Loading...
METRIC ENGINEERINGSECTION II ‐ EVALUATION FACTORS    COMPANY OVERVIEW  MEI is the prime respondent for this response. As a full service engineering firm complemented by key sub‐consultants,  MEI has the capabilities to perform all the requisite tasks for this contract.  MEI is joined by our subconsultants, the  Witkin Hults Design Group for landscape architecture services, and Air Quest Environmental, Inc. for asbestos related  services. MEI's emphasis is on providing professional engineering services to municipalities and the Florida Department  of Transportation (FDOT). MEI's key service areas include transportation; structural and civil engineering and analysis;  drainage design; environmental engineering assessments and permitting; project management; contract administration  and construction engineering inspection. MEI also boasts an advanced geographic information system (GIS) department  capable of programming and creating web‐based applications. MEI has received five FDOT "Best in" project awards.     Location  The MEI Miami office is located at 13940 SW 136th Street, just nine miles from the City of South Miami's City Hall.  This  office will be the primary work location for MEI for this contract.    Professional Staff  Within our Miami Engineering Design office Metric has 29 professional and technical staff including the following  relevant staff designations:  NUMBER CATEGORY NUMBER CATEGORY  12 Registered Engineers 6 Drafters (including CADD  operators)  11  Technical Staff    TOTAL PROFESSIONAL AND TECHNICAL PERSONNEL: 29  Please consult the resumes for MEI's key staff, included with this response, for more information on the pertinent  training, skills and experience that our staff bring to this contract.     WORKLOAD ASSESSMENT  MEI has selected the staff support for this contract that not only has the skills and expertise, but also substantial  availability to dedicate to the City. The following table summarizes the availability of MEI key staff (in bold) and support  staff.  STAFF MEMBER POSITION AVAILABILITY STAFF MEMBER POSITION AVAILABILITY Frank Panellas, PE Project Manager,   Sr. Engineer  75% Carlos Rodriguez, PE Sr. Engineer 55%  Manuel Salueda, PE Sr. Engineer 55% Michael McCoy, MSc Sr. Environmental Scientist 75%  Charles Alfaro, PE Sr. Engineer 60% Carmen Bermudez, EI Project Engineer 65%  Andrew Witkin, RLA Landscape Architect 50% James Whalen Sr. Environmental Scientist 50%  Manuel Inastrilla Engineer Analyst 65%Leanet Mujica, EI Project Engineer 65% Oskar Perez Engineer Analyst 75%Alejandro Jaureguy, EI Project Engineer 55% Enrique Antelo Engineer Analyst 45%Fernando Larios Engineer Analyst 45% Robert Gutierrez, PE Project Engineer 75% Sonia Shreffler, PE Project Engineer 60%  Justin Freedman, MSc Environmental Scientist 60% Daniel Cassalia, PG Environmental Scientist 65%  Jenny Basantes, MSc Environmental Scientist 45% Gabriela Garcia, EI Project Engineer 60%  Current and projected workloads of the firm  PROJECTS FEE   REMAINING   FEE  REMAINING  SR 849/NW 31 Ave. $68,951 SW 57 Ave. from SW 24 St. to SW 40 St. $81,044 NW 37th Ave Enhancement Project $78,055 SW 184th St. from SW 177 Ave. to SW 157 Ave. $86,282 Modesto Maidique Campus Loop $82,300 SW 40 St. from SW 95 Ave. to SW 85 Ave. $61,570 City of Key West S. Roosevelt Reconstruction $61,681 SW 88 St. from SW 79 Ave. to SW 75 Ave. $83,840  US 1 Design Phase 2 $54,016 Alton Rd. from Michigan Ave. to Ed Sullivan Rd. $299,374  SR 9/I‐95 Interchange at Spanish River $167,418 SW 137 Ave. from N. of SW 128 St. to S. of SW 88 St. $229,261  SR A1A in St. Lucie $66,932 NW 62 Ave. Bridge Replacement $63,776  SR 5/US 1 from SW 168 St. to 68 N. $294,531 Districtwide Traffic Operations $23,499  Total Fee: $1,802,530  FEE PER PERSON: $1,802,530/29 = $62,156  Many of the tasks listed above are approaching final completion.  In addition, with our current workforce, the above  tasks commit our design and environmental groups to approximately 50% capacity.  This leaves ample capacity for our  design group to provide timeliness submittals for this project and expedite deliverables as needed by the City.    RELEVANT PROJECT EXPERIENCE  Metric Engineering has a wealth of relevant project experience. Detailed project descriptions are included for projects  covering each of the five main Scope of Service areas, in the attached SF 330 Forms. In addition to those project  descriptions, the following list of recent (ongoing or completed within the last five years) related projects is provided for  a broader example of related project experience.   City of Doral General Engineering and Architecture Contract   City of Hialeah ‐ General Engineering and Architectural Services   City of Miami General Engineering and Architectural Services   City of Key West General Engineering and Architecture Support   Miami‐Dade Expressway Authority Misc. Design Services   FDOT District 1 ‐ Districtwide Traffic Operations   FDOT District 6 ‐ Districtwide Traffic Operations   FDOT District 6 ‐ Districtwide Miscellaneous Design   FDOT District 6 ‐ Districtwide Environmental Compliance   City of Homestead ‐ General Engineering/Architectural Services   City of Hallandale Beach ‐ General Engineeringl Services   Monroe County ‐ General Engineering and Architectural Services    Our experience conducting work in the above miscellaneous engineering service contracts provides the experience,  management framework and depth of staff available to respond to project needs help to ensure the successful  completion of all tasks, even in the midst of multiple assigned tasks and priorities and tight timelines.    PROJECT APPROACH  MEI is proposing to provide engineering and management services under all five disciplines listed in the RLOI. MEI's  single point of contact for the City is our Project Manager Frank Panellas. Mr. Panellas' successful, proven project  approach focuses on Quality Control, Project Budgets and Project Schedules.  These will be emphasized at each stage of  from preliminary design through construction support and project close out services, as applicable. MEI will serve as an  extension to the City's staff and will always act to preserve the City's interest in our projects, placing key emphasis on:  Budget Requirements ‐ MEI establishes realistic professional services budgets up‐front, to reduce the need for change  orders. When a given scope item cannot be adequately determined at the onset, MEI will prepare an estimate of costs  and then refine that to a cost proposal when appropriate. This allows for the City to budget appropriately but avoids  requiring the City to pay for "buffered" costs for unrefined scopes. MEI prepares cost proposals based on the lowest  applicable staff rate and due to our depth of staff, we are able to provide the most efficient staffing levels to match  these cost estimates. MEI also explores all opportunities for value engineering to conserve construction budgets.  Safety ‐ MEI's approach to safety begins in project design where we work to incorporate the most up‐to date safety  standards in roadway and civil design, as well as to insure adequate safety measures for construction. When conducting  inspections of construction activities, special attention is paid to work zone safety and maintenance of traffic.  The MEI  Team will work extensively in design and with contractors to keep projects safe for the traveling public and to help  ensure that the contractor complies with all City, FDOT and OSHA requirements regarding safety.  MEI maintains ATSSA  certified inspectors, available to monitor contractor Traffic Control Plans to  ensure that at minimum, they follow the  FDOT 2010 Design Standard 600 Indices, the most current MUTCD, the project plans, and other contract documents;  acting quickly in the appropriate manner when deficiencies are found.   Contract Administration‐ MEI is a recognized leader in contract administration, currently listed in the top 50  construction management firms nationally by Engineering News Record. Our experience with Construction  Administration includes: Review of construction bids and recommended selection of qualified contractor; Notice of  Award/Notice to Proceed; Shop drawing review; Site observations with reports; Responses to Requests for Information  (RFI’s); and Review and approval of payment applications.  Environmental Responsibility ‐ MEI puts environmental responsibility at the forefront of all of our engineering projects,  working internally to provide support and training to all engineering departments, and is involved from the onset of  each design project to help insure that environmental designs maximize conservation opportunities while minimizing  contamination and permit mitigation liabilities, permitting costs and permitting schedules.  Claims ‐ MEI first seeks to minimize contractor claims through detailed designs and specifications that clearly assign  contractor responsibilities and adhere to the controlling design criteria. As a quality assurance measure, our in‐house  Construction Engineering Inspection (CEI) Department, which conducts construction contract administration and  construction inspections, will review of construction documents prior to final design, to identify potential sources of  claims based on their project experience. Should a claim arise on any project whether designed by MEI or a third party,  MEI's CEI Department has the experience to address and administer the claim to represent the best interest of the City.  Innovative Approaches ‐ MEI's principal innovative approach is the development and implementation of contract‐ specific technology tools to enhance the productivity and quality of our work and to help our clients to "do more with  less." Examples of recently implemented contract‐specific technology tools include the development of a web‐based GIS  tools for FDOT District 6 and the City of Dania Beach to track construction projects, monitor compliance and catalog  project files geographically.   Section III - Supportive Information METRIC ENGINEERING RESUMES FRANK PANELLAS, PE: PROJECT MANAGER, SR. ENGINEER - ROADWAY Mr. Panellas is the Roadway Division Manager for Metric Engineering, with 12 years of experience in the design and the production management of highway plans for projects from FDOT, Miami-Dade County and local municipalities. His experience includes roadway design, pavement design, maintenance of traffic, signing and pavement markings and signalization projects within City of Hollywood, City of Pompano Beach, City of Miami, City of Doral, City of Homestead, City of Key West, and City of Riviera Beach among others. He has also performed numerous drainage reports for roadway improvement projects. He is intimately familiar with the FDOT’s design and procedural requirements as well as with Miami-Dade County and other local agencies’ permitting procedures. EDUCATION: B.S.C.E., Florida International University, 1997; Masters of Business Administration, Florida International University, 2001 PROFESSIONAL REGISTRATIONS AND CERTIFICATIONS Florida PE #59448, 2003, FDOT, Traffic Control Plans Certification YEARS OF EXPERIENCE: 13 years HIGHLIGHTED PROJECT EXPERIENCE On-Call Professional Engineering Services, Monroe County, Florida - Provide transportation engineering design services for road and bridge construction and rehabilitation projects, including design, traffic studies, lighting and signalization, permitting, drainage engineering, assisting with review of contractor bids, environmental engineering including environmental assessments water quality studies and structural engineering services including facility inspections and assessments and rehabilitation and/or retrofit of County facilities and buildings. Client: Monroe County, FL Contact: Clark Briggs (305) 295-4306, Begin/End Dates: January 2010 – Ongoing SR A-1-A/Collins Avenue from 63rd Street to 75th Street – Engineer of Record responsible for the preparation of the roadway, signing and pavement markings plans and signalization plans for this 1.1 mile RRR project. This project also added new paved shoulders along both side of the road plus new sections of sidewalk to provide a continuous sidewalk along each side of NW 31st Avenue. Client: Florida Department of Transportation D-6 Contact: Ms. Erenia Nagid, P.E. 305-470-5469, Begin/End Dates: September 2008 – January 2010, Role: Engineer of Record SR A1A/Ocean Boulevard in St Lucie County, Project Manager – Design and plans preparation for the roadway improvements of 5.3 miles of the existing two-lane, rural arterial in St. Lucie County. Improvements include drainage, signing and pavement marking, up- grade of pedestrian facilities and safety improvements. Client: FDOT District 4, Contact: Bing Wang, PE, 954-486-1400, Begin/End Dates: 2009 – December 2011, Role: Project Manager NW 31st Avenue from Atlantic Boulevard to Coconut Creek Pwy./Dr. Martin Luther King Jr. Blvd – Engineer of Record responsible for the preparation of the roadway, signing and pavement markings plans and signalization plans for this 0.9 mile RRR project. This project will also be adding new paved shoulders along both side of the road plus new sections of sidewalk to provide a continuous sidewalk along each side of NW 31st Avenue. Client: Florida Department of Transportation D-4, Contact: John Thompson, P.E. 954- 777-4680, Begin/End Dates: January 2009 – July 2011. SR-944/Hialeah Drive from East 4th Avenue to East 10th Avenue – Engineer of Record responsible for the preparation of the roadway, signalization and signing and pavement markings plans for this 0.74 mile RRR project. This project also included the full implementation of access management modifications within the corridor by providing raised medians throughout the corridor. Client: Florida Department of Transportation D-6, Contact: Mr. Jose Barrera, P.E. 305-470-5260, Begin/End Dates: April 2008 – January 2010, Role: Engineer of Record SR-5/US-1 Federal Highway from Young Circle to Sheridan Street – Engineer of Record responsible for the preparation of the roadway and signing and pavement markings plans for this 1.3 mile RRR project. After completion of the first design phase of this project, the FDOT added a second design phase consisting of replacing the existing lighting system along the corridor with decorative light poles including pedestrian features and banners. The second phase also includes the addition of new sections of median with landscape and irrigation. Client: Florida Department of Transportation D-4, Contact: Mr. James Hughes, P.E. 954-777-4419, Begin/End Dates: March 2006 – April 2011, Role: Engineer of Record ROBERT LINARES, PE: PRINCIPAL IN CHARGE EDUCATION: B.S.C.E., Florida International University, 2000 PROFESSIONAL REGISTRATIONS AND CERTIFICATIONS Florida PE #63003 YEARS OF EXPERIENCE: 12 years HIGHLIGHTED PROJECT EXPERIENCE NW 36th Street (SR 948) at NW 72nd Avenue (SR 969) Grade Separation PD&E Study in Miami-Dade County for FDOT District 6 - Project Manager for this transportation study focusing on providing a grade separation at the intersection of NW 36th Street and NW 72nd Avenue to relieve congestion while retaining and integrating the local access and traffic movements. Reports include Design Traffic Technical Memorandum, Preliminary Engineering Report, Conceptual Design Roadway Plan Set, Drainage, Geotechnical and Environmental reports. SR-874 (Don Shula Expressway) Ramp Connector PD&E Study for Miami-Dade Expressway Authority in Miami-Dade County - Project Manager for this transportation study to evaluate a potential new ramp connection from SR 974 (Don Shula Expressway) to SW 136th Street at SW 137th Avenue. The study will confirm the need and benefits to be provided by this connection, including identifying potential corridors and alignments as well as potential environmental impacts. I-395 PD&E Study in Miami-Dade County for FDOT District 6 – Project Manager for this transportation study entailing the preparation of an Environmental Impact Statement for a proposal to improve Interstate Route I-395 in Miami-Dade County, Florida. The proposed improvement involves the reconstruction of I-395 from I-95/Midtown Interchange to Biscayne Bay. Improvements to the corridor are considered necessary to provide for the existing and projected traffic demand. CHARLES ALFARO, PE: SR. ENGINEER - DRAINAGE EDUCATION: Masters of Business Administration, Florida International University, 2003 B.S.C.E., Florida International University, 2000 PROFESSIONAL REGISTRATIONS AND CERTIFICATIONS Florida PE #61411 YEARS OF EXPERIENCE: 11 years HIGHLIGHTED PROJECT EXPERIENCE W 11th Street and W 12th Street from W 4th Avenue to W 3rd Avenue, W 13th Street and W 14th Street from W 4th Avenue to W 2nd Avenue, W 15th Street from W 4th Avenue to Palm Avenue, and W 1st Avenue, W 2nd Avenue and W 3rd Avenue from W 13th Street to W 16th Street, City of Hialeah - Project Engineer overseeing the preparation of Roadway plans, Drainage design, calculations and report and Signing and Pavement markings plans for this 1.7-mile reconstruction project adjacent to the John E. Preston Water Treatment plant and included an outfall to the W 4th Avenue canal. SR 826/SW 8th Street Interchange Reconstruction, FDOT – Project Engineer assisting on the preparation of Roadway, Drainage and Signing and Pavement markings plans for this interchange reconstruction project. Assisted in the computation of the quantities and to the preparation of the Computation Book for the Roadway, Drainage and Signing and Pavement markings areas. Also assisted in the final QA/QC process. SW 180th Street from SW 137th Avenue to SW 147h Avenue, Miami-Dade County Public Works Department – Project Engineer assisting in the preparation of the roadway, drainage, signing and pavement markings and signalization plans for this 1-mile roadway reconstruction project. Amelia Earhart Park – Miami-Dade County Parks and Recreation Department – Responsible for the geometry, pavement and drainage design and plans of 2 new parking lots (one each for the soccer fields and softball fields). Responsible for the preparation of the water, sewer, grading and drainage calculations and plans needed for the construction of four new soccer and five softball fields and recreation areas, and access roads for these fields within Amelia Earhart Park. MANUEL SALUEDA, PE: SR. ENGINEER - CIVIL EDUCATION: B.S.C.E., University of Miami, 1987, BS Architectural Engineering, University of Miami, 1987 PROFESSIONAL REGISTRATIONS AND CERTIFICATIONS Florida PE #45988 YEARS OF EXPERIENCE: 21 years HIGHLIGHTED PROJECT EXPERIENCE City of Hialeah Water Treatment Plant – Project Manager and Engineer of Record for the design of raw water line, maintenance pipe line, and water main line to service the City Hialeah Reverse Osmosis Water Treatment Plant. Project location is on NW 154 St (theoretical) from west of NW 97 Ave to west of NW 102 Ave (theoretical) and along NW 102 Ave (theoretical) from NW 154 St (theoretical) to NW 166 St (theoretical). Additional duties include the design of the well site grading plans, permitting and environmental documentation. South Pointe, Phase II, City of Miami Beach – In a sub-consultant role, served as Project Manager for the water main replacement portion of the South Pointe Neighborhood Improvement Project, Phase II. Project site encompassed the area from 2nd Street to 5th Street and from Euclid Avenue to Alton Road. Blue Heron Boulevard (S.R. 708) from Military Trail to I-95, Palm Beach County for City of Riviera Beach – Engineer of Record for the design of force main and water main replacement under a Joint Project Agreement between the City of Riviera Beach and the Florida Department of Transportation. The project included the design to upgrade and relocate water main and force main in conjunction with the planned road improvements performed by the FDOT. 8” Watermain Extension Along Soho Alley – Engineer of Record for the design of 8” water main extension located at the Soho Alley between NW 1 St and NW 2 St in the City of Homestead. Additional duties included plans preparation and permitting. CARLOS RODRIGUEZ, PE: SR. ENGINEER - TRAFFIC EDUCATION: B.S.C.E., Florida International University, 2004 PROFESSIONAL REGISTRATIONS AND CERTIFICATIONS Florida PE #72638 YEARS OF EXPERIENCE: 8 years HIGHLIGHTED PROJECT EXPERIENCE Grove Area Traffic Calming in Miami-Dade County for City of Miami - The project involves the modification of existing intersections within the Coconut Grove Area of the City of Miami with Traffic Calming Circles and Flat-Topped Speed Hump. The design includes geometry re-alignment, grading, minor drainage improvements to prevent creating any drainage issues, and pavement markings to meet Miami-Dade County Public Works and City of Miami Standards. Silver Bluff Traffic Calming in Miami-Dade County for City of Miami - The project involves the modification of existing intersections within the City of Miami with Traffic Calming Circles. The design includes geometry re-alignment, grading, minor drainage improvements to prevent creating any drainage issues, and pavement markings to meet Miami-Dade County Public Works and City of Miami Standards. Downtown Homestead Transportation Plan Update for the City of Homestead Community Redevelopment Agency – The study aimed at resolving a number of Downtown Transportation planning issues in the City’s congested urban core. The study included recommendations for truck movement accommodations, bicycle-way alignments, traffic calming treatments and utilizing the new Miami-Dade transit Busway within Homestead’s urban core. Bridgeport Avenue and SW 30 Ct. Traffic Study in Miami-Dade County for City of Miami - Traffic Study to resolve traffic cut through, speeding and other concerns reported at Bridgeport Ave and SW 30 CT between US1 and Bird Ave within the City of Miami. The study will include such issues as traffic circulation, geometry, crash analysis (years 2005 to 2007), trip generation and attraction, etc. In addition, a pre-meeting with FDOT to properly coordinate the objectives and procedures of the study will be conducted as the initial study task. The study area is bounded by NW 27th Ave. on the east, Bird Ave. on the south and US-1 along the north and west. MICHAEL MCCOY, MSC: SR. ENVIRONMENTAL SCIENTIST EDUCATION: MSc Ecological Design, BSc Natural Resources PROFESSIONAL REGISTRATIONS AND CERTIFICATIONS FDEP Erosion Control Inspector, ISA Certified Arborist, Certified FL Landscape Inspector YEARS OF EXPERIENCE: 12 years HIGHLIGHTED PROJECT EXPERIENCE Preliminary contamination assessments, FDOT – 20+ FDOT projects - as part of Category I/PCE memo creation, providing GIS and field initial assessments to identify the presence of potential sources of contamination along proposed FDOT roadway improvement projects. Dollyland Property Phase I&II Environmental Site Assessment, K Hovnanian - Project Manager for these Environmental Site Assessments of a 63-acre parcel which involved coordination with well driller, water and soil sampling, laboratory analysis and a risk and remediation assessment, as well as an evaluation of the presence of wetlands and listed species. Dania Beach Property Acquisition Phase I's (10 sites), City of Dania Beach - Project Manager for a Phase I Environmental Site Assessment that covered 10 separate properties currently owned by the county that were proposed to be transferred to the City as part of a land exchange for airport expansion activities. Hialeah Water Treatment Plant Contamination Assessments, City of Hialeah - Environmental Project Manager for contamination and wetland issues including conducting Phase I Environmental Site Assessments for proposed construction locations, evaluation of the potential for water quality issues for drinking water extraction, wetland delineation and environmental resources permitting. Districtwide Environmental Compliance Inspection, FDOT District 6 - Project Manager for this environmental contract involving inspection of active FDOT construction projects throughout Miami-Dade and Monroe Counties, for compliance with all environmental compliance issues including contamination, NPDES, bridge lead paint/asbestos work, wetland, water use and right of way permit requirements, wildlife conservation requirements and historical/cultural resource preservation. CITY OF SOUTH MIAMI PROJECT MANAGER DRAINAGE DESIGN CIVIL ENGINEERING TRAFFIC ENGINEERINGROADWAY ENGINEERING PROJECT STAFFING ENVIRONMENTAL ENGINEERING PROFESSIONAL ENGINEERING & MANAGEMENT SERVICES Hector Mirabille, PhDCity Manager Frank Panellas, PE (MEI) KEY STAFFFRANK PANELLAS, PE (MEI) SUPPORT STAFFCARMEN BERMUDEZ, EI (MEI)MANNY INASTRILLA (MEI) KEY STAFFMANUEL SAULEDA, PE (MEI) SUPPORT STAFFLEANET MUJICA, EI (MEI)OSKAR PEREZ (MEI) KEY STAFFCHARLES ALFARO, PE (MEI) SUPPORT STAFFALEJANDRO JAUREGUY, EI (MEI)ENRIQUE ANTELO (MEI)FERNANDO LARIOS (MEI) KEY STAFFCARLOS RODRIGUEZ, PE (MEI) SUPPORT STAFFROBERT GUTIERREZ, PE (MEI)SONIA SHREFFLER-BOGART, PE, PTOE (MEI)GABRIELA GARCIA, EI (MEI) KEY STAFFMICHAEL MCCOY, MSC (MEI) WITKIN HULTS DESIGN GROUPLANDSCAPE ARCHITECTURE ANDY WITKIN, RLA SUPPORT STAFFDAN CASSALIA, PG (MEI)JUSTIN FREEDMAN, MSC (MEI)JENNY BASANTES, MSC (MEI) AIR QUEST ENVIRONMENTAL, INC.ASBESTOS ASSESSMENTS JAMES WHALEN SUPPORT SERVICES CADD DRAFTINGNARCISO TOME (MEI)OSKAR PEREZ (MEI) STRUCTURAL ENGINEERINGOSCAR CRUZ, PE (MEI)DOUGLAS RUGGIANO, PE (MEI) GISDAMIAN FOSTER (MEI)HUNTER WEI (MEI) PRINCIPAL-IN-CHARGE Robert Linares, PE (MEI) Metric Engineering, Inc. (MEI) Witkin Hults Design Group (WHDG) Air Quest Environmental, Inc. (AQE) THE METRIC TEAM CLIENT REFERENCES NAME & TITLE CONTRACT/PROJECT PHONE Eric Carpenter, PE Director of Public Works City of Doral General Engineering Services (305) 593-6725 Gus Pego, PE FDOT District 6, District Secretary FDOT District 6 Districtwide Engineering Contracts (305) 470-5197 Eman Gomaa Planning Manager FDOT District 6 Districtwide Traffic Operations Studies Contract (305) 470-5314 Robert Daniels Director, Community Development City of Dania beach Contamination Assessments for Property Acquisition (954) 924-6800 Tatiana Acosta Project Manager City of Miami Civil Engineering Services for Roadway Projects (305) 416-1263 Albert Sosa, PE Director, Capital Improvements Program City of Miami Civil Engineering Services for Roadway Projects (305) 416-1224 Tom Ruiz Director of Public Works City of Miami Gardens NW 7th Avenue Reconstruction (305) 622-8048 Cesar Llano President of Land Development Islands at Doral Landscaping (305) 599-8100 Jim Litrides Sr. Safety and Health Specialist Broward County Risk Management Division Asbestos Surveys (954) 357-8037     APPENDIX A ‐ SUBCONSULTANT RESUMES  307 south 21 avenue hollywood, fl 33020 p 954.923.9681 f 954.923.9689 witkindesign.com landscape architecture and planning ANDREW M. WITKIN DISCIPLINE / POSITION President & Founder ‐ Witkin Hults Design Group, Inc Landscape Architecture/Planning EDUCATIONAL BACKGROUND • Bachelor of Landscape Architecture – The Pennsylvania State University, 1979 • Bachelor of Science in Landscape Architecture – The Pennsylvania State University, 1978 REGISTRATION • Registered Professional Landscape Architect; State of Florida, 1982. Lic. #LA0000889 PROFESSIONAL AFFILIATIONS • Member of the American Society of Landscape Architects • Full Member of the Urban Land Institute • Life Director of the Builders Association of South Florida • Member of the Builders Association of South Florida Hall of Fame • Past Chairman of the Miami Dade County Shoreline Development Review Committee •Member of the College of Arts and Architecture at the Pennsylvania State University Campaign Committee FIELDS OF EXPERTISE • Landscape Architectural Design • Landscape Lighting Design • Large-scale Residential & Commercial Development • Caribbean Hospitality Design • Project Management & Contract Administration • Coastal Environmental Planting Design • Municipal Approval Process SPEAKING ENGAGEMENTS • 2006 - International Builders Show- Landscape Architecture as a Marketing Tool • 2007 - International Builders Show- Hurricane Restoration and TND Design • 2007 - Southeastern Builders Conference- TND Design • 2007 – Urban Land Institute- The Changing Role of Design in Today’s Urban Market • 2008 - International Builders Show- Landscape Architecture & First Impressions • 2008 – National Association of Home Building– Universal Design for 50+ Housing 5150 SW 48th Way, Suite 610 Fort Lauderdale, FL 33314 Phone 954/792-4549 Fax 954/792-2221 James Whalen, CIEC, LEED® AP Senior Project Manager Mr. Whalen has twenty (20) years experience providing air quality services across the United States. He began his career in the field of asbestos surveying, management, and abatement oversight. He has successfully managed over $55 million dollars in asbestos abatement. Under Mr. Whalen’s direction, the Miami Federal Building was voted the “Asbestos Abatement Project of the Year” by the General Services Administration. Early in his career, Mr. Whalen expanded his skills to include a variety of indoor air quality issues. Mr. Whalen is the radon qualifier for the business. Experience: 20 Years Professional Disciplines:  Asbestos Survey  Asbestos Abatement  Radon  Mold Assessment & Abatement Oversight  Indoor Air Quality  LEED®  Industrial Hygiene Education: Bachelor of Arts, 1982 California State University, Hayward, California Certifications Radon Measurement Technician, State of Florida (R2168), 2009 Leadership in Energy & Environmental Design (LEED®) Accredited Professional, 2008 Certified Indoor Environmental Consultant, 2007 Certified Indoor Environmentalist, 2002 (CIE # 01211 – Not Renewed) Mold Loss Prevention Specialist, 2003 (MLP #00069 – Not Renewed) Asbestos Building Inspector: 206 TSCA 15 USC 2646/AHERA, 1989 Asbestos Contractor/Supervisor: 206 TSCA 15 USC 2646/AHERA, 1989 NIOSH 582 Equivalency Course, 1992 AHERA Survey, 1992 Indoor Air Quality Inspector Course, 1993 Mold Assessment & Remediation, 2001 Mold Assessor, State of Florida (MRSA124), 2010 (The above course descriptions are for the original courses. The requisite annual courses have been taken as required to maintain certifications. All of the certificates are current.) Selected Project Experience Asbestos Abatement Project Management Project engineering and management of hundreds of projects including the Miami Federal Building, the San Francisco Federal Building, numerous commercial buildings, hospitals and banks, and industrial abatement within Florida Power & Light facilities. The General Services Administration voted the Miami Federal Building their “Asbestos Abatement Project of the Year” for 1989. Asbestos Emergency Response, Surveys & Abatement Oversight Provided project management to an emergency response to an asbestos release aboard a passenger cruise ship that was in dry-dock undergoing interior renovations. The logistics for the project included operating in a foreign country (Curacao, Netherland Antilles), coordinating and/or overseeing 100 asbestos abatement workers and asbestos consultants, foreign government officials, the vessel owner, the captain and crew of the vessel, the dry- dock owner’s representatives and consultants from the Netherlands and working under intense time constraints. The asbestos abatement project was successfully completed within eleven (11) working days. Air monitoring and onboard asbestos consulting continued for an additional six (6) weeks while renovations to the ship were completed.     APPENDIX B ‐ SF330 FORMS  [BEGIN PAGE1] ARCHITECT – ENGINEER QUALIFICATIONS PART I – CONTRACT SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State) PROFESSIONAL ENGINEERING & MANAGEMENT SERVICES, CITY OF SOUTH MIAMI, FLORIDA 2. PUBLIC NOTICE DATE December 9, 2011 3. SOLICITATION OR PROJECT NUMBER N/A B. ARCHITECT – ENGINEER POINT OF CONTACT 4. NAME AND TITLE Frank Panellas, PE 5. NAME OF FIRM Metric Engineering, Inc. 6. TELEPHONE NUMBER 305-235-5098 7. FAX NUMBER 305-251-5894 8. E-MAIL ADDRESS fpanellas@metriceng.com C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) (Check) 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT PR I M E J- V P A R T N E R SU B C O N - TR A C T O R a. x Metric Engineering, Inc. 13940 SW 136 Street Miami, FL 33186 Roadway Engineering, Drainage Design, Civil Engineering, Traffic Engineering, Environmental Engineering CHECK IF BRANCH OFFICE b. x Witkin Hults Design Group, inc. 307 S 21st Avenue, Hollywood Landscape Architecture Services CHECK IF BRANCH OFFICE c. x AirQuest Environmental, Inc. 5150 SW 48th Way Suite 610 Ft. Lauderdale, FL 33314 Asbestos Services CHECK IF BRANCH OFFICE d. CHECK IF BRANCH OFFICE g. CHECK IF BRANCH OFFICE i. CHECK IF BRANCH OFFICE D. ORGANIZATIONAL CHART OF PROPOSED TEAM Attached AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) STANDARD FORM 330 (6/2004) PAGE 11 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Frank Panellas, PE 13. ROLE IN THIS CONTRACT Project Manager, Sr. Engineer - Roadway 14. YEARS EXPERIENCE a. TOTAL 11 b. WITH CURRENT FIRM 1 Year 15. FIRM NAME AND LOCATION (City and State) Metric Engineering, Inc., Miami, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) Masters of Business Administration, FIU, 2001 BSCE, FIU, 1997 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Florida PE 59448 - 2003 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) N/A 19. RELEVANT PROJECTS a (1) TITLE AND LOCATION (City and State) NW 31st Avenue from Atlantic Boulevard to Coconut Creek Pwy./Dr. Martin Luther King Jr. Blvd Miami-Dade, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES On-going CONSTRUCTION (If Applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Engineer of Record responsible for the preparation of the roadway, signing and pavement markings plans and signalization plans for this 0.9 mile RRR project. This project will also be adding new paved shoulders along both side of the road plus new sections of sidewalk to provide a continuous sidewalk along each side of NW 31st Avenue. Project Fee: $355,000 Check if project performed with current firm b (1) TITLE AND LOCATION (City and State) Hollywood Boulevard from Young Circle to Intracoastal Waterway Broward County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2009 CONSTRUCTION (If Applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Engineer of Record responsible for the preparation of the roadway, signalization and signing and pavement markings plans for this 1.4 mile RRR project. Project includes widening for installation of raised landscape medians as well as drainage improvements. This project was very closely coordinated with the City of Hollywood to provide a new typical section which modified the existing 5 lane section into a 4-lane divided road with large sections of raised medians, and bicycle lanes and parallel parking lanes along both sides of the road. Project Fee: $665,000 Check if project performed with current firm c (1) TITLE AND LOCATION (City and State) SR-5/US-1 Federal Highway from Young Circle to Sheridan Street Broward County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES On-going CONSTRUCTION (If Applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Engineer of Record responsible for the preparation of the roadway and signing and pavement markings plans for this 1.3 mile RRR project. After completion of the first design phase of this project, the FDOT added a second design phase consisting of replacing the existing lighting system along the corridor with decorative light poles including pedestrian features and banners. The second phase also includes the addition of new sections of median with landscape and irrigation. Project Fee: $360,000 Check if project performed with current firm d (1) TITLE AND LOCATION (City and State) Blue Heron Blvd. (SR 708) from Avenue S to Old Dixie Highway Palm Beach County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2007 CONSTRUCTION (If Applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Design Engineer responsible for the completion of roadway and signing and pavement marking plans for this 0.93 miles project in Palm Beach County. Project Fee: $760,000 Check if project performed with current firm e (1) TITLE AND LOCATION (City and State) South Roosevelt Boulevard (US-1) from Bertha Street to Sta. 41+10 City of Key West, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2008 CONSTRUCTION (If Applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Engineer of Record for the preparation of the roadway and signing and pavement markings plans for this 0.9 -mile project which includes a complete roadway reconstruction with new drainage and lighting for a major four lane facility in the City of Key West. South Roosevelt Boulevard is a state road and this project is being designed for the City of Key West as a Local Agency Project (LAP). This project also includes the design of a new promenade. Project Fee: $596,000 Check if project performed with current firm STANDARD FORM 330 (6/2004) PAGE 10 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Robert Linares, PE 13. ROLE IN THIS CONTRACT Principal-in-Charge 14. YEARS EXPERIENCE a. TOTAL 12 b. WITH CURRENT FIRM 12 15. FIRM NAME AND LOCATION (City and State) Metric Engineering, Inc./Miami, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) BSCE Civil Engineering 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Florida P.E. # 63003 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 19. RELEVANT PROJECTS a (1) TITLE AND LOCATION (City and State) SR-710 PD&E Study Okeechobee/Martin Counties, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES On-going CONSTRUCTION (If Applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Project Manager. PD&E Study for a 15-mile stretch of SR710(a FIHS/SIS facility) in Martin County from the Okechobee/Martin County Line to CR 609 The study will consider additional thru lanes, special treatment and/or additional lanes at major intersections, and widening of the crossroads up to 1000ft. in each direction where necessary to provide intersection operation at an acceptable LOS. In addition a grade separated Highway/Rail crossing will be evaluated. This project will be developed following the ETDM methodology. Project Cost: $1.3 million. Check if project performed with current firm b (1) TITLE AND LOCATION (City and State) SR-874 Ramp Connector PD&E Study Miami, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES On-going CONSTRUCTION (If Applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PD&E Study to evaluate a potential new ramp connection from SR 974 (Don Shula Expressway) to SW 136 Check if project performed with current firm th Street at SW 137th c Avenue. SR 874 currently ends at the interchange with SR 821/Florida’s Turnpike/HEFT. This new ramp connection would provide an additional expressway access and mobility to the area. The study will confirm the need and benefits to be provided by this connection. Project Manager. Metric Fee: $379,539 (1) TITLE AND LOCATION (City and State) I-395 PD&E Study Miami-Dade County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES On-going CONSTRUCTION (If Applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Project Manager for this PD&E Study which entails the preparation of an EIS for a proposal to improve Interstate Route I-395 in Miami-Dade, Florida. The proposed improvement would involve the reconstruction of I-395 from I-95/Midtown Interchange to Biscayne Bay, a distance of 1.2 miles. Improvements to the corridor are considered necessary to provide for the existing and projected traffic demand. Project Cost: $1.3 million Check if project performed with current firm d (1) TITLE AND LOCATION (City and State) Krome Avenue North PD&E Study Miami-Dade County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2006 CONSTRUCTION (If Applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Project Manager for this study which investigated the proposed widening of Krome Avenue, one of South Florida’s most rural corridors. The project included a detailed safety analysis of the corridor and comprehensive alternative generation and selection process. Furthermore, the study required the preparation of preliminary engineering reports and master plans as well as extensive environmental work and coordination with all the regulatory agencies. Project Cost: $1 million Check if project performed with current firm e (1) TITLE AND LOCATION (City and State) NW 14th Miami-Dade County, FL Street Access Improvements to I-395 PD&E Study (2) YEAR COMPLETED PROFESSIONAL SERVICES 2005 CONSTRUCTION (If Applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Project Engineer for this PD&E Study for the addition of on/off ramps to I-95 and I-395. Study requires a comprehensive PD&E analysis and IJR. The project includes preliminary and final engineering reports and master plans, traffic modeling and technical memorandum, and extensive public involvement with the Overtown area. Project Cost: $900,000. Check if project performed with current firm STANDARD FORM 330 (6/2004) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Charles Alfaro, PE 13. ROLE IN THIS CONTRACT Sr. Engineer - Drainage 14. YEARS EXPERIENCE a. TOTAL 9 b. WITH CURRENT FIRM 1 15. FIRM NAME AND LOCATION (City and State) Metric Engineering, Inc., Miami, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) Masters of Business Administration, FIU, 2003 BSCE, FIU, 2000 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Florida PE#61411, 2004 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) N/A 19. RELEVANT PROJECTS a (1) TITLE AND LOCATION (City and State) SR-5/US-1 Federal Highway from Young Circle to Sheridan Street West Palm Beach, Fl (2) YEAR COMPLETED PROFESSIONAL SERVICES On-going CONSTRUCTION (If Applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Lead Design Engineer assisting in the preparation of the roadway and signing and pavement markings plans for this 1.3 mile RRR project. Project Fee: $360,000 b (1) TITLE AND LOCATION (City and State) Hollywood Boulevard from Young Circle to Intracoastal Waterway Broward County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES On-going CONSTRUCTION (If Applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Lead Design Engineer assisting in the preparation of the drainage, roadway and signing and pavement markings plans for this 1.4 mile RRR project. Project includes widening for installation of raised landscape medians. Project Fee: $665,000 c (1) TITLE AND LOCATION (City and State) Blue Heron Blvd. (SR 708) from Avenue S to Old Dixie Highway West Palm Beach, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2007 CONSTRUCTION (If Applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Engineer assisting in the preparation of roadway and signing and pavement markings plans for this 0.93 miles milling and resurfacing project in West Palm Beach County. Project Fee: $760,000 d (1) TITLE AND LOCATION (City and State) SR 924 Toll Plaza Modifications Miami, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2007 CONSTRUCTION (If Applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Engineer assisting in the preparation of the roadway geometry and maintenance of traffic plans for this toll plaza modification. This project consists of converting two existing Sun Pass lanes to Sun Pass Express Lanes. Project Fee: $1,060,900 e (1) TITLE AND LOCATION (City and State) SW 127th Avenue from SW 88th Street to SW 120th Street Miami, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2007 CONSTRUCTION (If Applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Engineer assisting in the preparation of the roadway, signing and pavement markings and signalization plans for this 2-mile project which includes a complete roadway reconstruction, new bridge design and a new shared use path. This project will convert a current two lane facility into a four lane divided corridor. Project Fee: $604,659 STANDARD FORM 330 (6/2004) PAGE E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Manuel Sauleda, PE 13. ROLE IN THIS CONTRACT Sr. Engineer - Civil 14. YEARS EXPERIENCE a. TOTAL 21 b. WITH CURRENT FIRM 1 year 15. FIRM NAME AND LOCATION (City and State) Metric Engineering, Inc./Miami, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) BSCE, University of Miami, 1987 BS Architectural Engineering, University of Miami, 1987 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Florida PE #45988, 1992 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 19. RELEVANT PROJECTS a (1) TITLE AND LOCATION (City and State) City of Hialeah Reverse Osmosis Water Treatment Plant (2) YEAR COMPLETED PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If Applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Manager and Engineer of Record for the design of raw water line, maintenance pipe line, and water main line to service the City Hialeah Reverse Osmosis Water Treatment Plant. Project location is on NW 154 St (theoretical) from west of NW 97 Ave to west of NW 102 Ave (theoretical) and along NW 102 Ave (theoretical) from NW 154 St (theoretical) to NW 166 St (theoretical). Additional duties include the design of the well site grading plans, permitting and environmental documentation. Project Fee: $272,200 b (1) TITLE AND LOCATION (City and State) South Pointe, Phase II, City of Miami Beach PROFESSIONAL SERVICES 2009 CONSTRUCTION (If Applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Manager, responsibilities included drainage analysis of system because of flooding problems and production of stormwater conv. Plans (closed) local permit application. Project Fee: $27,529 c (1) TITLE AND LOCATION (City and State) Blue Heron Boulevard (S.R. 708) from Military Trail to I-95, Palm Beach County for City of Riviera Beach (2) YEAR COMPLETED PROFESSIONAL SERVICES 2000 CONSTRUCTION (If Applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Manager for the final design plans of the reconstruction and widening of a 1.9 km section of the Palmetto Expressway including an interchange at South River Drive and Okeechobee Road. Duties consisted of supervising and managing project, geometric design, drainage design, permitting and plans. Project Fee: $2,321,094 d (1) TITLE AND LOCATION (City and State) SR 821 Homestead Extension of Florida’s Turnpike (HEFT) from US 1 to SR 874, Miami-Dade County, FL (2) YEAR COMPLETED Ongoing CONSTRUCTION (If Applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Manager/Engineer-of-Record (subconsultant to URS) for the widening of the HEFT from SW 216th Street to north of SW 184th Street. Responsible for geometric and drainage designs for the widening of the HEFT. Additional duties included the preparation of Bridge Hydraulic Reports at two South Florida Water Management District (SFWMD) canals: the C-1N and the C- 100 canal crossings. Project Fee: $3.75 million e (1) TITLE AND LOCATION (City and State) 8” Watermain Extension Along Soho Alley (2) YEAR COMPLETED PROFESSIONAL SERVICES 2004 CONSTRUCTION (If Applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Engineer of Record for the design of 8” water main extension located at the Soho Alley between NW 1 St and NW 2 St in the City of Homestead. Additional duties included plans preparation and permitting. STANDARD FORM 330 (6/2004) PAGE 7 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Carlos Rodriguez, PE 13. ROLE IN THIS CONTRACT Sr. Engineer - Traffic 14. YEARS EXPERIENCE a. TOTAL 9 b. WITH CURRENT FIRM 9 15. FIRM NAME AND LOCATION (City and State) Metric Engineering, Inc./Miami, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) BSCE, FIU, 2004 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Florida PE#72638 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 19. RELEVANT PROJECTS a (1) TITLE AND LOCATION (City and State) Grove Area Traffic Calming in Miami-Dade County for City of Miami (2) YEAR COMPLETED PROFESSIONAL SERVICES 2009 CONSTRUCTION (If Applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Project Manager. The project involved the modification of existing intersections within the Coconut Grove Area of the City of Miami with Traffic Calming Circles and Flat-Topped Speed Hump. The design included geometry re-alignment, grading, minor drainage improvements to prevent creating any drainage issues, and pavement markings to meet Miami-Dade County Public Works and City of Miami Standards. Metric Fee: $61,537 Check if project performed with current firm b (1) TITLE AND LOCATION (City and State) Silver Bluff Traffic Calmingo - PRIORITY II, B30168B & PRIORITY III, B30168A in Miami-Dade County for City of Miami (2) YEAR COMPLETED PROFESSIONAL SERVICES 2009 CONSTRUCTION (If Applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Project Manager. The project involved the modification of existing intersections within the City of Miami with Traffic Calming Circles. The design included geometry re-alignment, grading, minor drainage improvements to prevent creating any drainage issues, and pavement markings to meet Miami-Dade County Public Works and City of Miami Standards. Check if project performed with current firm Metric Fee: $81,340 (Priority II, B30168B) & $64,781 (Priority III, B30168A) c (1) TITLE AND LOCATION (City and State) Bridgeport Avenue and SW 30 Ct. Traffic Study in Miami-Dade County for City of Miami (2) YEAR COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION (If Applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Traffic Study to resolve traffic cut through, speeding and other concerns reported at Bridgeport Ave and SW 30 CT between US1 and Bird Ave within the City of Miami. The study will include such issues as traffic circulation, geometry, crash analysis (years 2005 to 2007), trip generation and attraction, etc. In addition, a pre-meeting with FDOT to properly coordinate the objectives and procedures of the study will be conducted as the initial study task. The study area is bounded by NW 27th Ave. on the east, Bird Ave. on the south and US-1 along the north and west. Metric Fee: $43,974 Check if project performed with current firm d (1) TITLE AND LOCATION (City and State) La Pastorita Traffic Study in Miami-Dade County for City of Miami (2) YEAR COMPLETED PROFESSIONAL SERVICES 2009 CONSTRUCTION (If Applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Traffic Study to address numerous complaints previously received from residents of SW 36th Ave. regarding potential traffic cut through along this avenue between SW 8th St. and SW 16th St. Apparently, a large volume of traffic uses this residential segment to avoid potential delays at the SW 37th Ave./SW 8th St. intersection. The study will include such issues as traffic circulation, geometry, crash analysis (years 2005 to 2007), trip generation and attraction, etc. The study area is bounded by SW 8th St. on the north, SW 16th St. on the south, SW 32nd Ave. on the east and SW 37th Ave. on the west. . Metric Fee: $26,809 Check if project performed with current firm e (1) TITLE AND LOCATION (City and State) Traffic Study at Mary Street/Grand Avenue and El Prado Boulevard in Miami-Dade County for City of Miami (2) YEAR COMPLETED PROFESSIONAL SERVICES 2009 CONSTRUCTION (If Applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE This project covers two distinct assignments. The first entails the investigation of the feasibility of providing a traffic circle at the Grand Ave./Mary St. intersection in Coconut Grove. The second assignment includes the investigation of various traffic calming schemes along a segment of El Prado Blvd. between Douglas Rd. and LeJeune Rd. in Coconut Grove geared towards the reduction/elimination of the present traffic cut through and/or speeding problems in this area. The study will include such issues as traffic circulation, geometry, crash analysis (years 2005 to 2007), trip generation and attraction, etc. In addition, a pre-meeting with city officials to properly coordinate the objectives and procedures of the study will be conducted as the initial study task. Metric Fee: $18,586 Check if project performed with current firm STANDARD FORM 330 (6/2004) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Michael McCoy 13. ROLE IN THIS CONTRACT Sr. Environmental Scientist 14. YEARS EXPERIENCE a. TOTAL 12 b. WITH CURRENT FIRM 1.5 years 15. FIRM NAME AND LOCATION (City and State) Metric Engineering, Inc., Miami, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) M.S. Ecological Design, The Robert Gordon University, Aberdeen Scotland B.S. Natural Resources; Ecosystem Assessment, North Carolina State University 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) FL Licensed Pesticide Applicator #CM21142 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) ISA Certified Arborist, LIAF Certified Florida Landscape Inspector 19. RELEVANT PROJECTS a (1) TITLE AND LOCATION (City and State) Dolly Land Phase I Environmental Site Assessment & Ecological Evaluation (2) YEAR COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION (If Applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Project Manager for this Phase I Environmental Site Assessment of a 63-acre parcel as part of a due diligence assessment that also included an evaluation of wetlands and listed species. Check if project performed with current firm b (1) TITLE AND LOCATION (City and State) Dollyland Property Phase II Environmental Site Assessment, K Hovnanian (2) YEAR COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION (If Applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Project Manager for this Phase II Environmental Site Assessment of a 63-acre parcel which involved coordination with well driller, water and soil sampling, laboratory analysis and a risk and remediation assessment. Check if project performed with current firm c (1) TITLE AND LOCATION (City and State) Dania Beach Property Acquisition Phase I's (10 sites), City of Dania Beach (2) YEAR COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION (If Applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Project Manager for a Phase I Environmental Site Assessment that covered 10 separate properties currently owned by the county that were proposed to be transferred to the City as part of a land exchange for airport expansion activities. Check if project performed with current firm d (1) TITLE AND LOCATION (City and State) Hialeah Water Treatment Plant Contamination & Ecologcial Assessments, City of Hialeah (2) YEAR COMPLETED PROFESSIONAL SERVICES On-going CONSTRUCTION (If Applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Environmental Project Manager for contamination and wetland issues including conducting Phase I Environmental Site Assessments for proposed construction locations, evaluation of the potential for water quality issues for drinking water extraction, wetland delineation and environmental resources permitting. Check if project performed with current firm e (1) TITLE AND LOCATION (City and State) Districtwide Environmental Compliance Inspection, FDOT District 6 (2) YEAR COMPLETED PROFESSIONAL SERVICES On-going CONSTRUCTION (If Applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Project Manager for this environmental contract involving inspection of active FDOT construction projects throughout Miami-Dade and Monroe Counties, for compliance with all environmental compliance issues including contamination, NPDES, bridge lead paint/asbestos work, wetland, water use and right of way permit requirements, wildlife conservation requirements and historical/cultural resource preservation. Check if project performed with current firm STANDARD FORM 330 (6/2004) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Andrew Witkin, RLA 13. ROLE IN THIS CONTRACT Landscape Architect 14. YEARS EXPERIENCE a. TOTAL 30 b. WITH CURRENT FIRM 21 15. FIRM NAME AND LOCATION (City and State) Witkin Hults Design Group 16. EDUCATION (DEGREE AND SPECIALIZATION) Bachelors Degree in Landscape Architecture 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Registered Landscape Architect, Florida #889 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Organizations: Member of ASLA, ULI, BASF, and Member of College of Arts and Architecture - 19. RELEVANT PROJECTS a (1) TITLE AND LOCATION (City and State) Flagler Station - Miami - Dade Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2009 CONSTRUCTION (If Applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Owner: Flagler Development Group - Architect: Forbes Architects, RLC Architects, Hunton Brady Architects - Contractor: Flagler - Contract Amount: In excess of $250,000 over 8 years - Role: Landscape Architectural Services for 635 acres industrial park. Check if project performed with current firm b (1) TITLE AND LOCATION (City and State) Miramar Town Center – Miramar - Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION (If Applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Owner: Rockefeller Group - Role: Landscape Architectural Services for blocks 5 & 6 Check if project performed with current firm c (1) TITLE AND LOCATION (City and State) Cap Juluca - Anguilla (2) YEAR COMPLETED PROFESSIONAL SERVICES 2009 CONSTRUCTION (If Applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Owner: Cap Juluca Properties, LTD. - General Contractor: Dick International - Contract Amount: $150,000 - Role: Hurricane Restoration and Landscape damage appraisal to luxury resort on 36 acres of oceanfront property. Check if project performed with current firm d (1) TITLE AND LOCATION (City and State) Park Square – Doral, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2008 CONSTRUCTION (If Applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Owner: Shoma Development - General Contractor: Shoma Development- Contract Amount: $35 million- Role: Landscape Architectural services for office tower, retail area and pedestrian plaza for special events. Check if project performed with current firm e (1) TITLE AND LOCATION (City and State) Islands at Doral – Doral, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2006 CONSTRUCTION (If Applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Owner: Century Builders Group. - General Contractor: Century Builders Group - Contract Amount: $100 million – Role: Landscape Architectural services for a large scale residential project with over 500 homes. Check if project performed with current firm STANDARD FORM 330 (6/2004) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME James Whalen, CIEC, LEED® AP 13. ROLE IN THIS CONTRACT Asbestos Services 14. YEARS EXPERIENCE a. TOTAL 20 b. WITH CURRENT FIRM 9 15. FIRM NAME AND LOCATION (City and State) Air Quest Environmental, Inc., Ft. Lauderdale, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) Bachelor of Arts 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Certified Indoor Environmental Consultant Florida Licensed Mold Assessor Florida Licensed Radon Measurement Technician Florida Licensed Asbestos Inspector Florida Licensed Asbestos Supervisor/ Contractor NIOSH 582 Microscopist 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) IAQA, USGBC 19. RELEVANT PROJECTS a (1) TITLE AND LOCATION (City and State) City of Lauderhill Fire Station #30 Lauderhill, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION (If Applicable) NA (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Mr. Whalen served as the Project Manager and conducted field activities for this contract. AirQuest was contracted by the City of Lauderhill to perform an Indoor Air Quality inspection, evaluate water damaged and mold impacted materials following Hurricane Wilma and to prepare a workplan for the remediation of the impacted materials within the two-story fire station building. A mold remediation workplan was developed for the City to solicit quotes from remediation contractors. AirQuest conducted post remediation air sampling and report preparation. The contract was valued at $4,500. Check if project performed with current firm b (1) TITLE AND LOCATION (City and State) St. Thomas University Miami Gardens, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION (If Applicable) NA (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Mr. Whalen served as Project Manager and conducted field activities for this contract. AirQuest was contracted by St. Thomas University to conduct an odor investigation in an office in response to occupant concerns. The scope of the investigation included a visual survey, a moisture survey and air sampling for fungi and volatile organic compounds (VOCs). Additionally, data logging equipment was deployed over a several day period to measure temperature, relative humidity, carbon monoxide, carbon dioxide, VOCs and total airborne particulate levels. Although an odor source was not identified (other than the low level of VOCs identified during the sampling), the results of the investigation addressed the occupant concerns and no additional investigation was conducted. The contract was valued at $4,400. Check if project performed with current firm c (1) TITLE AND LOCATION (City and State) Memorial Healthcare System Hollywood, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2008 CONSTRUCTION (If Applicable) NA (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Mr. Whalen served as Project Manager and conducted field activities for this contract. AirQuest was contracted to perform asbestos clearances following the removal of vinyl floor tile at the Memorial Regional Hospital. The project was conducted in phases to minimize interruptions to operations at the site. Samples were collected and analyzed by Phase Contrast Microscopy (PCM) in accordance with the NIOSH 7400 Method. The results of the analysis of the samples taken at the site did not identify the presence of airborne fiber concentrations at levels greater than 0.01 fibers per cubic centimeter (f/cc) of air, signifying that the work areas were safe for re-occupancy. Check if project performed with current firm d (1) TITLE AND LOCATION (City and State) Spring Gate School Plantation, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2007 CONSTRUCTION (If Applicable) NA (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Mr. Whalen served as Project Manager and conducted field activities for this contract. AirQuest collected samples for radon gas in accordance with the State of Florida Department of Health Requirements. Samples were collected and analyzed by a certified laboratory using EPA Method 402-R-92-004. The results were incorporated into a report documenting sampling locations and procedures and the results of the laboratory analysis. Check if project performed with current firm STANDARD FORM 330 (6/2004) PAGE 14 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, If not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 1 21. TITLE AND LOCATION (City and State) Downtown Infrastructure Street Phases I and II Miami, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2007 CONSTRUCTION (if Applicable) 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Miami b. POINT OF CONTACT NAME David Mendez, PE c. POINT OF CONTACT PHONE NUMBER 305-416-1240 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Street improvements (RRR) in the Miami Downtown project. The project covers all the streets at the center of Miami Downtown under jurisdiction of the City of Miami and extends North to South from North 5th to South 4th Street and West to East from I-95 to Biscayne Boulevard. Project involves milling and resurfacing, sidewalk restoration, ADA ramp reconstruction, new landscape installation, drainage improvements and utility and traffic signal modifications. Project also includes coordination with the Department of Homeland Security, FDOT, M- DCPWD and the City of Miami Design Cost $169,110, Estimated Construction Cost: $1,447,370. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a (1) FIRM NAME Metric Engineering, Inc. (2) FIRM LOCATION (City and State) Miami, FL (3) ROLE Project Management, Roadway Design b (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 (6/2004) PAGE 14 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, If not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 2 21. TITLE AND LOCATION (City and State) City of Homestead Downtown Area Transportation Plan Update, Homestead, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2006 CONSTRUCTION (if Applicable) 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Homestead b. POINT OF CONTACT NAME Dan Wick c. POINT OF CONTACT PHONE NUMBER 305-224-4484 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The study aimed at resolving a number of Downtown Transportation planning issues in the City’s congested urban core. The study included recommendations for truck movement accommodations, bicycle-way alignments, traffic calming treatments and utilizing the new Miami-Dade transit Busway within Homestead’s urban core. This analysis planned for an integrated multimodal transportation system providing a pedestrian friendly environment, motorized and un-motorized, that will serve as the backbone for continued growth within the City of Homestead. The Transportation Plan was intended to act as a guide for future improvements to the transportation infrastructure creating and developing a stronger more viable community. Design Cost $100,000. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a (1) FIRM NAME Metric Engineering, Inc. (2) FIRM LOCATION (City and State) Miami, FL (3) ROLE Conducted Study b (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 (6/2004) PAGE 14 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, If not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 3 21. TITLE AND LOCATION (City and State) Martin Luther King, Jr. Boulevard Miami, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2007 CONSTRUCTION (if Applicable) 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Miami b. POINT OF CONTACT NAME Kevin Brown, P.E. c. POINT OF CONTACT PHONE NUMBER 305-416-1090 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Resurfacing restoration and rehabilitation (RRR) improvements for the Dr. Martin Luther King, Jr. Boulevard (NW 62nd Street). Dr. Martin Luther King, Jr. Boulevard is a major urban road consisting generally of a four lane divided configuration with left and right turn lanes. The project corridor extends in two sections from NW 37th Avenue to NW 12th Avenue (under Miami-Dade County jurisdiction) and from NW 12th Avenue to I-95 (under City of Miami), with an approximate length of 2.56 miles and 0.64 miles respectively. The project design involves milling and resurfacing, sidewalk beautification and restoration, ADA ramp reconstruction, landscape restoration, new lighting and reconstruction of several linear parks. The project also includes coordination with FDOT, M-DCPWD and the City of Miami. Design Cost $124,294, Estimated Construction Cost: $2,591,660. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a (1) FIRM NAME Metric Engineering, Inc. (2) FIRM LOCATION (City and State) Miami, FL (3) ROLE Project Management, Roadway Design b (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 (6/2004) PAGE 14 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, If not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 4 21. TITLE AND LOCATION (City and State) Islands at Doral Doral, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2006 CONSTRUCTION (if Applicable) 2009 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Century Homebuilders b. POINT OF CONTACT NAME Cesar Llano c. POINT OF CONTACT PHONE NUMBER (305) 599-8100 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Landscape Architectural services for the largest residential community within the City of Doral; a residential development project with over 500 homes. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a (1) FIRM NAME Witkin Hults Design Group (2) FIRM LOCATION (City and State) Hollywood, FL (3) ROLE Landscape Architect b (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 (6/2004) PAGE 14 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, If not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 5 21. TITLE AND LOCATION (City and State) 12” WATER MAIN EXTENSION City of Dania Beach along Dania Beach Boulevard), Dania Beach, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2006 CONSTRUCTION (if Applicable) 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Dania Beach b. POINT OF CONTACT NAME Dominic Orlando, PE c. POINT OF CONTACT PHONE NUMBER 954-924-3740 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Design and construction contract plans for the installation of approximately 4,280 LF of a 12” potable water main to replace an existing 6” main for the City. Utility improvements were originally included in a Joint Project Agreement between the City and FDOT. In order to expedite the City’s need to provide additional water service to adjacent residential development, Metric Engineering was contracted to design the water main for immediate installation while accommodating planned roadway improvements including storm sewer systems and sanitary sewer relocations. The design included relocation of all existing water service connections as well as selection of pipe materials to resist corrosion in the elevated water table within the project corridor. Project construction plans included significant traffic control plans to safely permit open-trench construction while managing high-volume traffic from the beach area and the Dania Jai-Alai facility. Metric Engineering was also responsible for securing Right-of-Way Occupation Permits from FDOT and permits from Broward County Department of Environmental Protection and Health Department. Metric’s Fee: $20,000 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a (1) FIRM NAME Metric Engineering, Inc. (2) FIRM LOCATION (City and State) Miami, FL (3) ROLE Civil Engineering design, Utility Coordination, Traffic Control Plans, Permitting b (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 (6/2004) PAGE 14 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, If not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 6 21. TITLE AND LOCATION (City and State) CITY OF HIALEAH WATER TREATMENT PLANT DESIGN, HIALEAH, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES On-going CONSTRUCTION (if Applicable) 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Hialeah b. POINT OF CONTACT NAME Armando Vidal, Dir. of Water, Sewers and Public Works c. POINT OF CONTACT PHONE NUMBER (305) 556-3800 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Design of Raw Water Transmission Main, Well Maintenance Pipeline, Well Site Preparation, and Finished Water Transmission Main from Plant Site South Along Proposed NW 102nd Avenue and East Along NW 154th Street to NW 97th Avenue. Work includes environmental assessments for contamination, wetlands, wildlife and historic resources, design of pipelines, earthwork and drainage, design of well pads, coordination with geotechnical, drilling and construction contractors, obtaining all required permits, preparation of a project safety plan, estimation of summaries of quantities and construction costs, preparation of construction documents and construction inspection services. Metric's fee: $272,000. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a (1) FIRM NAME Metric Engineering, Inc. (2) FIRM LOCATION (City and State) Miami, FL (3) ROLE Civil Engineering design, permitting, construction support services b (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 (6/2004) PAGE 14 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, If not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 7 21. TITLE AND LOCATION (City and State) CIVIL ENGINEERING SERVICES FOR ROADWAY PROJECTS MIAMI, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES On-going CONSTRUCTION (if Applicable) 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Miami b. POINT OF CONTACT NAME Tatiana Acosta c. POINT OF CONTACT PHONE NUMBER 305-416-1263 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Example projects under this contract: TRAFFIC CALMING – GROVE AREA, B-30037A: The project involved the modification of existing intersections within the Coconut Grove Area of the City of Miami with Traffic Calming Circles and Flat-Topped Speed Hump. The design included geometry re- alignment, grading, minor drainage improvements to prevent creating any drainage issues, and pavement markings to meet Miami- Dade County Public Works and City of Miami Standards. Metric Fee: $61,537 SILVER BLUFF TRAFFIC CALMING – PRIOR ITY III, B30168A & PHASE II, B30168B: The project involved the modification of existing intersections within the City of Miami with Traffic Calming Circles. The design included geometry re-alignment, grading, minor drainage improvements to prevent creating any drainage issues, and pavement markings to meet Miami-Dade County Public Works and City of Miami Standards. Metric Fee: $64,781(III), $81,340(II) FLAGAMI TRAFFIC CALMING PRIORITY IV – B-40672A: The project involved the modification of existing intersections within the City of Miami with Traffic Calming Circles. The design included geometry re-alignment, grading, minor drainage improvements to prevent creating any drainage issues, and pavement markings to meet Miami-Dade County Public Works and City of Miami Standards. Metric Fee: $78,885 TRAFFIC CALMING STUDY – “SW 28TH ST BETWEEN SW 32 ND AVE AND SW 37TH AVE” - B-30662A: Traffic Study to evaluate the need of traffic calming devices on SW 28 St. The Study is bounded by SW 32 Ave. on the east and SW 37 Ave. on the west. Metric Fee: $28,836 WEST GROVE TRAFFIC CIRCLE FEASIBILITY STUDY B-30041A: The West Grove Traffic Circle Feasibility Study entails the investigation of the potential provision of traffic circles at several intersections in the West Grove neighborhood of Miami, Florida. The vicinity is generally bound by Bird Avenue to the north, Grand Avenue to the south, SW 27 Avenue to the east and Douglas Road (SW 37th Avenue) to the west. The intersections: Elizabeth Street at Shipping Avenue, New York Street at Shipping Avenue, Elizabeth Street at Day Avenue, New York Street at Day Avenue and McDonald Street (SW 32nd Avenue) at Day Avenue were selected by the City of Miami based on requests and concerns received from area residents. Metric Fee: $18,964 TRAFFIC STUDY – BRIDGEPORT AVE AND SW 30 CT - B-30662B: Traffic Study to resolve traffic cut through, speeding and other concerns reported at Bridgeport Ave and SW 30 CT between US1 and Bird Ave within the City of Miami. The study will include such issues as traffic circulation, geometry, crash analysis (years 2005 to 2007), trip generation and attraction, etc. In addition, a pre- meeting with FDOT to properly coordinate the objectives and procedures of the study will be conducted as the initial study task. The study area is bounded by NW 27th Ave. on the east, Bird Ave. on the south and US-1 along the north and west. Metric Fee: $43,974 TRAFFIC STUDY AT MARY STREET/GRAND AVENUE AND EL PRADO BOULEVARD – B-30662C: This project covers two distinct assignments. The first entails the investigation of the feasibility of providing a traffic circle at the Grand Ave./Mary St. intersection in Coconut Grove. The second assignment includes the investigation of various traffic calming schemes along a segment of El Prado Blvd. between Douglas Rd. and LeJeune Rd. in Coconut Grove geared towards the reduction/elimination of the present traffic cut through and/or speeding problems in this area. The study will include such issues as traffic circulation, geometry, crash analysis (years 2005 to 2007), trip generation and attraction, etc. In addition, a pre-meeting with city officials to properly coordinate the objectives and procedures of the study will be conducted as the initial study task. Metric Fee: $18,586 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a (1) FIRM NAME Metric Engineering, Inc. (2) FIRM LOCATION (City and State) Miami, FL (3) ROLE Prime - traffic and roadway engineering b (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 (6/2004) PAGE 14 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, If not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 8 21. TITLE AND LOCATION (City and State) DISTRICTWIDE TRAFFIC OPS MIAMI-DADE & MONROE COUNTIES, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES Ongoing CONSTRUCTION (if Applicable) 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER FDOT – District VI b. POINT OF CONTACT NAME Eman Gomaa, EI c. POINT OF CONTACT PHONE NUMBER 305-470-5314 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The objective of this contract is to provide traffic engineering reports/studies that will identify and evaluate/analyze the problems at certain intersections, arterials, etc., and recommend appropriate solution(s) based on an analysis of the cost effectiveness of each of the recommended improvements. In addition, highway safety studies/reports identifying and evaluating/analyzing certain problems and recommendations may be included. This job is based on Task Work Orders. Project Fee: $1,500,000 Work Order No. 1  SR A1A/Collins Avenue at 16 Street, located in Miami Beach, Florida The purpose of this qualitative assessment was to investigate and document existing traffic operations and safety conditions at the location and make recommendations for improvements (if necessary) or gauge the need to conduct further studies at the location. Metric ‘s Fee: $5,043.63 Work Order No. 2  SR A1A/Collins Avenue at 17 Street, located in Miami Beach, Florida The objective of this study is to evaluate the intersection of SR A1A/Collins Avenue at 17 Street from a traffic operations and safety standpoint and provide recommendations, if any. Metric’s Fee: $3,600.59 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a (1) FIRM NAME Metric Engineering, Inc (2) FIRM LOCATION (City and State) Miami, FL (3) ROLE Prime - traffic engineering and analysis to support operations and planning b (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 (6/2004) PAGE 14 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, If not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 9 21. TITLE AND LOCATION (City and State) CITY OF DANIA BEACH CONTAMINATION ASSESSMENTS FOR PROPERTY ACQUISITION DANIA BEACH, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION (if Applicable) 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Dania Beach b. POINT OF CONTACT NAME Robert Daniels, Dir. of Community Development c. POINT OF CONTACT PHONE NUMBER 954-924-6800 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Preparation of simultaneous Phase I Environmental Site Assessments for ten properties, in support of a major land exchange operation between the City of Dania Beach and Broward County, due to airport expansion activities. Due to a tight timeframe to meet City and County commission agenda meeting deadlines, the Phase I ESAs for all 10 sites were completed within a two-week timeframe from Notice to Proceed. Metric Engineering combined site activities including file reviews, EDR reports and site investigations to minimize costs and schedule. Metric fee: $4,615. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a (1) FIRM NAME Metric Engineering, Inc. (2) FIRM LOCATION (City and State) Miami, FL (3) ROLE Phase I Environmental Site Assessments b (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 (6/2004) PAGE 14 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, If not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 10 21. TITLE AND LOCATION (City and State) BROWARD COUNTY RISK MANAGEMENT DIVISION ASBESTOS SURVEYS BROWARD COUNTY, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES On-going CONSTRUCTION (if Applicable) 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Broward County Risk Management Division b. POINT OF CONTACT NAME Jim Litrides c. POINT OF CONTACT PHONE NUMBER 954-357-8037 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) AirQuest has maintained an industrial hygiene contract with Broward County’s Risk Management Division since 2008. Broward County elected to renew the contract in July 2011 for a third consecutive year. AirQuest conducted a comprehensive interior asbestos survey for the 590,000 SF Broward County Judicial Complex. In support of operation and maintenance activities at the site, a 10,000 entry spreadsheet was compiled of the findings. The project was valued at $48,000. Other project types completed for Broward County include: asbestos abatement oversight and clearance testing, mold remediation oversight and post remediation testing, odor investigations and personnel monitoring. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a (1) FIRM NAME Air Quest Environmental, Inc. (2) FIRM LOCATION (City and State) Ft. Lauderdale, FL (3) ROLE Industrial Hygiene, NESHAPS Asbestos Inspections, Asbestos Abatement Oversight and Clearance Testing, Mold and Moisture Assessments, Mold Remediation Oversight and Post Remediation Testing, Odor Investigations and Personnel Monitoring b (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 (6/2004) G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27. ROLE IN THIS CONTRACT (From Section E, Block 13) 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in “Example Projects Key” section below before completing table. Place “X” under project key number for participation in same or similar role.) 12345 6 78910 Frank Panellas, PE Project Manager, Sr. Engineer - Roadway x Robert Linares, PE Principal-in-Charge x x x x x x x x Manuel Sauleda, PE Sr. Engineer - Drainage x x x Charles Alfaro, PE Sr. Engineer - Civil x x Carlos Rodriguez, PE Sr. Engineer - Traffic x x Michael McCoy Senior Environmental Scientist x x x Andrew Witkin, RLA Landscape Architect x James Whalen Asbestos Services x 29. EXAMPLE PROJECTS KEY NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) 1 Downtown Infrastructure Street Phases I and II, Miami, FL 6 City of Hialeah Water Treatment Plant 2 City of Homestead Downtown Area Transportation Plan Update, Homestead, FL 7 City of Miami Civil Engineering for Roadway Projects 3 Martin Luther King, Jr. Boulevard Miami, FL 8 FDOT District 6 Districtwide Traffic Operations 4 Islands at Doral, Doral, FL 9 City of Dania Beach Contamination Assessments 5 Dania Beach 12" Water Main Extension 10 Broward County Risk Management Asbestos Surveys STANDARD FORM 330 (6/2004) H. ADDITIONAL INFORMATION 30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED. I. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. 31. SIGNATURE 32. DATE 12-6-11 33. NAME AND TITLE Robert Linares, PE ARCHITECT – ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If any) PART II – GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME Metric Engineering, Inc. 3. YEAR ESTABLISHED 1976 4. DUNS NUMBER 083104604 2b. STREET 13940 SW 136 Street, Suite 200 5. OWNERSHIP a. TYPE Corporation 2c. CITY Miami 2d. STATE FL 2e. ZIP CODE 33186 b. SMALL BUSINESS STATUS N/A 6a. POINT OF CONTACT NAME AND TITLE 7. NAME OF FIRM (If block 2a is a branch office) 6b. TELEPHONE NUMBER 305-235-5098 6c. E-MAIL ADDRESS 8a. FORMER FIRM NAME(S) (If any) 8b.YR ESTABLISHED 8c. DUNS NUMBER N/A N/A N/A 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM’S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function Code b. Discipline c. No. of Employees a. Profile Code b. Experience c. Revenue Index Number (see below) (1) FIRM (2) BRANCH 02 Administrative 42 C15 Construction Management 8 15 Construction Inspector 64 H07 Highways; Streets; Airfield Paving; Parking Lots 6 16 Construction Manager 23 P05 Planning (Community, Regional, Areawide and State) 5 24 Environmental Scientist 5 S09 Structural Design; Special Structures 2 29 GIS Specialist 3 S10 Surveying; Platting; Mapping; Flood Plain Studies 2 38 Land Surveyor 1 T03 Traffic & Transportation Engineering 6 47 Planner: Urban/Regional 6 57 Structural Engineer 2 58 Technician/Analyst 52 60 Transportation Engineer 40 Total 238 11. ANNUAL AVERAGE PROFESSIONAL PROFESSIONAL SERVICES REVENUE INDEX NUMBER SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) 1. 2. 3. 4. 5. Less than $100,000 $100,000 to less than $250,000 $250,000 to less than $500,000 $500,000 to less than $1 million $1 million to less than $2 million 6. 7. 8. 9. 10. $2 million to less than $5 million $5 million to less than $10 million $10 million to less than $25 million $25 million to less than $50 million $50 million or greater a. Federal Work b. Non-Federal Work 9 c. Total Work 9 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE b. DATE 12/5/2011 c. NAME AND TITLE Robert Linares, PE AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) PAGE 1 AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) PAGE 12 ARCHITECT-ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If any) PART II - GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME Witkin Hults Design Group 3. YEAR ESTABLISHED 1988 4. DUNS NUMBER 2b. STREET 307 S 21 Avenue 5. OWNERSHIP 2c. CITY Hollywood 2d. STATE FL 2e. ZIP CODE 33020 a. TYPE S- Corporation 6a. POINT OF CONTACT NAME AND TITLE Andrew Witkin - President b. SMALL BUSINESS STATUS Active 6b. TELEPHONE NUMBER 954-923-9681 6c. E-MAIL ADDRESS andyw@witkindesign.com 7. NAME OF FIRM (If block 2a is a branch office). 8a. FORMER FIRM NAME(S) (If any) Witkin Design Group 8b. YR. ESTABLISHED 1995 8c. DUNS NUMBER 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM’S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function Code b. Discipline c. No. of Employees a. Profile Code b. Experience c. Revenue Index Number (see below) (1) FIRM (2) BRANCH 02 Administrative 2 39 Landscape Architect 5 Other Employees Total 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000 6. $2 million to less than $5 million 2. $100,000 to less than $250,000 7. $5 million to less than $10 million 3. $250,000 to less than $500,000 8. $10 million to less than $25 million 4. $5000,000 to less than $1 million 9. $25 million to less than $50 million 5. $1 million to less than $2 million 10. $50 million or greater a. Federal Work 1 b. Non-Federal Work 6 c. Total Work 7 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE b. DATE 12/05/11 c. NAME AND TITLE Andrew Witkin - President PART II - GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) a. SIGNATURE ARCHITECT-ENGINEER QUALIFICATIONS 2a. FIRM (OR BRANCH OFFICE) NAME 2b. STREET 2c. CITY 2d. STATE2e. ZIP CODE 3. YEAR ESTABLISHED4. DUNS NUMBER 5. OWNERSHIP b. Discipline c. No. of Employees 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS b. Experience c. Revenue Index Number (see below) STANDARD FORM 330 (6/2004) PAGE 6 1. SOLICITATION NUMBER (If any) 8a. FORMER FIRM NAME(S) (If any)8b. YR. ESTABLISHED 9. EMPLOYEES BY DISCIPLINE Total (1) FIRM(2) BRANCH 1.Less than $100,000 2.$100,00 to less than $250,000 3.$250,000 to less than $500,000 4.$500,000 to less than $1 million 5.$1 million to less than $2 million 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) 7. NAME OF FIRM (If block 2a is a branch office) 6a. POINT OF CONTACT NAME AND TITLE 6c. E-MAIL ADDRESS 8c. DUNS NUMBER a. Federal Work b. Non-Federal Work c. Total Work 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. b. DATE c. NAME AND TITLE a. Function Code a. Profile Code 6b. TELEPHONE NUMBER a. TYPE b. SMALL BUSINESS STATUS PROFESSIONAL SERVICES REVENUE INDEX NUMBER 6.$2 million to less than $5 million 7.$5 million to less than $10 million 8.$10 million to less than $25 million 9.$25 million to less than $50 million 10.$50 million or greater Other Employees AUTHORIZED FOR LOCAL REPRODUCTION Corporation M/WBE NA AirQuest Environmental, Inc. 5150 SW 48thWay, Suite 610 Fort Lauderdale Traci-Anne Boyle President NA 02A01 A04 A11 B02 C04 C10 D07 E02 E07 P08 R04 S01 T02 T05 O01 L04 I01 H11 H10 H06 H01 G01 Administrative1 187 5 10 2 500+ 20 25 500+ 2 5 4 2 100+ 5 50 500+ 5 20 1 5 1 Environmental Scientist Industrial Hygienist Project Manager 24 36 48 Traci@airquestinc.com FL33314 2 2 1 2 1 8 954-792-4549, extension 112 2002119169683 NA Traci-Anne Boyle, President 12/05/2011Traci-Anne Boyle Digitally signed by Traci-Anne Boyle DN: cn=Traci-Anne Boyle, o=AirQuest Environmental, Inc., ou=President, email=traci@airquestinc.com, c=US Date: 2011.12.05 16:22:56 -05'00' 1 5 1 1 1 5 1 2 1 1 1 1 1 5 2 1 2 1 1 1 6 1 1 4 4     APPENDIX C ‐ SIGNED ADDENDUMS      APPENDIX D ‐ COMPANY LICENSES                 STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION ASBESTOS LICENSING UNIT (850) 487-1395 1940 NORTH MONROE STREET TALLAHASSEE FL 32399-0783 AIRQUEST ENVIRONMENTAL INC TRACI-ANNE BOYLE 5150 SW 48TH WAY STE 610 FORT LAUDERDALE FL 33314 STATE OF FLORIDA AC# 57827?b Congratulations! With this license you become one of the nearly one million DEPARTMENT OF BUSINESS ANDFloridians licensed by the Department of Business and Professional Regulation . PROFESSIONAL REGULATIONOur professionals and businesses range from architects to yacht brokers, from boxers to barbeque restaurants, and they keep Florida's economy strong. ZA304 09/27/11 118055808 Every day we work to improve the way we do business in order to serve you better I For information about our services, please log onto www.myfloridalicense.com. ASBESTOS BUSINESS ORGANIZATION There you can find more information about our divisions and the regulations that AIRQUEST ENVIRONMENTAL INC impact you, subscribe to department newsletters and learn more about the TRACI-ANNE BOYLE Department's initiatives. Our mission at the Department is: License Efficiently, Regulate Fairly. We constantly strive to serve you better so that you can serve your customers. IS LICENSED under the provisions of ch.469 FS.Thank you for doing business in Florida, and congratulations on your new license! Expiration date, NOV 30, 2013 Ll1092704900 ---' DETACH HE RE THIS DOCUMENT HAS A COLORED BACKGROUND' MICROPRINTING • LlNEMARK '· PATENTED PAPER AC# 5782776 STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION ASBESTOS LICENSING UNIT SEQ# Ll1092704900 ZA304 The ASBESTOS BUSINESS ORGANIZATION Named below IS LICENSED Under the provisions of Chapter Expiration date: NOV 30, 2013 AIRQUEST ENVIRONMENTAL INC TRACI-ANNE BOYLE 5150 SOUTHWEST 48TH WAY STE 610 FORT LAUDERDALE FL 33314 RICK SCOTT KEN LAWSON GOVERNOR SECRETARY DISPLAY AS REQUIRED BY LAW