouts and Drainage. (City of Coral Gables) 2010 Drainage Retention Improvements of State Rd. 907 (Alton Rd.) at Allison Drive. Milling and Asphalt Resurfacing. (FDOT, District 6) 2009` - Country Club of Miami Park Concrete and Asphalt Walkway (Miami -Dade County, Park & Recreation Dep.) 2009. - Brendwood Park Asphalt Walkway. (City of Miami Gardens) 2009: -West Little River Improve Asphalt Driveways. (Miami -Dade County Office of Community and Economic Development) 2008. -West Perrine Park Concrete Slabs and Poured Safety Surface. (M -D C Park and Recreation) 2008 - 'Asphalt Pavement Repair. Florida Department of Transportation (District 6). 2008-2%9,2009-2010 and 204 0- 201` 1. - Improve Intersections Countywide Project, include Milling and :Asphalt Resurfacing. (Sidewalk, Handicap Ramps, Curb & Gutters, Pavers, New Pavement, Drainage, Sodding (M -D County Public Work Dep.) 2008 -Seal Coat and Restrping of Station 13 and Logistics Parking Area., (MD County Fire Rescue Department) 2008 Dolphin Archaeological Site Sidewalk Construction. (M -D County Park and Recreation) 2008." - Olympic Park Sidewalks Construction. (M -D County Park and Recreation) 2007 - Norman & Jean Reach Park Foul Ball Netting. (M -D County Park and Recreation) 2007 - Drainage Improvement Project for NW 22 Court from NW 107 ST to NW -112 ST. (M -D County Public Work Dep.). 2006, etc Others Places where Gonzalez was working: SRS ENGINEERING, INC., Miami, Florida, USA. (August 2006 to July 2007). Construction Field Inspector of Drainage and Roadway Restoration. (Public Work Department, Miami= Dade County Projects). - Allaphatta Phase L - Hardwood Village Phase II. BERMELLO, AJAMIL & PARTNERS, INC., Miami, Florida, USA. (May 2005 to July 2006): Quality Control (QC) Construction Inspector (DOT Projects): (Earthwork, Concrete and Asphalt)' Okeechobee Road. (W 12 Ave to Palmetto Expwy) -Miami Garden Drive. (NW 2 Ave to NW 17 Ave.) - Biscayne Blvd. (NW 96 ST to NW 104 ST) - Golden Gate Pkwy (Naples) - Florida's Turnpike (Griffin Rd to Sunrise Blvd); -A -1 -A (Key West). MARLIN ENGINEERING INC., Miami, Florida, USA. (October 2000 May 2005). February 2004 to May 2005. Construction Field Inspector of Drainage and Roadway'(FEMA -DERM, Miami -Dade County Projects). Activities Included: Verify of storm drainage structures in accordance with the approved shop drawings, installation of drainage and pollution control structures, drainage pipe inverts, joints' seals, French Drain Systems, solid pipe; placement and bedding material. Check the Contractor's compliance with all Maintenance of Traffic. Reconstruction of Pavement, Roadway; Milling and Resurfacing; reconstruction of Curb and Gutter and Sidewalks; Site Restoration, including Grading; of Swales, Sod Placement, etc. ' Requirements: Ensure the quality of the construction work, as per the Public Works Department i Non- Collusion Affidavit Pinecrest Villas Neighborhood Traffic Calming Phase 11 a STATE OF FLORIDA COUNTY OF MIAMI -DADS } Q tPit 7, adf ?i being . first duty sworn, deposes and states that (1) He /She /They is /are the (owner, Partner, Officer, Representative or Agent) tJf Qthe BIDDER that has submitted the attached BID; (2) He /She/They is /are fully informed with respect to the preparation and contents of the attached- BID and of all pertinent circumstances concerning such BID; (3) Such BID is genuine and is not a collusive or sham BID; (4) Neither the said BIDDER nor any. of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affiant, have in;any way colluded, conspired, connived or agreed, directly or indirectly, with any other BIDDER, firm; or person to submit a collusive or sham BID in connection with the Work for which the attached BID has been submitted; or to refrain from bidding or proposing in connection with such Work; or have in any manner, directly or indirectly, sought by agreement or collusion, or communication, or conference with any BIDDER, firm, or person to fix any overhead, profit, or cost elements of the BID or of any otherr BIDDER, or to fix any overhead, profit, or cost elements of the BID Price or the BID Price of any other BIDDER, or to secure through any collusion, conspiracy, , connivance, or unlawful agreement any advantage against (Recipient), or any person interested in the proposed Work; (5) The price or prices quoted in the attached BID are fair and proper and are not tainted by any collusion, conspiracy, connivance, or unlawful agreement the p # e BIDDER or any other of its agents, representatives; owners, employees or anti s terest including this affant. Signed, sealed &;delivered in the presence of By: Sin ure ri t Name and—Title Subscribed and sworn to before me this ��t day M .20 PATRICIA A. RINERA titer °� MY COMMISSION#EE73340 No PUbIi ature) EXPIRES: MAR 13 2015 My Commission Expires: .8onded through 1st State Insurance 1 FAILURE TO COMPLETE, SIGN, & RETURN FORM MAY'` DISQUALIFY: YOUR RESPONSE O.thomasfpepe 09 -28 -1 1 (Updated 05 -I6- 2012)" Page 21' Pinecrest Villas Neighborhood Traffic Calming ,Phase I Pursuant to the provisions of Paragraph (2) (a) of Section 287.133, Florida State Statutes — "A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a Bid on a Contract to provide any goods or services to a public entity, may not submit a Bid on a Contract with a public entity for the construction of repair of a public building or public work, may not submit bids on leases or, real property to a public entity, may not be awarded to perform Work as a Contractor, supplier, Subcontractor, or Consultant under a Contract with any public entity, and may not transact business with any, public entity in excess of the threshold amount Category Two of Section 287.417, Florida Statutes, for thirty six (36) months from the date of being placed on', the convicted vendor list '. The award of any contract hereunder is subject to the provisions of Chapter 112, Florida State Statutes. BIDDERS must disclose with their Bids, the name of any officer, director, partner; associate or agent who is also an officer or, employee of the City of ;South Miami or its agencies. SWORN STATEMENT PURSUANT TO SECTION 287.133 (3) (a), FLORIDA STATUTES, CAN PUBLIC ENTITY CRIMES THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY 'PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. 1. This sworn statem n is submitted to i '(T P"A [Print name of the public entity] By [Print individual's name and ' le] For —A- [Pj56tWame of entity submitting sworn statement] Whose business R address is [Print full mailing address] and (if applicable) its Federal Employer Identification Number (FEIN) is -.- 3 3 5 -7-7`S— (If the entity has no FEIN, include the Social Security Number of the individual ' signing this sworn statement: 2. 1 Lunderstand that a "public entity crime "` as defined in Paragraph 287.133; (1)(g); Florida Statutes, means a violation of any state or federal lave by a 'person- with respect to and directly related' to the transaction of business with any public entity or with an agency or political subdivision of any other state or of the United States, including, but not limited to any bid or contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state or of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation, 3. I understand that "convicted or "conviction" as defined in Paragraph 287.133'(1) (b), Florida Statutes; means a finding of guilt or a conviction of a public entity crime, with - or without an adjudication of guilt, in any federal or state trial court of record relating to charges brought thomasfpepe- 04.2$ -1 I (Updated 05 -16 -2012) Page 22 by indictment or information after July I, 1989, as a result of a jury verdict, non -jury trial, or entry of a plea of guilty or, nolo contendere 4. 1 understand that an "affiliate" as defined in Paragraph 287.133 (1) (a), Florida Statutes, means: (a) A predecessor or successor of a person convicted of a public entity crime; or (b) An entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity crime:; The term "affiliate" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in any person, or, a pooling of equipment or income among persons when not for fair market value under an arm's length agreement, shall be a prima facie case that one person controls I another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall: be considered an affiliate. S. I understand that a "person" as defined in Paragraph 287.133 (1) (e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into `a binding contract and which bids or applies to bid on contracts for the provision of goods or services let by a public entity; or which otherwise transacts or applies to transact business with a public entity. The term "person includes those officers, directors, executives. partners, shareholders, employees, members, and agents who are active -in management of an entity, , 6. Based on information and belief, the statement which I have marked below is true in relation to tentity submitting this sworn statement. [Indicate which statement applies.] Neither the entity submitting this sworn statement, nor any of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the -entity, nor any affiliate of the 'entity has been charged with and convicted of a public entity crime subsequent to July, 1. 1989. The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders,; employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted I of a public entity crime subsequent of July 1 1989. However, there has been a subsequent proceeding before a Hearing Officer of the State of Florida, Division of Administrative 'Hearings and the Final Order entered by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. [Attach a copy of the final order.] UNDERSTAND THAT THE SUBMISSION OF THIS FORM, TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY INDENTIFIED IN PARAGRAPH I (CANE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY, AND THAT THIS FORM 1S VALID THROUGH DECEMBER 31; OF THE CALENDAR YEAR IN WHICH IT IS FILED. I ALSO UNDERSTAND THAT I AM REQUIRED' TO INFORM THE PUBLIC` ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS. OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.4,17, FLORIDA STATUTES; FOR CATEGORY TWO OF ANY CHANGE. IN THE INFORMATION CONTAINED IN THIS FORM. OO thomasfpepe- 09 -28 -I 1 (Updated 05 -16 -2012) Page 23. sl Qrug'Free Workplace Pinecrest Villas Neighborhood Traffic Calming Phase 11 Whenever two or more Bids which are equal with respect to price, quality and service are received by the State or by any political subdivisions for the procurement of commodities or contractual services, a Bid received from a business that certifies that it has implemented `a drug' - free workplace program shall be given preference in the award I process. Established procedures for processing tie Bids shall be followed if none of the tied vendors have a drug -free workplace program. In order to have a drug -free workplace program, a business shall: _ I) Publish a statement' notifying employees that the unlawful manufacture, distribution, dispensing, possession, or use of a controlled substance is prohibited in the workplace and specifying the actions that shall be taken against employees for violations of such prohibition. 2) Inform employees about the 'dangers of drug abuse in the workplace, the business' policy of maintaining a drug -free workplace, any available drug counseling, rehabilitation; and employee assistance programs, and the penalties that may be imposed upon employees for drug abuse violations. 3) Give each employee engaged; in providing the commodities or contractual services that are under Bid 'a copy of the statement specified in Subsection (1). 4) In the statement specified in: Subsection (I), notify the employees, that, as !a condition of working; of the commodities 'or contractual services that are under Bid, he employee shall abide by the terms of the statement and shall notify the employee of any conviction of, or plea of guilty or nolo contendere .to, any violation of" Chapter 893 or of any controlled substance law of the United States or any state, for a violation occurring in the workplace no later than five (5) days after such conviction: 5) Impose a sanction on, or require the satisfactory participation in a drug abuse assistance or rehabilitation program, if such is available . in the employee's community, by any employee who is so convicted, 6) Make a good faith ` effort to continue' to maintain > a drug -free workplace through implementation of this section. As the person authorized to sign the statement, I certify that this firm complies. fully with the above requirements. BIDDER's Signature: ` Print "Name: Date: FAILURE TO COMPLETE.. SIGN, & RETURN THIS FORM MAY DISQUALIFY YOUR RESPONSE �masfpepe- 04 -28-1 i (updated 05 -I6 -2012) Page,; 25 Lrs FAILURE TO COMPLETE, SIGN, & RETURN THIS FORM MAY DISQUALIFY YOUR RESPONSE List of Proposed Subcontractors and Principal Suppliers Pinecrest Villas Neighborhood Traffic Calming Phase 11 BIDDER shall list all Proposed Subcontractors to be used.on this project if they are awarded the Contract. Classification of Subcontractor Address - a s. Work - Landscape Sodding & Turf Work Electrical Irrigation Paving Park `Amenities Graphics Utilities Excavation . Building Structures. Plumbing / Palming „�. F� x . r' ,cJ t�Lfi - 9fI Testing Laboratory Soil Fumigator Signs: ' :7;z- Ot (g 1 8u� W 365r- 3-9Z 3400 :� "a 3316 - 4 46,9,5- This list shall be provided'to the City of South :Miami by the apparent lowest responsive and, responsible bidder within five (5) calendar days after Bid Opening. }thomasfpepe09 -28 -1I (Up4dted05-16 -2012) Page ° 27