Loading...
Res No 061-17-14862RESOLUTION NO.: 061-17-14862 A Resolution authorizing a temporary change in the permitted hours of construction operations of Florida Power & Light (FPL) to perform work on SW 62 Avenue, between SW 70th Street and South Dixie Highway. WHEREAS, Pursuant to Section 7-16(g) of Code of the Ordinances, as amended by Ordinance No. 5-15-2212, all construction sites shall comply with the city's noise code and it provides in pertinent part as follows: All construction sites shall comply with the city's noise code. Construction activity is limited to the hours of 7:00 a.m. through-6:00 p.m. on the weekdays of Monday thru through Friday; and between the hours of 9:00 a.m. through 5:00 p.m. on Saturday. No construction activity is permitted on Sunday. Notwithstanding the above, no construction activities shall take place in, or within 500 feet of, residentially zoned districts, other than those in the Hometown District, on either Saturday or Sunday and, as to construction activities in non-residentially zoned districts and in the Hometown District, all days of the week and hours of the day may be changed by resolution of the City Commission upon a finding of extraordinary circumstances. WHEREAS, FPL wishes to perform work along SW 62 Avenue, between SW 70th Street and South Dixie Highway to replace existing transmission line concrete poles along the east side of SW 62 Avenue; and WHEREAS, the transmission line clearances are only available during the night and the type of equipment being used will impact traffic due to a required lane closure. In addition, the FPL's operations at night will cause minimal traffic impact; and WHEREAS, allowing construction activities at night may be changed by resolution of the City Commission upon its finding of extraordinary circumstances; and WHEREAS, FPL is requesting authority to conduct transfer services during night hours; and WHEREAS, approval of this request will not be detrimental or harmful to the surrounding area of the community at large. NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA THAT: Section 1: The recitals set forth above have been found to be true and they are hereby incorporated by reference as if fully set forth herein. The construction hours are hereby changed temporarily for the current construction activities of FPL for three weeks, from the date of permit issuance or until such time as the City Commission or the City Manager revokes these extended hours of operation. The temporary hours of construction operations are limited to the hours of 9:00 PM to 6:00 AM. The contractor shall hire, at their own expense, an off duty City of South Miami Police officer for these days and during these hours to insure that the FPL complies with the City's ordinances and this resolution. The extended hours for construction activity authorized by this Resolution may also be reduced or revoked upon determination of the City Manager in his sole and absolute discretion that a violation of any of the City's ordinance or this Resolution has occurred and has not been resolved to his satisfaction or that the noise level is otherwise excessive. This resolution may be revoked at any time in the sole and absolute discretion of the City Commission. Pg. 2 of Res.!No. 061-17-14862 Section 2. Severability. If any section clause, sentence, or phrase of this resolution is for any reason held invalid or unconstitutional by a court of competent jurisdiction, the holding shall not affect the validity of the remaining portions of this resolution. Section 3. Effective Date. This resolution shall become effective immediately upon adoption by vote of the City Commission. PASSED AND ADOPTED this 4 th day of Apr i 1 ,2017. COMMISSION VOTE: 5-0 Mayor Stodd~rd Yea Vice Mayor Welsh Yea Commissioner Harris Yea Commissioner Liebman Yea Commissioner Edmond Yea THE CITY OF PLE ASAN T LIVI NG CITY OF SOUTH M IAMI OFFICE O F THE C ITY MANAG ER INTER-OFFICE M EMOR AN D UM To: The Honorable Mayor & Members of the City Commission FROM: Steven Alexander, City Manage r Age nda Item No.:l DATE: April 4, 2017 SUBJECT: A Resolution authorizing a temporary change in the permitted hours of construction operations of Florida Power & Light (FPL) to perform work on SW 62 Avenue, between SW 70th Street and South Dixie Highway. BACKGROUND: Ordinance No. 5-15-2212 prohibits construction activity to take place during night hours from 6:00 PM though 7:00 AM. FPL is transferring / replacing existing transmission line concrete poles along the east side of SW 62 Avenue as per the City's request to comp ly with ADA requirements to allow safe passage of bicycles and pedestrians. REQUEST: AMOUNT: ACCOUNT: Due to Heavy traffic during daylight hours on SW 62 Avenue, and because the electric transmission lines require traffic clearances during movement between poles which are only available during the night for this area, FPL is requested a waiver, to allow them to work during night hours. The Resolution attached is to wa ive the limitatio n on hours of construction, as authorized by the Or dinance. The work is anticipated to be completed within the next two weeks . Not applicable Not applicable ATTACHMENTS: Resolution Request from FPL Ordinance No. 5-15-2212 I=PL Tuesday, March 07,2017 City of South Miami Engineering & ConstlUction Division Attn: Ms. Grizel Martinez 4795 SW 75 th Avenue Miami, Florida 33155 (305) 403-2063; Fax (305) 668-7208 RE: Request for Night Work Utility Notification of Proposed Construction SW 62 nd Avenue Right-of-Way City of South Miami Miami-Dade County FPL 10# T00000015275 Dear Ms . Martinez: P.O. BOX 14000. JUNO BEACH, FL 33408-0420 Due to Disu'ibution line clearances available only during nighttime and early morning hours, Florida Power and Light Company respectfully request a resolution to waive the limitation on hours of constlUction and to authorize nighttime hours for the proposed constlUction. The location is along SW 62 11d Avenue between SW 70 th Street and S Dixie Highway. The proposed construction is to facilitate the transfer of Distribution underbuilt facilities to newly installed replacement poles, the removal of the replaced poles, and includes the restoration of the consuuction areas and any sidewalks damaged. Traffic control will confmm to FDOT's Roadway and Traffic Control Standards. Construction is scheduled to begin as soon as the resolution is approved. If you have any questions and! or comments peliaining to tins request, please call Natalie Borrelli, Transmission Engineer at (954) 717-3120 01' Rafael Vides at (561) 904-3692 . Thank you in advance for your assistance in tills matter. Please mail 01' email approval to : FPL, Attn: Rafael Vides (TS4/JW) 700 Universe Blvd. Sincerely, 4~/ Gregg Hall Florida Power & Light Company Manager -Siting & Permitting all FI'L G roup company Juno Beach, Florida 33408 rafael . e. vides@fpl .com r=PL Thursday, March 02,2017 City of South Miami Engineering & Construction Division Attn: Ms. Grizel Martinez 4795 SW 75 th Avenue Miami, Florida 33155 (305) 403-2063; Fax (305) 668-7208 RE : Power Line Maintenance Work Utility Notification of Proposed Construction SW 62 0d Avenue Right-of-Way City of South Miami, Dade County P.O. BOX 14000 , JUNO BEAC H, FL 33408·0420 Cutler-South Miami 138kV Transmission Line, FPL 10# T00000015275 Dear Ms. Martinez: Enclosed for your review are one (1) permit application and one (1) copy of our drawings detailing Florida Power & Light's proposed overhead power line construction in the City of South Miami, Dade County, Florida. The scope of work will entail the transfer of Distribution underbuilt facilities , the removal of the double poles, and restoration of the sidewalk located along the east side of SW 62nd Avenue between SW 70th Street and S Dixie Highway due to maintenance requirements. Traffic control will conform to FDOT's Roadway and Traffic Control Standards . This project will required night work. Construction is scheduled to begin on March 8, 2017. If you have any questions and/or comments pertaining to this request, please call Natalie Borrelli, Transmission Engineer at (954) 717-3120 or Rafael Vides at (561) 904-3692 . Thank you in advance for your assistance in this matter. Please mail the approved permit to: FPL, Attn: Rafael Vides (TS4/JW) 700 Universe Blvd. Sincerely, d~/-r;/vi /Co:~Hal1 Florida Power & Light Company Manager -Siting & Permitting an FPL G ro up cO lllp any Juno Beach, Florida 33408 rafael .e . vides@fpl.com THE CITY OF SOUTH MIAMI ~i PUBLIC WORKS AND ENGINEERING DEPARTMENT { IA } 4795 SW 75 th Avenue, M i am i, Florid a 33155 • • PI .. "" 305-403-2063 F'" 305-668-7208 Soutn'Mlaml E-mail : Engineering@SouthMiamiFL.gov THE CITY O F PL EA SANT LIVING PERMIT # PERMIT APPLICATION FOR WORK WITHIN THE PUBLIC RIGHT-OF-WAY Note: all fields shall be filled PROJECT LOCATION: Al ong the east side of SW 62nd Avenue between SW 70th Street and S Dixie Highway Natalie Borrelli (Project Enginee r) at (954) 717-3120 APPLICANT : Fl orida Power and Light Company Rafael Vi des at (561) 904-3692 NAME OF CO MPANY NA ME OF CONTACT Natalie .Borrel li @fpLcom PHONE/CELL # (954) 494-5360 , Mobile E-MAIL : RafaeLE.Vides@fpLcom -----------=~--------------------- APPLICANT'S ADDRESS : 700 Universe Boulevard (TS4/JW) STREET ADDRESS Juno Bea ch CITY I HEREBY REQUEST A PERMIT FOR THE FOLLOWING (BE SPECIFIC): Flo rida 33408 STATE ZIP The scope of work will entail the transfer of Distribution underbuilt facilities , remova l of the double .poles , and restorat ion of th e sidewalk . This project will required night work . Cutler-So uth Miam i 138kV Transm iss ion Line, FPL 10# T00000015275 . PROJECT DURATION: Start date : 3/8/17 , End date : 4/30/17 DATES (FROM -TO), DURATION ESTIMATED PROJECT COST: $ 75,0 00 .00 THE FOLLOWING HAS BEEN SUBMITTED WITH THIS PERMIT APPLICATION: TWO SETS OF PLANS, SKETCHES AND OTHER DOCUMENTATION DESCRIBING THE PROPOSED WORK ............................. 0 MAINTENANCE OFTRAFFIC (MOT) FOR VEHICULAR AND PEDESTRIAN TRAFFIC DURING PROJECT .................................. 0 COUNTY OR STATE LICENSE AND CERTI FICATE OF INSURANCE (COPIES ARE ACCEPTABLE) ............................................... 0 PERFORMANCE BOND ........................................................................................................................................................... 0 "BEFORE" PICTURES (NOTE THAT "AFTER" PICTURES SHALL BE SUBMITIED UPON COMPLETION OF WORK) ................... O CALL 811 FROM ANYWHERE IN FLORIDA TWO FULL BUSINESS DAYS BEFORE DIGGING. "IN SIGNING THIS APPLICA TlON, I UNDERSTAND THAT SEPARATE CITY AND/OR COUNTY PERMITS MAY BE REQUIRED FOR THIS PROJECT . FURTHERMORE, I AM AWARE THAT I AM RESPONSIBLE FOR ENSURING THAT THE PROJECT IS COMPLETED IN ACCORDANCE WITH THE PLANS AND SPECIFICA TlONS AS STIPULA TED IN THE PERMIT APPROVAL CONDITIONS." ~;tt;.--{,j Gregg Ha ll , Manager -Siting & Permitting 1 PRINT NAME & CONTRACTORS LICENSE NO . FinFf........,'--------------~~~W\NVVV;M;VVw..",.fi FOR OFFICE USE ONL Y A pPROVED I BY DATE PERMI T FEE COMMENTS D ,SAPPROVED Rev. 2016 PERM IT IS VALID FOR SI X MO NTHS FRO M DATE OF ISSUANCE , UNLESS OT HERWI SE NOTED . City of South Miami Public Works & Engineering Department 4795 SW 75th Avenue Miami, FL 33155 Tel. (305) 403-2063 Fa x (305) 668-7208 THF CIT Y OF PI FASAN T I.I VING PERMIT CONDITIONS Date: 3/212017 Permit # 17-100000 ____ _ Company: Florida Power & Li9ht Name: _G_r_e.:;::9:::..9 _H_8_1I ________ _ We accept the conditions listed below (signature): ~/J~4 /~. 1. Permit for construction work shall be on project site at all times. 2. Permits are valid for a period of six months from the date of issuance. If work is not complete before permit expiration (six months), a permit extension can be applied for, before the permit expires. Otherwise, a new permit application will be required for work on the right of way to be performed. A new permit application will be required if the permit expires . It is the sole responsibility of the contractor to apply for an extension at the PW office . 3. All materials and labor under the project shall be in strict accordance with the requirements of the City of South Miami, Miami-Dade County, and all other local, state, and national codes, where applicable. 4. All construction shall be performed in a safe manner in accordance with the rules and regulations of the Occupational Safety and Health Administration (OSHA). 5. Contract or shall notify the City of South Miami Public Works Department (CSM PW) forty-eight hours (48) prior to commencing work. 6 . Contractor shall notify any affected property owners prior the permitted work starts. a. In case when the work will disturb the traffic on the only accessing roadway, contractor is to notify all property owners who have properties in between the access points on that roadway . b. Egress and ingress shall remain accessible to each property . 7. During construction, the project site and all adjacent areas shall be secured and maintained in a neat and clean manner. 8 . Traffic shall be maintained in accordance with Florida Department ofTransportation (FOOT) Maintenance of Traffic (MOT) standards, Miami-Dade County standards, Manual of Uniform Traffic Control Devices (MUTCD) and any additional requirements by the CSM PW and Police Department. a. If a full or partial road closure is required, a MOT must be submitted and approved by CSM PW and City of South Miami Police Department (CSM PD). No street shall be closed without written authorization . b. Any pedestrian MOT shall be per FOOT Standard Inde x 660 . c. Applicant shall coordinate the schedule of the MOT with the CSM PD . Chief of Police and/or CSM PD may be reached at 305-663-6301. Any directions by CSM PO, before, during and/or after the work is being performed, shall be followed by the applicant, workers and/or any other i nvolved party. City of South Miami Public Works & Engineering Department 4795 5W 75th Avenue Miami, FL 33155 Tel. (305) 403-2063 Fa x (305) 668-7208 THf CITY OF PLFASANT liV ING d . Access for local traffic shall be maintained at all times . 9. If the work will obstruct parking of vehicles at the street paid parking spaces, the applican t shall pay the daily parking fees for each of the obstructed paid street parkin g spaces . 10. No material or equipment shall be staged in the public R/W overnight unless specifically authorized by the Department. 11. All pavement open-cut during permitted work shall be temporarily resto r ed with asphalt or steel plates at the end of each workday. NO TRENCHES OR PITS SHALL BE LEFT OPEN OVERNIGHT. Permanent asphalt restoration shall occur within 14 days of open-cut. 12. Contractor shall conduct daily dust control and implement storm water erosion and sediment control measures for pollution prevention. 13. Any damage to private property shall be restored to its original condition or better and as accepted by the owner. 14. Disturbed areas shall be restored to equal or better condition than they were before the work started. The restoration shall include the following : a. Road/pavement areas shall be restored at least 5' from the edges of disturbed areas and as per the City of South Miami Standard Details for Pavement Restoration. b. Sidewalk panels shall be replaced, i.e ., the sidewalk shall be restored in full width . c. Landscaped areas, including and not limited to grass, sod, shrubs and trees replacement, shall be fully restored. d . For intersections with pavers, the full intersection shall be restored regardless ofthe size ofthe disturbed area . 15. If all restoration work is not performed within 30 days of work completion, the CSM PW may restore the work area and charge the applicant for the cost of restoration plus a minimum of 15% for administrative fee and any additional incidental fees. 16. All utility location markings within the right-of-way shall be removed before project closeout. 17 . All rims of manholes and water valves shall be at grade when repair is finished . 18. Work is not permitted on Saturdays, Sundays and Holidays . Work is only allowed from 8 am to 5 pm , unless otherwise authorized . 19 . Call 811 prior to diggi ng . For Sunshine State One Call of Florida, call 1-800-432-4770; to make an online request for utilities to be marked, go to www .callsunshine .com or http://www 2 .callsunshine .com/irthinternet/welcome.asp . 11 R-SOUTH MIAMI 138 kV TRANSMISSION LINE Aoh:,,..,,,to 6 Structures and remove 1 at SW 62"d Avenue 10-1000000152 [lliEET!}clO t r l ~ CUTLER-SOUTH MIAMI 138 kV TRANSMISSION LINE Relocate 6 Structures and remove 1 at SW 62nd Avenue 10-roo . 0 01527.2 Section A-A (Existing) Structures 81A18, 81A18A, 81A19, 81A19A 81A20, 81A2l, 81A22 lii+w.§i§.iiii j Median "22' 6' EOP Notes: 1.-All new poles will be located back face of the pole against the back of the sidewal k. 2.-Utilities will be notified prior to start construction. RW 3.-New SPC poles w il l be located within 10 feet of existing squa re concrete poles, except for Str, 81A20, which will be moved 25 feet to South , 4 ,-Structure 81A19A will be completely r emoved. A new pole will be set In the back of the sidewalk to transfer Distribution facilities , 5.-Existing street light at Structure 81A18A will be also transferred to the new transmission pole, G.-Call 305-234 -2111 for final inspection. If lane closures are required, notify the South Miami Police and Public Works Departments. 7.-Call Miami Dade Fire Department 48 hours prior to construction starts. MOT: 660 and a signed and sealed custom MOT plan Is In process for the whole relocation project. o 69kV o 230kV Section A-A (Proposed) Structures 81A18, 81A18A, 81A19, 81A20, 81A21, 81A22 sldewalk ~ IM*-+I§iiiiil Median .' ~ ______ ~-U~· ________ ~.~+ _______ ~-Z~Z_· _______ ~ .' 6' -------EOP RW 13 , TWP . 54 S., RGE . 40 E. FPL 10-TOO000015275 CoU" W FOEP FOOT FFA line: Nllme: Cutler-South Mllml13e kV RR XI". DR .Dht. CaE County : Miami Dade o 115kV 138 kV Scope: Relocate 6 Structuru Ind remove 1 to meet ADA ilt SW 62 .... Avenue o SOOkV Dra wn by: Herlberto J Alvarel Date: oclober 2015 o CONTAMINATION Scale: Pro rtlon.1 Owg No. SHEET: B of 8