Loading...
05-658-011METAL DRIP 1x2 P.T. NAILER 1x6 FASCIA 4' WIDE CONT. SCREENED VENT. HURRICANE ANCHOR SEE STRUCTURE NEW MEMBRANE ROOFING ADJUST TO MATCH EXISTING 5/8' PLYWOOD SHEATHING HURRICANE ANCHOR SEE STRUCTURE PREFA1r3RICAtEp WOOD TRUSSES •.24'C/C 1/2' PLYWOOD SOFFIT (TYPICAL) 1 1'3 EACH NOSING (TYPICAL) 21-01 RHANG 4 EXISTING I 1 I I 4' CONC. 1x4,9 24'c/c 1'x6' TtG CEILING BEAM - 4EDULE PROVIDE ASPHALT PAPER SEPARATOR EXISTING CONC. CAP EXISTING CONCRET TIE BEAM to EXISTING STARTED COLUMN [ \ \�\ ( C-15-S. WALL BEYOND) d I I STONE FLOOR, MUDSET (OWNER SELECT) EXISTING PREFABRICATED WOOD TRUSSES I SLAB \ x x x x x x x x x x x x x- x�— —I VAPOR OARRIER – — � GRAD • / __ Y2' MEMBRANE SEPARATOR — — – — I — _CONT. GONG. FOOTING _ \ _ EL. MATCH ISTING TOP OF EXIS ING FOOTING • • j • s ► ® • 1 -1 - I __ — EXISTING FTG. -- — IF�TINGH�DULE SECTION � scaLe: sia' = r -0' A -3 EL +8' -5' EXISTING TOP OF T$. EL. +0-0' TOP OF FF. EL +10' -2' TOP OF T.15. METAL DRIP / 1x2 P.T. NAILER 1x6 FASCIA 4' WIDE CONT. PLASTIC SCREENED VENT. 11/2' PLYWOOD SOFFIT (TYPICAL) Z HURRICANE ANCHOR SEE STRUCTURE PREFABRICATED WOOD TRUSSES 0 24`C /C 12 (MATCH EXISTING) 2 G 21-01 OVERHANG 4tCH EXISTING i I I I I \ X x. ul EL. MATCH EXISTING TOP OF EXISTING FOOTING I- I'x6' T 4 CEILING BEAM 4EDULE 4' CONC. x� x • I CONT. CONC. FTG. SEE SCHEDULE SECTION 2 scaLe: 3i4' = r -m' A -3 I� U W L7 0 z c� z EA �a a3 d �z U ow z ow Up wm a �Q P4 3� wd �x E E- U ww WU aQ ad z Qa Oa zW y, a P ai Fdo w Ha ao a Wa P4 aww 0 wd �a d° w ox E W0 9w z as a� a� �a �a Ur w x� �U 3� d a AQ �U w F H J\ 1 N , ♦�.� � E- ---- - - - -__ _ -- O A O 04 44 0wx �74 1/2' PLYWOOD SOFFIT (TYPICAL) 1 1'3 EACH NOSING (TYPICAL) 21-01 RHANG 4 EXISTING I 1 I I 4' CONC. 1x4,9 24'c/c 1'x6' TtG CEILING BEAM - 4EDULE PROVIDE ASPHALT PAPER SEPARATOR EXISTING CONC. CAP EXISTING CONCRET TIE BEAM to EXISTING STARTED COLUMN [ \ \�\ ( C-15-S. WALL BEYOND) d I I STONE FLOOR, MUDSET (OWNER SELECT) EXISTING PREFABRICATED WOOD TRUSSES I SLAB \ x x x x x x x x x x x x x- x�— —I VAPOR OARRIER – — � GRAD • / __ Y2' MEMBRANE SEPARATOR — — – — I — _CONT. GONG. FOOTING _ \ _ EL. MATCH ISTING TOP OF EXIS ING FOOTING • • j • s ► ® • 1 -1 - I __ — EXISTING FTG. -- — IF�TINGH�DULE SECTION � scaLe: sia' = r -0' A -3 EL +8' -5' EXISTING TOP OF T$. EL. +0-0' TOP OF FF. EL +10' -2' TOP OF T.15. METAL DRIP / 1x2 P.T. NAILER 1x6 FASCIA 4' WIDE CONT. PLASTIC SCREENED VENT. 11/2' PLYWOOD SOFFIT (TYPICAL) Z HURRICANE ANCHOR SEE STRUCTURE PREFABRICATED WOOD TRUSSES 0 24`C /C 12 (MATCH EXISTING) 2 G 21-01 OVERHANG 4tCH EXISTING i I I I I \ X x. ul EL. MATCH EXISTING TOP OF EXISTING FOOTING I- I'x6' T 4 CEILING BEAM 4EDULE 4' CONC. x� x • I CONT. CONC. FTG. SEE SCHEDULE SECTION 2 scaLe: 3i4' = r -m' A -3 I� U W L7 0 z c� z EA �a a3 d �z U ow z ow Up wm a �Q P4 3� wd �x E E- U ww WU aQ ad z Qa Oa zW y, a P ai Fdo w Ha ao a Wa P4 aww 0 wd �a d° w ox E W0 9w z as a� a� �a �a Ur w x� �U 3� d a AQ �U w F H J\ I Z 1 N a � E- C9 W O A O 04 44 0wx �74 O o �z GvJ N A W H c x cfD Q; cfD a �WQ � � c H O a �fJ o � 00 I Z 1 N a � E- W A O 04 44 0wx �74 z o �z N A W H c x c H a I