Loading...
Maggolc Inc. Bid Documents Dorm Ave Drainage Improv. Event ate* Tim (EST) Advertisement/ Distribution of R P & Cone of 3/24/2014 4 PM silence begins Mandatory Pre-Proposal Conference 2 City of South Miami, City Hall Chambers, 3/31/2014 IOAM 6130 un et Drive, South Miami, FL 33143 3 Deadline to Submit Questions 4/2/2014 I O AM 4 IDeadline to City Responses to Questions 4/3/2014 I AM 5 Deadline to Submit Bid-Response 4/412014 IOAM 6 Evaluation of Bid ;Responses 4/7/2014 5 PM 7 Agenda for Commission Approval of 1611 4 l Contractors /Cone of Silence ends Proposal Submittal Checklist Form This checklist indicates the forms and documents required to be submitted for this solicitation and to be presented by the deadline set for within the solicitation. Fulfillment of all solicitation requirements listed is mandatory for consideration of response to the solicitation, Additional documents may be required and, if so, they will be identified in an addendum to this RFP. The response shall include the following items: Rid Form Proposal Bid Bond NIA Performance Bond Power of Attorney BIDDER Qualification Statement Non-Collusion Affidavit Public Entity Crimes and Conflicts of Interest Drug Free Workplace Acknowledgement of Conformance with OSHA Standards List of Proposed Subcontractors and Principal Suppliers Related Party Transaction Verification Form Indemnification and Insurance Documents Note: A Proposal Bid Bond is NOT required for the project. Submit this checklist along with your proposal indicating the completion and submission of each required forms and /or documents. END OF SECTION Page 9 of 68 Thomas P. Pepe, 2011 -2011 All rights reserved. 7/11/13/13 BID FORM m Page 10 of 69 fee breakdown, if applicable, for each task must be completed in the table shown above. Failure to RESPONDENT QUALIFICATION STATEMENT The response to this questionnaire shall be utilized as part of the CITY'S overall Proposal Evaluation and CONTRACTOR selection. 1. Number of similar construction projects completed, a) In the past 5 years In the past 5 years On Schedule b) In the past 10 years In the past 10 years On Schedule 45 2. List the last three (3) completed similar projects. a) Project Name: '71 Owner Name: 0 Owner Address: Owner Telephone: 4 06 -,5-0;L Original Contract Completion Time (Days): Original Contract Completion Date. Actual Final Contract Completion Date: Original Contract Price: Actual Final Contract Price: b) Project Name: C Tf68 Page 19 C Thomas F Pepe, 2011-2013, All rights reserved, 7/11113/13 s f t a s s s � � � � � � � � « 't. # a� � h �: � ,. e o + t e a t NON-COLLUSION AFFID"IT Dom Avenue Drainage Improvements ACKNOWLEDGEMENT OF CONFORMANCE WITH OSHA STANDARDS Dom venue Drainage Improvements LIST OF PROPOSED SUBCONTRACTORS AND PRINCIPAL SUPPLIERS BIDDER shall list all Proposed Subcontractors to be used on this project of they are awarded the Contract. . *. Landscape Sodding and Turf Work Electrical Irrigation Paving Park Amenities Graphics Utilities Excavation Building Structures Plumbing Painting Testing Laboratory Soil Fumigator Signs :her 091 Th I t shall be provided to the City of South Miami by the apparent lowest responsive and responsible Bidder within five 5 business days after Bid Opening. ng. Page 29 of 68 0 Thomas F. Pees, 2011 -2013, All rights reserved, 7/11/13/13 RELATED PARTY TRANSACTION VERIFICATION Dom v n ue Drainage Improvements Project Name: Dorn Avenue Drainage Improvements Project acme. Dom Avenue Drainage Improvements