Loading...
TARGET ENGINEERING GROUP, INC.I Section I — Cover/Introductory Letter 1TIr. Aector Mirabile, PhD City Manager City of South Miami 6130 Sunset Drive South Miami, FL 33143 Imis _M= ti f'Wr-Jqii1rQ �`w:, I...•... The Proposer represents that it presently has no interest and shall acquire no interest, either direct or indirect, which would conflict in any manner with the performance or services required hereunder, as provided for in Fla. Stat., § 112.3 11, et. Seq. The Proposer further represents that no person having any interest shall be employed for said performance. We are looking forward to the opportunity to provide excellent Construction Management Services for The City of South Miami. Target Engineering Gro c I p U n 8095 NW 12 Street, Suite 105 Miami, FL 33126 Tel. 305-436-8877 Fax: 305-436-8885 Qualification and Experience Target's engineering and inspection staff of over ninety (90) members have all the required certificati including CTQP (Construction Technician Qualification Program) and are cross-trained. Our team comprised of highly qualified individuals that possess a balanced combination of technical skills experience. Our team of engineering and construction professionals' expertise includes: I * Project Constructability Reviews * Document Control * Contract Administration and Compliance The proposed Target Team is experienced in providing Construction Engineering and Inspection services and the depth of available resources is unmatched. In addition, the Target Team has a proven track record of providing the most effective and comprehensive Construction Engineering and Inspection services, ensuring projects are completed on time and within budget. Willingness to Meet Time and Budget Requirements -P 1-777, 5 - W511-VY-11"'Y"101 Y v,M`ge7. Vur commitment starts before the construction phase and it will continue throughout the construction phase. The key tasks below summarize our proven approach: • Perform independent bidability & constructability reviews, • Review permit documents for special conditions, • Perform additional utty soft digs if needed to verify conflicts, Target Engineering Group, Inc. 8095 NW 12 Street, Suite 105 Miami, FL 33126 Tel® 305-436-8877 Far., 305-4368885 Recent, current and projected workloads C-M Um Target Engineering Group, Inc. 8095 NW 12 Street, Suite 105 Mialni, FL 33126 Tel. 305-436-8877 Fax., 305-436-8885 T r ngineering Group Inc 8095 NW 12 Street, Suite 105 Miami, FL 33126 Tel. 305-436-8877 Fax. 305-436-8885 Sample Projects Enhancement Project for the City of Riviera Beach, in conjunction with the 600 West Blue Heron City of Taal John Samadi, Florida Department of Transportation Construction Blvd, City of Riviera Riviera B.E. and the Federal Highway $921,742 04/2012 $13M Engineering Beach, Florida Beach (561) 845-4060 Administration. The Enhancements and consist of major drainage Inspection improvements, roadway widening, new water lines, sanitary sewer upgrades, landscaping, hardscape, decorative lighting, colored stamped sidewalks and mflflng�4c resurfacin . Drainage improvements, sidewalk, City Of Miami City of Eric Rush, P.E. roadway reconstruction, construction Construction Neighborhood Miami of round-abouts, landscaping, milling $IM 0412012 $IOM Engineering Improvements (305) 416-1298 and resurfacing in various locations and throughout the City of Miami, Inspection Milling, resurfacing, widening SR 845 Powerime Rd, FDOT Rudi Bat7, F.E. reconstruction, drainage landscaping , , lighting and signalization along S.R. $831,369 06/2006 Construction $$,2M Engineering Pompano Beach, Florida District 4 (954) 776-4300 845 (Powerline Rd) from SR 814 and (Atlantic Blvd) to Colinas Rd. Inspection Drainage, pavement widening, pavement reconstruction, signal ization, milling and resurfacing, SR 945/Powerline Road from North of 58s' Court FDOT signalization, TMS sensors, drainage Construction to South of Atlantic District 4 James Jeffers, P.E. (954) 7764300 structures, rcp's and French drain pipe, concrete curbs and sidewalk, $2 M 10/2008 Engineering $14M and Boulevard guardrail and picket railings, sheet Inspection piling, bridge be and post removals, landscaping and irrigation, Drainage installation, widening, median installation with traffic SR 615/25h Street; Ft. FDOT Dale Walker separator's and type E curb and gutter, --tion Construction Cons Pierce, Florida District 4 (772) 465-7396 signal and lighting work, type F curb $879,596 07/2009 E i curing $63M Engineering and gutter and sidewalk placement, and milling and resurfacing, and I sp otio. Inspection landscaping. Milling and Resurfacing, roadway widening, drainage improvements, new signalization, including drilled shaft foundations and new mast amn SR 817 University Drive structures, new roadway lighting, RRR Project from a concrete sidewalk including ADA point South of Pines FDOT Rit Ky, FDOT compliant curb ramps, concrete curb Construction Blvd to a Point South of District 4 Project Manager and gutter, traffic separators, three $ 787,985 11/2009 $10M Engineering Griffin Road, Pembroke (954) 486-1400 phases of Traffic Control, erosion and Pines, FL control devices, permanent steel sheet Inspection pile wall, guardrail improvements including parallel, bridge anchorages and flared end sections, painted pavement markings, signage, grassing 1 and new irrigation. Target Engineering Group, Inc. 809.5N 12 Street, Suite 105 Miami, F1, 33126 Tel. 305-436-8877 Fax. 305-436-8885 1 Target Engineering Group, Inc 8095 NW 12 Street, Baits 105 Miami, FL 33126 Teh 305-436-8877 Fax. 305-436-8885 SR845 (Powerline Rd) Inspection and verification testing for Construction d SR 25 (US27) P T Eghbal "Jay" Jalali milling and resurfacing, widening, 112010 766 $3.2M Engineering Broward County, Florida District 4 (954) 776 -4300 signalization 2 milling d resurfacing ,739 d ro°ects. Ins ction Filling, resurfacing, shoulder rework SR -25/US 27 in Pal T Eghbai "Jay" Jalali pavement reconstruction, signing, Construction Engineering Beach County, Florida District 4 (954) 290 -4261 selective clearing $i grubbing, and $792,470 8/2011 $95M and landscaping of approximately 20 miles along SR 251US27, Inspection Widening 1 -95, roadway widening from six to ten lanes, addition of HOV d General use lanes, bridge FDOT Scott Burris construction, including sub-structure, Construction I95 IIfB'V Widening District 4 (561)578 -5400 pile driving, milling and resurfacing, $3 F Current $44.5M Engineering new drainage, temporary retaining and wall, permanent MSE wall, sidewalk, Inspection landscaping, lighting, d Riprap Rubble alon 4 miles of I -95. $18.4 million roadway improvement, Project features included bridge Construction SR -AIA & Kittle Mud FDQT Carolyn Gish, PE replacement d repairs, milling d $1.7 M 07/2009 $18.4M Engineering Creek Bride g District 4 (772) 465 -7396 resurfacing seven iles of roadway, d widening, shoulder construction, Inspection drains c swales and si na e. 3.2 Mullion SF post tensioned Car Miami Interinodal FDDT - Ise Nunez, PE rental facility for Miami International Construction Center (MIC) MDAD Project Manager, Airport: This facility will house 18 car $80,556 Current $325M Management (305) 986 -2551 rental tenants and 6500 car parking Services with fuelin facili on all four levels. Terea Hebert, 570,000 SF performing arts center Miami Performing Arts Miami-Dade CEO, Performing facility for Miami. This state of art Program and Cost Center County Arts Center facility comprise of 2400 scats Bullet $434,030 04/2007 $454M (305) 74b ®8919 Opera House, 2200 seats Concert hall Management d 200 seats in Studio Theaters Services $97 million project includes the construction of two new major bridges, widening of three existing Turnpike Widening Turnpike Bill Sears, P.E. bridges d miscellaneous roadway Construction Sunrise Blvd to Atlantic En rise (954) 975 4855 improvements. The improvements $5.2M Current $97M Engineering Blvd under this contract consist of widening and approximately 6.5 miles of the Inspection existing six-lane expressway to an eight-lane section. 54.5 Mil New Toll Plaza Cons etion SR 836 ORT 1 Toll including "open Road Tolling, 2miles Plazas and Roadway Miami-Dade /}avid Chang, RE of roadway reconstruction to include: Construction Reconstruction e between Expressway . (305) 522 -1132 widening, milling and resurfacing, $2 M 0912007 $54.5M Engineering NW 107'` Ave and 87`s Authority drainage, lighting, signing and and Ave. construction of a 2mile bike path Inspection alone the north RAV Target Engineering Group, Inc 8095 NW 12 Street, Baits 105 Miami, FL 33126 Teh 305-436-8877 Fax. 305-436-8885 k D, te: Novembe Fax/E-mail/webpage This addendum submission is issued to Interest • Documents, d is hereby made part of the Dorequirements of Documents s modified force w forth. Receipt wY this Addendum shall be acknowledged on the Bid Form. Proposers may select from the listing of the five general engineering disciplines depending up the proposers # expertise discipline e# It is up to the proposer to ae how may categories of specialized engineering services they wish to be considered. \ a t # a Federal Forms 254, 255 or 330 may be submitted. Submission of the Federal Forms are excluded from the eight (8) page limit. Exhibit #1 - "Professional Service Agreement, General Engineering Services:" 0 Opening paragraph the statutory thresholds for construction costs have been amended as follows: CONSULTANT agrees to perform all professional services in connection with the� WORK, as described herein, on a continuing basis in connection with projects where the basic construction costs does not exceed - $2,000,000 or studies which do not exceed -$200,00 , herein after called the SERVICES". o NAME OF FIRM: DATE- 6� .° /---- - f/ a i !Jqgztflv Project a L ENGINEERING & MANAGEMENT SERVICES ate® December 5, 2011 Eft® Fax/E-mail/webpage This addendum Interest (LOI) Documents, and is hereby made part of the Documents. All requirements of the Documents not modified herein shall remain in full force and effect as originally set forth. Receipt of this Addendum t be acknowledged on ` Bid - Question #I: Are there any exclusions to the 8-page limit and please clarify how many copies of the Letters of Interest should be submitted? * Letters of Interest a limited to an 8-page maximum. The exclusions are listed below: Federal Forms 254, 255 or 330 may be submitted. Submission of the Federal Forms are •, from .. eight f page Resumes of sub-consultants be included . appendix •. are excluded from page copies. Companies must submit one unbound original, one electronic copy (flash drive or CD) and ten # •' address is: City of South Miami 6130 Sunset Drive South NAME OF FIRM: 17"W6-f T_ SIGNATURE: ' DATE. F, 2 c> t a Project Name: PROFESSIONAL ENGINEERING & MANAGEMENT SERVICES Date: December 6, 2011 Sent: Fax/E-mails webpage p n1I Issuea Letter Interest (LOI) Documents, and is hereby made part of the Documents. All requirements of the Documents not modified herein shall remain in full force and effect as originally set forth. Receipt of this Addendum shall be acknowledged on the Bid Form. Question #l: Are the documents required to be submitted, specifically. professional licenses, state certificates and list of clients/references, part of the eight (8) page limit or can they be included as an appendix? Question #2: Can a firm submitting a Letter of Interest as a prime also Y sub. consultant to another prime submitting? 0 Yes, there are no restrictions to submitting as a prime or a sub-consultant to another prime. Question #3: Upon review of the City of South Miami's Professional Services Agreement included in the Request y, of Interest for Professional Engineering & Management Services Pre-,Qualifi e 8, 9, 11, and 12. Will the City please furnish an updated agreement for review prior to the submittal deadline? NAME OF FIRM: 7 e62F 174 SIGNATURE: DATE: Z)lr (2- C:) 0 RICKSCOTr Rod& Department of Transportation GOVERNOR 605 Suwannee Street ANAM71 PPASAD, PX Tallahaswe, FL 32399-0450 SFCRETARY October 25, 2011 Ramzi B. Asfour, P.E. Executive Vice President TARGET ENGINEERING GROUP, INC. 8095 NW 12'h Street, Suite 105 Miami, Florida 33126 Group 3 - Highway Design - Roadway 3.1 - Minor Highway Design Group 6 - Traffic Engineering and Operations Studies Group 7 - Traffic Operations Design 7.1 Signing, Pavement Marking and Channelization 7.3 Signalization Group 10 - Construction Engineering Inspecticl 10A - Roadway Construction Engineering Inspection 10.3 - Construction Materials Inspection 1 0A - Minor Bridge & Miscellaneous Structures CEI 10.5.1 - Major Bridge CEI - Concrete 10.5.2 - Major Bridge CEI - Steel ON I 4JrjJ:' it www.dotstate.fi.us Facilities Home/Branch Field Capital Cost Overtime Office gf—fice -2f Money­ framium it Overhead Rate 157.05% 97M% 0.096% Reimbursed 4&91 %(Home) 25.55%(Field)* *Rent and utilities excluded from field office rate. These costs will be directly reimbursed on contracts that require the consultant to provide field office. Sincerely, Lorraine E. Odom Professional Services Qualification Administrator State of Florid�,o-,�,�! I certify from the records of this office that TARGET ENGINEERING GROUP, INC. is a corporation organized under the laws of the State of Florida,, filed on January 26, 1999. I 4i I further certify that said corporation has paid all fees due this offil 1 C' through December 31, 2011, that its most recent annual report was filet1 on January 6, 2011, and its status is active. I further certify that said corporation has not filed Articles of Dissolution. A Secretary ofState Authentication 11): 700190017607-010711 -P99000007624 i To authenticate this certificate,visit the following site, enter this ID, and then follow the instructions displa.yed. https://efile.sunbiz.org/certauthver.htmi & CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State) Professional Engineering & Management Services 2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER 11/18/11 1 MMEEE= 7. FAX NUMBER 8. E-MAIL ADDRESS 305-436-8885 1 raj@targetengineering.corn C. PROPOSED TEAM (Complete this section for the prime contractor and aff key subcontractors) z 0 9. FIRM NAME Target Engineering Group, I Inc. II I 1 [:1 CHECK IF BRANCH OFFICE C. I I I I ED CHECK IF BRANCH OFFICE -I I I JE:] II I 1 [:3 CHECK IF BRANCH OFFICE Suite 105 Miami, Florida 33126 D. ORGANIZATIONAL CHART OF PROPOSED TEAM (Attached) 1411 -AffH-ORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (612004) PAGE I FOOT District Four Broward Operations: 5548 NW 9'h Avenue Ft. PROFESSIONAL SERVICES I I-auderdaleFlorida J-1 )uly 2004 (3) BRIEF DESCRIPTION (Brief'scope, size, cost, etc.) AND SPECIFIC ROLE 0 Check if project performed with current firm F•OT District Four Fort Lauderdale !•..r t grolectsinc!udin a comAley J _ . Wiligi t Irt g 1 4 a W I oil I I . b, I p k I 1 9 i NTH 19 f l#JLrTLL*J# , a L# M J& A U R a Ut til I H a &I fe, AUTH6�1-M6 rO-R �O-CAL REPRODUCTON STANDARD FORM 330 (6r2w4) PAG E RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) IM106MME91010 A a. TOTAL b. WI Project Administrator TH CURRENT FIRM 1 16 1 O.2 15. FIRM NAME AND LOCATION (City and State) Target Engineering Group, Inc., Lake Mary, Floril 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION Bachelor of Science in Electrical Engineering (BSEE), University of (STATE AND DISCIPLINE) Miami, 1991 1 PE/FL # 63821 Civil 299101-�M'Afflv 19. RELEVANT PROJECTS Senior Project Engineer for FDOT District 1, SR 93 (1-75) Widening PROFESSIONAL SERVICES and Interchange Improvements, Lee County. 0 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE El Check if project Performed with current firm $29 million project which consist of adding lanes, milling and resurfacing, pavement widening, bridge widening, signing and pavement marking, signalization, installing intelligent transportation system components, lighting, drainage improvements, retaining walls, sound walls, landscaping, and 3 IPA's and coordination with 10 reimbursable utilities in Lee County. Part Time Senior Proiect Etoileer—uIrou*444P nrP-r*Tvqtrurt-ir-i, &?rm�zp (1) TITLE AND LOCATION (City and State) FOOT District I, Winter Haven ATMS, Polk County. PROFESSIONAL SERVICES I CONSTRUCTION (Happlicable) 9/10 (3) BRIEF DESCRIPTION (Briet'scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firit II PROFESSIONAL SERVICES I CONSTRUCTION (Ifappli-ble) (3) BRIEF DESCRIPTION (Bdefscqpe�, size, cost, etc.) AND SPECIFIC ROLE 0 Check if project performed with current firm AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 x2m) PAGE 1 (3) BRIEF DESCRIPTION (BriefscoPe, size, cost, etc.) AND SPECIFIC ROLE Cost: 54.5 Million / Duration 22 months Position: Project Engineer / Project Administrator PROFES IONAL SERVICES ! • I id 1111k,7A tn5 Lr74 . . Florida Department of Transportation Hurricane Consultant for Districts PROFESSIONAL SERVICES CONSTRUCTION ff applicable) Four (Broward, Palm Beach, Martin Indian River and St Lucie Counties) September 2005 and Six (MlarnEpad t�. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm After Hurricanes Jeanne and Francis Target Engineering Group, Inc as retained by the FDOT to Oversee the restoration of Broward, Palm Beach, Martin, Indian River and Palm Beach Counties. Consequently after Hurricane Wilma, Target Engineering Group, Inc. was retained to oversee the restoration of Miami-Dade County. Scope of Work included contract management, documentation and inspection of debris removal, signalization assessment and repair and signing restoration. Additional work mix included review, analysis and approval of all costs submitted by impacted municipalities for reimbursement by The Federal Highway Administration (FHWA), Restoration Costs for Hurricane Jeanne and Francis in District Four exceeded 300 million. Restoration Costs for Hurricane Wilma in Miami-Dade County were 200 million Construction Costs: 7 million Duration: 2 years PROFESSIONAL SERVICES — CONSTRUCTION (Itapplicable) January 2005 Scope of Work: Sawgrass Expressway modification at the Sunrise and Deerfield Main Toll Plaza to Open Road Tolling (ORI) . This work included concrete island removal, conductor and conduit installation to accommodate the ORT and roadway modification and signing. Scope of Work: Sawgrass Expressway 441 & Lyons Road Ramp Modifications. This work included adding additional concrete toll lanes new buildings for toll equipment and state of the art toll gantries. AUTHOR17ED FOR LOCAL REPRODUCTION STANDARD FORM 330 (woo4) PAGM E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) a. TOTAL b. WITH CU E SPE/ Project Administrator RRNT FIRM 1 24 1 3 Target Engineering Group, Inc. 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION B.S. Civil Engineering (STATE AND DISCIPLINE) Florida - Professional Engineer #42105 18 OTAER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) CT•• QC Manager Advanced Work Zone Traffic Control CTQP Asphalt Paving I & 11 FDOT New Direction for Florida Post-Tensioned Bridges CTQP Final Estimate I FHWA Design and Operation of Work Zone Traffic Control Certification FHWA Claims Avoidance Certification OSHA Compliance and Accident Prevention Certification Reinforced Earth Wall Construction FDEP Certified Storm Water Management FEMA ICS 200 Critical Structures Construction Issues - Self atudy-_ 19. RELEVANT PROJECTS - --------- - - E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 15. FIRM NAME AND LOCATION (City and State) Target Engineering Group, Inc. - Miami, Florida a• TOTAL b. WITH CURRENT FIRM 18 1 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION BA/1990/Computer Programmer A.S.T./National School of Technology (STATE AND DISCIPLINE) BS/1982/Civil Engineering/ Manuel L. Quezon University. Mawl�. Philionites PE/FL/Pegistration #49017 18. OTHER PROFESSIONAL (Publications, Organizations, Training, Awards, CTQP Asphalt Paving Technician I & 11 CTQP Earthwork Construction I & 11 CTQP Final Estimates I & II Qualified Stormwater Management Inspectors Florida Advanced Work Troxler/Padiation Safety and Use of Nuclear Gauge ACl/Concrete Field Testing Technician Grade I FOOT (District 4) Site Manager FOOT (District 4) Laboratory Information and Management System (LIMS) 19. RELEVANT PROJECTS USAMIM- MA1ffg#1*Jff*1Ei M . # (1) TITLE AND LOCATION (City and State) Turnpike Widening from Sunrise Blvd, to Atlantic Blvd., Florida's Turnpike PROFESSIONAL SERVICES Cu rzp-frt WM sfimflmmmx=�= (3) BRIEF DESCRIPTION (Briefscope, size, cost, etcl) AND SPECIFIC ROLE Check if Project Performed with current firm Project consists of the widening of six miles of the Florida Turnpike to provide four lanes in the Southbound direction. Work includes roadway bridge widening, reconstruction of two bridges, drainage improvements, overhead signing, noise walls, high mast fighting, landscaping and toll plaza improvements. Project Administrator (1) TITLE AND LOCATION (City and State) (2) YE koyal Park Bridge Replacement, FDOT District IV, Palm Beach County, Florida PROFESSIONAL SERVICES (1) TITLE AND LOCATION (City and State) HEFT Widening from SR 836 to 1-75, Florida's Turnpike Enterprise, Florida • (3) BRIEF DESCRIPTION (Briefscope, size, Cost, etc.) AND SPECIFIC ROLE El Check if project performed with current firm This project is to construct for the widening of 14 miles, beginning at the Homestead Extension of the Turngike, to Sr?Aid; tkge IRAPS it P-7-CA construction of two new toll plazas. Inspector (1) TITLE AND LOCATION (City and State) 1- Boynton Beach Bridge Replacement, FOOT District IV, Boynton Beach, Florida. PROFESSIONAL SERVICES 1 (3) BRIEF DESCRIPTION (Briefsoope, size, cost, etcJ AND SPECIFIC ROLE E! Check if project perform ed with c I urrent firm This new $24-million bascule bridge project consisted of total reconstruction - demolition • the existing bridge and reconstruction Of a new bascule bridge which had many unique features including architectural precast features, inverted concrete-T-ir i--x ,eg -*1WqVppgXM lensar retained earthi-wallapproaches. Office Engineer 1 (1) TITLE AND LOCATION (City and State) I Oakland Park Avenue Reconstruction of In and Out Ramps and Toll Plazas to ! Sawgrass Ep da I s Turnpike Enterprise, Ft. u , Fl - l� e (3) BRIEF DESCRIPTION (Briet'scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm This project involved the reconstruction of in and out ramps to Sawgrass Expressway and new construction of the toll plaza on each ramp. (3) BRIEF DESCRIPTION (Briel'scope, size, cost, etc.) AND SPECIFIC ROLE AUTH6RcEDF0ff1:&ALMPR659M* STANDARD FORM 330 (6om) PAQ QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requestedby the agency, or 10 projects, if nots L s7fie'd Complete one Section F for eack, *vject.) NUMBER 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED SR 836 Design Build Contract for construction of two new Toll Plazas, widening and reconstruction ♦ SR 836 between NW 87th Ave and NW September 2007 107" Ave a PROJECT OWNER Miami Florida xg . . . . . . . . . . . . . . 92x^ �* 305-522-1132 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24 BRIEF DESCRIPTION OF PROJECT ANDRIE-LEVANCE TO Miami Intermodal Center (MIC) improvements to NW 216t ST from A Pt. E of NW 42 nd Ave to NW 37th Ave. And At NW 27th St. NW 28th St. And NW 39th Ave. Scope of work consists of roadway widening, milling and resurfacing, installation of new drainage structures, new sidewalk, and improvement and new installation of the intersection between NW 38th Court and NW 2 1 st Street. Rental Car Facility (6,600 CAR PARKING GARAGE for Rental Car Companies) MIC Termin Access Roadways, MIC-MIA Station, Miami, Florida. 3.2 Million SF $326 million Car Rental Facili post tensioned concrete structure project i 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT El FIRM NAME k2) FIRM LOCATION (City and State) --k3) -ROLE lxl FIRM NAME Y2) FIRM LOCATION (City and State) 13) ROLE A tit F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as manyprojects as requested by the agency, or 10projects, if not specified, 3 Complete one Section F for each proiect.) 21. TITLE AND LOCATION (City and State) SR 7 (US441) City of Davie, City of Margate and North Lauderdale, Florida 22. YEAR COMPLETED OR a. PROJECT OWNER b. POINT OF CONTACT NAME c, POINT OF CONTACT TELEPHONE NUMBER State of Florida [)apartment of Eghbal "Jay' Jalali (954) 776-4300 Transportation District IV 24 BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope, size and cost) 111 1 1 rojecis going on simultaneously along State Road 7 at three different locations. Each project has a contractor, different from each other and each project is located within different jurisdiction from each other. SR 7 from Orange Drive to south of 1-595: This project consisted primarily on milling, resurfacing, sidewalk construction along with a Joint Project Agreement with the Town of Davie for landscaping and irrigation improvements along SR 7. Construction cost was $1,052,243.35 and the physical length of the project was 1.0 Mile. The Contractor operations had to be coordinated with an adjacent project along 1-595 because of the project hours. Milling and resurfacing was done at night while sidewalk, landscaping, irrigation and signalization improvements took place during the day. The duration of this project was 8 months and was completed on September 11, 2010. SR 7 from Bailey Rd to Blvd of Champions: This project consists of milling, resurfacing, sidewalk, signalization upgrades, hardscape (stamped concrete) along SR 7 within the limits of the City of North Lauderdale, Construction cost is estimated at $850,305 and the physical length of the project is 0.5 Miles. This project highlight was the installation of stamped concrete along the median in preparation for a future project by the City of North Lauderdale. Project duration is scheduled for 6 months and it is scheduled to be completed ahead of schedule November 2010. SR 7 from Cypress Canal to Sample Rd: This project consists of pavement reconstruction, pavement widening, drainagz improvements, sidewalk upgrades, intersection signalization upgrades, milling, resurfacing, landscape and irrigation. The projed lies within the City of Margate, Construction cost is $4,470,193.15 and the physical length of the project is 3.0 Miles, This is a multiple operation project both day and night so the main challenge is to ensure the travelling public is not adversely affected, Completed November 2011 All three jobs are happening concurrently with different contractors under different construction contracts. One of the projects is Federally Funded as well as State Funded. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 1) FIRM IWTIE �'2) FIRM LOCATION (City and State) i�� Target Engineering Group, Inc. IMiami, Florida/Ft. Lauderdale, Florida b. f1) FIRM NAME 2) FIRM LOCATION (City and State) 3) ROLE Creative Engineering Pt Lauderdale, Florida �BE Sub-Consultant ) FIRM NAME 2) FIRM LOCATION (City and State) 3) ROLE C. �IM Enginnering f LubcanSL ill F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAMS 20, EXAMPLE PROJECT—KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many ♦rqfects as requestedby the agency, or 10projects, if not specified, 4 Complete one Section F for eackpimiect2 21. TITLE AND LOCATION (City and State) I I ---------- 22. YEAR COMPLETED 600 West Blue Heron Blvd, City of Riviera Beach, Florida ROFESSIONAL s�ERVICI�S—; STRUCTION (if applicable) Present 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of Riviera Beach Lai John Samadi, P.E. 1 (561) 845-4060 Z4. 5RIt I FVN OF r-N#JECT A30 RELETARCE TO TAIS CONTRACT (Inclide scope, size and cost) East Blue Heron / SR AIA Enhancement Project for the City of Riviera Beach, in conjunction with the Florida Department a Transportation and the Federal Highway Administration, The Enhancements consist of major drainage improvements, roadwall widening, new water lines, sanitary sewer upgrades, landscaping, hardscape, decorative fighting, colored stamped sidewalks an milling & resurfacing. The cost of construction was approximately $13 million. 25. FIRMS FROM SECTION C IWOLVED WITH THIS PROJECT 1) FIRM NAME 2) FIRM LOCATION (City and State) --T, d: ROLE a. Target Engineering Group, Inc. sari, Florida a C ... Kant - Con-tr..Iio. Engineering FIRM NAME 2) FIRM LOCATION (City and State) k3) ROLE a F. EXAMPL:*!t E CH BEST ILLUSTRATE PROPOSED TEAMS QUALIFICATION\\O 2 THIS CONTRACT NUMBER (Present as manY Projects as requested by the agenW or 10 P-jects, if not specified, Complete one Section F for eac,,,� arciect.) *.Itworsycw MarIMMI Milling, resurfacing, widening reconstruction, drainage, signalization, guardrail installation and irrigation along S.R. 814 (Atlantic Blvd) from SW 27th Avenue to CSX Railroad Crossing. The ^ \`} » » } \/ roect duration is 210 calendar days and the project size is 1.5 Miles. The cost of construction rately $3,343,947.00. — ----------------- - ----- 2& FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT :1 MUM 2& FIRMS FROM s • -- D@ i F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJEU -KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified, 7 Complete one Section F for eachprgiect.2 21. TITLE AND LOCATION (City and State) SR 845/Powerline Road from North of SSth 22. YEAR OMPLETED Court to South 1PROFESSIONAL SERVICES I'CONSTRUCTION (if appricebla) of Atlantic Boulevard; Pompano Beach & Ft. Lauderdale, 2008 2008 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER Florida Department of Transportation James Jeffers, P.E., or Rudy Satz, P.E. (954) 776-4300 District Four, Froward Operations Offi ce 5548 N.W 9th Ave, Ft, Lauderdale, FL 33309 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 1) F1RM NAME 2) FIRM LOCATION (City and State) t3) ROLE a, Target Engineering Group t Lauderdale, Florida rime Consultant Constr-uction Engineering iami, Florida nspection"_ WIRM NAME [2) FIRM LOCATION (City and State) 3) ROLE is 2 ilil 24, BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRA& (Inchude -soope, srie ­andc6jt� Drainage improvements, sidewalk, roadway reconstruction, construction of round-abouts, landsc:a-* inLi�jrjyWj,"- va-r-bouslocations throughout the City of Miami. The cost of construction was approximately $1 0-million. - qrj�,.ijV(qj 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT i - FIRM LOCATION {City and State) ROLE a. I Target Engineering Group, Inc. IM jarni, Florida rime Consultant - Construction Engineering � 1) FIRM NAME 2; FIRM LOCATION (City and State) P) ROLE Uwz A W F. EXAMPLE PR cr BEST ILLUS m ewl : !! « *« <r» TEAM'S »- / , NUMBER X < Q d \ yl \ \O R \ \ \ \22« (Present as many prqfects as requested by the agency, or 10 projects, if not specified. EAND LOCATION «»zwox SIR 8261SR 836 Interchange from NW 87 Avenue to NW 57 Avenu4 6x«.w» ®� «a•� �, ».wa«.» « <,m»v :�&.:���rw.� . F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20, EXAMPLE PROJECT KE" QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not spedfied, 10 Cornolete one S,:rlior F 1br eacl xni,-ct) P� N 04 A ' . - - 22. YEAR COMPLETED -M b- POINT • CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMSE�U. ment • Rudi Batz, RE, 954-931-6175 Four, Broward FDOT Project Manager 954-776-4300 F PROJECT AND RELEVANCE TO THIS CONTRACT (include scope, size and cost) 25, FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 1) FIRM NAME ) FIRM LOCATION (City and State) 3) 3) ROLE a. Target Engineering Group I Lauderdale, Florida �taml, rime Consultant Construction Engineering — Florida pection 1) FIRM NAME — and 2) FIRM LOCATION (City and State) 3) ROLE b. 1) FIRM NAME 2) FIRM LOCATION (City and State) State) 3) ROLE o. John Corcoran Project Administrator X_ X Ian Castro Senior Inspector X X X Orfilio Hernandez Inspector X X X Adam Facer Inspector X X Raj Ahuja Project Administrator X Ha mid Eshafani Senior Inspector X X X + Wilbert Fairley Senior Inspector X X Roy Vaziri Inspector X Juan Gonzalez Inspector X X Kandarappafil Jose Senior Inspector X Chrishna Persaud Inspector X X Brian oshier Inspector X Florencia Scianmarello CSS/Inspector X Ronald Ramos, P.E. Project Administrator AUTHORIZED E#12KIMAU Karl Trewick, P.E. Project Administrator Carlos Perez Senior Signal Inspector lQ1 29. EXAMPLE PROJECT KEY No. 17ITLE OF EXAMPLE PROJECT (FROM SECTION F) 1 MlDX - SR 836, Miami-Dade County SRS45 (Powerline Rd) and SR 825 (US27) Broward County 2 E L li F1 Z ff.= #-'-.T* M* =wt a SR 845/Powerline Road from North of 58th Court to South ♦ Atlantic Boulevard, 3 SR 7 (US441) City of Davie, City of Margate and North Lauderdale, Florida --- —19 City of Miami Improvements 4 I City of Riviera Beach 9 SR 826/SR 836 Interchange from NW 87 Avenue to _NW 57 Avenue 5 Atlantic Blvd, Broward County Powerline to Atlantic, BrOward County AUTHORIZED E#12KIMAU STANDARD FORM 330 (wm) PACE 12 H. ADDITIONAL INFORMATION I ..& 11 a a an E - I a I .111m, I � � i � � i � � r1l Irml I l� I! I Irn � 1qW1T4!J:J�['IIjAI1'TII IIIH ff-0-ILK'"t 03 Target Engineering Group, Inc. will follow a comprehensive Quality Control Program (QCP) to monitor processes and quality. The plan will provide for and seek continuous improvement. The CEI QCP will be prepared based on the deliverables outlined in the Scope of Services for the project and each performance category of the CEI Work Performance Evaluation. The QCP will specify review frequencies, measurable expected performance results, actual performance results and follow-up action of items indicated as opportunities for improvement; in addition, it can measure exceptional performance and innovative practices. 1 16041-0 1 - MAMWgrI construction in Palm Beach County. HIS WJdr Let us do the same for you, 1. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. ERN90,72TINI� 32. DATE LWAM AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2m) PAGE 13 2a. FIRM (OR BRANCH OFFICE) NAME Target Engineering Group, Inc. 1. SOLICITATION NUMBER (Tfany) a. TYPE 2d. STATE I 2e. ZIP CODE b. SMALL BUSINESS STATUS FL 33126 Iar-4594= I M- I 4. DUNS NUMBER 05-314-5954 7. NAME OF FIRM (If block 2a is a branch office) F.IWOW I. . 01-Iff 6771TEW"M T-M, 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function a. Profile c.Revenue Code Code b Experience Index Numbe r I .T '11MMM Airports; Navaids; Airport Lighting; Aircraft Fueling Airports; Terminali —8,Hajj—g . , 9 jums & Theaters Si b'— Barracks; ormitories Construction Management 8 Educational Facilities; Classroom�s� ♦ Cost Engineer/Estimator Environmental Impact Studies. Assessments or Statements Electrical Engineer Fire Protection Environmental Heatink; Ventilati Environmental Scientist Highways; Streets; Airfield Paving; Parkingll�— L ots Foundation/Geotechnical Wvation Engineer Hydraulic Engineer Mech#nical En0eer Planner: Urban/Regional Libraries; Museums; Galleries Manager Office Building; Industrial 15—aiks- S cifications Writer -5e—s 4— Plumbing & Piping ign — - i Structural Enineer g P12 Power Generation, —Transmissiorj--�— Distribution Technician/Analyst Recreation Facili S��nai, tc. P� a9L—� Transportation Enginee R06 Retia—bilitation (Buildings; Structures; Facilities)