Loading...
KEITH & SCHNARS, P.A.City of Request for Letter of Interest - Professional Engineering & Management Services December 9, 2011 10305 NW 41st Street, Suite 112 Doral, Florida 33178 Phone: (305) 477-7667 Fax: (305) 477-4474 www.keithandschnars.com Table of Contents Section One: Introductory Letter Section Two: Evaluation Factors Section Three: Supportive Information Section Four: Required Forms December 9, 2011 Hector Mirabile, PhD, City Manager City of South Miami 6130 Sunset Drive South Miami, FL 33143 RE: Request for Letter of Interest – Professional Engineering & Management Services Dear Mr. Mirabile: The City of South Miami is home to a wide range of age groups and popular businesses, is one of Miami-Dade County’s most thriving communities, and Keith and Schnars (K&S) would be honored to assist the City with our professional engineering and management consulting services. We can provide the City with all the required Roadway Engineering (streets, sidewalks, curb and gutter, drainage, traffic control, striping, lighting, traffic calming and landscape architecture), Drainage Design (drainage improvements, paving, grading plans), Civil Engineering (water/wastewater analysis and design), and Traffic Engineering (traffic assessment, conceptual improvement plans, report presentations and all related traffic engineering reports and recommendations). We can also provide the City with Construction Engineering Inspection (CEI) Services, Environmental Services, Grant Application Services, and General Planning/Transportation Planning Services, as needed. We currently hold similar general engineering services contracts for the Cities of Fort Lauderdale, North Miami, Coconut Creek and West Palm Beach, to name a few. The Standard Form 330 provided in Section Four includes descriptions of these and other contracts. It also includes the reference materials requested by the City. Given our experience working with various local governments on similar projects, we believe the K&S Team is the most qualified and the best fit to help the City achieve its goals on this contract. As the Principal-in-Charge, I will actively oversee all the projects awarded to our firm under this contract and take responsibility for their successful completion. Our Vice President of Civil Engineering, Tim Hall, P.E., will join with me as overall Project Manager to ensure effective client communication and project implementation. We hereby state that, to the best of our knowledge, all information contained in this submittal is complete and accurate, and without possible conflicts of interest. We have attached a brief synopsis of our qualifications and a description of our process of managing general consulting contracts. We are ready to begin work! Sincerely, Mark Tomczyk, P.E. Vice President of Civil Engineering 10305 NW 41st Street, Suite 112 ● Doral, Florida 33178 ● Phone: (305) 477-7667 ● Fax: (305) 477-4474 City of Request for Letter of Interest - Professional Engi n e e r i n g & M a n agement Services December 9, 2011 Page 2www.keithandschnars.com City of South Miami Section Two: Evaluation Factors Firm Overview Representing the continuation of historic firms dating to 1929, Keith and Schnars (K&S) was incorporated in Florida in 1972. The firm is currently home to over 100 civil and structural engineers; public outreach professionals; planners; surveyors; transportation planners; construction inspection specialists; environmental scientists; landscape architects; graphic designers; and a whole range of technical and administrative support staff. Our Clients Our client base at K&S is extremely diversified. Our clientele includes private developers, municipalities, contractors, architects, utility companies, state agencies, and an impressive number of City and County governments. The abbreviated listing of our long-term clients below gives some indication of the importance we place on maintaining relationships. City of Fort Lauderdale (2002 – Present)• Miami-Dade County (2002 – Present)• Seminole Tribe of Florida (2002 – Present)• City of Port St. Lucie (2002 – Present) • South Florida Water Management District • (2002 – Present) City of Boca Raton (1995 – Present)• Florida Department of Transportation District • (1993 – Present) Broward County (1985 – Present)• Civil/Water Resource Engineering Services K&S provides civil engineering services to a number of Counties, Municipalities and Drainage Districts throughout the State of Florida. Our services include water analysis and master-planning of water distribution and sewer collection systems as well as design of over half a million linear feet of utilities improvements, large transmission mains, lift stations (design/re-habilitation) and related construction observation. Our Water Resources group offers hydrologic/hydraulic analyses for site specific flood (drainage) studies to more complex large watershed stormwater management programs. We use the latest in industry standard software in our analyses, which ultimately lead to design, permitting, and production of construction documents. From large modeling and masterplans to specific construction documents and inspection services, our full array of Civil Engineering services provides the versatility required to adapt to the diversity of project needs and objectives for both our municipal and private clients. Highway Engineering Services The Highway Engineering Division of K&S provides transportation engineering and related services on all types of highway and road projects, from access roads in residential areas, to multi-lane divided expressways with bridges, to tolls and interchanges for the FDOT and County and municipal road departments. A typical project includes the design of signalized intersections, signing and marking plans, closed storm drainage and retention pond systems, sound barrier walls, landscape plans, new street lighting system, design survey and utility location and coordination. Surveying and Mapping Services The Survey Department at K&S offers a full range of surveying and mapping services including: Boundary Surveys, Legal Descriptions, Topographic Surveys, Horizontal and Vertical Control, Profiles and Cross Sectioning, Right-of- Way Mapping, Monumentation of Right-of-Way Corridors, Bridge Data Surveys, Digital Terrain Models (DTM), Hydrographic/Bathymetric Surveys, Specific Purpose Surveys, American Land Title Association Surveys, Wetland/ Mitigation Surveys, Environmental Surveys, Platting, Expert Witness Testimony, Construction Surveys, Record and As-built, Route, Electronic Field Book/GIS Mapping, all mainstream versions of CADD/GIS Differential Leveling, Global Positioning Systems (GPS), Engineering Design Surveys, and other surveying and mapping related services. Landscape Architecture Services K&S’ landscape architects have the technical background and experience to provide high quality services from initial planning, to construction observation and final inspection. We are accustomed to managing multiple concurrent projects for a single government client. The projects we have successfully completed recently have included parks, streetscapes, community enhancements, traffic calming, beautification, roadway improvements, and municipal facilities. Our landscape architecture team has provided services to over eight municipalities/agencies in the past five years, with projects including City Halls, Public Works Facilities, municipal complexes, and fire stations. Services for these projects have included preliminary studies, site planning, irrigation design, site amenities design, planting plans, tree preservation plans, and development review approvals and permitting. Permitting Services Aside from the need for responsible budgeting and adequate funding, nearly every project undertaken also requires some form of permitting, whether it is local, county, State or federal. So, in addition to providing clients with practical advice regarding grant monies that can be utilized to add value to their projects, we also provide them with engineering consulting services in the area of permitting. We have considerable experience in these matters, having worked in numerous counties throughout the State of Florida, on projects involving all levels of government. Page 3 CEI Services/Resident Project Representation Construction management requires the ability to work with others while maintaining a clear view of the process and the systems to manage. Therefore, we offer the following construction engineering and inspection services: Project management, Schedule control, Cost control, Contract administration and Expert witness testimony Traffic Planning and Engineering Services The K&S transportation planning team is one of the most experienced and stable traffic engineering teams in South Florida. The team boasts five licensed professional engineers, and several team members have working relationships that extend over 20 years. The teams’ deep expertise has been applied to some of the most challenging technical assignments such as three dimensional microscopic simulations of the most complex interchanges in Florida. The team’s expertise and experience is rooted in the fundamentals of traffic engineering which is applied to services for both private sector and governmental clients including local, county, and state agencies. Among the services provided are concurrency and growth management studies, traffic calming, municipal reviews, site-specific traffic impact and parking studies, interchange justification and modification reports, traffic safety studies, land use plan amendments, signal warrant studies, amendments to thoroughfare preservation plans, and transportation planning and traffic forecasting for airports, new towns and large-scale Developments of Regional Impact containing as much as twenty-two square miles. Continuing Services Contract Approach and Methodology K&S uses a proactive and comprehensive approach toward the management of its projects. This approach is based on the selection of the organizational structure best suited to meet the requirements and needs of each specific project. This allows us to match the technical and administrative needs of our clients with the skills, talents and experience of a team specially selected for the project. As a firm that routinely handles several Continuous Consulting Engineering Services contracts, our organizational structure lends itself to providing design services for multiple projects of various sizes in short timeframes. The K&S Team recognizes that its strong credentials, resources and ability to respond quickly and efficiently are not sufficient, in and of themselves, to guarantee successful performance on this contract. The contract requires a management plan designed to specifically address the staffing, monitoring, planning and communications problems inherent in open-ended contracts. It also calls for a management plan that deals with the need for well-documented and understandable procedures so that staff can be efficiently managed. Specifically our management plan will provide: An efficient management system, with clearly defined • roles and responsibilities for scope, schedule and budget; A Contract Manager as the primary point-of-contact • for the CRA; Quick-turnaround capability, as well as long-term • program continuity; Compliance with Work Order schedules and budgets;• Flexibility to respond to changes in scope and • direction; and Quality assurance and quality control throughout • phases of the project. Cost Control We believe the success of a project can be directly attributed to proper staffing of the project, the development of a challenging but achievable project schedule, good communication between all team members and the proper project documentation and control. We are confident this can be achieved because of the excellent project management system that is an integral part of our corporate structure. We believe K&S has a well-earned reputation of delivering quality plans on time and within budget. We control costs by implementing a strong Project Management System corporate wide. We consider our history of cost overruns and supplemental agreements to be lower than the average within our industry. For instance, between 2001 and 2007, K&S completed twelve projects for FDOT with a construction value in excess of $120 million. Our average cost overrun average was only 4%, and our construction time overrun was 1%. No other firm selected by FDOT that completed that volume of work, maintained such low overruns in cost and time. We believe in getting a strong start on all our projects by strictly adhering to a proven system of project management and control. K&S’ Project Management System starts with the development of a well prepared project scope which is properly staffed and budgeted. Staffing availability is compared with the project budget and schedule during the preparation of the project staffing plan in order to ensure that no team members are over committed which could lead to project delays. Once a good scope is used to develop a good schedule, and qualified professionals are selected with the resources necessary to meet that schedule, the rest comes down to good communication and project management skills to document the flow of the project. Communication and coordination are the primary keys to success of any design assignment. Strong project management ensures that a quality product will be produced, that the work product is delivered on or ahead of schedule, and that the lines of communication are open. www.keithandschnars.com City of South Miami Section Two: Evaluation Factors Page 4www.keithandschnars.com City of South Miami Section Three: Supportive Information PROJECT MANAGER DRAINAGE DESIGN Roberto Goncalves Project Engineer Frank Vilar, P.E. Project Manager Tim Hall, P.E. Vice President of Civil Engineering Mark Tomczyk, P.E. Vice President of Civil Engineering Chris Miller, RLA, LEED AP Landscape Architecture Project Manager Carlos Alcantara, P.E. Senior Project Manager Bruce Reed, RLA Director of Landscape Architecture Tim Hall, P.E. Vice President of Civil Engineering Mayra Manrique, E.I. Project Engineer Matt Neddeff, P.E. Associate Designer Frank Vilar, P.E. Project Manager Carlos Alcantara, P.E. Senior Project Manager Mayra Manrique, E.I. Project Engineer Frank Vilar, P.E. Project Manager John Krane, P.E. Director of Transportation Planning Mark Tomczyk, P.E. Vice President of Civil Engineering José Rodríguez, P.E. Senior Project Manager ROADWAY ENGINEERING PRINCIPAL-IN-CHARGE/QA/QC ROADWAY ENGINEERING CIVIL ENGINEERING ROADWAY ENGINEERING ROADWAY ENGINEERING ROADWAY ENGINEERING ROADWAY ENGINEERING DRAINAGE DESIGN DRAINAGE DESIGN DRAINAGE DESIGN CIVIL ENGINEERING TRAFFIC ENGINEERING CIVIL ENGINEERING TRAFFIC ENGINEERING Eric Penfield, P.E. Assistant Director of Traffic Engineering TRAFFIC ENGINEERING Organizational Chart Page 5 Supportive Information Tim Hall, P.E. – PM/Drainage Design - With over 24 years of experience, Mr. Hall has been involved in numerous diverse Land Development and Civil Engineering projects. His experience providing construction management for a Builder/Developer, permit review and program management for a large municipality, and Design/Consulting services for both Private and Public sector clients, provides broad insight into the variety of issues related to project development. Having participated in the design and implementation of everything from small in-fill development to large neighborhood improvement projects, Mr. Hall has been exposed to a wide range of private land development and public infrastructure projects. His experience spans from modeling and master planning to preparation of construction documents, permitting, and construction administration, for numerous water distribution, sewer collection, storm water management, and land development projects. Mark Tomczyk, P.E. – Principal in Charge/Civil Engineering - Mr. Tomczyk has more than 20 years of general civil engineering experience, with a specialty in Land Development, stormwater management, floodplain modeling, permitting and private development engineering and construction administration. He has extensive experience with the design/implementation of grant funded public and quasi-public entities in the generation of technical specification and grant management. Additionally, Mr. Tomczyk has been utilized as an expert witness for courtroom testimony for land use and stormwater management/floodplain management issues. Mr. Tomczyk has also provided engineering and support services for federal, public and private clients for residential, industrial, and institutional development. Key services include structural, land development site plan/engineering preparation, development feasibility study, subdivision design, roadway design, stormwater management , floodplain and riparian engineering, grading (earthworks), drainage and erosion control, road design, traffic improvements , environmental design and restoration, construction specification, commissioning, and procurement of all local, county, state and other governmental approvals. Frank Vilar, P.E. – Drainage Design/Civil Engineering - Mr. Vilar has over 14 years of extensive professional experience in the design of water/ wastewater systems, design of drainage and storm water management systems, site design and development, preparation of contract documents and specifications for bid and permitting services experience through numerous South Florida agencies. His experience includes design of water and wastewater improvements for the City of Fort Lauderdale, rehabilitation of lift stations in City of Coconut Creek and North Lauderdale, and neighborhood improvements for the Westgate CRA. Professional experience also includes work on various land development projects for Seminole Tribe of Florida, Coscan Homes and also administering the NPDES Program for the City of Miami. Carlos Alcantara, P.E. – Drainage Design/Roadway Engineering - Mr. Alcantara is a Senior Project Manager and an engineering professional with over 10 years of experience that encompasses: plans preparation and development, roadway design, maintenance of traffic, lighting design, utility coordination, signalization design, signing & pavement marking design and drainage. Mayra Manrique, E.I. – Drainage Design/Roadway Engineering - Ms. Manrique is a Project Engineer with over 10 years of experience in land development and roadway design. She is currently involved in various roadway projects. Ms. Manrique has provided the following services on roadway design projects: calculation of quantity take offs for cost estimating; preparation of typical section packages; development of flexible pavement design; preparation of proposals and manhour estimates; utility coordination; roadway lighting design and reports; assitance with drainage design, calculations, and reports; design of horizontal and vertical roadway geometry; and signing and pavement marking design. Matt Neddeff, P.E. – Roadway Engineering - Mr. Neddeff is a professional engineer experienced in the production of roadway design. He has provided roadway design services for various FDOT and municipal projects. Mr. Neddeff’s involvement in roadway design is as follows: flexible pavement www.keithandschnars.com City of South Miami Section Three: Supportive Information Page 6 design, development of typical section packages, design of horizontal and vertical geometry, signing and pavement marking design, signalization design, utility coordination, work zone traffic control, computation of quantities, specification development and assisted in drainage design. He has developed expertise in the use of AASHTO, FDOT and municipality design standards. He has also prepared Geotechnical Reports. Mr. Neddeff is proficient with Microstation/Geopak and other software that aids in the efficient design and production of roadway plans. Bruce Reed, RLA – Roadway Engineering - Mr. Reed has extensive experience in a wide variety of projects where he has provided a full range of landscape architectural services. These services consist of the following land development activities: master planning, programming, plan review, site design and development, landscape and irrigation design, cost analysis, environmental mitigation design/ permitting, site approval processing/permitting and public/ client presentation. As an experienced project manager, Mr. Reed has competently prepared and administered construction and bid documents, QA/QC, contract negotiation, written reports and correspondence, review of project invoices and construction observation. As a divisional staff supervisor, he directs and schedules the design teams in completion of landscape architectural design development. Mr. Reed has developed a perceptive understanding of park and recreational facility design and has consistently established positive rapport with municipal and agency personnel. He has demonstrated responsible capabilities in team coordination and client/staff/public project comprehension and status awareness. He also has significant experience in the areas of roadway and streetscape beautification design and commercial/industrial/ residential land development analysis and design. In addition, he possesses a wide range of state-of-the-art computer technology capabilities resulting in the presentation and submission of the latest computer-aided calculations, reports and design production by his design team. Chris Miller, RLA LEED-AP – Roadway Engineering - Mr. Miller is a highly qualified landscape and irrigation designer with a keen interest in the Green Industry. His broad range of experience includes all phases of the design process from site analysis, concept generation and project planning to the computer-aided drafting of landscape, irrigation and amenity designs through final implementation. He is known for his innovative design solutions and immaculate attention to design details, specification writing, plan reviews and construction inspection. Combined with the ability to recognize and solve the complex requirements of project integration, Mr. Miller’s expertise includes a thorough understanding of the South Florida landscape and critical sustainable design principles. These strengths are complimented by his skill in photography and effective presentations. His many years of experience include planning and design for commercial developments, parks, municipal centers, streetscapes and FDOT roadway beautification projects. Mr. Miller currently holds 12 Green Industry Certifications in addition to his Landscape Architecture license. Roberto Goncalves – Civil Engineering - Mr. Goncalves serves as a Project Engineer under the Keith and Schnars’ Municipality Division for site development, water, drainage and sewer projects for the City of Fort Lauderdale. His expertise in the use of computer aided drafting software, with the latest addition of Civil 3D for AutoCAD, contributes to timely and precise delivery of drawings and complex design documents. John Krane, P.E. – Traffic Engineering - Mr. Krane has over 22 years of experience in planning, transportation engineering, preliminary engineering/ PD&E, access management, traffic operations, and safety, with 12-plus years of management experience. His primary areas of expertise include site impact analyses, intersection and roadway operational and level of service analyses, development and application of transportation demand forecasting models, project traffic development, and project management. He currently serves as the Director of Transportation Planning activities statewide. In addition to acting as senior advisor on division work and project manager for important projects, he is responsible for the oversight of workflow, staff development, and Quality Assurance of his Division. José Rodríguez, P.E. – Traffic Engineering - Mr. Rodríguez has more than 35 years of experience in transportation and traffic engineering including work as a graduate research engineer at the University of Maryland. Mr. Rodríguez has directed and actively participated in numerous and wide- www.keithandschnars.com City of South Miami Section Three: Supportive Information Page 7 ranging transportation studies and projects for both the public and private sectors. These projects have been concerned with traffic (site and access impacts for both private and public developments; traffic calming; roadway corridor and alignment studies; pedestrian malls and auto-restricted zones; HOV feasibility, and roadway and intersection design and operation analyses); transit (bus and paratransit planning and operations analyses including route planning, jitney systems; downtown shuttle bus feasibility studies; transit corridors; multi-modal alternatives analyses; public transit terminal feasibility studies including location, operations, and design; transit travel characteristics; public policy development); parking (demand studies; facilities needs and development planning; public policy development); environmental impacts (traffic noise and air quality; construction and right-of-way impacts; socio- economic aspects; general traffic and parking impacts); and airport planning (aviation demand; land side operations, capacities, and airport master plans). Eric Penfield, P.E. – Traffic Engineering - Mr. Penfield has 14 years of transportation engineering experience working for public and private sector clients. The author of an article on the relationship between microscopic simulation and signalized intersection delay, his areas of expertise include traffic impact studies, corridor studies, capacity analysis, microscopic simulation, and operational analysis. He has conducted conceptual design and alternatives analyses for roadway facilities; transportation analyses associated with amendments to Local Government Compre¬hensive and Trafficway plans; regional and site-related transportation concurrency evaluations; and Development of Regional Impact (DRI) studies. Additionally, he has been involved in the development of design traffic forecasts for a number of major roadway projects. Mr. Penfield also serves as a Development Review Committee (DRC) member for several South Florida municipalities. In this capacity, Mr. Penfield applies his traffic experience in regional and site- specific evaluations and provides expert advice on a range of issues, including land use planning, access management, and transportation concurrency. www.keithandschnars.com City of South Miami Section Three: Supportive Information Page 8www.keithandschnars.com City of South Miami Section Four: Required Forms ARCHITECT – ENGINEER QUALIFICATIONS PART I - CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State) Professional Engineering & Management Services, South Miami, FL 2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER B. ARCHITECT-ENGINEER POINT OF CONTACT 4. NAME AND TITLE Mark Tomczyk, P.E., Vice President of Civil Engineering 5. NAME OF FIRM Keith and Schnars 6. TELEPHONE NUMBER (954) 776-1616 7. FAX NUMBER (954) 771-7690 8. E-MAIL ADDRESS mtomczyk@keithandschnars.com C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) (Check) PR I M E J- V PA R T N E R SU B C O N - TR A C T O R 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT a. √ Keith and Schnars † CHECK IF BRANCH OFFICE 10305 NW 41st Street, Suite 112 Doral, FL 33178 Prime b. † CHECK IF BRANCH OFFICE c. † CHECK IF BRANCH OFFICE d. † CHECK IF BRANCH OFFICE e. † CHECK IF BRANCH OFFICE f. † CHECK IF BRANCH OFFICE g. † CHECK IF BRANCH OFFICE h. † CHECK IF BRANCH OFFICE D. ORGANIZATIONAL CHART OF PROPOSED TEAM …(Attached) Page 9www.keithandschnars.com E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE 12. NAME Mark Tomczyk, P.E. 13. ROLE IN THIS CONTRACT Principal-in-Charge/Civil Engineering a. TOTAL 23 years b. WITH CURRENT FIRM 1 year 15. FIRM NAME AND LOCATION (City and State) KEITH AND SCHNARS – Fort Lauderdale, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) M.S., Environmental Engineering, Pennsylvania State University B.S., Civil Engineering, The Pennsylvania State University 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Registered Professional Engineer, FL #63171 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) American Society of Civil Engineers; National Society of Professional Engineers; Florida Society of Professional Engineers; Florida Engineering Society 19. RELEVANT PROJECTS (2) YEAR COMPLETED 1) TITLE AND LOCATION (City and State) Monroe County EAR Monroe County, FL PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) N/A a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ;… Check if project performed with current firm Monroe County has contracted with Keith and Schnars to update their Comprehensive Plan Policy and Technical Documents to the 2011-2031 planning timeframe, and prepare their Evaluation, Appraisal and Report (EAR). The last update occurred in 1995. This includes extensive public involvement to define the Major Issues of the County; data collection and inventory of all aspects of the County; and close coordination with County staff and all agencies within the County. The final phase of this project is to realign the LDC sections to make it more user friendly, incorporate modern planning strategies, and implement the Goals, Objectives and Policies of the updated Comprehensive Plan. (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) Countess Hoernle Park IDC Boca Raton, FL PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) N/A b (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †… Check if project performed with current firm Project Manager/Civil Engineer for a contract providing comprehensive project management and full turnkey consulting services for the development of a 228-acre park. The City completed a preliminary Master Plan in early 2006 for the entire site. The overall scope of services for the park development includes the following: project management; survey; geotechnical; environmental; landscape architecture/land planning; reclaimed water; civil engineering; architecture; mechanical / electrical engineering; structural engineering; permitting; bidding and construction. This project includes the design of the Phase I Master Plan components for the South Site, comprising approximately 171 acres, to satisfy the City's immediate need for softball and soccer playing fields, while being environmentally and culturally innovative. ($50K fee to date) (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) Fort Lauderdale General Engineering Projects Fort Lauderdale, FL PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) c (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ;… Check if project performed with current firm The Keith and Schnars team is providing a broad range of consulting services to the City of Fort Lauderdale. These services include, but are not limited to, general surveying, aerial photography, civil engineering design, architectural design, landscape architectural design, drafting and mapping, and construction management. City of South Miami Section Four: Required Forms Page 10www.keithandschnars.com E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE 12. NAME Tim Hall, P.E. 13. ROLE IN THIS CONTRACT Project Manager/Drainage Design a. TOTAL 25 years b. WITH CURRENT FIRM 8 years 15. FIRM NAME AND LOCATION (City and State) KEITH AND SCHNARS – Fort Lauderdale, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S., Civil Engineering, University of Maryland, 1987 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Registered Professional Engineer, FL #50588 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) N/A 19. RELEVANT PROJECTS (2) YEAR COMPLETED 1) TITLE AND LOCATION (City and State) Fort Lauderdale – General Engineering Services Contract Fort Lauderdale, FL PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) N/A a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm Provide civil design and project management for various City improvement projects. Projects include program to provide sanitary service to 1,200 residences and businesses to eliminate septic systems, streetscape and landscape improvements, correction of inadequate water and drainage systems, roadway re-alignment and traffic calming. Fees: $8.6 million (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) Edgewood Drainage Analysis Fort Lauderdale, FL PROFESSIONAL SERVICES 2005 CONSTRUCTION (If applicable) N/A b (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm Project lead on drainage analysis of existing 600-acre neighborhood with the purpose of quantify and identifying cause for frequent and substantial flooding. Orchestrated project modeling, proposed alternatives, and provided cost estimates with defined level of service. Presentation findings to homeowners and City officials. (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) Septic Area 18 Fort Lauderdale, FL PROFESSIONAL SERVICES 2006 CONSTRUCTION (If applicable) N/A c (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm Analyze capacity and impacts to existing infrastructure and lift stations resulting from full build-out of a 130-acre partially developed parcel. Services included modeling, analysis, and recommendations for proposed improvements. Using atlas and as-built information, developed a baseline model reflecting existing conditions. Once calibrating, the model was modified to reflect expanded service areas. Upon evaluation, a complete report of findings was prepared outlining design criteria, assumptions, baseline data, exhibits, and calculations with recommended alternatives. (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) Fort Lauderdale – WW2011 Program Fort Lauderdale, FL PROFESSIONAL SERVICES 2010 CONSTRUCTION (If applicable) N/A d (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm Project Lead for design services related to City’s Capital Improvements Program which included approximately $636 million in utilities infrastructure repair, replacement, and upgrades. The program includes analysis, modeling and design for improvements to water and wastewater facilities in meeting a comprehensive plan in response to expanded demand and service areas. City of South Miami Section Four: Required Forms Page 11www.keithandschnars.com E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE 12. NAME Carlos Alcantara, P.E. 13. ROLE IN THIS CONTRACT Roadway Engineering/Drainage Design a. TOTAL 10 years b. WITH CURRENT FIRM 10 years 15. FIRM NAME AND LOCATION (City and State) KEITH AND SCHNARS – Fort Lauderdale, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S. Civil Engineering, High Honors, University of Florida, 2001 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Registered Professional Engineer, FL #64760 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) N/A 19. RELEVANT PROJECTS (2) YEAR COMPLETED 1) TITLE AND LOCATION (City and State) University of Miami Coral Gables, FL PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) N/A a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm Currently Project Manager responsible for design and preparation of construction documents for an internal circulation roadway throughout the University of Miami campus. Also, Project Manager for various external roadway projects that the University must complete in order to comply with several City of Coral Gables ordinances. (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) SW 157th Avenue Miami-Dade County, FL PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) N/A b (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm Currently Project Manager for design and preparation of construction documents for the widening of SW 157th Avenue from SW 184th Street to SW 152nd Street from a two-lane undivided facility to a four-lane divided facility. Project also includes drainage, signalization, lighting, signing and marking. (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) Sawgrass Expressway Broward County, FL PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) N/A c (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm Design-Build Project Manager and Engineer of Record responsible for design and preparation of roadway construction plans and permitting for Florida’s Turnpike Enterprise. Scope of work includes the construction of dedicated Sunpass lanes with signature gantries at four (4) interchanges on the Sawgrass Expressway. The interchanges involved were Commercial Boulevard, Atlantic Boulevard, Sample Road, and University Drive. (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) FDOT District 6 Districwide General Engineering Consultant Services, Miami-Dade County, FL PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) N/A d (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm Keith and Schnars has managed a District General Engineering Consultant Services Contract for FDOT's District 6 The purpose of the contract is basically to serve as an extension of the District's staff. The scope includes assisting in basically all sections throughout the Department. Including professional services, planning, public transportation, project development and environmental (PD&E), design, production management, right-of-way services, surveying and mapping services, value engineering, construction engineering management (CEI), maintenance engineering management etc. City of South Miami Section Four: Required Forms Page 12www.keithandschnars.com E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE 12. NAME Mayra Manrique 13. ROLE IN THIS CONTRACT Roadway Engineering/Drainage Design a. TOTAL 10 years b. WITH CURRENT FIRM 9 years 15. FIRM NAME AND LOCATION (City and State) KEITH AND SCHNARS – Doral, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S., Civil Engineering, University of Florida, 2001 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) N/A 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) N/A 19. RELEVANT PROJECTS (2) YEAR COMPLETED 1) TITLE AND LOCATION (City and State) Tri-Rail Palm Beach County, FL PROFESSIONAL SERVICES 2005 CONSTRUCTION (If applicable) N/A a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †;Check if project performed with current firm Assisted with drainage design calculations for proposed tracks. Developed drainage details, profiles and cross sections for drainage design. Assisted with responses to comments from several reviewing agencies. Fees: $5,000,000.00 (Construction) (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) Yamato Road Palm Beach County, FL PROFESSIONAL SERVICES 2005 CONSTRUCTION (If applicable) N/A b (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm Assisted with roadway design (horizontal layout), drainage design, typical section package, signing and pavement marking design. Fees: $472,477 (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) Biscayne Boulevard/SR-5 Miami-Dade County, FL PROFESSIONAL SERVICES 2009 CONSTRUCTION (If applicable) N/A c (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †;Check if project performed with current firm Lead Engineer - Assisted the Engineer of Record with the roadway, lighting and maintenance of traffic design for the reconstruction of 1.4 miles of Biscayne Boulevard (SR-5/US-1) from NE 15th Street to NE 35th Terrace. The project includes the construction of a new 5-lane section, drainage, decorative lighting, signalization, signing and pavement markings and landscaping. (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) Andrews Avenue Broward County, FL PROFESSIONAL SERVICES 2005 CONSTRUCTION (If applicable) N/A d (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †;Check if project performed with current firm Assisted with the preparation of horizontal and vertical alignment, signing and pavement marking design, quantities, cross sections, and cost estimating. Fees: $16,000,000.00 (Construction) City of South Miami Section Four: Required Forms Page 13www.keithandschnars.com E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE 12. NAME Matt Neddeff, P.E. 13. ROLE IN THIS CONTRACT Roadway Engineering a. TOTAL 6 years b. WITH CURRENT FIRM 5 years 15. FIRM NAME AND LOCATION (City and State) KEITH AND SCHNARS – Fort Lauderdale, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S., Civil Engineering, University of Florida, 2005 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) N/A 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Florida Academic Scholar Member of American Society of Civil Engineers (ASCE) 19. RELEVANT PROJECTS (2) YEAR COMPLETED 1) TITLE AND LOCATION (City and State) Fort Lauderdale Beach Streetscape Fort Lauderdale, FL PROFESSIONAL SERVICES 2006 CONSTRUCTION (If applicable) N/A a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm Worked on the utility details and noted utility conflicts. (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) Becker Road Interchange Design Port St. Lucie, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) N/A b (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm Assisted on interchange detail, and started summary of pay items. (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) University of Miami Miami Gardens, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) N/A c (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm Designer of external projects, including the widening of Red Road to add turn lane at Albenga Avenue (alignment and stripping), and lengthen turn lanes at Standford Drive and Alhambra Circle (horizontal and vertical alignment and striping). (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) I-95 RRR St. Lucie County, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) N/A d (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm Responsible for specification package, Long Range Estimate, TRNS*PORT inputs, and computing the quantities for the project. Created sign improvement package that included images and signs identified in plans that need improvement, review and implement comments from DOT, and created change memo for final responses to comments. (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) El Rio Canal Shared Use Pathway Palm Beach County, FL PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) N/A e (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm Lead Designer tasked with the development of complete construction plans and specifications. The project scope includes the construction of a 12 foot wide concrete path, and a signalized crosswalk where the proposed path meets Congress Avenue. The project also involves ADA ramp improvements, signing and marking, sidewalk construction, utility coordination, permitting, signal video detection improvements and landscaping. City of South Miami Section Four: Required Forms Page 14www.keithandschnars.com E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE 12. NAME Bruce Reed, RLA 13. ROLE IN THIS CONTRACT Roadway Engineering a. TOTAL 21 years b. WITH CURRENT FIRM 17 years 15. FIRM NAME AND LOCATION (City and State) KEITH AND SCHNARS – Fort Lauderdale, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S., Landscape Architecture, University of Florida, 1987 A.A., Florida State University, 1984 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Registered Landscape Architect, FL #0001479 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Crime Prevention through Environmental Design (CPTED) December 1998 American Society of Landscape Architects 19. RELEVANT PROJECTS (2) YEAR COMPLETED 1) TITLE AND LOCATION (City and State) Coconut Creek Casino Coconut Creek, FL PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) N/A a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm The Coconut Creek Casino is a complex project located on 49 acres of Tribal Land at the intersection of SR-7 and Sample Road in the City of Coconut Creek. Due to split jurisdictional responsibilities, the project has involved complex land-use and zoning issues. Keith and Schnars has developed a whole range of plans on behalf of the Tribe, from easement and right of way abandonments, to DRI and Master plan processing. As the project’s lead consultant, we have been involved in the preparation and analysis of all land use, zoning, civil engineering, traffic engineering, and survey services for the project. (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) Districtwde Landscape Architectural Services FDOT District 6, FL PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) N/A b (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm Consulting services including construction plans for landscape, hardscape, and irrigation improvements; tree relocation, plan reviews, reports, construction inspection and/or field assessments, renderings, permitting, coordinating and updating of project logs, project coordination, correspondence, project scopes, roadway and traffic control plans. Contract Fee Limit: $1,500,000 per 5-year term (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) Beach Streetscape Master Plan Fort Lauderdale, FL PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) N/A c (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm Project Manager for this $9 million Streetscape Enhancement Project. Tasks include field analysis, concept development, budget s and public presentations. Fees: $9,000,000 (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) Brighton Reservation Fitness Trail Seminole Tribe of Florida PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) N/A d (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm The Keith and Schnars Landscape Architecture Division provided services from a Site Master Plan through construction documents, including program elements of pedestrian trails, outdoor exercise equipment, lighting, signage, park furniture, pavilions, and wetland plantings for the Seminole Tribe of Florida. City of South Miami Section Four: Required Forms Page 15www.keithandschnars.com E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE 12. NAME Chris Miller, RLA, LEED AP 13. ROLE IN THIS CONTRACT Roadway Engineering a. TOTAL 17 years b. WITH CURRENT FIRM 13 years 15. FIRM NAME AND LOCATION (City and State) KEITH AND SCHNARS – Fort Lauderdale, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S./ongoing/Landscape Architecture Vicenza, Italy Institute of Architecture (European Study program), University of Florida, fall 1997 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Registered Landscape Architect, FL #6666970 ISA Certified Arborist #FL-5218A, FNGLA Certified Horticultural Professional #HC7 5726 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Associate Member American Society of Landscape Architects, LEED Accredited, American Horticultural Society, Florida Irrigation Society, Florida Native Plant Society, Florida Nursery Growers and Landscape Association, Florida Urban Forestry Council, International Society of Arboriculture, International Palm Society, Landscape Inspectors Association of Florida, The Irrigation Association 19. RELEVANT PROJECTS (2) YEAR COMPLETED 1) TITLE AND LOCATION (City and State) Districtwide Landscape Architectural Services FDOT District 6, FL PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) N/A a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm Consulting services including construction plans for landscape, hardscape, and irrigation improvements; tree relocation, plan reviews, reports, construction inspection and/or field assessments, renderings, permitting, coordinating and updating of project logs, project coordination, correspondence, project scopes, roadway and traffic control plans. Contract Fee Limit: $1,500,000 per 5-year term (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) FDOT, Miami Rental Car Facility and Miami Inter-modal Center, Miami-Dade, FL PROFESSIONAL SERVICES 2007 CONSTRUCTION (If applicable) N/A b (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm Planning, irrigation and landscape lighting design for this major Miami International Airport facility. Construction Budget: $3,500,000.00; Design Fees $221,000.00 (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) SR-7 Miami Gardens Miami Gardens, FL PROFESSIONAL SERVICES 2006 CONSTRUCTION (If applicable) N/A c (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm Streetscape design including hardscape layout, planting and irrigation design from concepts through bid documents. Construction Budget: $1,500,000; Consultant Fee: $108,000 (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) Town of Lantana Municipal Beach Complex Lantana, FL PROFESSIONAL SERVICES 2007 CONSTRUCTION (If applicable) N/A d (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm Keith and Schnars provided park master planning; programming, survey, design, citizens and park user’s survey, public meetings; drainage improvement recommendations, opinion of implementation cost, concepts, preliminary and final master plan. Construction Budget: $3,935,000; Consultant Fee: $73,700 City of South Miami Section Four: Required Forms Page 16www.keithandschnars.com E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE 12. NAME Frank Vilar, P.E. 13. ROLE IN THIS CONTRACT Roadway Engineering/Drainage Design/Civil Engineering a. TOTAL 16 years b. WITH CURRENT FIRM 11 years 15. FIRM NAME AND LOCATION (City and State) KEITH AND SCHNARS – Fort Lauderdale, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) M.S., Environmental Engineering, 1995 B.S., Civil Engineering, 1992 A.A., Miami-Dade Community College, 1988 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Registered Professional Engineer, FL #55459 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) The City of Miami's Illicit Discharge Control Program for the Wagner Creek Sub-Basin Area. Publication of the Florida Association of Stormwater Utilities, Tallahassee, Florida, 1996 19. RELEVANT PROJECTS (2) YEAR COMPLETED 1) TITLE AND LOCATION (City and State) Septic Areas 3, 4, 5 and 8 Utility Improvements Fort Lauderdale, FL PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) N/A a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †;Check if project performed with current firm These project areas include the Lauderdale West, Sunset North, River Run, Flamingo Park, Oak River, Shady Banks and Edgewood Communities. Complete design, permitting and construction phase services for these projects that includes over 175,000 lineal feet of gravity sewer, 5,500 lineal feet of force mains, ten (10) new wastewater pump stations, and 36,000 lineal feet of water mains. The total construction value is estimated to be 30 million dollars. (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) City of Deerfield Beach Public Works Facility Deerfield Beach, FL PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) N/A b (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm Site engineering, permitting, bidding and construction management for development of a 20-acre former landfill site in Deerfield Beach, Florida Estimated Construction Fees: $8,000,000 (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) Sewer Study for Chula Vista/River Lands/Lauderdale Isle and River Lanes Communities Broward County, FL PROFESSIONAL SERVICES 2007 CONSTRUCTION (If applicable) N/A c (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †;Check if project performed with current firm Project Manager for an engineering study to provide sanitary sewer systems to several residential communities which are being serviced by individual septic tank systems and recently annexed by the City of Fort Lauderdale. The study area comprised of 425-acres of mostly single-family dwellings. The study identified and evaluated several options to service the subject communities. The recommended wastewater system includes 55,000 linear feet of gravity sanitary sewer collection systems, 7,000 linear feet of force mains and three (3) wastewater pump stations. The total construction value was estimated to be $10 million. (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) Interlachen North Lauderdale, FL PROFESSIONAL SERVICES 2003 CONSTRUCTION (If applicable) N/A d (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †;Check if project performed with current firm Lift Station 4: Rehabilitation of Lift Station in the City of North Lauderdale, Florida. Complete design, permitting and construction phase services for the rehabilitation and conversion of a dry pit station to a submersible installation with peak flows of 915 gpm, 40 HP pumps and 8” force mains. Approximate Construction Fees: $200,000 City of South Miami Section Four: Required Forms Page 17www.keithandschnars.com E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE 12. NAME Roberto Goncalves 13. ROLE IN THIS CONTRACT Civil Engineering a. TOTAL 11 years b. WITH CURRENT FIRM 9 year 15. FIRM NAME AND LOCATION (City and State) KEITH AND SCHNARS – Fort Lauderdale, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S., Civil Engineering, Florida International University, 2001 A.A., Broward Community College, 1999 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) N/A 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Member, Florida Engineer Society; Member, Order of the Engineer; Member, American Institute of Steel Construction 19. RELEVANT PROJECTS (2) YEAR COMPLETED 1) TITLE AND LOCATION (City and State) Water and Wastewater Improvement Project Fort Lauderdale, FL PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) N/A a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm Project Engineer for the on-going design of water and wastewater improvements for the City of Fort Lauderdale. The service area is bordered to the North by Davie Boulevard, to the South by Riverland Road, to the East by New River and to the West by State Road 441. Fees: $ 20 million – Construction (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) Sewer Study for Chula Vista/River Lands/Lauderdale Isle and River Lanes Communities Fort Lauderdale, FL PROFESSIONAL SERVICES 2007 CONSTRUCTION (If applicable) Ongoing b (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm Project Engineer for an engineering study to provide sanitary sewer systems to several residential communities which are being serviced by individual septic tank systems and recently annexed by the City of Fort Lauderdale. The study area comprised of 425-acres of mostly single-family dwellings. Fees: $9,500,000 (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) 48” Water Main Design Fort Lauderdale, FL PROFESSIONAL SERVICES 2007 CONSTRUCTION (If applicable) N/A c (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm Project Engineer for the design of water improvements for the City of Fort Lauderdale. This project includes replacing of approximately 900 LF of pipe by removing the existing 36” PCCP Water Main and installing new 30” Ductile Iron Pipe in its place and connections to existing water mains and installation of approximately 6,000 LF of 48”. Tie-back Wall Design was utilized to secure a 42” Butterfly Valve that was to be abandoned. (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) Oakland Park, W.M. Sub-Aqueous Large Pressurized Water Main Design, Fort Lauderdale, FL PROFESSIONAL SERVICES 2007 CONSTRUCTION (If applicable) N/A d (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm Project Engineer for the design of 3,336 LF of 30” DIP Transmission water main and connections to existing water mains. Approximately 906 LF of the water main was designed to utilize Directional Drill technique. Project required special permits from FDOT, US COAST GUARD, ARMY CORE and Florida Department of Environmental Protection. City of South Miami Section Four: Required Forms Page 18www.keithandschnars.com E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE 12. NAME John Krane, P.E. 13. ROLE IN THIS CONTRACT Traffic Engineering a. TOTAL 23 years b. WITH CURRENT FIRM 4 years 15. FIRM NAME AND LOCATION (City and State) KEITH AND SCHNARS – Fort Lauderdale, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S, Civil Engineering, Michigan State University, 1988 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Registered Professional Engineer, FL #0048952 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) N/A 19. RELEVANT PROJECTS (2) YEAR COMPLETED 1) TITLE AND LOCATION (City and State) Davie Commons DRI, IMR and LUPA Studies Davie, FL PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) N/A a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm Senior advisor to the study team preparing complex development related studies including a Development of Regional Impact (DRI) report, Interchange Modification Report (IMR) and a Land Use Plan Amendment (LUPA) for a development of 2,000,000 square feet. (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) Matanzas Woods Parkway and I-95 IJR Flagler County, FL PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) N/A b (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm Project Manager for a new interchange proposal along I-95 between the existing interchanges of Palm Coast Parkway in Flagler County and US-1 in St. Johns County. The approval of the Interchange Justification Report (IJR) will enable the reconstruction of the existing bridge crossing of Matanzas Woods Parkway into a full interchange with I-95. The interchange will serve the City of Palm Coast, Bunnell, and future DRI scale developments that have been approved in the area. (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) Crosstown Parkway Extension PD&E (EIS) Port St. Lucie, FL PROFESSIONAL SERVICES 2008 CONSTRUCTION (If applicable) N/A c (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm Project Manager for the Project Development and Environment (PD&E) study for the extension of Crosstown Parkway across the North Fork of the St. Lucie River to US-1. This study has been designated as an Environmental Impact Statement (EIS). Responsible for project coordination between the FDOT, FHWA, the City of Port St. Lucie, and the host of State and federal resource and regulatory agencies. (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) Village of Valencia Lakes DRI DeSoto County, FL PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) N/A d (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm Senior advisor to the study team preparing the Question 21 responses to the DRI application. Mr. Krane provides policy and technical guidance related to Concurrency, Proportionate Share and Fair Share legislation, and Strategic Intermodal System (SIS) policies relating to the impacted State roadways. City of South Miami Section Four: Required Forms Page 19www.keithandschnars.com E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE 12. NAME José Rodríguez, P.E. 13. ROLE IN THIS CONTRACT Traffic Engineering a. TOTAL 37 years b. WITH CURRENT FIRM 12 years 15. FIRM NAME AND LOCATION (City and State) KEITH AND SCHNARS – Fort Lauderdale, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) M.S., Transportation Engineering, University of Maryland, 1974 B.S., Civil Engineering, University of Maryland, 1972 Transportation Systems Management course, School of Engineering and Applied Sciences, Princeton University, 1976 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Registered Professional Engineer, FL #45596 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Professional Affiliations: Member, Institute of Transportation Engineers Publications: Author co-author of three articles dealing with traffic operations and public/private transit operations published by the Transportation Research Board and the Institute of Transportation Engineers Broward County MPO, Citizens’ Involvement Roundtable: Representative for the City of Coral Springs 2008-present 19. RELEVANT PROJECTS (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) Special Urban Sector Traffic and Parking Studies Various Locations PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) N/A a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm City of Pompano Beach CRA, City of North Miami Beach, City of Fort Lauderdale, City of West Palm Beach, City of Plantation, Town of Jupiter; Development of Regional Impact Reports (DRI) in Broward and Miami-Dade Counties; the Caracas/Prados del Este HOV corridor feasibility study for the World Bank; access road/terminal integration at the new Athens Airport; historic zone traffic and transit studies for Old San Juan and Ponce, Puerto Rico; and the Miami-Dade Countywide Policy Study. Traffic engineering project review services for the cities of Plantation, Fort Lauderdale, North Lauderdale, and North Miami Beach. (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) Development review Committee Consultant Broward County, FL PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) N/A b (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †;Check if project performed with current firm Mr. Rodriguez is currently the Project Manager/Principal Engineer responsible for the coordination and review of traffic and/or parking reduction studies prepared by traffic consultants for project developments in the City of Fort Lauderdale. His responsibilities include: project administration, review and approval of traffic study methodologies, traffic report reviews and assistance at City committee meetings including City Commission. (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) Old Cutler Road Traffic Engineering Study Miami-Dade County, FL PROFESSIONAL SERVICES 2005 CONSTRUCTION (If applicable) N/A c (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm The project involved the operational evaluation of the Old Cutler Road Corridor between SW 87th Avenue and SW 212th Street with the intention of assessing the viability of establishing traffic roundabouts at SW 89th and 97th Avenues, incorporating the roadway operations and infrastructure into the approved Corridor Master Plan, and improvements to the pedestrian/bicycle trails. This project included the feasibility assessment and the design and evaluation of two roundabouts. As Project Manager for this special study, with a limited budget and time frame, Mr. Rodríguez directed the engineering specialists of Keith and Schnars in the conceptual design, cost estimates determination, roundabout design and traffic operations analyses and simulations. City of South Miami Section Four: Required Forms Page 20www.keithandschnars.com City of South Miami Section Four: Standard Form 330 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE 12. NAME Eric Penfield, P.E. 13. ROLE IN THIS CONTRACT Traffic Engineering a. TOTAL 14 years b. WITH CURRENT FIRM 2 years 15. FIRM NAME AND LOCATION (City and State) KEITH AND SCHNARS – Fort Lauderdale, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) M.S., Civil Engineering, Michigan State University, 1997 B.S., Civil Engineering, Michigan State University, 1994 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Registered Professional Engineer, FL #56717 Professional Engineer, MI #6201052212 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Institute of Transportation Engineers 19. RELEVANT PROJECTS (2) YEAR COMPLETED 1) TITLE AND LOCATION (City and State) General Planning Consultant Systems FDOT District 4, FL PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) N/A a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm As the Project Manager, Mr. Penfield helped provide on-demand transportation engineering and planning services for the FDOT District 4. Through the issuance of task work orders for the five-county study area, rendered services included SIS Facilities Long Range Travel Demand Forecasts, Access Management analyses, Districtwide Design Traffic Forecasting, IOAR/IMR/IJR reviews, PD&E study reviews, transportation modeling updates, Broward County Action Plans Reviews, and a Park-and-Ride Lot Study. (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) General Traffic Engineering Services Sunny Isles Beach, FL PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) N/A b (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm Project Manager for Traffic Engineering, conducted intersection and corridor safety studies, and queuing analyses, as part of the site plan approval process. Reviews include traffic impact and trip generation analyses, traffic operations, site access/circulation, stacking/queuing analysis, marking review, geometric considerations, and safety compliance. Site plan reviews were also performed. (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) General Transportation Engineering and Planning Services Fort Lauderdale, FL PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) N/A c (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm Project Manager for Traffic Engineering, provided as-needed transportation services. These have included traffic impact study reviews, and parking study and shared parking assessments that were conducted in accordance with the city’s land development regulations. Extensive intergovernmental coordination and quasi-judicial presentations were required. (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) General Transportation Engineering and Planning Services Parkland, FL PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) N/A d (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm Project Manager for Traffic Engineering, provided as-needed transportation services that included traffic control, operating analysis, traffic impact, site plan review, comprehensive planning, concurrency evaluations, and traffic safety studies. Extensive intergovernmental coordination was required. (2) YEAR COMPLETED (1) TITLE AND LOCATION (City and State) Arvida Parkway/I-75 Southbound Exit Ramp Traffic Study Weston, FL PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) N/A e (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE †; Check if project performed with current firm The southbound exit ramp from I-75 to westbound Arvida Parkway is a free-flow ramp experiencing excessive delay during peak hours. Further, a unique weaving situation develop-ed due to lane geometry and alignment coupled with the explosive population growth downstream of the ramp junction. As Lead Technical Traffic Engineer, Mr. Penfield evaluated alternatives to cost-effectively solve the ramp’s operational problem as well as downstream bottlenecking. Phase I identified ways to minimize weaving and delay while Phase II monitored and addressed potential problems at the ramp junction with I-75. Page 21www.keithandschnars.com F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 1 22. YEAR COMPLETED 21. TITLE AND LOCATION (City and State) Fort Lauderdale General Engineering Projects Fort Lauderdale, FL PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT NAME City of Fort Lauderdale c. POINT OF CONTACT NAME Paul Bohlander, P.E. c. POINT OF CONTACT TELEPHONE NUMBER (954) 828-6527 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost.) The Keith and Schnars team is providing a broad range of consulting services to the City of Fort Lauderdale. These services include, but are not limited to, general surveying, aerial photography, civil engineering design, architectural design, landscape architectural design, drafting and mapping, and construction management. Task orders authorized under this contract have included the following: •Miami Road (Area) Sanitary Sewer Improvements •River Oaks/Edgewood Stormwater Management Study •Northeast 15th Avenue Streetscape •11th Avenue Swing Bridge Rehabilitation •Renovations to Holiday Park Gymnasium •Woodlawn Cemetery Site Improvements •Northeast 18th Avenue Streetscape •Feasibility Report for Relocation of Cherry Building •Site Study for New City Hall •Fort Lauderdale Beach Streetscape Master Plan •Feasibility Study and Design for new building for Building and Zoning Department •Northeast 34th Avenue/Northeast 33rd Avenue sidewalk construction •Renovation to War Memorial Building •Feasibility Analysis for International Swimming Hall of Fame •Beach restrooms survey •Improvements at George English Park •Northeast 33rd Avenue/Dolphin Isles Neighborhood Improvement Project •Septic Tank Area 3 Sanitary Sewer and watermain improvements Fees: $7.6 million (to date) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Keith and Schnars (2) FIRM LOCATION (City and State) Fort Lauderdale, FL (3) ROLE Prime City of South Miami Section Four: Required Forms Page 22www.keithandschnars.com F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 2 22. YEAR COMPLETED 21. TITLE AND LOCATION (City and State) FDOT District 4 Districtwide GEC Traffic Operations Access Management and Studies FDOT District 4, FL PROFESSIONAL SERVICES 2010 CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER FDOT District 4 c. POINT OF CONTACT NAME Beth Coe c. POINT OF CONTACT TELEPHONE NUMBER (954) 777-4373 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost.) As part of Keith and Schnars’ districtwide general traffic operations consultant contract with the FDOT District 4, we provided an oversight role for on-site support services, and support of miscellaneous traffic operations studies for the five-county study area. These include: Signal Warrant Studies Conflict Analysis Hospital Guidesign Master Plan Speed and Gap Studies In addition to an oversight role of general support to their Access Management program, a Master Plan was developed for all hospitals in Palm Beach County meeting the wayfinding guidelines of the FDOT Traffic Engineering Manual. Additionally, several Signal Warrant studies, Speed and Gap studies and a Conflict Analysis were conducted in accordance with the FDOT Traffic Engineering Manual and Manual on Uniform Traffic Studies. Fees: Ongoing Task-based 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Keith and Schnars (2) FIRM LOCATION (City and State) Fort Lauderdale, FL (3) ROLE Prime City of South Miami Section Four: Required Forms Page 23www.keithandschnars.com F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 3 22. YEAR COMPLETED 21. TITLE AND LOCATION (City and State) EL Rio Multi-Use Trail Greenway – Segment 3 Boca Raton, FL PROFESSIONAL SERVICES 2009 CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Boca Raton c. POINT OF CONTACT NAME Joy Puerta c. POINT OF CONTACT TELEPHONE NUMBER (561) 416-3410 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost.) The El Rio Trail is a 12’ wide shared use pathway which follows the El Rio Canal. Keith and Schnars designed a non-vehicular greenway area in the middle of the urban fabric that integrates the user with natural features. This trail segment runs from Yamato Road to L-40 Canal under a Local Participation Agreements (LAP) with the FDOT. Keith and Schnars services included design plan preparation, design surveys, environmental permitting, landscape architecture, structural engineering, preparation of specifications package, and post design services. This segment of the El Rio Multi-Use Trail includes pedestrian bridges and seating areas. The trail corridor is adjacent to business and office parks and crosses the L-40 Canal. Fees: $116,000 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Keith and Schnars (2) FIRM LOCATION (City and State) Fort Lauderdale, FL (3) ROLE Prime City of South Miami Section Four: Required Forms Page 24www.keithandschnars.com F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 4 22. YEAR COMPLETED 21. TITLE AND LOCATION (City and State) FDOT District 6 Districtwide General Engineering Consultant Services Florida PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT NAME Florida Department of Transportation District 6 c. POINT OF CONTACT NAME Ali Toghiani c. POINT OF CONTACT TELEPHONE NUMBER (305) 470-5343 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost.) Since March 14, 2002, Keith and Schnars has managed a District General Engineering Consultant Services Contract for FDOT's District 6. The purpose of the contract is basically to serve as an extension of the District's staff. The scope includes assisting in basically all sections throughout the Department. Including professional services, planning, public transportation, project development and environmental (PD&E), design, production management, right-of-way services, surveying and mapping services, value engineering, construction engineering management (CEI), maintenance engineering management etc. The contract is a task order driven contract with the following services (tasks) already completed: 1) MIC Plans Review/Structural Design - Bridge plans review for bridges in the MIC-MIA Interchange system. FDOT PM: Kouroche Mohandes. Review and minor design was on schedule. Dates: 7/03 through approx. 12/03 4) I-95 Pavement Rehabilitation Study and Plans - Perform analysis and final design for deficiencies along the I-95 corridor in Miami-Dade County. FDOT PM: Jason Chang Study completed on time 2) MIC MTAR/RCF Landscaping - Provide full landscape architecture analysis and final design for the Miami Intermodal Center's (MIC) MTAR and Rental Car Facility's (RCF) facilities FDOT PM: Kuoroche Mohandes Final Design Ongoing and on schedule 5) NW 122nd Street and SR-826 (Palmetto Expressway) - Perform final design for deficiencies to the interchange at NW 122nd Street and SR-826 in Miami-Dade County FDOT PM: Jason Chang NTP on 6/07/04 3) I-95 Widening & Pedestrian Bridge Overpass - Perform analysis and final design for a pedestrian bridge along the I-95 corridor. FDOT PM: Jason Chang Final Design: Completed in 2006 Construction: Completed in 2006 6) SR-5/US-1/Biscayne Boulevard from NE 13th Street to NE 38th Street - Perform preliminary engineering and final design services for approximately 2 miles along the Biscayne Boulevard corridor. FDOT PM: Jason Chang NTP on 6/16/04 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Keith and Schnars (2) FIRM LOCATION (City and State) Fort Lauderdale, FL (3) ROLE Prime City of South Miami Section Four: Required Forms Page 25www.keithandschnars.com F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 5 22. YEAR COMPLETED 21. TITLE AND LOCATION (City and State) Boca Raton Downtown Redevelopment Boca Raton, FL PROFESSIONAL SERVICES 1995 CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT NAME City of Boca Raton c. POINT OF CONTACT NAME Tony Puerta from Boca Traffic Project c. POINT OF CONTACT TELEPHONE NUMBER (561) 416-3402 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost.) Keith and Schnars provided redevelopment program. Services included right-of-way acquisition, drainage, water and sewer system improvements, intersection improvements, roadway reconstruction and widening, and other improvements for Boca Raton's downtown renaissance project. Final improvements included streetscape plans, implementing landscape, irrigation, site furnishings and pavers. planning, design and construction management for the city's roadway and infrastructure improvements in the $52 million roadway. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Keith and Schnars (2) FIRM LOCATION (City and State) Fort Lauderdale, FL (3) ROLE Prime City of South Miami Section Four: Required Forms Page 26www.keithandschnars.com F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 6 22. YEAR COMPLETED 21. TITLE AND LOCATION (City and State) Coconut Creek Main Street Master Plan Boca Raton, FL PROFESSIONAL SERVICES 2004 CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT NAME City of Coconut Creek c. POINT OF CONTACT NAME Jim Hetzel c. POINT OF CONTACT TELEPHONE NUMBER (954) 973-6770 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost.) Keith and Schnars is part of the team that worked with the City of Coconut Creek to prepare a Main Street Design Manual for the creation of a pedestrian oriented green community in one of the last large tracts of undeveloped infill parcels in northern Broward County. Keith and Schnars was responsible for analyzing the existing infrastructure and quantifying the impacts of the proposed development. The Landscape Architecture Department designed the streetscapes, assisted in the preparation of a traffic analysis and land use plan amendment for the City. The amendment allowed for creation of a designation of “Regional Activity Center” for this project. Fees: $83,500 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Keith and Schnars (2) FIRM LOCATION (City and State) Fort Lauderdale, FL (3) ROLE Prime City of South Miami Section Four: Required Forms Page 27www.keithandschnars.com F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 7 22. YEAR COMPLETED 21. TITLE AND LOCATION (City and State) Mitchell Moore Park Improvements Pompano Beach, FL PROFESSIONAL SERVICES 2007 CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Pompano Beach c. POINT OF CONTACT NAME Randall Fowler c. POINT OF CONTACT TELEPHONE NUMBER (954) 786-4144 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost.) Keiith and Schnars provided Site Design through Construction Administration for this $1million dollar, 2 phase renovation to 16 acre Mitchell Moore Park. The renovation included: a par course, play structure, 2 ball fields, dugouts, scorer’s platforms, site furniture, a football field, bleachers, court resurfacing, an irrigation system, drainage improvements and miscellaneous other elements. To help the City conserve its valuable potable water, Keith and Schnars secured a SFWMD General Water Use permit to irrigate the park from an adjacent canal via a new pump station. The irrigation system renovation included athletic fields and converting the system from municipal supply to surface water. Design Fees: $165,000 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Keith and Schnars (2) FIRM LOCATION (City and State) Fort Lauderdale, FL (3) ROLE Prime City of South Miami Section Four: Required Forms Page 28www.keithandschnars.com F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 8 22. YEAR COMPLETED 21. TITLE AND LOCATION (City and State) One Stop Shop Fort Lauderdale, FL PROFESSIONAL SERVICES 2003 CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Fort Lauderdale c. POINT OF CONTACT NAME Mehrdad Fayyaz, P.E. c. POINT OF CONTACT TELEPHONE NUMBER (954) 828-6527 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost.) Keith and Schnars prepared Civil Engineering, Landscaping and Irrigation Plans for the City of Fort Lauderdale's future "One Stop Shop" located on the north side of Sistrunk Boulevard between NW 18th Avenue and NW 19th Avenue. The site is approximately 4- acres in size and will contain parking for employees and the public. Keith and Schnars prepared engineering drawings for the demolition of the existing site, paving, grading, storm drainage, potable water, sanitary sewer, pavement markings, striping and all necessary details for site construction. In addition, site landscaping and irrigation design was performed. Off-site Engineering design included driveway connections, potable water main connections and drainage analysis. Keith and Schnars obtained all necessary state, county and local engineering permits. Permits were obtained from the City of Fort Lauderdale Engineering Department, the City of Fort Lauderdale Building Department, the Broward County Department of Planning and Environmental Protection, the Broward Public Health Unit, and the South Florida Water Management District. Keith and Schnars also played a role in developing the cost estimates bid packages for construction of the project. Fees: $280,000 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Keith and Schnars (2) FIRM LOCATION (City and State) Fort Lauderdale, FL (3) ROLE Prime City of South Miami Section Four: Required Forms Page 29www.keithandschnars.com F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 9 22. YEAR COMPLETED 21. TITLE AND LOCATION (City and State) River Oaks - Edgewood Communities Stormwater Analysis Fort Lauderdale, FL PROFESSIONAL SERVICES 2008 CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT NAME City of Ft. Lauderdale c. POINT OF CONTACT NAME Paul Bohlander c. POINT OF CONTACT TELEPHONE NUMBER (954) 522-2604 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost.) Keith and Schnars prepared a drainage analysis for the existing flooding problems within the neighborhoods of River Oaks and Edgewood located in the City of Fort Lauderdale. The contract for this study totaled $108,065 and included a Master Storwmater Analysis, meeting with governmental agencies to determine permit requirements, a cost analysis, a projected construction schedule and a topographic survey to determine areas of flooding. Individual street blocks within these areas were analyzed to determine the extent of flooding and where the flooding was the most substantial. Five methods of providing drainage relief were analyzed: roadside swales, exfiltration trench, dry retention ponds, injection wells and discharge into the New River Canal. Injection wells were immediately ruled out since wells within this area would not be able to meet State standards. Keith and Schnars also provided a cost estimate for each of the drainage methods and the corresponding flood protection being provided for each. The cost estimate was prepared in a tiered format in order to show how each drainage method or combination of drainage method or combination of drainage methods was reducing flooding and the cost for each. The costs ranged from 461,000 to $2.8 million for River Oaks and from $886,000 to $1.3 million for Edgewood. The implementation of the project is currently on hold pending funding. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Keith and Schnars (2) FIRM LOCATION (City and State) Fort Lauderdale, FL (3) ROLE Prime City of South Miami Section Four: Required Forms Page 30www.keithandschnars.com F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 10 22. YEAR COMPLETED 21. TITLE AND LOCATION (City and State) Turtle Run Community Development District Coconut Creek, FL PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT NAME District Engineer c. POINT OF CONTACT NAME Dennis Baldis c. POINT OF CONTACT TELEPHONE NUMBER (954) 721-8681 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost.) The Keith and Schnars team has served as District Engineer for the Turtle Run Community Development District for more than 22 years. In the capacity of District Engineer, Keith and Schnars attends all Board Meeting and coordinates closely with the District management team, Board Members and Council on a variety of projects within the district. Keith and Schnars reviews engineering permit plans submitted for compliance with District Criteria and best engineering practices and techniques. In addition, Keith and Schnars has also provided surveying, design, permitting, bidding and negotiation, construction management, and inspection services for various district projects. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Keith and Schnars (2) FIRM LOCATION (City and State) Fort Lauderdale, FL (3) ROLE Prime City of South Miami Section Four: Required Forms Page 31www.keithandschnars.com G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in “Example Projects Key” section below, before completing table. Place “X” under project key number for project participation same or similar role.) 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27. ROLE IN THIS CONTRACT (From Section E, Block 13) 1 2 3 4 5 6 7 8 9 10 Mark Tomczyk, P.E. Principal-in-Charge/Civil Engineering X X X X Tim Hall, P.E. Project Manager/Drainage Design X X X X X X Carlos Alcantara, P.E. Roadway Engineering/Drainage Design X Mayra Manrique, E.I. Roadway Engineering X Matt Neddeff, P.E. Roadway Engineering X Bruce Reed, RLA Roadway Engineering X X X X X X X X Chris Miller, RLA, LEED AP Roadway Engineering X X X X X X Frank Vilar, P.E. Roadway Engineering/Drainage Design/Civil Engineering X X X X Roberto Goncalves Civil Engineering X X X X X X John Krane, P.E. Traffic Engineering X José Rodríguez, P.E. Traffic Engineering X X X X Eric Penfield, P.E. Traffic Engineering X X 29. EXAMPLE PROJECT KEY No. TITLE OF EXAMPLE PROJECT (FROM SECTION F) No. TITLE OF EXAMPLE PROJECT (FROM SECTION F) 1. Fort Lauderdale General Engineering Projects 6. Coconut Creek Main Street Master Plan 2. FDOT District 4 Districtwide GEC Traffic Operations Access Management and Studies 7. Mitchell Moore Park Improvements 3. EL Rio Multi-Use Trail Greenway – Segment 3 8. One Stop Shop 4. FDOT District 6 Districtwide General Engineering Consultant Services 9. River Oaks - Edgewood Communities Stormwater Analysis 5. Boca Raton Downtown Redevelopment 10. Turtle Run Community Development District City of South Miami Section Four: Required Forms Page 32www.keithandschnars.com H. ADDITIONAL INFORMATION 30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED. Keith and Schnars is a firm dedicated to the timely and cost-efficient delivery of our services. In fact, in 2007, when the Florida Department of Transportation released its annual summary of design overruns (time and money), Keith and Schnars ranked among the best of the over two hundred firms surveyed. In the six-year period studied, Keith and Schnars designed and surveyed twelve projects with a construction value in excess of $120 million dollars. Our average cost overun for the period was only 4%, while our average construction time overrun was 1%. No other firm selected by FDOT in that six-year period completed this volume of work, and maintained such low overruns in cost and time. This commitment to customer service and high professional standards has also earned us other peer and industry recognition. For instance, last year (for the third year in a row) we took home a Best Places to Work Award at an event co- sponsored by Polk Works Workforce 2020 and the United Way of Central Florida. In 2007, the Florida Chapter of the American Planning Association selected one of our planning projects, the South Miami-Dade Watershed Study and Plan, for a prestigious FAPA Award of Excellence; McGraw-Hill Companies, publisher of Business Week Magazine, selected Keith and Schnars as one of the Southeast’s Top 50 in Design; and Engineering News Record named Keith and Schnars one of the nation’s Top 500 engineering firms, for the fifth year in a row. The year before that Keith and Schnars took home two of the twelve Best in Construction Awards given out by the Florida Transportation Builders’ Association, a 73-year old non-profit organization that many consider the "the voice" of Florida’s road and bridge building industry. As these awards indicate, we are a firm dedicated to our staff, to our communities, and to providing high quality consulting services across a broad range of disciplines. I. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. 31. SIGNATURE 32. DATE December 8, 2011 33. NAME AND TITLE Mark Tomczyk, P.E., Vice President City of South Miami Section Four: Required Forms Page 33www.keithandschnars.com ARCHITECT – ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If any) PART II – GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME Keith and Schnars 3. YEAR ESTABLISHED 1972 4. DUNS NUMBER 072227762 5. OWNERSHIP 2b. STREET 10305 NW 41st Street, Suite 112 a. TYPE Corporation 2c. CITY Doral 2d. STATE FL 2e. ZIP CODE 33178 b. SMALL BUSINESS STATUS N/A 6a. POINT OF CONTACT NAME AND TITLE Mark Tomczyk, P.E., Vice President of Civil Engineering 6b. TELEPHONE NUMBER (305) 477-7667 6c. E-MAIL ADDRESS mtomczyk@keithandschnars.com 7. NAME OF FIRM (If block 2a is a branch office) N/A 8a. FORMER FIRM NAME(S) (If any) 8b.YR ESTABLISHED 8c. DUNS NUMBER 072227762 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM’S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS c. No. of Employees a. Function Code b. Discipline (1) FIRM (2) BRANCH a. Profile Code b. Experience c. Revenue Index Number (see below) 02 Administrative 20 B02 Bridges 02 06 Biologist 4 C15 Construction Management 06 07 CADD Technician 3 C16 Construction Surveying 07 12 Civil Engineer 5 E01 Ecological Surveys 12 15 Construction Inspector 13 E09 Environmental Impact Studies Assessments 15 24 Environmental Scientist 6 E11 Environmental Planning 24 30 Geologist 1 G06 Graphic Design 30 38 Land Surveyor 10 H07 Highways, Streets 38 39 Landscape Architect 8 L02 Land Surveying 39 47 Planner: Urban/Regional 3 L03 Landscape Architecture 47 57 Structural Engineer 4 P05 Planning - Community 57 60 Transportation Engineer 6 P06 Planning –Site 60 62 Water Resources Engineer 2 T03 Traffic & Transportation Engineering 62 Attorney 1 T05 Topographic Surveying & Mapping Construction Engineer 6 W02 Water Resources Engineering Technician 8 W03 Water Supply – Treatment & Distribution Marketing, Graphics Public Involvement 6 Civil Engineering General Services MIS Managers/Support 2 Public Involvement & Outreach Services Planners: Transportation 6 Total 117 11. ANNUAL AVERAGE PROFESSIONAL PROFESSIONAL SERVICES REVENUE INDEX NUMBER SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) a. Federal Work 0 b. Non-Federal Work 9 c. Total Work 9 1. 2. 3. 4. 5. Less than $100,000 $100,000 to less than $250,000 $250,000 to less than $500,000 $500,000 to less than $1 million $1 million to less than $2 million 6. 7. 8. 9. 10. $2 million to less than $5 million $5 million to less than $10 million $10 million to less than $25 million $25 million to less than $50 million $50 million or greater 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE b. DATE December 8. 2011 City of South Miami Section Four: Required Forms Page 34www.keithandschnars.com ADDENDUM No. 1 Project Name: PROFESSIONAL ENGINEERING & MANAGEMENT SERVICES Date: November 23, 2011 Sent: Fax/E-mail/webpage This addendum submission is issued to clarify, supplement and/or modify the previously issued Letter of Interest (LOI) Documents, and is hereby made part of the Documents. All requirements of the Documents not modified herein shall remain in full force and effect as originally set forth. Receipt of this Addendum shall be acknowledged on the Bid Form. Scope of Services: Proposers may select from the listing of the five general engineering disciplines depending upon the proposers interest and expertise in each discipline listed. It is up to the proposer to decide how may categories of specialized engineering services they wish to be considered. Submission of Letters of Interest: Federal Forms 254, 255 or 330 may be submitted. Submission of the Federal Forms are excluded from the eight (8) page limit. Exhibit #1 - “Professional Service Agreement, General Engineering Services:” o Opening paragraph the statutory thresholds for construction costs have been amended as follows: CONSULTANT agrees to perform all professional services in connection with the WORK, as described herein, on a continuing basis in connection with projects where the basic construction costs does not exceed - $2,000,000 or studies which do not exceed -$200,000, herein after called the SERVICES”. HIS ADDENDUM SHOULD BE SIGNED AND DATED BY THE BIDDER AND SUBMITTED AS PROOF OF RECEIPT WITH THE SUBMISSION OF BIDS. THE BIDDER BY IDENTIFYING THE ADDENDUM NUMBER IN THE BID PROPOSAL AND BY SIGNING AND SUBMISSION OF THEIR BID SHALL SERVE AS PROOF OF RECEIPT OF THIS ADDENDUM. NAME OF FIRM: ____________________________________ SIGNATURE: _______________________________________ DATE: _____________________________________________ 1 Keith and Schnars December 8,2011 City of South Miami Section Four: Required Forms Page 35www.keithandschnars.com ADDENDUM No. 2 Project Name: PROFESSIONAL ENGINEERING & MANAGEMENT SERVICES Date: December 5, 2011 Sent: Fax/E-mail/webpage This addendum submission is issued to clarify, supplement and/or modify the previously issued Letter of Interest (LOI) Documents, and is hereby made part of the Documents. All requirements of the Documents not modified herein shall remain in full force and effect as originally set forth. Receipt of this Addendum shall be acknowledged on the Bid Form. Submission of Letters of Interest: Question #1: Are there any exclusions to the 8-page limit and please clarify how many copies of the Letters of Interest should be submitted? Letters of Interest are limited to an 8-page maximum. The exclusions are listed below: Federal Forms 254, 255 or 330 may be submitted. Submission of the Federal Forms are excluded from the eight (8) page limit. Resumes of sub‐consultants can be included as an appendix and are excluded from the  (8) page limit. Companies must submit one unbound original, one electronic copy (flash drive or CD) and ten copies. The mail and delivery address is: Mrs. Maria Menendez, City Clerk City of South Miami 6130 Sunset Drive South Miami, FL 33143 HIS ADDENDUM SHOULD BE SIGNED AND DATED BY THE BIDDER AND SUBMITTED AS PROOF OF RECEIPT WITH THE SUBMISSION OF BIDS. THE BIDDER BY IDENTIFYING THE ADDENDUM NUMBER IN THE BID PROPOSAL AND BY SIGNING AND SUBMISSION OF THEIR BID SHOULD SERVE AS PROOF OF RECEIPT OF THIS ADDENDUM. NAME OF FIRM: ____________________________________ SIGNATURE: _______________________________________ DATE: _____________________________________________ 1 Keith and Schnars December 8,2011 City of South Miami Section Four: Required Forms Page 36www.keithandschnars.com City of South Miami Section Four: Required Forms ADDENDUM No. 3 Project Name: PROFESSIONAL ENGINEERING & MANAGEMENT SERVICES Date: December 6, 2011 Sent: Fax/E-mail/webpage This addendum submission is issued to clarify, supplement and/or modify the previously issued Letter of Interest (LOI) Documents, and is hereby made part of the Documents. All requirements of the Documents not modified herein shall remain in full force and effect as originally set forth. Receipt of this Addendum shall be acknowledged on the Bid Form. Submission of Letters of Interest: Question #1: Are the documents required to be submitted, specifically: professional licenses, state certificates and list of clients/references, part of the eight (8) page limit or can they be included as an appendix? Professional licenses and state certificates are excluded from the eight (8) page limit. Question #2: Can a firm submitting a Letter of Interest as a prime also be a sub- consultant to another prime submitting? Yes, there are no restrictions to submitting as a prime or a sub-consultant to another prime. Question #3: Upon review of the City of South Miami’s Professional Services Agreement included in the Request for Letter of Interest for Professional Engineering & Management Services Pre-Qualification Pool it appears that text is missing from the bottom of pages 7, 8, 9, 11, and 12.Will the City please furnish an updated agreement for review prior to the submittal deadline? A complete Professional Service Agreement is included with addendum. HIS ADDENDUM SHOULD BE SIGNED AND DATED BY THE BIDDER AND SUBMITTED AS PROOF OF RECEIPT WITH THE SUBMISSION OF BIDS. THE BIDDER BY IDENTIFYING THE ADDENDUM NUMBER IN THE BID PROPOSAL AND BY SIGNING AND SUBMISSION OF THEIR BID SHOULD SERVE AS PROOF OF RECEIPT OF THIS ADDENDUM. NAME OF FIRM: ____________________________________ SIGNATURE: _______________________________________ DATE: _____________________________________________ 1 Keith and Schnars December 8,2011 Page 37www.keithandschnars.com City of South Miami Section Four: Required Forms 10305 NW 41st Street, Suite 112 • Doral, Florida 33178 Phone: (305) 477-7667 • Fax: (305) 477-4474 www.keithandschnars.com