Loading...
Res. No. 194-97-10164RESOLUTION NO. 194-97-10164 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA, AUTHORIZING A FIELD STUDY TO INSTALL STORMWATER DRAINAGE AT THE TENNIS COURTS AT DANTE FASCELL PARK AND CHARGING THE DISBURSEMENT OF $4,150 FROM THE PARKS & RECREATION DEPARTMENT ACCOUNT NUMBER 2000-3100, "PROFESSIONAL SERVICES" . WHEREAS, the drainage at the Tennis Courts at Dante Fascell Park is inadequate; and WHEREAS, after it rains, standing water accumulates on the courts; and WHEREAS, this situation could be hazardous to the players and deteriorates the condition of the courts; and WHEREAS, the Public Works Department has determined that a survey and an engineering study should be preformed to determine actual construction costs; and WHEREAS, the Parks & Recreation Department has agreed with the overall study in an amount not to exceed $4,150, so that Stormwater Drainage for the Tennis Courts at Dante Fascell Park could be installed. NOW THEREFORE BE IT RESOLVED BY THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI, FLORIDA: Section 1. That a purchase order is awarded to Vera & Associates to perform a survey for the Stormwater Drainage at the Tennis Courts at Dante Fascell Park not to exceed $1,100. Section 2. That a purchase order is awarded to Corzo, Castella, Carballo, Thompson & Salman, P.A. (C3TS), to perform an engineering study for the Stormwater Drainage to be placed at the Tennis Courts at Dante Fascell Park not to exceed $3,050. Section 3. upon approval. This resolution shall take effect immediately PASSED AND ADOPTED this 16th day of ATTEST, ~ ~~ CITY CLERK READ AND APPROVED AS TO FORM: ---::f:.~ I b, ro c.. ) ) ~ ;L CITY ATTORNEY / COMMISSION VOTE: Mayor Price: Vice Mayor Robaina: Commi s s ion e1?\r<aatth,e,al~dante97 Commissioner Oliveros: Commissioner Young: 5-0 Yea Yea Yea Yea Yea City of South Miami Inter-Office Memorandum TO:. ~ &-f'Iayor & COmmiS~iO~ P~r(4~b4~r FROM: L. Denrus Whitt: SUBJECT: DATE: City Manager September 10, 1997 Agenda Item # .I'D Commission Meeting September 16, 1997 Stormwater Drainage Tennis Facility at Dante Fascell Park The attached resolution seeks approval for a field study on the stormwater drainage at Dante Fascell Tennis Courts. Charges would be disbursed from account number 2000-3100, "Professional Services", not to exceed $4,150 . . The Public Works department has been working with the Parks & Recreation department to fmd an appropriate vendor. The recommendation of the Public Works department is to have Vera & Associates and C3TS perform this job. The Parks & Recreation Department is in agreement. I recommend approval. c:\wpdocs\agenda.stonn watertennis97 TO: FROM: SOUTH MAIMI PUBLIC WORKS DEPARTMENT INTER-DEPARTMENTAL MEMORANDUM Melvin Tooks Parks & Recreation Director ~ ernando J. Ro g"""4u':;ez~O/f' Acting Public Works Direc~ DATE: July 7, 1997 SUBJECT: Stormwater Drainage for the tennis courts at Dante Fascell Park As you know, when it rains on the tennis courts at Dante Fascell Park, standing water will accumulate on the courts due to inadequate drainage. This problem is most pronounced at the northern and southern edges of the tennis, but standing water will also accumulate along the eastern and western edges as well. This is an unacceptable condition since the standing water poses a slipping hazard to players and will cause the accelerated deterioration of the clay courts. The deterioration will force the City to resurface the courts more frequently. The primary reason for the standing water on the courts is the difference in elevation between the col:lrt surface and the adjacent landscaped and sodded areas which are at a higher elevation. As a result, rainwater has no where to drain; the stormwater stays on the courts until it evaporates, or until it is absorbed by the court clay. There are two solutions for this problem ... The "low-tech" solution would be to excavate a channeVgutter around the perimeter of the tennis courts facility. This earthen channel would provide an area of lower elevation for stonnwater to drain into, and allow for stormwater to infiltrate into the subsurface. The gutter solution has the advantage of low initial costs to install Gust the excavation and re-sodding expenses), but has significant disadvantages as well; the gutters could become unsightly "mud holes" during the rainy season. It is for this reason that the "low tech" solution is not recommended. The other solution is to install a formal stormwater water collection and drainage system. Such a system would probably include trench drains located between the courts to collect the water, underground conduits to carry the stormwater to a pre-treatment structure to remove clay particles from the water, and underground stormwater exfiltration trenches. It would be necessary to perform an engineering study and elevation survey before costs for such a system can be determined. The survey can be performed by Vera & Associates (a firm currently under contract with the City) for approximately $1,100. The engineering study can be performed by C3TS (the firm handling the re-development of Sunset Drive, and who is also preparing a Stormwater Management Program for the City) for $3,050. Thus, the total initial costs to determine actual construction and long-term maintenance costs would be $4,150. Cc: David K. Goodin, Engineering Inspector If) Engin •• rs Arch i rec:ls Plonne r ) EBOOO.s022 AAC0021A2 WORK ORDER fOR PROFESSIONAL SERVICES TO; ATTENTION: City of South Miami Public WOrks Department 4795 S.W. 75th Avenue South Miami, Florida 33155 Fernando Rodriguez Public Works Director PROJECT NAME: Drainage Study for Tennis Courts at Dante Fascell Park DESCRIPTION OF SERVICES: DATE: 7/3/97 FILE: SM/PW Investigation of the current drainage problem with the clay tennis courts at Dante Fascell Park to include: Field sUivey of differential elevations. Visual inspection of site. Review of available plans and other records. Study of alternates for drainage remediation 1. 2. 3. 4. 5. Preparation of report outlining investigation procedures, analyses, findings and recommendations. We Shall provide you three (3) copies of the report. TERMS ANQ CONDITIONS: All terms and conditions shalf be per our General Agreement for Professional Services. Our fee for the above described services shall be $3,050.00. We are ready to begin working on this aSSignment upon your authorization to proceed. If acceptable to you, we will accept a Signed copy of this form as your written authorization to proceed with the assignment. Thank you. RCler City of South Miami Approved by: mpson Salman. P _A. Date: C_\22I1-OO\11-M~O~'O~311T~-------- 901 Ponc:c do loon Blvd_. Suit. 900 Corol Gobles, Florida 3313j 305.445.2900 1.800.448.0227 FQ~simil8 305.445.3366 Eqwl OpportunIty Employer (I , ~, TO: Mr. Randall Boiko FAX TRANSMITTAL 6i/i-IZ''-' (3 01/9&'3# c/o City oj South Miami Recreation Department FROM: Michael P. Patey, P.E. Project Manager PROJECT: Dante Fascell Park Tennis Courts Drainage Improvements DATE.. SeptemberS, 1997 Number of Pages Including Cover Sheet: 5 REMARKS: --_._------ Attached hereto 'Please find this firm's proposal for the referenced project as we discussed I am also mailing q copy or this firm 's qualifications and experience booklet for your review. Please gjve me a call if you have any questions Dr require additional information. If you receive this communication In error, or if you encountered any problems with transmission, please call (305) 670-1011. This facsimile is privileged and confidential and is intended only for the individual or entity named above and others who have been specifically authorized to receive it. If you are not the intended recipient, you are hereby notified that any dissemination, distribution or copying of this communication is strictly prohibited Original: [Xl by Regular Mail [ ] by Express Mail [J by Courier 9400 South Dadeland Boulevard. Suite 370, MIami. Florida 33156 Telephone (305) 670·' 01 ~ • Fax (305) 670"016 ................................................... (.fI ...... . ....r-I A82MT CONSULTANTS, INC. FILE· COpy September 5, 1997 Mr. Randall Boiko cIa City of South Miami Recreation Department 6120 Sunset Drive South Miami, Florida 33133 Re: Consulting Engineering Services for Dante Fascell Park Tennis Courts located at S.W. 57th Avenue and S.W. 88th Street, South Miami, Florida Dear Mr. Boiko: ... .n."".c... ~/ f Thank you for considering AB2MT Consultants, Inc., to provide consulting engineering services in connection with the above referenced property (hereinafter called the "Project"). The Basic Services proposed to be provided by this firm consist of design, permitting and construction management of. drainage improvements to alleviate localized ponding of stonnwater around existing tennis courts which occurs following storm events. The type and size of drainage improvements required for the site will be dependent on the results of field percolation testing. and topographic surveying, which are included in our Scope of Work. If percolation testing has been performed in the past at this site and reports could be made available to us, then additional field testing may not be necessary. Additionally, if topographic survey infonnation is available for the property, surveying may not be necessary. The Total Fee Amount proposed for our Basic Services is $4,800, which includes field testing and surveying as set forth in the attached Scope of Work. We would expect to start our services promptly after receipt of your acceptance of this Proposal and to complete the design phase of our services within forty-five (45) days from receipt of an Authorization to Proceed. If there are protracted delays for reasons beyond our control, if construction is not started within six (6) months after completion of our final Drawings and Specifications, or if construction is not completed within one (1) year, we would expect to negotiate with you an equitable adjustment-of our compensation taking into consideration the impact of such delay. For the purposes of this Project, the City of South Miami will be known as the "Client u • The Client is expected to furnish AB2MT Consultants, Inc., with full information as to the Client's requirements, including any special or extraordinary considerations for the Project or special services needed. 9400 South Dadeland Boulevard, Suite 370, Miami. f'lorlda 33156 Telephone (305) 670·1011 • Fax (305) 670-1016 (0 r / I ,., Please advise us at an early date if there are any budgetary limitations for that portion of the Project set forth in the Soope of Work. We will advise you if said limitations are realistic and. if so, endeavor to work within those limitations. If you request, we will submit to you periodically during the design phase of our services our opinions as to the probability of completing construction within your budget. We do not guarantee that our opinions will not differ materially from negotiated prices or bids. If you wish to have greater assurance as to probable construction cost, or if you wish formal estimates, an independent cost estimator should be employed. Additional Services, if authorized by the Client, will be charged based upon the attached Schedule of Charges for Professional Services. Reimbursable Expenses incurred in connection with all Basic and Additional Services will also be billed in accordance with the attached Schedule of Charges for Professional Services, and will be in addition to the fee for our Basic Services. ADMT Consultants, Inc., prepares invoices at the end of each calendar month based upon the work completed during the billing cycle. Invoices become due twenty (20) days after the datt~ of the invoice, and past due amounts are subject to a 1.5% per month finance charge. This Proposal, the Scope of Work, and the General Terms and Conditions attached as Exhibit A, along with the Schedule of Charges for Professional Services, represent the entire Agreement between 'You and us in respect to the Project. If this satisfactorily sets forth your understanding of our Agreement, please sign the enclosed copy of this Proposal in the space provided below and return same to us; this will serve as our Authorization to Proceed. This Proposal will be open for acceptance until October 5, 1997, unless changed by us in writing. Very truly yours, [1ettft.'lcitsomie.pro I Accepted the ____ day of ______________ ~, 19 ____ _ By: __ . _______ _ Authorized Representative City of South Miami A82MT CONSULTANTS, INC. • ENGINEERING • ENVIRONMENTAL. PLANNING. (305) 670-1011 • Fa)( (3015) 870-101 (3 I , • .,.. I AB2MT CONSULTANTS, INC. SCHEDULE OF CHARGES FOR PROFESSIONAL SERVICES STAFF CATEGORY • Principals • Project Managers • Project Engineers • Engineering Technicians • Environmental Scientists • Field Technicians • CADD OperatorstDraftsmen • Secretarial Services REIMBURSABLE EXPENSES February 1996 HOURLY RATE $95 $80 $65 $55 $55 $SO $45 $30 • Transportation Expense • Photocopy Charges • Facsimile $ .31S per mile $ .20 per copy l . + 1 S% Management Fee $ .50 per sheet J • Other Reimbursable ExpensesCost + 15% Management Fee GEOTECHNICAL AND FIELD EXPENSES In accordance with Supplemental Billings List. LABORATORY ANALYSIS In accordance with Supplemental Billings List. FORENSIC ENGINEERING SERVICES Expert testimony in legal, litigation or arbitration matters: Services Rendered S!.af(CateiOlY Hourly Rate Time in Court Principal PAYMENT TERMS .. NET 20 DAYS 9400 South Dadeland Boulevard, Suite 370, Miami, Florida 33156 Telephone (305) 670·1011 t Fax (305) 670-'0'6 $135.00 IIJ I. A. B. C. D. E. .~ l SCOPE OF WORK FOR CITY OF SOUTH MIAMI DANTE FASCELL PARK TENNIS COURTS s.w. S7th AVENUE AND S.W. 88th STREET SOUTH MIAMI, DADE COUNTY, FLORIDA BASIC SERVICES Description Design, preparation and permitting of engineering plans for on-site drainage improvements for existing tennis courts. (Note: includes Dade County Department of Environmental Resources Management permitting only) Related geotechnical services necessary for design of drainage improvements: Percolation Testing: 2 tests @ $350/test Related survey expenses required for design of drainage improvements: Contract Management Activities: 1. Preparation of written technical specifications 2. Procurement and evaluation of bids from Contractors, bids, and making recommendations regarding Contract Award. Limited Inspection Services and Shop Drawing Review, including; 1. Review of Contractor ' s Shop Drawings for general conformance with design concept. 2. Two (2) site visits to observe work in progress. TOTAL FEE AMOUNT Page 1 of 2 Fee Amount $2,750 $ 700 $ 500 $ 150 $ 300 S 150 $ 2~O 'of, $4.800 Ae2MT CONSULTANTS,INC. • ENGINEERING • ENVIRONMENTAL • PLANNING' (305) 670·1011 • Fax (305) 670-101-(3 tf) ll. ADDITIONAL SERVICES Unless othetwise specifically set forth in Item I., the following items are not included in the Basic Services and are customarily considered to be Additional Services: A. Design, pennitting and construction management of improvements in adjacent right-of- way corridors. B. Field surveys for staking out the work of the Contractor and preparation of as-bullt drawings. C. Plan processing through the City of South Miami Building and Zoning Department, or any other regulatory agencies aside from the Dade County Department of Environmental Resources Management. D. Payment of plan review fees, pennit fees, impact charges, etc., which may be required by the regulatory agencies. E. Services resulting from significant changes in the general scope, extent, or character of tile Project or major changes in documentation previously accepted by the Client where changes are due to causes beyond the control of AB~T. Page 2 of 2 AB2MT CONSUl. TANTS, INC •• ENGINEERING • ENVIRONMENTAL. PLANNING • (305) 670-'011 • Fax (305) 670-1016 EXlUBITA GENERAL TERMS AND CONDITIONS TO THE AGREEMENT BY AND BETWEEN AB:aMT CONSULTANTS; INC. (AB2MT) AND THE CITY OF SOUTH MIAMI I. PAYMEN! !ERMa AB2M'I' COIIIultan1l, !no. (AB2MT) will IlUlunlt Involcea for .~ rendered Inoludina nimburlable upON. It the end of each calendar moath butd upon wotk compl.ted during the oalendar month billing cycle. Invoic. begome duo twenty (20) daY' aa.r tho date ofth, invoicIe, and put duo amounte u. lubjeoL to I 1.'% per month flnanoe f01!wg.. which Client Iii'"' to pay. In acIdltlon, AB2MT WIL b, entitlild to recover all reuonahl. IIOIta woolated with collllllion ofpaat duo invoice amounts lnc1uding but not Ilmhed to ItIff time, court eoN, fI1tOJney feel and other nlawd axponaot. AB2MT relletVell tho rlaht to oeuo all wark on a projogt, wtwn.wr an invoice amount b~ put due. IL INSURANCE AB2MT oarries IJIatutory Warlcor'l CompONation Irwllfllllla, Oonetal LJihillty, Automobile LIability and Un!naurlld Motorist gov"a ... lnIutanoe oerii&ate. Cot AB2MT or to: any IUbeontt'lOIot to be utilizfd by AB2MT In portbmwwl of the 8eNioea delaribed in th. letter aareement will ba ftlmlahod to 1M Client on nquat. nL IJMITA,TlQN OF PROFESSIONAL LIABILITY To th, fulloat extent pennittod by law. tho tatal liability. in the Iggre,ate, of AB2MT and AB2MTI offigen, dirtQtora, employee .. allenta and Independont protalional Ulooiatcl. wbCOlUlultants and contraClton and any of them. to the Client and anyone claiming by. through or under the Client, for any and all ir\iuriel, claims. loue8, expeJI.IIK or damaall whatsoever. &riling out of or in any way related to AB2MT'J. lotVicea, the projeot, or thia Aartemom. fi'om any CIU." or caulK whatloevor. inc:Juding but not llmlted to the f1ealigtmll" mon, omisaiOlll, IItiot llablllty or breach of OOntraDt of AB2MT or AB2MT's offioen. dlrooton, employe., Ilpnta or independent proti.ionlll lVlIalliatea, aubcoNultanta, or gonlrarMn, ar any af them. IIhalI not .~~ the total oompONatiClill reoeind by AB2MT under thll agreemem. or the total amount of S'O,OOO, whiMlvw is gr .. w. IV. lUIiPl'US In the even11hat any dilpute should aria. rlllatlng to tho nrvioe. dncribed hemn. and Ihould that dilpute remit in litiption or arbitf8Uon.lt I. -&reed by AB2MT and the ell. that tho-prevalUna party aha1l bt entitlad to recover all reuonable oom incumd In pumalng a clelm &ri.ina il'om th.a dllJMl, illl).\udlng but not limited to staff time, ooun OOItIi attomay r.... and athar td&ted expent. A92MT and 'tho Client t\Jnher agna Uiat any lIotlon btouahi to mfbr,;" any provillona of the Aanement Wll only be broII&h.t In a oowt of ~ jutlldlGtlon looated in. Dad, County, Flarid&. Tho enUre Ap-eenmJt will be governed In all reapw by the laM of tho stat. ofPlorid&. v. TERMINATIO~ OF AGRUMINI ThiJ Agllment may be temUnated by either party upon IDVen (7) daY' written notio .. in the event of mbttantlal failure by the othIr p.ny to perform In aogordarn:, with tho t..-ma heteln. Such Utmination abaJl not b, alfeotive lfthai IUbltantial t'a1lun has bMn renwdilld before expltatlon of the period sp"1lif1*i In tho written notioe. In the n.m of~inaUo.n, AB2MT Ihall be paid to: • .vioel petftd'med to 1M tenninatian not1oe didtI, plua any reucmabie and ~muy expense. Illociated with the tenninatlon. such II tho oolls of demobilization. VI. USI OF DOCUMENTS All reports. fi.w data, fLCld not., analytical data, oaleu.IatiON, cost e.stimatea and other clMummtl prepared or fumillhed by AB~MT pIllIuant to thla Agroement, includina dowmenl$ prepared by luboonau1tantl and eontrl<lton of Aa2MT art instNtnenis of.orvioe and AB2MT shall n1Ain an ownerlhlp and property intereat therein. Any roule of IUch lnllnllnmtl of lervice by tho Client without written authorization from AB2MT will be at the CJilllR'l lole rilk and without liability or lep! expcmre to AB1MT. Of 10 lilY Illboonlultanta or 00Jt1tICt0tI of ABlMT. AB2MT will retain all pordnent docmmenll p"p!ated or produced pumluU to thit A&feement fOr a period of lit I-BIt thrM (3) ye .... after 1he 1ut prot_IonaL wvloea !ate provided. If) AB2MT CONSULTANTS, INC. • eNGINEERING • ENVIIiONM8NTAL· PLANNING. (305) 670·1011. Fax (305) 670·1016 TO: FROM: SOUTH MIAMI PUBLIC WORKS DEPARTMENT INTER-DEP ARTMENT AL MEMORANDUM Maria Stout-Tate DATE: September 8, 1997 Administrative Secretary David K. G~';~ SUBJECT: Dante Fascell Tennis Courts Engineering nspector Stormwater Drainage Attached is an extra copy of that memo Fernando and I developed discussing the stormwater drainage problems at the Dante Fascell Tennis Courts. Fernando and I have also reviewed the proposal from VSN Engineering, Inc., to prepare stormwater drainage plans for the tennis facility. When questioned, Mr. Rodolfo Vargas- Fournier, P.E., of VSN admitted that he had not anticipated the special problems associated with clay tennis courts. However, he did say that he would research this issue and that the plans submitted would be appropriate for the job. As long as our authorization contract with VSN stipulates that this job is "lump sum" billing and that final payment cannot be given until the plans are approved by the City's Building Department (i.e., Peter Iglesias) and Public Works Department, then we should be protected in case the first set of plans (or subsequent plans) are inappropriate for clay courts. On another issue, I have attached a copy of DERM's Best Management Practices for golf courses (the closest they have to public parks). Please give these to Mr. Doug Baker to review. I am preparing a National Pollutant Discharge Elimination System (NPDES) report for submittal to DERM and the EPA, and would like to say that the City's use of pesticides, herbicides, and fertilizer is in accordance with these Best Management Practices. Thanks. Please call if you have any questions. If) August 22, 1997 CITY OF SOUTH MIAMI Public Works Department 4795 SW 75th Avenue South Miami, Fl. 33155 Attention: Mr. Fernando Rodriguez .. Public Works Director CML LAND DEVELOPM:NT TRAFFIC AND TRANSPORTAl1ON Reference: Proposal for Civil Engineering Services for Tennis Court Drainage at Dante Fascell Park Gentlemen: VSN Engineering, Inc. is pleased to submit this proposal for providing Civil Engineering services for the above referenced project. VSN Engineering, Inc. (VSN) hereafter referred to as "the Engineer", offers to provide the CITY OF SOUTH MIAMI (CSM) the following services for the fee stipulated herein: Grading and Drainage System Plans Design, Plans preparation and regulatory approvals for a storm drainage system to serve the above mentioned facilities. VSN will research the existing records,inspect the site and prepare a Preliminary Drainage Plan based on a Topographic Survey provided by CSM. After review and approval by CSM of the Preliminary Drainage Plan, VSN will finalize the Construction Plans and submit them for approval to City of South Miami Public Works and Metropolitan Dade County Department of Environmental Resources Management (DERM). VSN will conduct two (2) site visits during construction and prepare certifications based on As-Built plans prepared by a Registered Land Surveyor. Topographic, As-Built Surveys and Percolation Tests are not included in this proposal. Meetings and additional services beyond the above referenced scope will be provided at a rate of $ 70.00 per hour. . LUMP SUM FEE ...... '" '" ........... , ................. ; .................... $ 1,500.00 If you have any questions, please contact this office. Rodolfo Vargas-Fournier, PE 8550 W. FLAGLER STREET, SUITE 113, MIAMI, FLORIDA 33144 TEL: (305) 551-6267 • FAX: (305) 551-4542 August 22, 1997 Page 2 PAYMENT: :1" CML LAND DEVELOI't.ENT . TRAFFIC AND TRANSPORTATION The Engineer proposes to, submit invoices for services rendered based on the percent completion of the work. Payments are due and payable upon receipt of invoice. Printing, approval fees and out-of-pocket expenses are not included in this fee and will be invoiced separately. Payment Schedule: Payment #1 (at Notice to Proceed) .............. ...... .............. $ 750.00 Payment #2 (At 100% Plans Completion) .......................... $ 750.00 Total ............................................................................... $ 1,500.00 . Any amount unpaid after 30 days from date of invoice shall bear interest at a rate of 1.1 % per month. The CITY OF SOUTH MIAMI shall pay for all expenses incurred in connection with the collection of overdue amounts including attorney's fees and out-of- pocket expenses. The Engineer shall reserve the right to discontinue providing services on all past due accounts and/or if the Client fails to substantially perform in accordance with the terms of this Agreement. 8550 W. FLAGLER STREET, SUITE 113, MIAMI, FLORIDA 33144 TEL: (305) 551-6267 • FAX: (305) 551-4542 If) August 22, 1997 Page 3 TERMINATION OF AGREEMENT: CML LAND DEVELOPMENT TRAFFIC AND TRANSPORTATION . ~ This Agreement may be terminated by either party upon not less than seven days written notice should the other party fail to substantially perform in accordance with the terms of this agreement through no fault of the party initiating the termination. In the event of termination not the fault of the Engineer, or due to the suspension of the Project, the Engineer shall be compensated for all services performed prior to termination including Reimbursable Expenses. ACCEPTANCE OF PROPOSAL: The above fee and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined previously. THIS PROPOSAL IS ACCEPTED BY: Name and Title CITY OF SOUTH MIAMI Date Rodolfo Vargas-Fournier, PE Principal VSN Engineering, Inc. Date 8550 W. FLAGLER STREET, SUITE 113, MIAMI, FLORIDA 33144 TEL: (305) 551-6267 • FAX: (305) 551-4542 ... .... i . If) August 22, 1997 CITY OF SOUTH MIAMI Public Works Department 4795 SW 75 th Avenue South Miami, FI. 33155 Attention: Mr. Fernando Rodriguez Public Works Director CIVIL LAND DEVELOPM:NT TRAFFIC AND TRANSPORTATION Reference: Proposal for Civil Engineering Services for Tennis Court Drainage at Dante Fascell Park Gentlemen: VSN Engineering, Inc. is pleased to submit this proposal for providing Civil Engineering services for the above referenced project. VSN Engineering, Inc. (VSN) hereafter referred to as "the Engineer", offers to provide the CITY OF SOUTH MIAMI (CSM) the following services for the fee stipulated herein: Grading and Drainage System Plans Design, Plans preparation and regulatory approvals for a storm drainage system to serve the above mentioned facilities. VSN will research the existing records, inspect the site and prepare a Preliminary Drainage Plan based on a Topographic Survey provided by CSM. After review and approval by CSM of the Preliminary Drainage Plan, VSN will finalize the Construction Plans and submit them for approval to City of South Miami Public Works and Metropolitan Dade County Department of Environmental Resources Management (DERM). VSN will conduct two (2) site visits during construction and prepare certifications based on As-Built plans prepared by a Registered Land Surveyor. Topographic, As-Built Surveys and Percolation Tests are not included in this proposal. Meetings and additional services beyond the above referenced scope will be provided at a rate of $ 70.00 per hour. LUMP SUM FEE ........... , ............................. : ............ '" ..... $1,500.00 If you have any questions, please contact this office. Rodolfo Vargas-Fournier, PE 8550 W. FLAGLER STREET, SUITE 113, MIAMI, FLORIDA 33144 TEL: (305) 551-6267 • FAX: (305) 551-4542 to August 22, 1997 Page 2 PAYMENT: CIVIL LAND DEVELOPMENT TRAFFIC AND TRANSPORTATION The Engineer proposes to submit invoices for services rendered based on the percent completion of the work. Payments are due and payable upon receipt of invoice. Printing, approval fees and out-of-pocket expenses are not included in this fee and will be invoiced separately. Payment Schedule: Payment #1 (at Notice to Proceed) ., ......... , ......... , ............ $ 750.00 Payment #2 (At 100% Plans Completion) ., .......... '" .......... , $ 750.00 TotaL-...................................... , ................................ , ..... $ 1,500.00 Any amount unpaid after 30 days from date of invoice shall bear interest at a rate of 1.1 % per month. The CITY OF SOUTH MIAMI shall pay for all expenses incurred in connection with the collection of overdue amounts including attorney's fees and out-of- pocket expenses. The Engineer shall reserve the right to discontinue providing services on all past due accounts and/or if the Client fails to substantially perform in accordance with the terms of this Agreement. 8550 W. FLAGLER STREET, SUITE 113, MIAMI, FLORIDA 33144 TEL: (305) 551-6267 • FAX: (305) 551-4542 to August 22, 1997 Page 3 TERMINATION OF AGREEMENT: CIVIL LAND DEVELOPJJENT TRAFFIC AND TRANSPORTATION This Agreement may be terminated by either party upon not less than seven days written notice should the other party fail to substantially perform in accordance with the terms of this agreement through no fault of the party initiating the termination. In the event of termination not the fault of the Engineer, or due to the suspension of the Project, the Engineer shall be compensated for all services performed prior to termination including Reimbursable Expenses. ACCEPTANCE OF PROPOSAL: The above fee and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined previously. THIS PROPOSAL IS ACCEPTED BY: Name and Title CITY OF SOUTH MIAMI Date Rodolfo Vargas-Foumier, PE Principal VSN Engineering, Inc. Date 8550 W. FLAGLER STREET, SUITE 113, MIAMI, FLORIDA 33144 TEL: (305) 551-6267 • FAX: (305) 551-4542 10 METROPOLI'l'AN DADE COUNTY ENGINEERING, ARCHITECTURAL AND SURVEYING AND YAPPING PROFESSIONAL SERVl:CES CER'rIFICATION CATEGORY INI'ORMATION FORM CATEGORY No. AND TITLE 16.0 General Civil Engineering List the full-time, Florida registered professionals employed by your firm qualified to do this work. detailed education and experience resume for each certifying agent listed supporting their ability. Attach a Name of Employee/ Title/ Florida Years of Professional City & State of Residence Areas ot: Re~PQn~ibilitv_ Reqistration Number Experience " ~ Rodolfo J. Vargas, P.E. President/ Miami, Florida Engineering P.E. No. 35648 18 Services List recent projects the above individuals have completed for this type of work. Name of Employee/ Areas of Responsibility Rodolfo J. Vargas, P.E. Project Engineer Name/Location of Project/ Date completed DADE COUNTY RESOURCES RECOVERY FACILITY Miami, Fl. 1991 to present Description of Project The work for this project has included civil engineering design services for various projects Within this facility such as: STORMWATER MANAGEMENT SYSTEM to include design, plans preparation, regulatory approvals and construction inspections for a system to serve a 120 acre Ash Landfill and a 40 acre trash processing plant. This project had to be designed to meet the requirements of an FDEP Settlement Agreement mandating strict compliance with water quality and quantity requirements. Some the features included a 22 acre stormwater retention pond with 8 acres of recreated wetlands, separate treatment systems for the 40 Acre Plant which, depending on the levels of potential contamination varied from french drain systems to clay lined storm water conveyance swales to pump systems for storage at remote lined surge ponds with capabilities of re-cycling of stormwater into the plant to be used as cooling tower make-up water to supplement current well water use. Page 1 of 4 } .......... ~ METROPOLITAN DADE CC rY ENGINEElUNG, ARCHITECTURAL AND SURVEYING AND HAPPING k'ROFESSIONAL SERVICES CERTIFICATION CATEGORY INFOlQQ.TION FORM CATEGORY No. AND TITLE 16.0 General Civil Engineering List recent projects the above individuals have completed for this type of work. Name of Employee/ Areas of Responsibility Rodolfo J. Vargas, P.E. Project Engineer Rodolfo J. Vargas, P.E. Project Engineer Name/Location of Project/ Date completed DADE COUNTY RESOURCES RECOVERY FACILITY (Cont'd) DADE COUNTY RESOURCES RECOVERY FACILITY (Cont'd) Description of Project CEP ROADWAY IMPROVEMENTS: This project included a comprehensive traffic study and circulation analysis to determine the necessary on and off-site roadway improvements to meet the demands of the Retrofit, CEP and Trash to Fuel projects. The project included design and plans preparation for the internal roadway system at the Plant, design of new parking facility, design of new truck entrances, design of storm drainage systems to serve the parking and roadways, regulatory approvals and construction supervision. SANITARY SEWER PEAK MANAGEMENT SYSTEM: This project included a comprehensive flow study of the discharges generated form the 80 Acre Ash Landfill and the 40 Acre Plant sites. A system j'-, " ) was designed to reduce the peak discharges into , the sanitary sewer system to the maximum allowed / Page 2 of 4 by MDWASD by the use of an 800,000 gallon tank. Peak discharges from large areas subject to to rainfall in the order of 4,000 gpm had to be reduced to a maximum discharge of 400 gpm while at the same time having to contain the large rainfall volumes generated by the design 100 year 24 hour storm event. This project included a fully automated control system to operate the tank inflow and outflow pumps according to the inflow rates, tank levels and force main pressure. The pump system was integrated into the MDWASD SCADA monitoring system . METROPOLITAN DADE COUNTY ENGINEERING, ARCHITECTURAL AND SURVEYING AND MAPPING PROFESSIONAL SERV:[CES CERTIFICATION CATEGORY INFORMATION FORM CATEGORY No. AND TITLE 16.0 General Civil Engineering List recent projects the above individuals have completed for thi's type of work. Name of Employee/ Name/Location of Project/ Areas of Besponsibility Date completed Descrjptioo of Project Rodolfo J. Vargas, P.E. Project Engineer Rodolfo J. Vargas, P.E. Project Engineer ~ TROPICAIRE SHOPPING CENTER Bird Road and Palmetto Expwy Miami, Fl. 1994 International Corporate Park Miami, Flordia 1997 Page 3 of 4 This project included design, plans preparation and approvals for a 28 Acre Shopping Center. Responsibilities included the following: Site geometric design, design of water distribution system, sewer collection system, design of paving, grading and drainage systems, design of of roadway improvements on Bird Road to accommodate a new traffic signal at the main entrance. Project included a signal warrant analysis and and Traffic Study to justify the construction of of a traffic signal at Bird Road to serve the project and preparation and approval through Dade County and FDOT of the Signalization and Roadway Improvement Plans. Project included site engineering design, plans preparation approvals and construction inspections for twelve Office/Warehouse Buildings in the Airport West Section. Project included master plan preparation of, design of proposed parking and roads, design of paving, grading, drainage, water and sewer systems to serve each individual building. This project also included traffic signal warrant analysis for a proposed signalized intersection at NW 19th Street and NW 107 lli Avenue. ". METROPOLITAN DADE COUNTY ENG:INEElUNG, ARCHITEC'l'URAL AND SURVEYING AND MAPPING PROFESSIONAL SERVICES CERTII'ICAT:ION CATEGORY INFORMATION FORM CATEGORY No. AND TITLE 16.0 General Civil Engineering List recent projects the above individuals have completed for this type of work. Name of Employee/ Areas of Responsibility Rodolfo J. Vargas, P.E. Name/Location of Project/ Date completed Description of Project BJ's Wholesale Marlin Road, Miami 1997 This project included site engineering design, plans preparation and regulatory approvals for ) this large retail store. Design included on-site paving grading and drainage system to meet DERM's Environmental Permit Requirements, design of water and sewer systems to serve the project requirements including design and approvals for an aerial water main canal crossing over SFWMD Canal C1-N. Project also included design, plans preparation and approvals for the required off-site roadway improvements for Marlin Road from the site to the US 1 intersection, and design and approval of the required signal modifications at US 1 and Marlin Road I hereby certify that to the best of my knowledge the information contained in this form is true and correct. President 06-05-97 SIGNATURE (SEAL) * TITLE DATE *Personal State of Florida Professional registration seal of signator. ~ Page 4 of 4 I / METROPOLITAN DADE COUN'rY ENG:mEE1UNG, ARCHITECTURAL AND SURVEYING AND MAPPING PROFESSIONAL SERV:ICES CERTIFICATION CATEGORY INFOBMATION FORM CATEGORY No. AND TITLK __ 3. Q Hiahwav Systems List the full-time, Florida registered professionals employed by your firm qualified to do this work. detailed education and experience resume for each certifying agent listed supporting their ability. Attach a Name of Employee/ Title/ Florida Years of Professional City ~ St-,~,te~f ~§!s~c:i~nc~ ____ .. _ A!:eCiS at R'§~PQnsibilitv Reqistration Number Experience Rodolfo J. Vargas, P.E. President/ Miami, Florida Engineering P.E. No. 35648 18 Services List recent projects the above individuals have completed for this type of work. Name of Employee/ Areas of Responsibility Rodolfo J. Vargas, P.E. Project Engineer ~ Name/Location of Project/ Date completed SW 104 th Street from SW 122nd Ave. To SW 137 th Ave. Miami, Fl. 1982 Page 1 of 4 Description of Project Project included design of horizontal vertical alignment of a six lane divided urban highway, design of roadway drainage ex filtration system, canal culvert crossing, drainage structures, signing and pavement marking, signalization, maintenance of traffic and summary of quantities. Responsibilities included plans preparation and preparation of packages for regulatory agency approvals. METROPOLITAN DADK COUNTY BNGINEElUNG, ARCHl:TECTURAL AND SURVEYING AND MAPPING PROFESSIONAL SERVICES CERTIFICATION CATEGORY INFO~TION FOm{ CATEGORY No. AND TITLE 3.0 Highway Systems List recent projects the above individuals have completed for this type of work. Name of Employee/ Areas of Responsibility Rodolfo J. Vargas, P.E. Project Engineer Rodolfo J. Vargas, P.E. Project Engineer , Ct Name/Location of Project/ Date completed SW 67~ Avenue from SW 40~ St. to SW 88~ St. Miami, Fl 1985 1-95 HOV Lanes Dade County Line to Hollywood Blvd. Broward County, Fl. 1988 Page 2 of 4 Description of Project Project included design horizontal and vertical alignment of a five lane urban highway with dual left turn lanes, design of roadway drainage exfiltration system with canal high level overflows, signing and pavement marking, signalization, maintenance of traffic and summary of quantities. Responsibilities included plans preparation and preparation of submittals required for agency regulatory approvals. Project included design of the storm Drainage conveyance system and storm Water management system for a 12 lane Interstate Highway. Responsibilities included preparation of all the required storm drainage calculations and reports for the approval of the regulatory agencies. -; METROPOLITAN DADE COUNTY ENGD1EER:ING, ARCHITECTURAL AND SURVEYD1G .AND MAPPING PROFESSIONAL SERVICES CERTIFICATION CATEGORY INFORMATION FORM CATEGORY No. AND TITLK _ 3. Q H~qhw_av Systems List recent projects the above individuals have completed for th~s type of work. Rodolfo J. Vargas, P.E. Project Engineer , ~ NW 98~ Court from NW 18~ St. to NW 12th St. 1996 Page 3 of 4 Design, plans preparation, approvals and contract administration for a roadway widening project from a four lane divided to a six lane divided highway. This project was prepared for a private development and and required to design a profile grade line to fit the existing curb and gutter and sidewalks. Other responsibilities included design of two signalized intersections, design of signing and pavement marking plans, preparation of maintenance of traffic plans, summary of quantities and permitting. Project included design, plans preparation approvals and construction inspections for a three lane roadway with dual turning lanes to serve an industrial park. Design included horizontal and vertical alignment, signing and pavement markings, exfiltration trench storm drainage system and design of conduit plans to accommodate the requirements of Florida Power and Light and Bell South. ~ METROPOLU'JUq DADE COUNTY ENGINEERING, ARCHITBCTORAL AND SURVEYING AND HAPPING PROFESSIONAL SERVJ:CES CERTIFICATION CATEGORY INFOmfATJ:ON FOmi CATEGORY No._AND TITLE __ 3.0 Hiahwav Systems List recent projects the above individuals have completed for this type of work. Name of Employee/ Areas of Responsibility Rodolfo J. Vargas, P.E. Project Manager Name/Location of Project/ Date completed Description of Project Design, plans preparation and construction inspections for the improvement of the " DADE COUNTY RESOURCES RECOVERY FACILITY Roadway Improvements 1995 internal roadway system of this facility i) to meet the requirements of the Retrofit and . RTI Projects. Also associated with this was the design of a storm water management system to serve the 40 Acre Plant site and the 160 Acre Landfill. The Stormwater Management System Project was designed to meet the water quantity and quality requirements of DERM, SFWMD and FDEP. I hereby certify that to the best of my knowledge the information contained in this form is true and correct. ., ./ President 06-05-97 SIGNATURE (SEAL) * TITLE DATE. *Personal State of Florida Professional registration seal of signator. Page 4 of 4 METROPOLI:1'AN DADE COUNTY ENGINEBRING, ARCHITECTURAL AND SURVEYING AND MAPPING PROFESSIONAL SERVICES CERTIFICATION CATEGORY INFORMATION FORM CATEGORY No ._ANDTITLE __ 6. ~ Water and SanitarvSewer Svstems List the full-time, Florida registered professionals employed by your firm qualified to do this work. detailed education and experience resume for each certifying agent listed supporting their ability. Attach a Name of Employee/ Title/ Florida Years of Professional City & State_Qf R~si(::tenc~ Areas of Responsibility Reqistratio~lJ.IDber: Experience Rodolfo J. Vargas, P.E. President/ Miami, Florida Engineering P.E. No. 35648 18 Services List recent projects the above individuals have completed for this type of work. Name of Employee/ Areas of Responsibility Rodolfo J. Vargas, P.E. Project Engineer ........ ~ Name/Location of Project/ Date completed DADE COUNTY RESOURCES RECOVERY FACILITY PUMP STATION 938 UPGRADE 1995 Description of Project Services for this project included a detailed study of the flows generated at the 80 Acre Ash Landfill and 40 Acre trash processing facilities being served by this Pump Station. This upgrade was a requirement of an FDEP Settlement agreement. Design for the project had to meet strict discharge limitations into MDWASD's force main system. For that reason, and due to the very large leachate flows from large areas subject to direct rainfall, a discharge attenuation system capable of reducing the peak discharge rates as we] as managing the 100 year rainfall volumes generated at the site had to be designed. Design included an 800,000 gallon double containment leachate storage tank, a system of three 1,000 gpm self priming tank inflow pumps, two 225 gpm dry pit tank discharge pumps and upgrading two existing self priming pumps to act as the system tank by-pas~ Design included a gravity collection system, a forcE main discharge system, emergency generator with 7 de diesel storage tank capacity and wet well. The system included a fully automated bubbler pump control system and force main pressure monitoring system to operate the pumps according ~ .. METROPOLI'l'AN DADE COONTY ENGINEElUNG, ARClUTECTORAL AND stJElVEYING AND MAPPING PROFESSIONAL SERVICES CEllTIFlCATION CATEGORY INFORMATION FORM CATEGORY No. AND TITLE 6.0 Water and Sanitary Sewer Systems List recent projects the above individuals have completed for this type of work. Name of Employee/ Areas of Responsibility Rodolfo J. Vargas, P.E. Project Engineer Name/Location of Project/ Date completed DADE COUNTY RESOURCES RECOVERY FACILITY PUMP STATION 938 UPGRADE 1995 Description of Project according to the levels at the wet well, at the tank and the force main pressures. The system was also equipped with MDWASD's SCADA system for remote telemetry. Responsibilities included detailed design, regulatory approvals, equipment selection, construction inspections, shop drawing reviews final certifications and preparation of As- Built drawings. OML LAND DEVELOPMENT TRAFFIC AND TRANSPORTATION RODOLFO J. VARGAS, P.E., Civil EngIneer! President EDUCATION: Bachelorot Scisnce,Civil Engineering Technology; Florida International University. REGISTRATION:: Professional Ehglrieer~Florlda (#35648) PROFESSIONAL EXPERIENCE: In over twenty·year of professional practice. Mr. Vargas has been Project Engineer responsible for. the preparation of plahS and construction specifications, review of construction drawings, design of commercial and residential site developments, design, calculation and preparation of plats, paving and drainage, water and sewer plans for major and minor residential projects throughout bade and Broward · Counties, permitting and contract administration. As e' Design E:hgineer,; Mr. Varga~ has been responsible for the desigh and plan preparation of urban highway projects with bade;, Plnelias . and Alachua Counties as well as Interstate Highways and Expressways. ' Prior to forhiing. V,S.N~ Engineering, Inc., Mr. Vargas provided design. and; regulatory permitting of complete development plans. He also developed a specialized forte in the . desigri of complex highway stormwater manage- '. ment and drainage systems;; . • •• '".' ,"to' \ , Hi'S'SP~c'lfic'; dut,ies . hav~ .I~cluded all' phases of preparation of 'roadway"plal1s . Including design,' supervision and coordination of construction plans for Dade County Public, Works ' Department . and the· Florida Department· of , Transportation;· site design,' permitting and supervision for, · warehouse facilities, . shopping centers and governmental facilities; and the preparation of Planning Development and E:nvironmental $tudies (P.O. & E.) in Dade County. . ' ,,' ~ .,.~. ; . . •• ,' ';. "r " . '. ' ,', . t' " .'<', .. : . >, " ,:," ..... : I •• :.' '. ::>". ' • ~:" • : " f .. , • ..., .•• " .'. '. :. • r' • ~. ,... \~', ;. " ~ '. ;: ~:. ;' : ...... ' .• . ". ";",,<>:,,,,: i',;;:':.'; . ';" ..... ;.: ~:.::" . " 8550'W.' FLAGiEh ~t~~'~t;~'J:~~E'113,' M~~MI: FLORiDA' 33144 TEL: (305) 551-6261 • FAX: (305) 551-4542 10 /' ! CMl lAND DEVElDPUENT TRAFFIC AND TRANSPORTA11ON 'REPRESENTATIVEPROJECT EXPERIENCE INCLuDES: Design Engineer for 1-95 HOV lanes from Dade County line to south of Sheridan Street, ,Broward County. This project is for a 10 to 12 lane section with complete redesign of three interchanges at, Hallandale, Pembroke and Hollywood Boulevards and Broward County. Design E:hgineer' for' th$ Stormwater Management System and major Pump Station for the Dade County Resource Recovery Facility 'which includes 160 Acres of combined Landfill and ProtessingPlant Facility~ Additional project experience inc/udes the design of S. W. ,67th 'Avenue, Dade" County, Milam Dairy Road, Dade County; S.W;:'104th , .. ," Street, Dade County, Bryan Dairy Road, Pinellas County;"'N.W.2Sth Stteet,Dade County, 10- 12 ' 'Avenue', COhnector," Dade County; Americas Gateway Park, Dade, County; San Jose-Siquirres; Costa Rica; 'Hunter's 'Creek Shopping Center, Orange County; The Hammocks Shopping Center,' Miami; Trade Winds Shopping , Center" Pehsacola; Valrico • 'Shopping Center, lampa; Stirling Square Shopping Center, Fort Lauderdale; The Landings ' Shopping Center; Loehman's Plaza Shopping, Center DadE{ County; Sarasota; Lake Fair Mall, Tampa; d, 'Westwihd Lakes Development, Dade County; 'Country , Lake "Mal1nors, Dade County; Couva South Hdusing, ,i tril1idad;, 'and James C. Scott (HUD), Dade County~ International Corporate Park, Dade County; TropiCalre .' Shopping Center,' bade County; Lakeview Commerce Park, "Dade County; Transal Office and Warehouse ParkjDade County. • • " ' • " ;'. 1 • " )'" ,"', i . , " , .' ' : ~'. ,; t,:", . ~.'. ~,::.' : ... . " ,0,;,:,., " . . ', .". ~, .. """ ,': : :~: " ,:"~'.' ~,., " ''':, ' , ' '\:. ,., 4r .' ;' ,',;<' .;;::;':> '>:::,~ ;\":' , , ,' .... : , " ,',' {", . ' :: .: .. ~'. ,,' " ',., .. ,' : .. f. • :" , " (0 :.\\n,: :, _Wir~ ------= "'[N]: LAND DEVElOPMENT TRAFFIC AND 'TRANSPORTA11ON ~t=MPLOYMENT HistORY: ,': V.S.N. ENGINEERING, INC., Miami, Florida 1990 -Present I PresidenUProject Managerl Engineer respohsible for the planning, design, production and construction coordination of specialized Civil design projects including: rural 'and urban highway design, g~ometric highway: design, design of water,' sewer, paving and drainage systems~: land development and Site Civil Improvements. ,H.'J,' ROSS ASSOC!IATES, INC. Miami, Florida, 1981 .. 1989 1 Project Manager/Project Engineer respons,ible for all phases of civil engineering planning, design, production,' and constructions supervision for Interstate, and Urban: Highways, Expressways and : Roadways: as well:, as commercial, residehtial and : , governmentai:faciUtles. ,. . '.' ", . , "I,,', , • '. ' LUbIVICI·ANO' dRA'NGE CONSUL liNG ENGINEERS, Cot~1 Gables" Florida', 1918~1981 I. Design ·Engineer responsible for design and plan p'reparation of plats! Paving and Drainage and Water and Sewer plans for major and minor residential projects throughout Dade and Broward Counties, Direct involvement in the: .regulatory. permitting process for all phases of developmenL::; ..,1) , , ' , , i. :' I '. ~.'. '," ~:. ": I ' • .' : .. " .~~: :. [ : . :~ : .' '. ':':~<'" . ". ' .," .... ~ ('" .. " " .. ',~,' -:: :. ,,' :'.', . ·.f,· .•.. ' '.1' ... ,",' '. ;,,' '"" ", :",', ',".' '; , :, , .' . ,; ~ . ',' .. . ,' ...•. ', ",;, .. , : .. '. ','.'. ::' .! .'. ' ,'; .:',' " ". . .:: '!.~ ' .. :. :.:::,.', : ;'!'.' , .' '~'. -.: r ,-"", r , .~ • " : ! ! '. J' ,: , . . ' . 1 .: " " ., ... '. , .,' . ~.' ~, . .~ .; J , . . ) ," ...... . 'j •• " r' '. .', . ", "', .' .' : . \' {O FLORIDA STATE BOARD of PROFESSIONAL ENGINEERS CERTIFICATE No. EB..o005529 CERTIFICATE OF AUTHORIZATION PERMITTING INDIVIDUAL REGISTERED PROFESSIONAL ENGINEERS TO OFFER PROFESSIONAL SERVICES TO THE PUBLIC THROUGH A CORPORATION, PARTNERSHIP, FICTITIOUS NAME OR ASSOCIATION. WHEREAS VSN ENGINEERING, INC. HAS MET THE REQUIREMENTS OF CHAPTER 471.023, FLORIDA STATUTES, FLORIDA STATE BOARD OF PROFESSIONAL ENGINEERS AUTHORIZES THE SAID CORPORATION TO OFFER TO THE PUBLIC PROFESSIONAL ENGINEERING SERVICES OF THE FOLLOWING LISTED INDIVIDUALS: RODOLFO J. VARGAS #PE0035648 IN TESTIMONY WHEREOF, WITNESS THE SIGNATURE OF THE DIRECTOR UNDERSEAL OF THE BOARD THIS 14th DAY OF December 1989 [SEAL] DIRECTOR 1I to ......... o ACt 4322156 . :~'. ., STATE OF FLORIDA Department of Business and Professional Regulation BOARI) OF PROFESSIONAL ENGINEERS The E'NGINEER BUSINESS Named below I SeE R T I FIE 0 Under the provisions of Chapjer 4 71 FS. Expiration date: F E 8 2 8. 1 9 9 9 VSN ENGINEERING. INC 8550 W FLAGLER ST -STE 113 MIAMI FL 33144 LA"'TON' CHILES GQVERNOR DISPLAY AS REQUIRED BY LAW RICHARD T. FARRELL SECRETARY , ~ AC# 4322770 STATE OF FLORIDA Department of Business and Professional Regulation BOAR~ OF PROFESSIONAL ENGINEERS 10110 ~'~\ 997 ~:::i~~51l i, ~: c ~ ~~: 5 ::: The PROFESSIONAL ENGINEER Named below I S lIe ENS E 0 Under the provisions of ChapJer 4 7 1 FS. Expiration date: FEB 2 8. 1 9 9 9 VARGAS. RODOlFO J 1227 AlGARDI AVE CORAL GABLES L.AWTON CHILES GOVERNOR Fl 33146 DISPLAY AS REQUIRED BY LAW RICHARD T. FARRELL SECRETARY METROPOLITAN DADE C JNTY, FLORIDA .. ID July 10, 1997 VSN Enqineerinq, Inc. 8550 W. Flagler street, suite 113 Miami, FL 33144 Mr. Rodolfo Vargas-Fournier .1r~ -"Jl' STEPHEN P. CLARK CEt-lTER " PUBLIC WORKS DEPARTMENT SUITE 1610 111 N.W. 1st STREET MIAMI, FLORIDA 33128-1970 RE: Professional Services certification Dear Consultant: Upon review of the information submitted in support of your application for Dade County certification as qualified to provide professional services to the County, we hereby certify acceptance of your qualifications in the work categories identified on the attached Statement of certification. This certification will expire on the date indicated for each of the approved work categories. It may be renewed by written request submitted not less than 30 days prior to the expiration date. Renewal requests must be accompanied by the required signed and sealed forms, personnel resumes, and copies of the secretary of state and Florida Department of Professional Regulation certificates of Authorization to transact business in the state of Florida as a Corporation and a Professional Business, respectively, as may be appropriate for your firm. You are required to notify us immediately of any change in professional personnel and of any significant change in the strength of support personnel which occurs during the period your certification is in effect. Failure to comply with this requirement may result in revocation of certification. certification in additional work categories will be considered at any time upon your written request if supported by appropriate information. JWR/JRB/hs Enclosures Very truly yours, Equal Opportunity/Handicap Em,ployer/Servlces .,0 , I METROPOLITAN DADE COUNTY, FLORIDA SfATEMENf OF ENGINEERING, ARCIIITECTURE AND LAND SURVEYING TECHNICAL CERTIFICATION VSN Engineering, Inc. 8550 W. Flagler Street, Suite 113 Miami, FL 33144 Mr. Rodolfo Vargas-Fournier CATEGORY CERTIFIED 1.00 -TRANSPORTATION PLANNING 2.00 -MASS TRANSIT SYSTEMS 3.00 -HIGHWAY SYSTEMS 7/10/97 4.00 -A VIA TION SYSTEMS 5.00 -PORT AND WATERWAY SYSTEMS 6.00 -WATER AND SANITARY SEWER SYSTEMS 7.00 -SOLID WASTE COLLECTION AND DISPOSAL SYSTEMS 8.00 -TELECOMMUNICATION SYSTEMS 9.00 -SOILS, FOUNDATIONS AND MATERIALS TESTING 10.00 -ENVIRONMENTAL STUDIES 11.00 -GENERAL STRUCTURAL ENGINEERING 12.00 -GENERAL MECHANICAL ENGINEERING 13.00 -GENERAL ELECTRICAL ENGINEERING 14.00 -ARCHITECTURE 15.00 -GENERAL SURVEYING 16.00 -GENERAL CIVIL ENGINEERING 7/10/97 17.00 -ENGINEERING CONSTRUCTION MANAGEMENT 18.00 -ARCHITECTURAL CONSTRUCTION MANAGEMENT 19.00 -VALUE ANALYSIS AND LIFE-CYCLE COSTING John W. Renfrow, P.E., Chairperson Certification Committee EXPIRES 7/31198 7/31198 ID