Loading...
05-658-012METAL DRIP STANDING C INC METAL ROOFING PREFABRICATED INSTALL PER MANUFACTURED WOOD TRUSSES APPROVED INSTALLATION s 24'C /C REQUIREMENT SLOPPED BOTTOM CHORD 1x2 P.T. NAILER. • • 8x8 SLOPPED CONC. CAP SMOOTH STUCCO EL +8' -5' TOP OF T.B. 8'x8' CONC. LINTEL 8'x8' CONC. SILL GRADE CONC. T.D. SEE SCHEDULE C] V DRYWALL ON • 1x2 P.T. FURRING STRIP s 1(o'c% IDURO -ROK s SHOWER) BENCH 7 SHOWER -7 CERAMIC TILE is BATH LA I'x6' TtG CEILING SMOOTH STUCCO 9 CAA HORIZONTAL BLOCK Rr= IN1=. IT l(o' C/C r— x x- x x x x —LA—X— x x x x x x — / ///,�l -Ii 4' GONG. SLAB i i MONOLITHIC —III MONOLITHIC FOOTING FOOTING SECTION r, _"� scaLr=: sia' = r -0' A -4 HURRICANE ANCHOR HURRICANE ANCHOR METAL DRIP 1x2 P.T. NAILER 1x6 FASCIA , = CONT. :EENED VENT. °LYWOOD SOFFIT PICAL) -1' -9' ' OF FF. • • 0 0 ca WOOD BRACKET i 8'x8' CONC. CAP [STING CONC. SLAB RECEIVE CONC. SE ER tERPROOFING 1x4 • 24'c/c V DRYWALL - Ix4 P.T. FIRE STOP CONC. LINTEL DOOR ZD 9 Ax EXISTING SLAB •1 • CERAMICI (TILE STANDING CINC METAL. ROOFING INSTALL PER MANUFACTURED APPROVED INSTALLATION REQUIREMENT 12 PREFABRICATED WOOD TRUSSES 9 24'C /C � HURRICANE ANCHOR SEE STRUCTURE i I'x6' TtG CEILING 1x4 P.T. FIRE STOP ' CONC. T.B. SEE SCHEDULE BENCH —%' DRYWALL ON 1x2 P.T. FURRING STRIP 9 16'c/c (DURO -ROK is SHOWER) 7 BHOWER —y SECTION 2 SCALE: 3 /4' = I' -0' ,4 -4 CERAMIC TILE 9 BATH - 21-01 OVERHANG SMOOTH STUCCO 9 GA HORIZONTAL BLOCK RE INF. • 16' C/C GRADE x x x x �✓ —VAPOR BARRIER— - —1 (�— — MONOLITHIC FOOTING U W o� E l r— x x- x x x x —LA—X— x x x x x x — / ///,�l -Ii 4' GONG. SLAB i i MONOLITHIC —III MONOLITHIC FOOTING FOOTING SECTION r, _"� scaLr=: sia' = r -0' A -4 HURRICANE ANCHOR HURRICANE ANCHOR METAL DRIP 1x2 P.T. NAILER 1x6 FASCIA , = CONT. :EENED VENT. °LYWOOD SOFFIT PICAL) -1' -9' ' OF FF. • • 0 0 ca WOOD BRACKET i 8'x8' CONC. CAP [STING CONC. SLAB RECEIVE CONC. SE ER tERPROOFING 1x4 • 24'c/c V DRYWALL - Ix4 P.T. FIRE STOP CONC. LINTEL DOOR ZD 9 Ax EXISTING SLAB •1 • CERAMICI (TILE STANDING CINC METAL. ROOFING INSTALL PER MANUFACTURED APPROVED INSTALLATION REQUIREMENT 12 PREFABRICATED WOOD TRUSSES 9 24'C /C � HURRICANE ANCHOR SEE STRUCTURE i I'x6' TtG CEILING 1x4 P.T. FIRE STOP ' CONC. T.B. SEE SCHEDULE BENCH —%' DRYWALL ON 1x2 P.T. FURRING STRIP 9 16'c/c (DURO -ROK is SHOWER) 7 BHOWER —y SECTION 2 SCALE: 3 /4' = I' -0' ,4 -4 CERAMIC TILE 9 BATH - 21-01 OVERHANG SMOOTH STUCCO 9 GA HORIZONTAL BLOCK RE INF. • 16' C/C GRADE x x x x �✓ —VAPOR BARRIER— - —1 (�— — MONOLITHIC FOOTING F O z z E- 8 oW Up wm U 5 �W+ H U� EL +8' -5'� top OF x F w04 w V4 �A ca x� w xc w� F oz >a a F 1z °a w .w aw 02 w� ox FF F G. V4 a� z az w� �a a U� wwxw E> s �WUW dU A� a� d� A� WU xx F I U W o� E F O z z E- 8 oW Up wm U 5 �W+ H U� EL +8' -5'� top OF x F w04 w V4 �A ca x� w xc w� F oz >a a F 1z °a w .w aw 02 w� ox FF F G. V4 a� z az w� �a a U� wwxw E> s �WUW dU A� a� d� A� WU xx F I