Loading...
Res. No. 213-97-10183RESOLUTION NO.213-97-10183 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI,FLORIDA,AUTHORIZING THE CITY MANAGER TO ENTER INTO AN AGREEMENT WITH SOUTHERN PETROLEUM SYSTEMS INCORPORATED (PIECO DIVISION)TO INSTALL AN EMERGENCY SHUT-OFF SWITCH FOR THE UNDERGROUND FUEL TANK AT THE PUBLIC WORKS YARD,AT COST NOT TO EXCEED $1,625 AND CHARGING THE DISBURSEMENT TO "MAINTENANCE AND REPAIR OF GROUNDS AND STRUCTURES" ACCOUNT NO.1710-519-4670. WHEREAS,the existing storage tank system lacks an emergency shut-off switch to cut electrical power tothefuel pumps in case of fire,and; WHEREAS,such a shut-off switch is being required by the Metropolitan Dade County Building Department,and; WHEREAS,Southern Petroleum Systems Incorporated (PIECO Division)isa properly licensed "Pollutant Storage System Specialty Contractor"(PSSSC)through Dade County,and; WHEREAS,Southern Petroleum Systems Incorporated (PIECO Division)is the lowest bidder of the interested firms who submitted bids for this work. NOW THEREFORE,BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI,FLORIDA: Section 1.The following quotes were obtained from pollutant storage system specialty contractors: Southern Petroleum (PIECO)$1,625 Bagwell Equipment Co.$5,850 Miller Industrial Equipment (contacted,but did not submit a bid) Lutz Petroleum (contacted,but did not submit a bid) Page2 of Res •#213-97-10183 Section 2.The City Manager is hereby authorized to disburse the sum of $1,625to Southern PetroleumSystems Incorporated (PIECO Division)upon satisfactory completion of the aforementioned work. Section 3.This resolution shall become effective immediately after adoption hereof. PASSEDANDADOPTEDthis 7th day of October,1997. ATTEST: APPROVE COMMISSION VOTE: Mayor Price: Vice Mayor Robaina: Commissioner Bethel: Commissioner Young: Commissioner Oliveros: READ AND APPROVED AS TO FORM City Attorney 5-0 Yea Yea Yea Yea Yea TO: FROM: CITY OF SOUTH MIAMI INTER-OFFICE MEMORANDUM ayorand Commission DATE:October 7,1997 Dennis Whitt City Manager RE:Agenda Item #ll Commission Meeting, October 7,1997 INSTALLATION OF AN EMERGENCY SHUT-OFF SWITCH FOR THE PUBLIC WORKS YARD UNDERGROUND STORAGE TANK FACILITY Theattachedresolutionseeksapprovalof funding toauthorizeSouthernPetroleum Systems Incorporated (PIECO Division)toinstallan emergency shut-offswitchforthe undergroundstoragetankfacilitylocatedatthePublicWorksYard.The shut-off switch (tobelocatedintheMotorPoolbuilding)isanimportantsafetyfeaturewhichwillallow apersontosafelycutallelectricalpowertothefuelpumpsincase of fire.The installation ofthe emergency shut-off switch is being required bythe Metropolitan Dade County Building Department. The installation ofan emergency shut-off switch isa highly specialized typeof work which requires a contractor properly licensed to work on underground storage tank facilities (i.e.,aPollutantStorageSystemSpecialty Contractor).Of thefourknownlocal firmscapable of performingthiswork,onlytwosubmittedbids.Theothertwofirms (LutzPetroleumandMillerIndustrial Equipment)indicatedthattheywerenotinterested in submitting a proposal forthis work.It should be noted that PIECO was recently awarded a contract toinstallaleak detection systemforthissame underground "tank followinga competitive bidding process;PIECO submitted the lowest bid of thethree competing firms. Thisfundingwillbechargedtothe "Maintenance andRepair of Groundsand Structures" (Account No.1710-519-4670),and is not to exceed $1,625 to install. Itis therefore recommended thattheCity Commission approve the proposed expenditure. Attachments l RESOLUTION NO. 2 3 A RESOLUTION OF THE MAYOR AND CITY 4 COMMISSION OF THE CITY OF SOUTH 5 MIAMI,FLORIDA,AUTHORIZING THE CITY 6 MANAGER TO ENTER INTO AN 7 AGREEMENT WITH SOUTHERN 8 PETROLEUM SYSTEMS INCORPORATED 9 (PIECODIVISION)TOINSTALLAN io EMERGENCY SHUT-OFF SWITCH FOR THE ii UNDERGROUND FUEL TANK AT THE 12 PUBLIC WORKS YARD,AT COST NOT TO 13 EXCEED $1,625 AND CHARGING THE 14 DISBURSEMENT TO "MAINTENANCE AND is REPAIR OF GROUNDS AND STRUCTURES" 16 ACCOUNTNO.1710-519-4670. 17 is WHEREAS,the existing storage tank system lacksan emergency 19 shut-off switch tocut electrical power tothe fuel pumps in case of fire,and; 20 21 WHEREAS,suchashut-offswitchisbeingrequiredbythe 22 MetropolitanDadeCountyBuildingDepartment,and; 23 24 WHEREAS,Southern Petroleum Systems Incorporated (PIECO 25 Division)isa properly licensed "Pollutant Storage System Specialty 26 Contractor"(PSSSC)throughDadeCounty,and; 27 28 WHEREAS,Southern Petroleum Systems Incorporated (PIECO 29 Division)is the lowest bidder of the interested firms who submitted bids for 30 this work. 31 32 NOW THEREFORE,BE IT RESOLVED BY THE MAYOR AND 33 CITYCOMMISSIONOFTHECITYOFSOUTHMIAMI,FLORIDA: 34 35 Section 1.The following quotes were obtained from pollutant 36 storage system specialty contractors: 37 38 Southern Petroleum (PIECO)$1,625 39 Bagwell Equipment Co.$5,850 40 MillerIndustrialEquipment(contacted,butdidnot 4i submit a bid) 42 LutzPetroleum (contacted,butdidnot 43 submit a bid)/t SOUTHERN PETROLEUM SYSTEMS INCORPORATED South Florida-nECODivtoon 730SW.19thCotttt Hiale*h,FL 33014 (306)558-0*40-FAX (306)36Z4S20 City of South Miami Public Works 4/22/97 4795 SW 73 Ave.FAXED Miami,Fl.331SS Attn:David Gooden Re:Emergency Stop Switch and electrical revisions. DearMr.Gooden,4 As requested,please find listed below a cost estimate for the Mowing scope of services. 1.0 Furnish and install one (1)each emergency stop switch on maintenance building closest to the existingfuelisland. 1.1 Re-work electrical circuits to maintenance building to eliminate existing conduits running on fence. The Total Cost Estimate forthe scope of services listed above is $1,625.00. Upon receipt of your notification to proceed I will mobilize a crew to provide these services and complete the project.If you have any questions or require additional information,please contact me at yourconvenienceat 558-0440. Sincerel: Brian S.Webster,Sr. OperationsManager Sales/ProjectManager BSW/ww cc:file s« a —rw*^.ww.>i.iw.,o £.Qiwi ji r.tJl^UI FAX.MEMO from tent Co,, Consultants /Contractors page(s)sent including coversheet Date:September 29,1997 To:City of South Miami Public Works Department ATTN:DaveGoodin Phone#(305)663-6350 FAX #(305)261-3791 From:Ron Bagwell,Bagwell Equipment Co.,Inc. Phone #(305)247-3820 FAX#(305)245-3522 Re:Quote for Emergency Shut-Off Switch (USTS) Dave, As per our phone conversation Friday the cost to install the USTS emergency shut-off switch is $5,850.00.This price includes the permitting,materials,and labor for installing a three-circuit shutoff switch.This price also includes one (1)post (4"steel)to accommodate the switch,and two (2)ballards (4M steel)at each side of the post to protect the switch post.The installation of an emergency shut-off sigh is also included with this price.. Ifyou have any questions or would like a contract sent for the work proposed here,call me at the number above,or at 342-0965 (mobile)if you wish to reach me directly. Ron Bagwell o'eiiw <-a*iiaet Ciiiis ollk-t?iiyimr Ca€simik timctimeatis)are incompki&or sisK^ar. TOTAL P.01 fi