KEITH & SCHNARS, P.A.City of
Request for Letter of Interest - Professional Engineering & Management Services
December 9, 2011
10305 NW 41st Street, Suite 112
Doral, Florida 33178
Phone: (305) 477-7667
Fax: (305) 477-4474
www.keithandschnars.com
Table of Contents
Section One:
Introductory Letter
Section Two:
Evaluation Factors
Section Three:
Supportive Information
Section Four:
Required Forms
December 9, 2011
Hector Mirabile, PhD, City Manager
City of South Miami
6130 Sunset Drive
South Miami, FL 33143
RE: Request for Letter of Interest – Professional Engineering
& Management Services
Dear Mr. Mirabile:
The City of South Miami is home to a wide range of age groups and popular businesses, is one of Miami-Dade County’s most
thriving communities, and Keith and Schnars (K&S) would be honored to assist the City with our professional
engineering and management consulting services.
We can provide the City with all the required Roadway Engineering (streets, sidewalks, curb and gutter, drainage, traffic
control, striping, lighting, traffic calming and landscape architecture), Drainage Design (drainage improvements, paving,
grading plans), Civil Engineering (water/wastewater analysis and design), and Traffic Engineering (traffic assessment,
conceptual improvement plans, report presentations and all related traffic engineering reports and recommendations).
We can also provide the City with Construction Engineering Inspection (CEI) Services, Environmental Services, Grant
Application Services, and General Planning/Transportation Planning Services, as needed. We currently hold similar general
engineering services contracts for the Cities of Fort Lauderdale, North Miami, Coconut Creek and West Palm Beach, to
name a few. The Standard Form 330 provided in Section Four includes descriptions of these and other contracts. It also
includes the reference materials requested by the City.
Given our experience working with various local governments on similar projects, we believe the K&S Team is the most
qualified and the best fit to help the City achieve its goals on this contract. As the Principal-in-Charge, I will actively
oversee all the projects awarded to our firm under this contract and take responsibility for their successful completion.
Our Vice President of Civil Engineering, Tim Hall, P.E., will join with me as overall Project Manager to ensure effective
client communication and project implementation.
We hereby state that, to the best of our knowledge, all information contained in this submittal is complete and accurate,
and without possible conflicts of interest. We have attached a brief synopsis of our qualifications and a description of
our process of managing general consulting contracts.
We are ready to begin work!
Sincerely,
Mark Tomczyk, P.E.
Vice President of Civil Engineering
10305 NW 41st Street, Suite 112 ● Doral, Florida 33178 ● Phone: (305) 477-7667 ● Fax: (305) 477-4474
City of
Request for Letter of Interest - Professional Engi
n
e
e
r
i
n
g
&
M
a
n
agement Services
December 9, 2011
Page 2www.keithandschnars.com
City of South Miami
Section Two: Evaluation Factors
Firm Overview
Representing the continuation of historic firms dating to
1929, Keith and Schnars (K&S) was incorporated in Florida
in 1972. The firm is currently home to over 100 civil
and structural engineers; public outreach professionals;
planners; surveyors; transportation planners; construction
inspection specialists; environmental scientists; landscape
architects; graphic designers; and a whole range of technical
and administrative support staff.
Our Clients
Our client base at K&S is extremely diversified. Our
clientele includes private developers, municipalities,
contractors, architects, utility companies, state agencies, and
an impressive number of City and County governments.
The abbreviated listing of our long-term clients below gives
some indication of the importance we place on maintaining
relationships.
City of Fort Lauderdale (2002 – Present)•
Miami-Dade County (2002 – Present)•
Seminole Tribe of Florida (2002 – Present)•
City of Port St. Lucie (2002 – Present) •
South Florida Water Management District •
(2002 – Present)
City of Boca Raton (1995 – Present)•
Florida Department of Transportation District •
(1993 – Present)
Broward County (1985 – Present)•
Civil/Water Resource Engineering Services
K&S provides civil engineering services to a number of
Counties, Municipalities and Drainage Districts throughout
the State of Florida. Our services include water analysis
and master-planning of water distribution and sewer
collection systems as well as design of over half a million
linear feet of utilities improvements, large transmission
mains, lift stations (design/re-habilitation) and related
construction observation. Our Water Resources group
offers hydrologic/hydraulic analyses for site specific flood
(drainage) studies to more complex large watershed
stormwater management programs. We use the latest in
industry standard software in our analyses, which ultimately
lead to design, permitting, and production of construction
documents. From large modeling and masterplans to
specific construction documents and inspection services,
our full array of Civil Engineering services provides the
versatility required to adapt to the diversity of project
needs and objectives for both our municipal and private
clients.
Highway Engineering Services
The Highway Engineering Division of K&S provides
transportation engineering and related services on all
types of highway and road projects, from access roads
in residential areas, to multi-lane divided expressways
with bridges, to tolls and interchanges for the FDOT and
County and municipal road departments. A typical project
includes the design of signalized intersections, signing and
marking plans, closed storm drainage and retention pond
systems, sound barrier walls, landscape plans, new street
lighting system, design survey and utility location and
coordination.
Surveying and Mapping Services
The Survey Department at K&S offers a full range of
surveying and mapping services including: Boundary Surveys,
Legal Descriptions, Topographic Surveys, Horizontal and
Vertical Control, Profiles and Cross Sectioning, Right-of-
Way Mapping, Monumentation of Right-of-Way Corridors,
Bridge Data Surveys, Digital Terrain Models (DTM),
Hydrographic/Bathymetric Surveys, Specific Purpose
Surveys, American Land Title Association Surveys, Wetland/
Mitigation Surveys, Environmental Surveys, Platting, Expert
Witness Testimony, Construction Surveys, Record and
As-built, Route, Electronic Field Book/GIS Mapping, all
mainstream versions of CADD/GIS Differential Leveling,
Global Positioning Systems (GPS), Engineering Design
Surveys, and other surveying and mapping related
services.
Landscape Architecture Services
K&S’ landscape architects have the technical background
and experience to provide high quality services from initial
planning, to construction observation and final inspection.
We are accustomed to managing multiple concurrent
projects for a single government client. The projects we
have successfully completed recently have included parks,
streetscapes, community enhancements, traffic calming,
beautification, roadway improvements, and municipal
facilities. Our landscape architecture team has provided
services to over eight municipalities/agencies in the past
five years, with projects including City Halls, Public Works
Facilities, municipal complexes, and fire stations. Services
for these projects have included preliminary studies, site
planning, irrigation design, site amenities design, planting
plans, tree preservation plans, and development review
approvals and permitting.
Permitting Services
Aside from the need for responsible budgeting and
adequate funding, nearly every project undertaken also
requires some form of permitting, whether it is local, county,
State or federal. So, in addition to providing clients with
practical advice regarding grant monies that can be utilized
to add value to their projects, we also provide them with
engineering consulting services in the area of permitting.
We have considerable experience in these matters, having
worked in numerous counties throughout the State of
Florida, on projects involving all levels of government.
Page 3
CEI Services/Resident Project Representation
Construction management requires the ability to work with
others while maintaining a clear view of the process and
the systems to manage. Therefore, we offer the following
construction engineering and inspection services: Project
management, Schedule control, Cost control, Contract
administration and Expert witness testimony
Traffic Planning and Engineering Services
The K&S transportation planning team is one of the most
experienced and stable traffic engineering teams in South
Florida. The team boasts five licensed professional engineers,
and several team members have working relationships that
extend over 20 years. The teams’ deep expertise has been
applied to some of the most challenging technical assignments
such as three dimensional microscopic simulations of the
most complex interchanges in Florida. The team’s expertise
and experience is rooted in the fundamentals of traffic
engineering which is applied to services for both private
sector and governmental clients including local, county, and
state agencies. Among the services provided are concurrency
and growth management studies, traffic calming, municipal
reviews, site-specific traffic impact and parking studies,
interchange justification and modification reports, traffic
safety studies, land use plan amendments, signal warrant
studies, amendments to thoroughfare preservation plans, and
transportation planning and traffic forecasting for airports,
new towns and large-scale Developments of Regional Impact
containing as much as twenty-two square miles.
Continuing Services Contract Approach and
Methodology
K&S uses a proactive and comprehensive approach toward
the management of its projects. This approach is based on
the selection of the organizational structure best suited to
meet the requirements and needs of each specific project.
This allows us to match the technical and administrative
needs of our clients with the skills, talents and experience
of a team specially selected for the project. As a firm
that routinely handles several Continuous Consulting
Engineering Services contracts, our organizational
structure lends itself to providing design services for multiple
projects of various sizes in short timeframes. The K&S
Team recognizes that its strong credentials, resources and
ability to respond quickly and efficiently are not sufficient,
in and of themselves, to guarantee successful performance
on this contract. The contract requires a management plan
designed to specifically address the staffing, monitoring,
planning and communications problems inherent
in open-ended contracts. It also calls for a management
plan that deals with the need for well-documented and
understandable procedures so that staff can be efficiently
managed. Specifically our management plan will provide:
An efficient management system, with clearly defined •
roles and responsibilities for scope, schedule and
budget;
A Contract Manager as the primary point-of-contact •
for the CRA;
Quick-turnaround capability, as well as long-term •
program continuity;
Compliance with Work Order schedules and budgets;•
Flexibility to respond to changes in scope and •
direction; and
Quality assurance and quality control throughout •
phases of the project.
Cost Control
We believe the success of a project can be directly
attributed to proper staffing of the project, the development
of a challenging but achievable project schedule, good
communication between all team members and the proper
project documentation and control. We are confident this
can be achieved because of the excellent project management
system that is an integral part of our corporate structure.
We believe K&S has a well-earned reputation of delivering
quality plans on time and within budget. We control costs
by implementing a strong Project Management System
corporate wide. We consider our history of cost overruns
and supplemental agreements to be lower than the average
within our industry.
For instance, between 2001 and 2007, K&S completed
twelve projects for FDOT with a construction value in
excess of $120 million. Our average cost overrun average
was only 4%, and our construction time overrun was 1%.
No other firm selected by FDOT that completed that
volume of work, maintained such low overruns in cost and
time.
We believe in getting a strong start on all our projects by
strictly adhering to a proven system of project management
and control.
K&S’ Project Management System starts with the
development of a well prepared project scope which
is properly staffed and budgeted. Staffing availability is
compared with the project budget and schedule during
the preparation of the project staffing plan in order to
ensure that no team members are over committed which
could lead to project delays. Once a good scope is used
to develop a good schedule, and qualified professionals
are selected with the resources necessary to meet that
schedule, the rest comes down to good communication
and project management skills to document the flow of
the project. Communication and coordination are the
primary keys to success of any design assignment. Strong
project management ensures that a quality product will be
produced, that the work product is delivered on or ahead
of schedule, and that the lines of communication are open.
www.keithandschnars.com
City of South Miami
Section Two: Evaluation Factors
Page 4www.keithandschnars.com
City of South Miami
Section Three: Supportive Information
PROJECT MANAGER
DRAINAGE DESIGN
Roberto Goncalves
Project Engineer
Frank Vilar, P.E.
Project Manager
Tim Hall, P.E.
Vice President of Civil Engineering
Mark Tomczyk, P.E.
Vice President of Civil Engineering
Chris Miller, RLA, LEED AP
Landscape Architecture Project Manager
Carlos Alcantara, P.E.
Senior Project Manager
Bruce Reed, RLA
Director of Landscape Architecture
Tim Hall, P.E.
Vice President of Civil Engineering
Mayra Manrique, E.I.
Project Engineer
Matt Neddeff, P.E.
Associate Designer
Frank Vilar, P.E.
Project Manager
Carlos Alcantara, P.E.
Senior Project Manager
Mayra Manrique, E.I.
Project Engineer
Frank Vilar, P.E.
Project Manager
John Krane, P.E.
Director of Transportation Planning
Mark Tomczyk, P.E.
Vice President of Civil Engineering
José Rodríguez, P.E.
Senior Project Manager
ROADWAY
ENGINEERING
PRINCIPAL-IN-CHARGE/QA/QC
ROADWAY
ENGINEERING
CIVIL ENGINEERING
ROADWAY
ENGINEERING
ROADWAY
ENGINEERING
ROADWAY
ENGINEERING
ROADWAY
ENGINEERING
DRAINAGE DESIGN
DRAINAGE DESIGN
DRAINAGE DESIGN
CIVIL ENGINEERING TRAFFIC ENGINEERING
CIVIL ENGINEERING
TRAFFIC ENGINEERING
Eric Penfield, P.E.
Assistant Director of Traffic Engineering
TRAFFIC ENGINEERING
Organizational Chart
Page 5
Supportive Information
Tim Hall, P.E. – PM/Drainage Design
- With over 24 years of experience, Mr.
Hall has been involved in numerous
diverse Land Development and Civil
Engineering projects. His experience
providing construction management
for a Builder/Developer, permit review
and program management for a large
municipality, and Design/Consulting
services for both Private and Public sector clients, provides
broad insight into the variety of issues related to project
development. Having participated in the design and
implementation of everything from small in-fill development
to large neighborhood improvement projects, Mr. Hall has
been exposed to a wide range of private land development
and public infrastructure projects. His experience spans
from modeling and master planning to preparation of
construction documents, permitting, and construction
administration, for numerous water distribution, sewer
collection, storm water management, and land development
projects.
Mark Tomczyk, P.E. – Principal in
Charge/Civil Engineering - Mr.
Tomczyk has more than 20 years of
general civil engineering experience,
with a specialty in Land Development,
stormwater management, floodplain
modeling, permitting and private
development engineering and
construction administration. He has
extensive experience with the design/implementation
of grant funded public and quasi-public entities in the
generation of technical specification and grant management.
Additionally, Mr. Tomczyk has been utilized as an expert
witness for courtroom testimony for land use and
stormwater management/floodplain management issues.
Mr. Tomczyk has also provided engineering and support
services for federal, public and private clients for residential,
industrial, and institutional development. Key services
include structural, land development site plan/engineering
preparation, development feasibility study, subdivision
design, roadway design, stormwater management , floodplain
and riparian engineering, grading (earthworks), drainage
and erosion control, road design, traffic improvements
, environmental design and restoration, construction
specification, commissioning, and procurement of all local,
county, state and other governmental approvals.
Frank Vilar, P.E. – Drainage Design/Civil Engineering
- Mr. Vilar has over 14 years of extensive professional
experience in the design of water/
wastewater systems, design of drainage
and storm water management systems,
site design and development, preparation
of contract documents and specifications
for bid and permitting services experience
through numerous South Florida
agencies. His experience includes design
of water and wastewater improvements
for the City of Fort Lauderdale, rehabilitation of lift
stations in City of Coconut Creek and North Lauderdale,
and neighborhood improvements for the Westgate CRA.
Professional experience also includes work on various land
development projects for Seminole Tribe of Florida, Coscan
Homes and also administering the NPDES Program for the
City of Miami.
Carlos Alcantara, P.E. – Drainage
Design/Roadway Engineering - Mr.
Alcantara is a Senior Project Manager and
an engineering professional with over 10
years of experience that encompasses:
plans preparation and development,
roadway design, maintenance of traffic,
lighting design, utility coordination,
signalization design, signing & pavement
marking design and drainage.
Mayra Manrique, E.I. – Drainage
Design/Roadway Engineering - Ms.
Manrique is a Project Engineer with
over 10 years of experience in land
development and roadway design. She
is currently involved in various roadway
projects. Ms. Manrique has provided the
following services on roadway design
projects: calculation of quantity take offs
for cost estimating; preparation of typical section packages;
development of flexible pavement design; preparation of
proposals and manhour estimates; utility coordination;
roadway lighting design and reports; assitance with drainage
design, calculations, and reports; design of horizontal and
vertical roadway geometry; and signing and pavement
marking design.
Matt Neddeff, P.E. – Roadway
Engineering - Mr. Neddeff is a
professional engineer experienced in the
production of roadway design. He has
provided roadway design services for
various FDOT and municipal projects.
Mr. Neddeff’s involvement in roadway
design is as follows: flexible pavement
www.keithandschnars.com
City of South Miami
Section Three: Supportive Information
Page 6
design, development of typical section packages, design of
horizontal and vertical geometry, signing and pavement
marking design, signalization design, utility coordination,
work zone traffic control, computation of quantities,
specification development and assisted in drainage design.
He has developed expertise in the use of AASHTO, FDOT
and municipality design standards. He has also prepared
Geotechnical Reports. Mr. Neddeff is proficient with
Microstation/Geopak and other software that aids in the
efficient design and production of roadway plans.
Bruce Reed, RLA – Roadway
Engineering - Mr. Reed has extensive
experience in a wide variety of projects
where he has provided a full range of
landscape architectural services. These
services consist of the following land
development activities: master planning,
programming, plan review, site design and
development, landscape and irrigation
design, cost analysis, environmental mitigation design/
permitting, site approval processing/permitting and public/
client presentation. As an experienced project manager,
Mr. Reed has competently prepared and administered
construction and bid documents, QA/QC, contract
negotiation, written reports and correspondence, review
of project invoices and construction observation. As a
divisional staff supervisor, he directs and schedules the
design teams in completion of landscape architectural
design development. Mr. Reed has developed a perceptive
understanding of park and recreational facility design and
has consistently established positive rapport with municipal
and agency personnel. He has demonstrated responsible
capabilities in team coordination and client/staff/public
project comprehension and status awareness. He also
has significant experience in the areas of roadway and
streetscape beautification design and commercial/industrial/
residential land development analysis and design. In addition,
he possesses a wide range of state-of-the-art computer
technology capabilities resulting in the presentation and
submission of the latest computer-aided calculations,
reports and design production by his design team.
Chris Miller, RLA LEED-AP –
Roadway Engineering - Mr. Miller
is a highly qualified landscape and
irrigation designer with a keen interest
in the Green Industry. His broad range
of experience includes all phases of the
design process from site analysis, concept
generation and project planning to the
computer-aided drafting of landscape,
irrigation and amenity designs through
final implementation. He is known for his innovative
design solutions and immaculate attention to design
details, specification writing, plan reviews and construction
inspection. Combined with the ability to recognize and
solve the complex requirements of project integration, Mr.
Miller’s expertise includes a thorough understanding of
the South Florida landscape and critical sustainable design
principles. These strengths are complimented by his skill in
photography and effective presentations. His many years
of experience include planning and design for commercial
developments, parks, municipal centers, streetscapes and
FDOT roadway beautification projects. Mr. Miller currently
holds 12 Green Industry Certifications in addition to his
Landscape Architecture license.
Roberto Goncalves – Civil
Engineering - Mr. Goncalves serves as
a Project Engineer under the Keith and
Schnars’ Municipality Division for site
development, water, drainage and sewer
projects for the City of Fort Lauderdale.
His expertise in the use of computer aided
drafting software, with the latest addition
of Civil 3D for AutoCAD, contributes to
timely and precise delivery of drawings
and complex design documents.
John Krane, P.E. – Traffic Engineering
- Mr. Krane has over 22 years of
experience in planning, transportation
engineering, preliminary engineering/
PD&E, access management, traffic
operations, and safety, with 12-plus years
of management experience. His primary
areas of expertise include site impact
analyses, intersection and roadway
operational and level of service analyses, development and
application of transportation demand forecasting models,
project traffic development, and project management. He
currently serves as the Director of Transportation Planning
activities statewide. In addition to acting as senior advisor
on division work and project manager for important
projects, he is responsible for the oversight of workflow,
staff development, and Quality Assurance of his Division.
José Rodríguez, P.E. – Traffic
Engineering - Mr. Rodríguez has
more than 35 years of experience in
transportation and traffic engineering
including work as a graduate research
engineer at the University of Maryland.
Mr. Rodríguez has directed and actively
participated in numerous and wide-
www.keithandschnars.com
City of South Miami
Section Three: Supportive Information
Page 7
ranging transportation studies and projects for both the
public and private sectors. These projects have been
concerned with traffic (site and access impacts for both
private and public developments; traffic calming; roadway
corridor and alignment studies; pedestrian malls and
auto-restricted zones; HOV feasibility, and roadway and
intersection design and operation analyses); transit (bus and
paratransit planning and operations analyses including route
planning, jitney systems; downtown shuttle bus feasibility
studies; transit corridors; multi-modal alternatives analyses;
public transit terminal feasibility studies including location,
operations, and design; transit travel characteristics;
public policy development); parking (demand studies;
facilities needs and development planning; public policy
development); environmental impacts (traffic noise and
air quality; construction and right-of-way impacts; socio-
economic aspects; general traffic and parking impacts); and
airport planning (aviation demand; land side operations,
capacities, and airport master plans).
Eric Penfield, P.E. – Traffic
Engineering - Mr. Penfield has 14 years
of transportation engineering experience
working for public and private sector
clients. The author of an article on
the relationship between microscopic
simulation and signalized intersection
delay, his areas of expertise include traffic
impact studies, corridor studies, capacity
analysis, microscopic simulation, and operational analysis. He
has conducted conceptual design and alternatives analyses
for roadway facilities; transportation analyses associated
with amendments to Local Government Compre¬hensive
and Trafficway plans; regional and site-related transportation
concurrency evaluations; and Development of Regional
Impact (DRI) studies. Additionally, he has been involved in
the development of design traffic forecasts for a number
of major roadway projects. Mr. Penfield also serves as a
Development Review Committee (DRC) member for
several South Florida municipalities. In this capacity, Mr.
Penfield applies his traffic experience in regional and site-
specific evaluations and provides expert advice on a range
of issues, including land use planning, access management,
and transportation concurrency.
www.keithandschnars.com
City of South Miami
Section Three: Supportive Information
Page 8www.keithandschnars.com
City of South Miami
Section Four: Required Forms
ARCHITECT – ENGINEER QUALIFICATIONS
PART I - CONTRACT-SPECIFIC QUALIFICATIONS
A. CONTRACT INFORMATION
1. TITLE AND LOCATION (City and State)
Professional Engineering & Management Services, South Miami, FL
2. PUBLIC NOTICE DATE
3. SOLICITATION OR PROJECT NUMBER
B. ARCHITECT-ENGINEER POINT OF CONTACT
4. NAME AND TITLE
Mark Tomczyk, P.E., Vice President of Civil Engineering
5. NAME OF FIRM
Keith and Schnars
6. TELEPHONE NUMBER
(954) 776-1616
7. FAX NUMBER
(954) 771-7690
8. E-MAIL ADDRESS
mtomczyk@keithandschnars.com
C. PROPOSED TEAM
(Complete this section for the prime contractor and all key subcontractors.)
(Check)
PR
I
M
E
J-
V
PA
R
T
N
E
R
SU
B
C
O
N
-
TR
A
C
T
O
R
9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT
a. √ Keith and Schnars
CHECK IF BRANCH OFFICE
10305 NW 41st Street, Suite 112
Doral, FL 33178 Prime
b.
CHECK IF BRANCH OFFICE
c.
CHECK IF BRANCH OFFICE
d.
CHECK IF BRANCH OFFICE
e.
CHECK IF BRANCH OFFICE
f.
CHECK IF BRANCH OFFICE
g.
CHECK IF BRANCH OFFICE
h.
CHECK IF BRANCH OFFICE
D. ORGANIZATIONAL CHART OF PROPOSED TEAM (Attached)
Page 9www.keithandschnars.com
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
14. YEARS EXPERIENCE 12. NAME
Mark Tomczyk, P.E.
13. ROLE IN THIS CONTRACT
Principal-in-Charge/Civil
Engineering
a. TOTAL
23 years
b. WITH CURRENT FIRM
1 year
15. FIRM NAME AND LOCATION (City and State)
KEITH AND SCHNARS – Fort Lauderdale, FL
16. EDUCATION (DEGREE AND SPECIALIZATION)
M.S., Environmental Engineering, Pennsylvania State University
B.S., Civil Engineering, The Pennsylvania State University
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND
DISCIPLINE)
Registered Professional Engineer, FL #63171
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
American Society of Civil Engineers; National Society of Professional Engineers; Florida Society of Professional Engineers; Florida
Engineering Society
19. RELEVANT PROJECTS
(2) YEAR COMPLETED
1) TITLE AND LOCATION (City and State)
Monroe County EAR
Monroe County, FL
PROFESSIONAL SERVICES
Ongoing
CONSTRUCTION (If
applicable) N/A
a
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
Monroe County has contracted with Keith and Schnars to update their Comprehensive Plan Policy and Technical Documents to the 2011-2031
planning timeframe, and prepare their Evaluation, Appraisal and Report (EAR). The last update occurred in 1995. This includes extensive public
involvement to define the Major Issues of the County; data collection and inventory of all aspects of the County; and close coordination with
County staff and all agencies within the County. The final phase of this project is to realign the LDC sections to make it more user friendly,
incorporate modern planning strategies, and implement the Goals, Objectives and Policies of the updated Comprehensive Plan.
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
Countess Hoernle Park IDC
Boca Raton, FL
PROFESSIONAL SERVICES
Ongoing
CONSTRUCTION (If
applicable) N/A
b
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Project Manager/Civil Engineer for a contract providing comprehensive project management and full turnkey consulting services for the
development of a 228-acre park. The City completed a preliminary Master Plan in early 2006 for the entire site. The overall scope of services for
the park development includes the following: project management; survey; geotechnical; environmental; landscape architecture/land planning;
reclaimed water; civil engineering; architecture; mechanical / electrical engineering; structural engineering; permitting; bidding and construction. This
project includes the design of the Phase I Master Plan components for the South Site, comprising approximately 171 acres, to satisfy the City's
immediate need for softball and soccer playing fields, while being environmentally and culturally innovative. ($50K fee to date)
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
Fort Lauderdale General Engineering Projects
Fort Lauderdale, FL
PROFESSIONAL SERVICES
Ongoing
CONSTRUCTION (If
applicable)
c
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
The Keith and Schnars team is providing a broad range of consulting services to the City of Fort Lauderdale. These services include, but are not
limited to, general surveying, aerial photography, civil engineering design, architectural design, landscape architectural design, drafting and mapping,
and construction management.
City of South Miami
Section Four: Required Forms
Page 10www.keithandschnars.com
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
14. YEARS EXPERIENCE 12. NAME
Tim Hall, P.E.
13. ROLE IN THIS CONTRACT
Project Manager/Drainage Design
a. TOTAL
25 years
b. WITH CURRENT FIRM
8 years
15. FIRM NAME AND LOCATION (City and State)
KEITH AND SCHNARS – Fort Lauderdale, FL
16. EDUCATION (DEGREE AND SPECIALIZATION)
B.S., Civil Engineering, University of Maryland, 1987
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND
DISCIPLINE)
Registered Professional Engineer, FL #50588
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
N/A
19. RELEVANT PROJECTS
(2) YEAR COMPLETED
1) TITLE AND LOCATION (City and State)
Fort Lauderdale – General Engineering Services Contract
Fort Lauderdale, FL
PROFESSIONAL SERVICES
Ongoing
CONSTRUCTION (If
applicable) N/A
a
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
Provide civil design and project management for various City improvement projects. Projects include program to provide sanitary service to 1,200
residences and businesses to eliminate septic systems, streetscape and landscape improvements, correction of inadequate water and drainage
systems, roadway re-alignment and traffic calming. Fees: $8.6 million
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
Edgewood Drainage Analysis
Fort Lauderdale, FL
PROFESSIONAL SERVICES
2005
CONSTRUCTION (If
applicable) N/A
b
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
Project lead on drainage analysis of existing 600-acre neighborhood with the purpose of quantify and identifying cause for frequent and substantial
flooding. Orchestrated project modeling, proposed alternatives, and provided cost estimates with defined level of service. Presentation findings to
homeowners and City officials.
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
Septic Area 18
Fort Lauderdale, FL
PROFESSIONAL SERVICES
2006
CONSTRUCTION (If
applicable) N/A
c
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
Analyze capacity and impacts to existing infrastructure and lift stations resulting from full build-out of a 130-acre partially developed parcel. Services
included modeling, analysis, and recommendations for proposed improvements. Using atlas and as-built information, developed a baseline model
reflecting existing conditions. Once calibrating, the model was modified to reflect expanded service areas. Upon evaluation, a complete report of
findings was prepared outlining design criteria, assumptions, baseline data, exhibits, and calculations with recommended alternatives.
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
Fort Lauderdale – WW2011 Program
Fort Lauderdale, FL
PROFESSIONAL SERVICES
2010
CONSTRUCTION (If
applicable) N/A
d
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
Project Lead for design services related to City’s Capital Improvements Program which included approximately $636 million in utilities infrastructure
repair, replacement, and upgrades. The program includes analysis, modeling and design for improvements to water and wastewater facilities in
meeting a comprehensive plan in response to expanded demand and service areas.
City of South Miami
Section Four: Required Forms
Page 11www.keithandschnars.com
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
14. YEARS EXPERIENCE 12. NAME
Carlos Alcantara, P.E.
13. ROLE IN THIS CONTRACT
Roadway Engineering/Drainage
Design
a. TOTAL
10 years
b. WITH CURRENT
FIRM
10 years
15. FIRM NAME AND LOCATION (City and State)
KEITH AND SCHNARS – Fort Lauderdale, FL
16. EDUCATION (DEGREE AND SPECIALIZATION)
B.S. Civil Engineering, High Honors, University of Florida, 2001
17. CURRENT PROFESSIONAL REGISTRATION (STATE
AND DISCIPLINE)
Registered Professional Engineer, FL #64760
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
N/A
19. RELEVANT PROJECTS
(2) YEAR COMPLETED
1) TITLE AND LOCATION (City and State)
University of Miami
Coral Gables, FL
PROFESSIONAL SERVICES
Ongoing
CONSTRUCTION (If
applicable) N/A
a
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
Currently Project Manager responsible for design and preparation of construction documents for an internal circulation roadway throughout
the University of Miami campus. Also, Project Manager for various external roadway projects that the University must complete in order to
comply with several City of Coral Gables ordinances.
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
SW 157th Avenue
Miami-Dade County, FL
PROFESSIONAL SERVICES
Ongoing
CONSTRUCTION (If
applicable) N/A
b
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
Currently Project Manager for design and preparation of construction documents for the widening of SW 157th Avenue from SW 184th Street
to SW 152nd Street from a two-lane undivided facility to a four-lane divided facility. Project also includes drainage, signalization, lighting, signing
and marking.
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
Sawgrass Expressway
Broward County, FL
PROFESSIONAL SERVICES
Ongoing
CONSTRUCTION (If
applicable) N/A
c
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
Design-Build Project Manager and Engineer of Record responsible for design and preparation of roadway construction plans and permitting for
Florida’s Turnpike Enterprise. Scope of work includes the construction of dedicated Sunpass lanes with signature gantries at four (4)
interchanges on the Sawgrass Expressway. The interchanges involved were Commercial Boulevard, Atlantic Boulevard, Sample Road, and
University Drive.
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
FDOT District 6 Districwide General Engineering Consultant
Services, Miami-Dade County, FL
PROFESSIONAL SERVICES
Ongoing
CONSTRUCTION (If
applicable) N/A
d
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
Keith and Schnars has managed a District General Engineering Consultant Services Contract for FDOT's District 6 The purpose of the contract
is basically to serve as an extension of the District's staff. The scope includes assisting in basically all sections throughout the Department.
Including professional services, planning, public transportation, project development and environmental (PD&E), design, production
management, right-of-way services, surveying and mapping services, value engineering, construction engineering management (CEI), maintenance
engineering management etc.
City of South Miami
Section Four: Required Forms
Page 12www.keithandschnars.com
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
14. YEARS EXPERIENCE 12. NAME
Mayra Manrique
13. ROLE IN THIS CONTRACT
Roadway Engineering/Drainage
Design
a. TOTAL
10 years
b. WITH CURRENT
FIRM
9 years
15. FIRM NAME AND LOCATION (City and State)
KEITH AND SCHNARS – Doral, FL
16. EDUCATION (DEGREE AND SPECIALIZATION)
B.S., Civil Engineering, University of Florida, 2001
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND
DISCIPLINE)
N/A
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
N/A
19. RELEVANT PROJECTS
(2) YEAR COMPLETED
1) TITLE AND LOCATION (City and State)
Tri-Rail
Palm Beach County, FL
PROFESSIONAL SERVICES
2005
CONSTRUCTION (If
applicable) N/A
a
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ;Check if project performed with current firm
Assisted with drainage design calculations for proposed tracks. Developed drainage details, profiles and cross sections for drainage design. Assisted
with responses to comments from several reviewing agencies. Fees: $5,000,000.00 (Construction)
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
Yamato Road
Palm Beach County, FL
PROFESSIONAL SERVICES 2005
CONSTRUCTION (If
applicable) N/A
b
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
Assisted with roadway design (horizontal layout), drainage design, typical section package, signing and pavement marking design. Fees: $472,477
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
Biscayne Boulevard/SR-5
Miami-Dade County, FL
PROFESSIONAL SERVICES
2009
CONSTRUCTION (If
applicable) N/A
c
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ;Check if project performed with current firm
Lead Engineer - Assisted the Engineer of Record with the roadway, lighting and maintenance of traffic design for the reconstruction of 1.4 miles of
Biscayne Boulevard (SR-5/US-1) from NE 15th Street to NE 35th Terrace. The project includes the construction of a new 5-lane section, drainage,
decorative lighting, signalization, signing and pavement markings and landscaping.
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
Andrews Avenue
Broward County, FL
PROFESSIONAL SERVICES
2005
CONSTRUCTION (If
applicable) N/A
d
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ;Check if project performed with current firm
Assisted with the preparation of horizontal and vertical alignment, signing and pavement marking design, quantities, cross sections, and cost
estimating. Fees: $16,000,000.00 (Construction)
City of South Miami
Section Four: Required Forms
Page 13www.keithandschnars.com
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
14. YEARS EXPERIENCE 12. NAME
Matt Neddeff, P.E.
13. ROLE IN THIS CONTRACT
Roadway Engineering a. TOTAL
6 years
b. WITH CURRENT FIRM
5 years
15. FIRM NAME AND LOCATION (City and State)
KEITH AND SCHNARS – Fort Lauderdale, FL
16. EDUCATION (DEGREE AND SPECIALIZATION)
B.S., Civil Engineering, University of Florida, 2005
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND
DISCIPLINE)
N/A
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Florida Academic Scholar
Member of American Society of Civil Engineers (ASCE)
19. RELEVANT PROJECTS
(2) YEAR COMPLETED
1) TITLE AND LOCATION (City and State)
Fort Lauderdale Beach Streetscape
Fort Lauderdale, FL
PROFESSIONAL SERVICES
2006
CONSTRUCTION (If
applicable) N/A
a
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
Worked on the utility details and noted utility conflicts.
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
Becker Road Interchange Design
Port St. Lucie, FL
PROFESSIONAL SERVICES
CONSTRUCTION (If
applicable) N/A b
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
Assisted on interchange detail, and started summary of pay items.
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
University of Miami
Miami Gardens, FL
PROFESSIONAL SERVICES
CONSTRUCTION (If
applicable) N/A
c
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
Designer of external projects, including the widening of Red Road to add turn lane at Albenga Avenue (alignment and stripping), and lengthen turn
lanes at Standford Drive and Alhambra Circle (horizontal and vertical alignment and striping).
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
I-95 RRR
St. Lucie County, FL
PROFESSIONAL SERVICES
CONSTRUCTION (If
applicable) N/A
d
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
Responsible for specification package, Long Range Estimate, TRNS*PORT inputs, and computing the quantities for the project. Created sign
improvement package that included images and signs identified in plans that need improvement, review and implement comments from DOT, and
created change memo for final responses to comments.
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
El Rio Canal Shared Use Pathway
Palm Beach County, FL
PROFESSIONAL SERVICES
Ongoing
CONSTRUCTION (If
applicable) N/A
e
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
Lead Designer tasked with the development of complete construction plans and specifications. The project scope includes the construction of a 12
foot wide concrete path, and a signalized crosswalk where the proposed path meets Congress Avenue. The project also involves ADA ramp
improvements, signing and marking, sidewalk construction, utility coordination, permitting, signal video detection improvements and landscaping.
City of South Miami
Section Four: Required Forms
Page 14www.keithandschnars.com
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
14. YEARS EXPERIENCE 12. NAME
Bruce Reed, RLA
13. ROLE IN THIS CONTRACT
Roadway Engineering
a. TOTAL
21 years
b. WITH CURRENT FIRM
17 years
15. FIRM NAME AND LOCATION (City and State)
KEITH AND SCHNARS – Fort Lauderdale, FL
16. EDUCATION (DEGREE AND SPECIALIZATION)
B.S., Landscape Architecture, University of Florida, 1987
A.A., Florida State University, 1984
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND
DISCIPLINE)
Registered Landscape Architect, FL #0001479
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Crime Prevention through Environmental Design (CPTED) December 1998
American Society of Landscape Architects
19. RELEVANT PROJECTS
(2) YEAR COMPLETED
1) TITLE AND LOCATION (City and State)
Coconut Creek Casino
Coconut Creek, FL
PROFESSIONAL SERVICES
Ongoing
CONSTRUCTION (If
applicable) N/A
a
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
The Coconut Creek Casino is a complex project located on 49 acres of Tribal Land at the intersection of SR-7 and Sample Road in the City of
Coconut Creek. Due to split jurisdictional responsibilities, the project has involved complex land-use and zoning issues. Keith and Schnars has
developed a whole range of plans on behalf of the Tribe, from easement and right of way abandonments, to DRI and Master plan processing. As the
project’s lead consultant, we have been involved in the preparation and analysis of all land use, zoning, civil engineering, traffic engineering, and
survey services for the project.
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
Districtwde Landscape Architectural Services
FDOT District 6, FL
PROFESSIONAL SERVICES Ongoing
CONSTRUCTION (If
applicable) N/A
b
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
Consulting services including construction plans for landscape, hardscape, and irrigation improvements; tree relocation, plan reviews, reports,
construction inspection and/or field assessments, renderings, permitting, coordinating and updating of project logs, project coordination,
correspondence, project scopes, roadway and traffic control plans. Contract Fee Limit: $1,500,000 per 5-year term
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
Beach Streetscape Master Plan
Fort Lauderdale, FL
PROFESSIONAL SERVICES
Ongoing
CONSTRUCTION (If
applicable) N/A
c
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
Project Manager for this $9 million Streetscape Enhancement Project. Tasks include field analysis, concept development, budget s and public
presentations.
Fees: $9,000,000
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
Brighton Reservation Fitness Trail
Seminole Tribe of Florida
PROFESSIONAL SERVICES
Ongoing
CONSTRUCTION (If
applicable) N/A
d
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
The Keith and Schnars Landscape Architecture Division provided services from a Site Master Plan through construction documents, including
program elements of pedestrian trails, outdoor exercise equipment, lighting, signage, park furniture, pavilions, and wetland plantings for the Seminole
Tribe of Florida.
City of South Miami
Section Four: Required Forms
Page 15www.keithandschnars.com
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
14. YEARS EXPERIENCE 12. NAME
Chris Miller, RLA, LEED AP
13. ROLE IN THIS CONTRACT
Roadway Engineering a. TOTAL
17 years
b. WITH CURRENT FIRM
13 years
15. FIRM NAME AND LOCATION (City and State)
KEITH AND SCHNARS – Fort Lauderdale, FL
16. EDUCATION (DEGREE AND SPECIALIZATION)
B.S./ongoing/Landscape Architecture
Vicenza, Italy Institute of Architecture (European Study program),
University of Florida, fall 1997
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND
DISCIPLINE)
Registered Landscape Architect, FL #6666970
ISA Certified Arborist #FL-5218A, FNGLA Certified Horticultural
Professional #HC7 5726
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Associate Member American Society of Landscape Architects, LEED Accredited, American Horticultural Society, Florida Irrigation Society,
Florida Native Plant Society, Florida Nursery Growers and Landscape Association, Florida Urban Forestry Council, International Society of
Arboriculture, International Palm Society, Landscape Inspectors Association of Florida, The Irrigation Association
19. RELEVANT PROJECTS
(2) YEAR COMPLETED
1) TITLE AND LOCATION (City and State)
Districtwide Landscape Architectural Services
FDOT District 6, FL
PROFESSIONAL SERVICES
Ongoing
CONSTRUCTION (If
applicable) N/A
a
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
Consulting services including construction plans for landscape, hardscape, and irrigation improvements; tree relocation, plan reviews, reports,
construction inspection and/or field assessments, renderings, permitting, coordinating and updating of project logs, project coordination,
correspondence, project scopes, roadway and traffic control plans.
Contract Fee Limit: $1,500,000 per 5-year term
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
FDOT, Miami Rental Car Facility and Miami Inter-modal Center,
Miami-Dade, FL
PROFESSIONAL SERVICES 2007
CONSTRUCTION (If
applicable) N/A
b
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
Planning, irrigation and landscape lighting design for this major Miami International Airport facility. Construction Budget: $3,500,000.00; Design Fees
$221,000.00
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
SR-7 Miami Gardens
Miami Gardens, FL
PROFESSIONAL SERVICES
2006
CONSTRUCTION (If
applicable) N/A
c
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
Streetscape design including hardscape layout, planting and irrigation design from concepts through bid documents. Construction Budget:
$1,500,000; Consultant Fee: $108,000
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
Town of Lantana Municipal Beach Complex
Lantana, FL
PROFESSIONAL SERVICES
2007
CONSTRUCTION (If
applicable) N/A
d
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
Keith and Schnars provided park master planning; programming, survey, design, citizens and park user’s survey, public meetings; drainage
improvement recommendations, opinion of implementation cost, concepts, preliminary and final master plan. Construction Budget: $3,935,000;
Consultant Fee: $73,700
City of South Miami
Section Four: Required Forms
Page 16www.keithandschnars.com
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
14. YEARS EXPERIENCE 12. NAME
Frank Vilar, P.E.
13. ROLE IN THIS CONTRACT
Roadway Engineering/Drainage
Design/Civil Engineering
a. TOTAL
16 years
b. WITH CURRENT FIRM
11 years
15. FIRM NAME AND LOCATION (City and State)
KEITH AND SCHNARS – Fort Lauderdale, FL
16. EDUCATION (DEGREE AND SPECIALIZATION)
M.S., Environmental Engineering, 1995
B.S., Civil Engineering, 1992
A.A., Miami-Dade Community College, 1988
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND
DISCIPLINE)
Registered Professional Engineer, FL #55459
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
The City of Miami's Illicit Discharge Control Program for the Wagner Creek Sub-Basin Area.
Publication of the Florida Association of Stormwater Utilities, Tallahassee, Florida, 1996
19. RELEVANT PROJECTS
(2) YEAR COMPLETED
1) TITLE AND LOCATION (City and State)
Septic Areas 3, 4, 5 and 8 Utility Improvements
Fort Lauderdale, FL
PROFESSIONAL SERVICES
Ongoing
CONSTRUCTION (If
applicable) N/A
a
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ;Check if project performed with current firm
These project areas include the Lauderdale West, Sunset North, River Run, Flamingo Park, Oak River, Shady Banks and Edgewood Communities. Complete
design, permitting and construction phase services for these projects that includes over 175,000 lineal feet of gravity sewer, 5,500 lineal feet of force mains,
ten (10) new wastewater pump stations, and 36,000 lineal feet of water mains. The total construction value is estimated to be 30 million dollars.
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
City of Deerfield Beach Public Works Facility
Deerfield Beach, FL
PROFESSIONAL SERVICES Ongoing
CONSTRUCTION (If
applicable) N/A
b
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
Site engineering, permitting, bidding and construction management for development of a 20-acre former landfill site in Deerfield Beach, Florida Estimated
Construction Fees: $8,000,000
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
Sewer Study for Chula Vista/River Lands/Lauderdale Isle and River Lanes
Communities
Broward County, FL
PROFESSIONAL SERVICES
2007
CONSTRUCTION (If
applicable) N/A
c
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ;Check if project performed with current firm
Project Manager for an engineering study to provide sanitary sewer systems to several residential communities which are being serviced by individual
septic tank systems and recently annexed by the City of Fort Lauderdale. The study area comprised of 425-acres of mostly single-family dwellings.
The study identified and evaluated several options to service the subject communities. The recommended wastewater system includes 55,000 linear
feet of gravity sanitary sewer collection systems, 7,000 linear feet of force mains and three (3) wastewater pump stations. The total construction
value was estimated to be $10 million.
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
Interlachen
North Lauderdale, FL
PROFESSIONAL SERVICES
2003
CONSTRUCTION (If
applicable) N/A
d
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ;Check if project performed with current firm
Lift Station 4: Rehabilitation of Lift Station in the City of North Lauderdale, Florida. Complete design, permitting and construction phase services for the
rehabilitation and conversion of a dry pit station to a submersible installation with peak flows of 915 gpm, 40 HP pumps and 8” force mains. Approximate
Construction Fees: $200,000
City of South Miami
Section Four: Required Forms
Page 17www.keithandschnars.com
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
14. YEARS EXPERIENCE 12. NAME
Roberto Goncalves
13. ROLE IN THIS CONTRACT
Civil Engineering a. TOTAL
11 years
b. WITH CURRENT FIRM
9 year
15. FIRM NAME AND LOCATION (City and State)
KEITH AND SCHNARS – Fort Lauderdale, FL
16. EDUCATION (DEGREE AND SPECIALIZATION)
B.S., Civil Engineering, Florida International University, 2001
A.A., Broward Community College, 1999
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND
DISCIPLINE)
N/A
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Member, Florida Engineer Society; Member, Order of the Engineer; Member, American Institute of Steel Construction
19. RELEVANT PROJECTS
(2) YEAR COMPLETED
1) TITLE AND LOCATION (City and State)
Water and Wastewater Improvement Project
Fort Lauderdale, FL
PROFESSIONAL SERVICES
Ongoing
CONSTRUCTION (If
applicable) N/A
a
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
Project Engineer for the on-going design of water and wastewater improvements for the City of Fort Lauderdale. The service area is bordered to
the North by Davie Boulevard, to the South by Riverland Road, to the East by New River and to the West by State Road 441. Fees: $ 20 million –
Construction
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
Sewer Study for Chula Vista/River Lands/Lauderdale Isle and River
Lanes Communities
Fort Lauderdale, FL
PROFESSIONAL SERVICES
2007
CONSTRUCTION (If
applicable) Ongoing
b
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
Project Engineer for an engineering study to provide sanitary sewer systems to several residential communities which are being serviced by individual
septic tank systems and recently annexed by the City of Fort Lauderdale. The study area comprised of 425-acres of mostly single-family dwellings.
Fees: $9,500,000
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
48” Water Main Design
Fort Lauderdale, FL
PROFESSIONAL SERVICES
2007
CONSTRUCTION (If
applicable) N/A
c
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
Project Engineer for the design of water improvements for the City of Fort Lauderdale. This project includes replacing of approximately 900 LF of
pipe by removing the existing 36” PCCP Water Main and installing new 30” Ductile Iron Pipe in its place and connections to existing water mains
and installation of approximately 6,000 LF of 48”. Tie-back Wall Design was utilized to secure a 42” Butterfly Valve that was to be abandoned.
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
Oakland Park, W.M. Sub-Aqueous Large Pressurized Water Main
Design, Fort Lauderdale, FL
PROFESSIONAL SERVICES
2007
CONSTRUCTION (If
applicable) N/A
d
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
Project Engineer for the design of 3,336 LF of 30” DIP Transmission water main and connections to existing water mains. Approximately 906 LF of
the water main was designed to utilize Directional Drill technique. Project required special permits from FDOT, US COAST GUARD, ARMY CORE
and Florida Department of Environmental Protection.
City of South Miami
Section Four: Required Forms
Page 18www.keithandschnars.com
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
14. YEARS EXPERIENCE 12. NAME
John Krane, P.E.
13. ROLE IN THIS CONTRACT
Traffic Engineering
a. TOTAL
23 years
b. WITH CURRENT FIRM
4 years
15. FIRM NAME AND LOCATION (City and State)
KEITH AND SCHNARS – Fort Lauderdale, FL
16. EDUCATION (DEGREE AND SPECIALIZATION)
B.S, Civil Engineering, Michigan State University, 1988
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND
DISCIPLINE)
Registered Professional Engineer, FL #0048952
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
N/A
19. RELEVANT PROJECTS
(2) YEAR COMPLETED
1) TITLE AND LOCATION (City and State)
Davie Commons DRI, IMR and LUPA Studies
Davie, FL
PROFESSIONAL SERVICES
Ongoing
CONSTRUCTION (If
applicable) N/A
a
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
Senior advisor to the study team preparing complex development related studies including a Development of Regional Impact (DRI) report,
Interchange Modification Report (IMR) and a Land Use Plan Amendment (LUPA) for a development of 2,000,000 square feet.
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
Matanzas Woods Parkway and I-95 IJR
Flagler County, FL
PROFESSIONAL SERVICES Ongoing
CONSTRUCTION (If
applicable) N/A
b
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
Project Manager for a new interchange proposal along I-95 between the existing interchanges of Palm Coast Parkway in Flagler County and US-1 in
St. Johns County. The approval of the Interchange Justification Report (IJR) will enable the reconstruction of the existing bridge crossing of Matanzas
Woods Parkway into a full interchange with I-95. The interchange will serve the City of Palm Coast, Bunnell, and future DRI scale developments
that have been approved in the area.
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
Crosstown Parkway Extension PD&E (EIS)
Port St. Lucie, FL
PROFESSIONAL SERVICES
2008
CONSTRUCTION (If
applicable) N/A
c
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
Project Manager for the Project Development and Environment (PD&E) study for the extension of Crosstown Parkway across the North Fork of
the St. Lucie River to US-1. This study has been designated as an Environmental Impact Statement (EIS). Responsible for project coordination
between the FDOT, FHWA, the City of Port St. Lucie, and the host of State and federal resource and regulatory agencies.
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
Village of Valencia Lakes DRI
DeSoto County, FL
PROFESSIONAL SERVICES
Ongoing
CONSTRUCTION (If
applicable) N/A
d
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
Senior advisor to the study team preparing the Question 21 responses to the DRI application. Mr. Krane provides policy and technical guidance
related to Concurrency, Proportionate Share and Fair Share legislation, and Strategic Intermodal System (SIS) policies relating to the impacted State
roadways.
City of South Miami
Section Four: Required Forms
Page 19www.keithandschnars.com
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
14. YEARS EXPERIENCE 12. NAME
José Rodríguez, P.E.
13. ROLE IN THIS CONTRACT
Traffic Engineering
a. TOTAL
37 years
b. WITH CURRENT FIRM
12 years
15. FIRM NAME AND LOCATION (City and State)
KEITH AND SCHNARS – Fort Lauderdale, FL
16. EDUCATION (DEGREE AND SPECIALIZATION)
M.S., Transportation Engineering, University of Maryland, 1974
B.S., Civil Engineering, University of Maryland, 1972
Transportation Systems Management course, School of Engineering
and Applied Sciences, Princeton University, 1976
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND
DISCIPLINE)
Registered Professional Engineer, FL #45596
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Professional Affiliations: Member, Institute of Transportation Engineers
Publications: Author co-author of three articles dealing with traffic operations and public/private transit operations published by the
Transportation Research Board and the Institute of Transportation Engineers
Broward County MPO, Citizens’ Involvement Roundtable: Representative for the City of Coral Springs 2008-present
19. RELEVANT PROJECTS
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
Special Urban Sector Traffic and Parking Studies
Various Locations
PROFESSIONAL SERVICES
Ongoing
CONSTRUCTION (If
applicable) N/A
a
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
City of Pompano Beach CRA, City of North Miami Beach, City of Fort Lauderdale, City of West Palm Beach, City of Plantation, Town of Jupiter;
Development of Regional Impact Reports (DRI) in Broward and Miami-Dade Counties; the Caracas/Prados del Este HOV corridor feasibility study for
the World Bank; access road/terminal integration at the new Athens Airport; historic zone traffic and transit studies for Old San Juan and Ponce,
Puerto Rico; and the Miami-Dade Countywide Policy Study. Traffic engineering project review services for the cities of Plantation, Fort Lauderdale,
North Lauderdale, and North Miami Beach.
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
Development review Committee Consultant
Broward County, FL
PROFESSIONAL SERVICES
Ongoing
CONSTRUCTION (If
applicable) N/A
b
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ;Check if project performed with current firm
Mr. Rodriguez is currently the Project Manager/Principal Engineer responsible for the coordination and review of traffic and/or parking reduction
studies prepared by traffic consultants for project developments in the City of Fort Lauderdale. His responsibilities include: project administration,
review and approval of traffic study methodologies, traffic report reviews and assistance at City committee meetings including City Commission.
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
Old Cutler Road Traffic Engineering Study
Miami-Dade County, FL
PROFESSIONAL SERVICES
2005
CONSTRUCTION (If
applicable) N/A
c
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
The project involved the operational evaluation of the Old Cutler Road Corridor between SW 87th Avenue and SW 212th Street with the intention of
assessing the viability of establishing traffic roundabouts at SW 89th and 97th Avenues, incorporating the roadway operations and infrastructure into
the approved Corridor Master Plan, and improvements to the pedestrian/bicycle trails. This project included the feasibility assessment and the design
and evaluation of two roundabouts. As Project Manager for this special study, with a limited budget and time frame, Mr. Rodríguez directed the
engineering specialists of Keith and Schnars in the conceptual design, cost estimates determination, roundabout design and traffic operations analyses
and simulations.
City of South Miami
Section Four: Required Forms
Page 20www.keithandschnars.com
City of South Miami
Section Four: Standard Form 330
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
14. YEARS EXPERIENCE 12. NAME
Eric Penfield, P.E.
13. ROLE IN THIS CONTRACT
Traffic Engineering a. TOTAL
14 years
b. WITH CURRENT FIRM
2 years
15. FIRM NAME AND LOCATION (City and State)
KEITH AND SCHNARS – Fort Lauderdale, FL
16. EDUCATION (DEGREE AND SPECIALIZATION)
M.S., Civil Engineering, Michigan State University, 1997
B.S., Civil Engineering, Michigan State University, 1994
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND
DISCIPLINE)
Registered Professional Engineer, FL #56717
Professional Engineer, MI #6201052212
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Institute of Transportation Engineers
19. RELEVANT PROJECTS
(2) YEAR COMPLETED
1) TITLE AND LOCATION (City and State)
General Planning Consultant Systems
FDOT District 4, FL
PROFESSIONAL SERVICES
Ongoing
CONSTRUCTION (If
applicable) N/A
a
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
As the Project Manager, Mr. Penfield helped provide on-demand transportation engineering and planning services for the FDOT District 4. Through the
issuance of task work orders for the five-county study area, rendered services included SIS Facilities Long Range Travel Demand Forecasts, Access
Management analyses, Districtwide Design Traffic Forecasting, IOAR/IMR/IJR reviews, PD&E study reviews, transportation modeling updates, Broward
County Action Plans Reviews, and a Park-and-Ride Lot Study.
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
General Traffic Engineering Services
Sunny Isles Beach, FL
PROFESSIONAL SERVICES Ongoing
CONSTRUCTION (If
applicable) N/A
b
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
Project Manager for Traffic Engineering, conducted intersection and corridor safety studies, and queuing analyses, as part of the site plan approval process.
Reviews include traffic impact and trip generation analyses, traffic operations, site access/circulation, stacking/queuing analysis, marking review, geometric
considerations, and safety compliance. Site plan reviews were also performed.
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
General Transportation Engineering and Planning Services
Fort Lauderdale, FL
PROFESSIONAL SERVICES
Ongoing
CONSTRUCTION (If
applicable) N/A
c
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
Project Manager for Traffic Engineering, provided as-needed transportation services. These have included traffic impact study reviews, and parking study and
shared parking assessments that were conducted in accordance with the city’s land development regulations. Extensive intergovernmental coordination and
quasi-judicial presentations were required.
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
General Transportation Engineering and Planning Services
Parkland, FL
PROFESSIONAL SERVICES
Ongoing
CONSTRUCTION (If
applicable) N/A d
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
Project Manager for Traffic Engineering, provided as-needed transportation services that included traffic control, operating analysis, traffic impact, site plan
review, comprehensive planning, concurrency evaluations, and traffic safety studies. Extensive intergovernmental coordination was required.
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (City and State)
Arvida Parkway/I-75 Southbound Exit Ramp Traffic Study
Weston, FL
PROFESSIONAL SERVICES
Ongoing
CONSTRUCTION (If
applicable) N/A
e
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ; Check if project performed with current firm
The southbound exit ramp from I-75 to westbound Arvida Parkway is a free-flow ramp experiencing excessive delay during peak hours. Further, a unique
weaving situation develop-ed due to lane geometry and alignment coupled with the explosive population growth downstream of the ramp junction. As Lead
Technical Traffic Engineer, Mr. Penfield evaluated alternatives to cost-effectively solve the ramp’s operational problem as well as downstream bottlenecking.
Phase I identified ways to minimize weaving and delay while Phase II monitored and addressed potential problems at the ramp junction with I-75.
Page 21www.keithandschnars.com
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
1
22. YEAR COMPLETED 21. TITLE AND LOCATION (City and State)
Fort Lauderdale General Engineering Projects
Fort Lauderdale, FL
PROFESSIONAL SERVICES
Ongoing
CONSTRUCTION (If applicable)
N/A
23. PROJECT OWNER’S INFORMATION
a. PROJECT NAME
City of Fort Lauderdale
c. POINT OF CONTACT NAME
Paul Bohlander, P.E.
c. POINT OF CONTACT TELEPHONE NUMBER
(954) 828-6527
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost.)
The Keith and Schnars team is providing a broad range of consulting services to the City of Fort Lauderdale. These services
include, but are not limited to, general surveying, aerial photography, civil engineering design, architectural design, landscape
architectural design, drafting and mapping, and construction management. Task orders authorized under this contract have included
the following:
•Miami Road (Area) Sanitary Sewer Improvements
•River Oaks/Edgewood Stormwater Management Study
•Northeast 15th Avenue Streetscape
•11th Avenue Swing Bridge Rehabilitation
•Renovations to Holiday Park Gymnasium
•Woodlawn Cemetery Site Improvements
•Northeast 18th Avenue Streetscape
•Feasibility Report for Relocation of Cherry Building
•Site Study for New City Hall
•Fort Lauderdale Beach Streetscape Master Plan
•Feasibility Study and Design for new building for Building and Zoning Department
•Northeast 34th Avenue/Northeast 33rd Avenue sidewalk construction
•Renovation to War Memorial Building
•Feasibility Analysis for International Swimming Hall of Fame
•Beach restrooms survey
•Improvements at George English Park
•Northeast 33rd Avenue/Dolphin Isles Neighborhood Improvement Project
•Septic Tank Area 3 Sanitary Sewer and watermain improvements
Fees: $7.6 million (to date)
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
Keith and Schnars
(2) FIRM LOCATION (City and State)
Fort Lauderdale, FL
(3) ROLE
Prime
City of South Miami
Section Four: Required Forms
Page 22www.keithandschnars.com
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
2
22. YEAR COMPLETED 21. TITLE AND LOCATION (City and State)
FDOT District 4 Districtwide GEC Traffic
Operations Access Management and Studies
FDOT District 4, FL
PROFESSIONAL
SERVICES
2010
CONSTRUCTION (If applicable)
N/A
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
FDOT District 4
c. POINT OF CONTACT NAME
Beth Coe
c. POINT OF CONTACT TELEPHONE NUMBER
(954) 777-4373
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost.)
As part of Keith and Schnars’ districtwide general traffic operations consultant contract with the FDOT District 4, we provided an
oversight role for on-site support services, and support of miscellaneous traffic operations studies for the five-county study area.
These include:
Signal Warrant Studies
Conflict Analysis
Hospital Guidesign Master Plan
Speed and Gap Studies
In addition to an oversight role of general support to their Access Management program, a Master Plan was developed for all
hospitals in Palm Beach County meeting the wayfinding guidelines of the FDOT Traffic Engineering Manual. Additionally, several
Signal Warrant studies, Speed and Gap studies and a Conflict Analysis were conducted in accordance with the FDOT Traffic
Engineering Manual and Manual on Uniform Traffic Studies.
Fees: Ongoing Task-based
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
Keith and Schnars
(2) FIRM LOCATION (City and State)
Fort Lauderdale, FL
(3) ROLE
Prime
City of South Miami
Section Four: Required Forms
Page 23www.keithandschnars.com
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
3
22. YEAR COMPLETED 21. TITLE AND LOCATION (City and State)
EL Rio Multi-Use Trail Greenway – Segment 3
Boca Raton, FL
PROFESSIONAL
SERVICES
2009
CONSTRUCTION (If applicable)
N/A
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
City of Boca Raton
c. POINT OF CONTACT NAME
Joy Puerta
c. POINT OF CONTACT TELEPHONE NUMBER
(561) 416-3410
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost.)
The El Rio Trail is a 12’ wide shared use pathway which follows the El Rio Canal. Keith and Schnars designed a non-vehicular
greenway area in the middle of the urban fabric that integrates the user with natural features. This trail segment runs from Yamato
Road to L-40 Canal under a Local Participation Agreements (LAP) with the FDOT.
Keith and Schnars services included design plan preparation, design surveys, environmental permitting, landscape architecture,
structural engineering, preparation of specifications package, and post design services. This segment of the El Rio Multi-Use Trail
includes pedestrian bridges and seating areas. The trail corridor is adjacent to business and office parks and crosses the L-40 Canal.
Fees: $116,000
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
Keith and Schnars
(2) FIRM LOCATION (City and State)
Fort Lauderdale, FL
(3) ROLE
Prime
City of South Miami
Section Four: Required Forms
Page 24www.keithandschnars.com
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
4
22. YEAR COMPLETED 21. TITLE AND LOCATION (City and State)
FDOT District 6 Districtwide General Engineering
Consultant Services
Florida
PROFESSIONAL SERVICES
Ongoing
CONSTRUCTION (If applicable)
N/A
23. PROJECT OWNER’S INFORMATION
a. PROJECT NAME
Florida Department of Transportation District 6
c. POINT OF CONTACT NAME
Ali Toghiani
c. POINT OF CONTACT TELEPHONE NUMBER
(305) 470-5343
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost.)
Since March 14, 2002, Keith and Schnars has managed a District General Engineering Consultant Services Contract for FDOT's
District 6. The purpose of the contract is basically to serve as an extension of the District's staff. The scope includes assisting in
basically all sections throughout the Department. Including professional services, planning, public transportation, project
development and environmental (PD&E), design, production management, right-of-way services, surveying and mapping services,
value engineering, construction engineering management (CEI), maintenance engineering management etc.
The contract is a task order driven contract with the following services (tasks) already completed:
1) MIC Plans Review/Structural Design - Bridge
plans review for bridges in the MIC-MIA Interchange
system.
FDOT PM: Kouroche Mohandes.
Review and minor design was on schedule.
Dates: 7/03 through approx. 12/03
4) I-95 Pavement Rehabilitation Study and Plans -
Perform analysis and final design for deficiencies along the I-95
corridor in Miami-Dade County.
FDOT PM: Jason Chang
Study completed on time
2) MIC MTAR/RCF Landscaping - Provide full
landscape architecture analysis and final design for the
Miami Intermodal Center's (MIC) MTAR and Rental
Car Facility's (RCF) facilities
FDOT PM: Kuoroche Mohandes
Final Design Ongoing and on schedule
5) NW 122nd Street and SR-826 (Palmetto
Expressway) - Perform final design for deficiencies to
the interchange at NW 122nd Street and SR-826 in
Miami-Dade County
FDOT PM: Jason Chang
NTP on 6/07/04
3) I-95 Widening & Pedestrian Bridge Overpass -
Perform analysis and final design for a pedestrian bridge
along the I-95 corridor.
FDOT PM: Jason Chang
Final Design: Completed in 2006
Construction: Completed in 2006
6) SR-5/US-1/Biscayne Boulevard from NE 13th Street
to NE 38th Street - Perform preliminary engineering and
final design services for approximately 2 miles along the
Biscayne Boulevard corridor.
FDOT PM: Jason Chang
NTP on 6/16/04
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
Keith and Schnars
(2) FIRM LOCATION (City and State)
Fort Lauderdale, FL
(3) ROLE
Prime
City of South Miami
Section Four: Required Forms
Page 25www.keithandschnars.com
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
5
22. YEAR COMPLETED 21. TITLE AND LOCATION (City and State)
Boca Raton Downtown Redevelopment
Boca Raton, FL
PROFESSIONAL SERVICES
1995
CONSTRUCTION (If applicable)
N/A
23. PROJECT OWNER’S INFORMATION
a. PROJECT NAME
City of Boca Raton
c. POINT OF CONTACT NAME
Tony Puerta from Boca Traffic Project
c. POINT OF CONTACT TELEPHONE NUMBER
(561) 416-3402
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost.)
Keith and Schnars provided redevelopment program.
Services included right-of-way acquisition, drainage, water
and sewer system improvements, intersection
improvements, roadway reconstruction and widening, and
other improvements for Boca Raton's downtown
renaissance project. Final improvements included
streetscape plans, implementing landscape, irrigation, site
furnishings and pavers. planning, design and construction
management for the city's roadway and infrastructure
improvements in the $52 million roadway.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
Keith and Schnars
(2) FIRM LOCATION (City and State)
Fort Lauderdale, FL
(3) ROLE
Prime
City of South Miami
Section Four: Required Forms
Page 26www.keithandschnars.com
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
6
22. YEAR COMPLETED 21. TITLE AND LOCATION (City and State)
Coconut Creek Main Street Master Plan
Boca Raton, FL
PROFESSIONAL
SERVICES
2004
CONSTRUCTION (If applicable)
N/A
23. PROJECT OWNER’S INFORMATION
a. PROJECT NAME
City of Coconut Creek
c. POINT OF CONTACT NAME
Jim Hetzel
c. POINT OF CONTACT TELEPHONE NUMBER
(954) 973-6770
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost.)
Keith and Schnars is part of the team that worked with the
City of Coconut Creek to prepare a Main Street Design
Manual for the creation of a pedestrian oriented green
community in one of the last large tracts of undeveloped
infill parcels in northern Broward County. Keith and
Schnars was responsible for analyzing the existing
infrastructure and quantifying the impacts of the proposed
development. The Landscape Architecture Department
designed the streetscapes, assisted in the preparation of a
traffic analysis and land use plan amendment for the City.
The amendment allowed for creation of a designation of
“Regional Activity Center” for this project.
Fees: $83,500
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
Keith and Schnars
(2) FIRM LOCATION (City and State)
Fort Lauderdale, FL
(3) ROLE
Prime
City of South Miami
Section Four: Required Forms
Page 27www.keithandschnars.com
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
7
22. YEAR COMPLETED 21. TITLE AND LOCATION (City and State)
Mitchell Moore Park Improvements
Pompano Beach, FL
PROFESSIONAL
SERVICES
2007
CONSTRUCTION (If applicable)
N/A
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
City of Pompano Beach
c. POINT OF CONTACT NAME
Randall Fowler
c. POINT OF CONTACT TELEPHONE NUMBER
(954) 786-4144
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost.)
Keiith and Schnars provided Site Design through Construction Administration for this $1million dollar, 2 phase renovation to 16
acre Mitchell Moore Park. The renovation included: a par course, play structure, 2 ball fields, dugouts, scorer’s platforms, site
furniture, a football field, bleachers, court resurfacing, an irrigation system, drainage improvements and miscellaneous other
elements.
To help the City conserve its valuable potable water, Keith and Schnars secured a SFWMD General Water Use permit to irrigate
the park from an adjacent canal via a new pump station. The irrigation system renovation included athletic fields and converting
the system from municipal supply to surface water.
Design Fees: $165,000
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
Keith and Schnars
(2) FIRM LOCATION (City and State)
Fort Lauderdale, FL
(3) ROLE
Prime
City of South Miami
Section Four: Required Forms
Page 28www.keithandschnars.com
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
8
22. YEAR COMPLETED 21. TITLE AND LOCATION (City and State)
One Stop Shop
Fort Lauderdale, FL
PROFESSIONAL SERVICES
2003
CONSTRUCTION (If applicable)
N/A
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
City of Fort Lauderdale
c. POINT OF CONTACT NAME
Mehrdad Fayyaz, P.E.
c. POINT OF CONTACT TELEPHONE NUMBER
(954) 828-6527
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost.)
Keith and Schnars prepared Civil Engineering, Landscaping and Irrigation Plans for the City of Fort Lauderdale's future "One Stop
Shop" located on the north side of Sistrunk Boulevard between NW 18th Avenue and NW 19th Avenue. The site is approximately 4-
acres in size and will contain parking for employees and the public. Keith and Schnars prepared engineering drawings for the
demolition of the existing site, paving, grading, storm drainage, potable water, sanitary sewer, pavement markings, striping and all
necessary details for site construction. In addition, site landscaping and irrigation design was performed. Off-site Engineering design
included driveway connections, potable water main connections and drainage analysis.
Keith and Schnars obtained all necessary state, county and local engineering permits. Permits were obtained from the City of Fort
Lauderdale Engineering Department, the City of Fort Lauderdale Building Department, the Broward County Department of Planning
and Environmental Protection, the Broward Public Health Unit, and the South Florida Water Management District.
Keith and Schnars also played a role in developing the cost estimates bid packages for construction of the project.
Fees: $280,000
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
Keith and Schnars
(2) FIRM LOCATION (City and State)
Fort Lauderdale, FL
(3) ROLE
Prime
City of South Miami
Section Four: Required Forms
Page 29www.keithandschnars.com
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
9
22. YEAR COMPLETED 21. TITLE AND LOCATION (City and State)
River Oaks - Edgewood Communities Stormwater
Analysis
Fort Lauderdale, FL
PROFESSIONAL
SERVICES 2008
CONSTRUCTION (If applicable)
N/A
23. PROJECT OWNER’S INFORMATION
a. PROJECT NAME
City of Ft. Lauderdale
c. POINT OF CONTACT NAME
Paul Bohlander
c. POINT OF CONTACT TELEPHONE NUMBER
(954) 522-2604
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost.)
Keith and Schnars prepared a drainage analysis
for the existing flooding problems within the
neighborhoods of River Oaks and Edgewood
located in the City of Fort Lauderdale. The
contract for this study totaled $108,065 and
included a Master Storwmater Analysis, meeting
with governmental agencies to determine
permit requirements, a cost analysis, a projected
construction schedule and a topographic survey
to determine areas of flooding.
Individual street blocks within these areas were
analyzed to determine the extent of flooding
and where the flooding was the most
substantial. Five methods of providing drainage
relief were analyzed: roadside swales, exfiltration trench, dry retention ponds, injection wells and discharge into the New River
Canal. Injection wells were immediately ruled out since wells within this area would not be able to meet State standards. Keith
and Schnars also provided a cost estimate for each of the drainage methods and the corresponding flood protection being
provided for each. The cost estimate was prepared in a tiered format in order to show how each drainage method or
combination of drainage method or combination of drainage methods was reducing flooding and the cost for each. The costs
ranged from 461,000 to $2.8 million for River Oaks and from $886,000 to $1.3 million for Edgewood.
The implementation of the project is currently on hold pending funding.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
Keith and Schnars
(2) FIRM LOCATION (City and State)
Fort Lauderdale, FL
(3) ROLE
Prime
City of South Miami
Section Four: Required Forms
Page 30www.keithandschnars.com
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
10
22. YEAR COMPLETED 21. TITLE AND LOCATION (City and State)
Turtle Run Community Development District
Coconut Creek, FL
PROFESSIONAL
SERVICES
Ongoing
CONSTRUCTION (If applicable)
N/A
23. PROJECT OWNER’S INFORMATION
a. PROJECT NAME
District Engineer
c. POINT OF CONTACT NAME
Dennis Baldis
c. POINT OF CONTACT TELEPHONE NUMBER
(954) 721-8681
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost.)
The Keith and Schnars team has served as District
Engineer for the Turtle Run Community Development
District for more than 22 years. In the capacity of
District Engineer, Keith and Schnars attends all Board
Meeting and coordinates closely with the District
management team, Board Members and Council on a
variety of projects within the district. Keith and Schnars
reviews engineering permit plans submitted for
compliance with District Criteria and best engineering
practices and techniques. In addition, Keith and Schnars
has also provided surveying, design, permitting, bidding
and negotiation, construction management, and
inspection services for various district projects.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
Keith and Schnars
(2) FIRM LOCATION (City and State)
Fort Lauderdale, FL
(3) ROLE
Prime
City of South Miami
Section Four: Required Forms
Page 31www.keithandschnars.com
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS
28. EXAMPLE PROJECTS LISTED IN SECTION F
(Fill in “Example Projects Key” section below, before completing table. Place “X” under project key number for project participation same or similar role.)
26. NAMES OF KEY PERSONNEL
(From Section E,
Block 12)
27. ROLE IN THIS CONTRACT
(From Section E,
Block 13) 1 2 3 4 5 6 7 8 9 10
Mark Tomczyk, P.E.
Principal-in-Charge/Civil Engineering
X X X X
Tim Hall, P.E.
Project Manager/Drainage Design
X X X X X X
Carlos Alcantara, P.E.
Roadway Engineering/Drainage Design
X
Mayra Manrique, E.I.
Roadway Engineering
X
Matt Neddeff, P.E.
Roadway Engineering
X
Bruce Reed, RLA
Roadway Engineering
X X X X X X X X
Chris Miller, RLA, LEED AP
Roadway Engineering
X X X X X X
Frank Vilar, P.E.
Roadway Engineering/Drainage
Design/Civil Engineering
X X X X
Roberto Goncalves
Civil Engineering
X X X X X X
John Krane, P.E.
Traffic Engineering
X
José Rodríguez, P.E.
Traffic Engineering
X X X X
Eric Penfield, P.E.
Traffic Engineering
X X
29. EXAMPLE PROJECT KEY
No. TITLE OF EXAMPLE PROJECT (FROM SECTION F) No. TITLE OF EXAMPLE PROJECT (FROM SECTION F)
1.
Fort Lauderdale General Engineering Projects
6. Coconut Creek Main Street Master Plan
2.
FDOT District 4 Districtwide GEC Traffic
Operations Access Management and Studies
7. Mitchell Moore Park Improvements
3.
EL Rio Multi-Use Trail Greenway – Segment 3
8. One Stop Shop
4.
FDOT District 6 Districtwide General Engineering
Consultant Services
9. River Oaks - Edgewood Communities Stormwater
Analysis
5.
Boca Raton Downtown Redevelopment
10. Turtle Run Community Development District
City of South Miami
Section Four: Required Forms
Page 32www.keithandschnars.com
H. ADDITIONAL INFORMATION
30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS
NEEDED.
Keith and Schnars is a firm dedicated to the timely and cost-efficient delivery of our services. In fact, in 2007, when the
Florida Department of Transportation released its annual summary of design overruns (time and money), Keith and Schnars
ranked among the best of the over two hundred firms surveyed. In the six-year period studied, Keith and Schnars designed
and surveyed twelve projects with a construction value in excess of $120 million dollars. Our average cost overun for the
period was only 4%, while our average construction time overrun was 1%. No other firm selected by FDOT in that
six-year period completed this volume of work, and maintained such low overruns in cost and time.
This commitment to customer service and high professional standards has also earned us other peer and industry
recognition. For instance, last year (for the third year in a row) we took home a Best Places to Work Award at an event co-
sponsored by Polk Works Workforce 2020 and the United Way of Central Florida. In 2007, the Florida Chapter of the
American Planning Association selected one of our planning projects, the South Miami-Dade Watershed Study and
Plan, for a prestigious FAPA Award of Excellence; McGraw-Hill Companies, publisher of Business Week Magazine,
selected Keith and Schnars as one of the Southeast’s Top 50 in Design; and Engineering News Record named Keith
and Schnars one of the nation’s Top 500 engineering firms, for the fifth year in a row. The year before that Keith
and Schnars took home two of the twelve Best in Construction Awards given out by the Florida Transportation
Builders’ Association, a 73-year old non-profit organization that many consider the "the voice" of Florida’s road
and bridge building industry.
As these awards indicate, we are a firm dedicated to our staff, to our communities, and to providing high quality consulting
services across a broad range of disciplines.
I. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
31. SIGNATURE
32. DATE December 8, 2011
33. NAME AND TITLE
Mark Tomczyk, P.E., Vice President
City of South Miami
Section Four: Required Forms
Page 33www.keithandschnars.com
ARCHITECT – ENGINEER QUALIFICATIONS
1. SOLICITATION NUMBER (If
any)
PART II – GENERAL QUALIFICATIONS
(If a firm has branch offices, complete for each specific branch office seeking work.)
2a. FIRM (OR BRANCH OFFICE) NAME
Keith and Schnars
3. YEAR
ESTABLISHED
1972
4. DUNS
NUMBER
072227762
5. OWNERSHIP 2b. STREET
10305 NW 41st Street, Suite 112
a. TYPE
Corporation
2c. CITY
Doral
2d. STATE
FL
2e. ZIP CODE
33178
b. SMALL BUSINESS STATUS
N/A
6a. POINT OF CONTACT NAME AND TITLE
Mark Tomczyk, P.E., Vice President of Civil Engineering
6b. TELEPHONE NUMBER
(305) 477-7667
6c. E-MAIL ADDRESS
mtomczyk@keithandschnars.com
7. NAME OF FIRM (If block 2a is a
branch office)
N/A
8a. FORMER FIRM NAME(S) (If any) 8b.YR
ESTABLISHED
8c. DUNS
NUMBER
072227762
9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM’S EXPERIENCE AND
ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
c. No. of
Employees a.
Function
Code
b. Discipline (1)
FIRM
(2)
BRANCH
a. Profile
Code b. Experience
c. Revenue Index
Number
(see below)
02 Administrative 20 B02 Bridges 02
06 Biologist 4 C15 Construction Management 06
07 CADD Technician 3 C16 Construction Surveying 07
12 Civil Engineer 5 E01 Ecological Surveys 12
15 Construction Inspector 13 E09 Environmental Impact Studies Assessments 15
24 Environmental Scientist 6 E11 Environmental Planning 24
30 Geologist 1 G06 Graphic Design 30
38 Land Surveyor 10 H07 Highways, Streets 38
39 Landscape Architect 8 L02 Land Surveying 39
47 Planner: Urban/Regional 3 L03 Landscape Architecture 47
57 Structural Engineer 4 P05 Planning - Community 57
60 Transportation Engineer 6 P06 Planning –Site 60
62 Water Resources Engineer 2 T03 Traffic & Transportation Engineering 62
Attorney 1 T05 Topographic Surveying & Mapping
Construction Engineer 6 W02 Water Resources
Engineering Technician 8 W03 Water Supply – Treatment & Distribution
Marketing, Graphics Public Involvement 6 Civil Engineering General Services
MIS Managers/Support 2 Public Involvement & Outreach Services
Planners: Transportation 6
Total 117
11. ANNUAL AVERAGE PROFESSIONAL PROFESSIONAL SERVICES REVENUE INDEX NUMBER
SERVICES REVENUES OF FIRM
FOR LAST 3 YEARS
(Insert revenue index number shown at right)
a. Federal Work 0
b. Non-Federal Work 9
c. Total Work 9
1.
2.
3.
4.
5.
Less than $100,000
$100,000 to less than $250,000
$250,000 to less than $500,000
$500,000 to less than $1
million
$1 million to less than $2
million
6.
7.
8.
9.
10.
$2 million to less than $5 million
$5 million to less than $10
million
$10 million to less than $25
million
$25 million to less than $50
million
$50 million or greater
12. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
a. SIGNATURE
b. DATE December 8. 2011
City of South Miami
Section Four: Required Forms
Page 34www.keithandschnars.com
ADDENDUM No. 1
Project Name: PROFESSIONAL ENGINEERING & MANAGEMENT SERVICES
Date: November 23, 2011
Sent: Fax/E-mail/webpage
This addendum submission is issued to clarify, supplement and/or modify the previously issued Letter of
Interest (LOI) Documents, and is hereby made part of the Documents. All requirements of the
Documents not modified herein shall remain in full force and effect as originally set forth. Receipt of
this Addendum shall be acknowledged on the Bid Form.
Scope of Services:
Proposers may select from the listing of the five general engineering disciplines depending upon
the proposers interest and expertise in each discipline listed. It is up to the proposer to decide
how may categories of specialized engineering services they wish to be considered.
Submission of Letters of Interest:
Federal Forms 254, 255 or 330 may be submitted. Submission of the Federal Forms are
excluded from the eight (8) page limit.
Exhibit #1 - “Professional Service Agreement, General Engineering Services:”
o Opening paragraph the statutory thresholds for construction costs have been amended
as follows:
CONSULTANT agrees to perform all professional services in connection with the
WORK, as described herein, on a continuing basis in connection with projects where
the basic construction costs does not exceed - $2,000,000 or studies which do not
exceed -$200,000, herein after called the SERVICES”.
HIS ADDENDUM SHOULD BE SIGNED AND DATED BY THE BIDDER AND SUBMITTED AS
PROOF OF RECEIPT WITH THE SUBMISSION OF BIDS. THE BIDDER BY IDENTIFYING THE
ADDENDUM NUMBER IN THE BID PROPOSAL AND BY SIGNING AND SUBMISSION OF THEIR
BID SHALL SERVE AS PROOF OF RECEIPT OF THIS ADDENDUM.
NAME OF FIRM: ____________________________________
SIGNATURE: _______________________________________
DATE: _____________________________________________
1
Keith and Schnars
December 8,2011
City of South Miami
Section Four: Required Forms
Page 35www.keithandschnars.com
ADDENDUM No. 2
Project Name: PROFESSIONAL ENGINEERING & MANAGEMENT SERVICES
Date: December 5, 2011
Sent: Fax/E-mail/webpage
This addendum submission is issued to clarify, supplement and/or modify the previously issued Letter of
Interest (LOI) Documents, and is hereby made part of the Documents. All requirements of the
Documents not modified herein shall remain in full force and effect as originally set forth. Receipt of
this Addendum shall be acknowledged on the Bid Form.
Submission of Letters of Interest:
Question #1: Are there any exclusions to the 8-page limit and please clarify how many
copies of the Letters of Interest should be submitted?
Letters of Interest are limited to an 8-page maximum. The exclusions are listed below:
Federal Forms 254, 255 or 330 may be submitted. Submission of the Federal Forms
are excluded from the eight (8) page limit.
Resumes of sub‐consultants can be included as an appendix and are excluded from the
(8) page limit.
Companies must submit one unbound original, one electronic copy (flash drive or CD) and
ten copies. The mail and delivery address is:
Mrs. Maria Menendez, City Clerk
City of South Miami
6130 Sunset Drive
South Miami, FL 33143
HIS ADDENDUM SHOULD BE SIGNED AND DATED BY THE BIDDER AND SUBMITTED AS
PROOF OF RECEIPT WITH THE SUBMISSION OF BIDS. THE BIDDER BY IDENTIFYING THE
ADDENDUM NUMBER IN THE BID PROPOSAL AND BY SIGNING AND SUBMISSION OF THEIR
BID SHOULD SERVE AS PROOF OF RECEIPT OF THIS ADDENDUM.
NAME OF FIRM: ____________________________________
SIGNATURE: _______________________________________
DATE: _____________________________________________
1
Keith and Schnars
December 8,2011
City of South Miami
Section Four: Required Forms
Page 36www.keithandschnars.com
City of South Miami
Section Four: Required Forms
ADDENDUM No. 3
Project Name: PROFESSIONAL ENGINEERING & MANAGEMENT SERVICES
Date: December 6, 2011
Sent: Fax/E-mail/webpage
This addendum submission is issued to clarify, supplement and/or modify the previously issued Letter of
Interest (LOI) Documents, and is hereby made part of the Documents. All requirements of the
Documents not modified herein shall remain in full force and effect as originally set forth. Receipt of
this Addendum shall be acknowledged on the Bid Form.
Submission of Letters of Interest:
Question #1: Are the documents required to be submitted, specifically: professional
licenses, state certificates and list of clients/references, part of the eight (8) page limit or
can they be included as an appendix?
Professional licenses and state certificates are excluded from the eight (8) page limit.
Question #2: Can a firm submitting a Letter of Interest as a prime also be a sub-
consultant to another prime submitting?
Yes, there are no restrictions to submitting as a prime or a sub-consultant to another prime.
Question #3: Upon review of the City of South Miami’s Professional Services Agreement
included in the Request for Letter of Interest for Professional Engineering & Management
Services Pre-Qualification Pool it appears that text is missing from the bottom of pages 7,
8, 9, 11, and 12.Will the City please furnish an updated agreement for review prior to the
submittal deadline?
A complete Professional Service Agreement is included with addendum.
HIS ADDENDUM SHOULD BE SIGNED AND DATED BY THE BIDDER AND SUBMITTED AS
PROOF OF RECEIPT WITH THE SUBMISSION OF BIDS. THE BIDDER BY IDENTIFYING THE
ADDENDUM NUMBER IN THE BID PROPOSAL AND BY SIGNING AND SUBMISSION OF THEIR
BID SHOULD SERVE AS PROOF OF RECEIPT OF THIS ADDENDUM.
NAME OF FIRM: ____________________________________
SIGNATURE: _______________________________________
DATE: _____________________________________________
1
Keith and Schnars
December 8,2011
Page 37www.keithandschnars.com
City of South Miami
Section Four: Required Forms
10305 NW 41st Street, Suite 112 • Doral, Florida 33178
Phone: (305) 477-7667 • Fax: (305) 477-4474