Loading...
Res. No. 023-79-9994and: RESOLUTION NO.23~97~"9 4 A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF SOUTH MIAMI,FLORIDA,AUTHORIZING THE CITY MANAGER TO DISBURSE THE SUM OF $6,200.00 TO PIECO,INC.FOR THE INSTALLATION OFA FUEL LEAK DETECTION SYSTEM FOR THE FUEL STORAGE TANKS AT THE PUBLIC WORKS DEPARTMENT AND CHARGING THIS DISBURSEMENT TO ACCOUNT NUMBER 1710-4670,"MAINTENANCE AND REPAIRS-GROUNDS AND STRUCTURES." WHEREAS,the City operates afuel dispensing facility atthe Public Works Department, WHEREAS,thefuel dispensing storagetanksareina location within a Metropolitan Dade County water well field (specifically,the Alexander Orr facility),and; WHEREAS,the Public Works Department hasbeen notified by Metropolitan Dade County of existing violations of County ordinances and State statutes,and; WHEREAS,in order to satisfy existing violations,afuel leak detection system must be installed at the Public Works facility. NOW THEREFORE,beit RESOLVED bythe MAYOR AND CITY COMMISSION of the CITY OF SOUTH MIAMI,FLORIDA: Section 1.Staff has obtained alocal vendor per Metropolitan Dade County bidlistfor work specifically tobe performed onor about petroleum equipment. Section 2.The City Manager be,andis hereby authorized to disburse the sum of $6,200.00 to PIECO,INC.forthe installation of theleak detection system. Section 3.That this resolution shallbe effective immediately and after adoption hereof. PASSED AND ADOPTED this 18th ATTEST: ALfi t /jZ*£>* CITY CLERK READ AND APPROVED AS TO FORM CITY ATTORNEY .day of February 1997 APPROVED W-*w^P VICE MAYOR COMMISSION VOTE:4-0 Vice Mayor Robaian:Yea Commissioner Price:Yea Commissioner Bethel:Yea Commissioner Young:Yea CITY OF SOUTH MIAMI INTER-OFFICE MEMORANDUM TO:Mayorand Commission DATE:February 12,1997 FROM:L.Dennis Whitt f&n^RE:Agenda Item#^^ CityManager Commission Meeting,2/18/97 Installation of a Fuel Leak Detection System at the Public Works Facility The Public Works fuel dispensing facility isin need ofa fuel leak detection system.An inspection revealed thatthe facility does not have a monitoring device that would alert otherstoagasleakfromthe underground fuelstoragetanksthereto. The costofthe installation willbe $6,200.00 and canbepaid from account number 1710- 4670,"Maintenance and Repairs-Grounds and Structures."payable to PIECO,Inc. I recommend approval. B PIECO.INCORPORATED Reply to: ANAIR A WATER TECHNOLOGIES CO. City of South Miami Attn..:Mr Watson Re:Monitoring system Rhuaryl2,1997 Dear Mr.Watson, Atyour request,Pieco Jtac.ispleasedto submit the following costfortheinstallation of amonitoring systemasrequiredbyDERM. Thesystemconsists ofoneeachalannpanelwith both audibleandvisual alarms,one each interstitial tanksensorandtwoeachpipingsumpsensors. Thescope of constructionwillincludethe following: 1.Provideengineered drawings. 2.Providerequiredpermits. 3.Locatingtheinterstitialopening. 4.Trenchfromthetanktotheclosestcorner oftheexistinggarage. 5.Installconduitfromtanktobuildingandfromexistingbreakerpaneltonewalarm paneL 6.Installnew alann panelandsensors. 7.Backfill trenchedareaandre-surfacetomatchexisting. 8.TestalarmpaneL Thetotalcostfortheaboveprojectis $6200.00. Aswehavediscussed,Pieco Inc isanapprovedand authorized contractorforDadeCounty.The GSA contract numberunderwhichtheseservicescanbeprovidedis 2926-2/97.This contract is offered underthetermsandconditionsset forth byDadeCounty GSA. Ithas been my pleasure to assist youwiththisproject.Ifyouhaveany Questions orrequire additional information,pleaW contactmeatyour convenience at 558-0440. Sincerelyyours. BrianS.Webster,Sr. CMO Post-ir Fax Note 7671 To^6.toartsaAi. CoJDept Prwne* Fas*zti-mt Dm 9 Co. PtlUllt)# Infill ifiS**T Fan* (Jq