Loading...
RPM Invitation to Bid Instructions and Addendums S. Miami BuC*ty of South Miami Request for Proposal for Bus Shelters Phase 2 RFP # C2013-07 Submittal Due Date: Friday, July 26, 2013 at 10 A.M. CHARTERED OFFICIALS City Manager: City Attorney: City Clerk: Steven Alexander Thomas Pepe, Esq. Maria M. Menendez, CMC Capital Improvement Project Manager: Jorge 1. Vera Capital Improvements Program City of South Miami "Excellence, Integrity and Inclusion" South Miami bcftA /'? I," interested persons who wish to respond to this RFP can obtain the complete RFP package at the City Cierk's office Monday through Friday from 9:00 A. M. to 4:00 P.M. or by accessing the following web age: http://vrww.southmiamifl.gov/ which is the City of South Miami's web address for solicitation information. Proposals are subject to the Standard Terms and Conditions contained in the complete RFP Package, hiciuding ali documents included with the RFP. SCOPE-OF: SE�RY 1 CES 1. SCOPE OF SERVICES The project consists of furnishing of all labor, materials, tools, equipment, machinery, superintendence and services necessary for the complete in place construction of bus shelters at two different locations. The proposed construction project is located on the NE corner of Sunset and SW 58 Avenue and at the SE corner of SW 59 Pi, and SW 69 St. 2. PLANS AND SPECIFICATIONS The proposed project is to be estimated and constructed in accordance with plans, refer to Exhibit #1 and Exhibit #2, entitled leer is l 1 re red ,tlst ss cl a-tes date d * EKhibit #1: NE corner of Sunset and SW 58 Avenue and; * ExhibitA2: The SE corner of SW 59 P1. and SW 69 St. 3. PROJECT DURATION The current estimate to complete construction of the project is 120 days from issuance of Notice to Proceed. This is an estimate and the public bidding process will determine the actual construction cost. A Performance and Payment Bond is required for the full amount of the project END OF SECTON INSTRUCTIONS for RESPONDENT But Shelters Phase IT IS THE RESPONSIBILITY OF THE RESPONDENT T T THE SOLICITATION N T ENSURE THAT THE RESPONSE TO THE SOLICITATION (HEREINAFTER ALSO REFERRED TO AS THE -PROPOSAL" THROUGHOUT THE CONTRACT DOCUMENTS) REACHES THE CITY CLERK ON R BEFORE THE CLOSING HOUR AND DATE STATED ON THE RFP FORM, a u Im m tpepe02-18-13 Page 6 of 69 IN In m Im 29, 30, 3L 32, m tpepe02-18-13 Page 8 of 69 H END OF SECTION ADDENDUM No. #1- Project Name: Bus Shelters Phase 2 RFP NO. C2013-07 Date: July 19, 2013 Sent: Fax/E-mail/webpage Is a bid bond required for this project and if so, what is the percentage of the bid bond? —Answen-t—o Qu—estion #1* No Bid Bond is required. What is the budget for this project? Answer to _Q—uestion #2: The budget for this project is $98,000, Please refer to the "Capital Improvement Program 5- Year Plan,, the City's adopted budget FY 2 012- FY 2 013, attached to this Addendum. Answer to gy-estion #3: Is the contractor responsible to provide and install the metal City Seal affixed to the bus shelters? smmmmm All City of South Miami permit fees will be waived, Other government entity permits, if required, are the financial responsibility of the contractor. Pre-approved City of South Miami permits have been pulled and are waiting for the awarded contractor's signature. smmml= Does the Bus Shelter require approval from Miami-Dade CountYs Public Works department? Answer to gestion #7: No, both Bus Shelter locations are not located on roadways maintained by Miami-Dade County. IT SHALL BE THE SOLE RESPONSIBILITY OF THE BIDDER TO SECURE ADDENDUMS THAT MAY BE ISSUED FOR A SPECIFIC SOLICITATIOK A—DDEND—UMNo- #2 Project Name: Bus Shelters Phase 2 RFP NO. C2013-07 Date: July 239 2013 Sent: Fax/E-mail/webpage Sheet A- 101 for both shelters under General Conditions lists a $900 site visit allowance x 6 visits! Is this for each shelter — so you have 12 visits total = $10,800? .:sti #1 Both shelters shall include a total of six (6) visits, or three (3) visits per shelter. Is a project sign required or is this optional? —Answet:_to_Question #2,. The project sign is to be purchased and installed by the City and is not the responsibility of the awarded contractor. Pagel off3 just wanted to confirm that this project no longer requires a bid bond of 5% per the Addendum #1 dated July 19, 2013. Also, the Proposal Checklist indicates Performance Bond (pg 16) is required in the proposal, but the bid documents say this is only necessary if awarded contract. Please clarify. Answer to _ _Qqestion #3: The Performance Bond is a condition for the awarded contractor. A Performance and is not required with the proposal. 13MMEOW Can we have the specs and fastening details for the SS mesh ? Answer to uestion The mesh and attachment is to be stainless steel rust resistant "grid" pattern, architectural mesh with "u frame"' by Cambridge Architectural or approved equal. The mesh is to be installed as per manufactures specification. Awarded contractor to provide shop drawings signed and sealed by Florida registered Engineer What type of paint is used on the steel? Answer to _Qlaestion #S: (1) Roof & Beam flnis h - Painted finish with Tiger Drylock PAL color 6012 powder coat or approved equal. Awarded contractor must provide sample to the City's Project Manager for approval. (2) Roof Systen2 - To be hurricane proof galvanized corrugated metal panels and fasteners by Centria. To be install as per manufacture specifications. Awarded contractor provide shop drawings signed and sealed by Florida registered Engineer Are the existing benches and trash receptacles to be finished? Ans wLer to QM-qstiQn-#7: No, the existing benches and trash receptacles are not to be finished. Is the slab 4 Inches or 6 inches? Answer t stir #8: The slab is 6" (inches.) Will a roofer be involved in this project? Such as permits. AnswerAo Question #9: No a roofer is not required; this would be up to the contractor. 9—mestion #10, Plans call for soil treatment, is it necessary? Answer !q —Q—uestionn #10. No, soil treatment is not required. IT SHALL BE THE SOLE RESPONSIBILITY OF THE BIDDER TO SECURE ADDENDUMS THAT MAY BE ISSUED FOR A SPECIFIC SOLICITATION.