Loading...
Bid Check List and PricingItem Description Unit Qty %. , 1!m I Mobilization LS I 4�j 600, rqn, 2 Demolition of playground LS I 3 Playground equi pment (2 -5 yrs) LS I j� /�� � 4 Playground equipment (5- 12yrs) LS I .1:34t zO 5 Installation of playground equipment LS I t Subtotal 6TD b Performance Band LS I %. , 1!m 7 OH &profit (Labor& Office Personnel) LS I � 0 CT : G Total $ eS z C END OF SECTON Page I5 af72 "<u2' ThmnavA I'op$20llZ01a. All nghts tu�enetf. 1/I 1/13/13 5.. The ENTIRE WORK shall be completed, in full, within 60 working days from the date stipulated in the NOTICE TO PROCEED. Failure to complete the entire work during the described time period shall result in the assessment of liquidated damages as set forth in the Contract. 6. Communications concerning this Proposal shall be addressed to: RESPONDENT: / y 9 Gt i / 6 < Address: �2 4,2 f <t�fvf l C , Telephone: k�'t7 .a7Q'.2..'V Facsimile: . S-: „t ' 4 --,5'3 'T-Z) . Attention: 7. The terms used in this Proposal which are defined in the Contract shall have the same meaning as is assigned to them in the Contract Documents, unless specifically defined in this RFP Package. - SUBMITTED THIS 304'* DAY OF 2%. Q PROPOSAL SUBMITTED BY: Company-° ,-y Telephone Number - Name of Person Authorized to Submit f Fax Number ..Proposal y F -R O 9 L c Fl t7 yc L d2, C Signature„: =` Email Address Title Page 14 of 72 ©ThomasP Pepe; 2C}P1- 2013:All rights reserved. X/1 i1t3 /l3 iii. Respondent has correlated the results of all such observations, examinations, investigations, :explorations, tests, reports and studies with the terms and conditions of the Contract Documents. iv. Respondent has reviewed and checked all information and data shown or indicated in the RFP Package or in the Contract Documents with respect to existing Underground Facilities at or contiguous to the site and assumes responsibility for the accurate location ' of all '. Underground:. Facilities, No additional examinations, investigations, explorations, .tests, reports or similar information or data in respect to any Underground Facilities are, or will be, required by Respondent in order to perform and furnish the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents. -- d. Respondent has given the City written notice of all conflicts, errors or discrepancies that it has discovered in the Contract Documents and, if any conflicts; errors or discrepancies have been found and notice given, the Respondent represents, by submitting its proposal to the City; that the Respondent has received sufficient notice of the resolution thereof from the City, that such resolution is acceptable to Respondent and that the Respondent waives any claim regarding the conflicts, errors or discrepancies. e. This Proposal is genuine and not made in the interest of or on behalf of any undisclosed person, . firm or corporation:' and is not submitted pursuant to any agreement or rules of any group, association, organisation, or corporation;Respondent Iias notdireciJy or indirectly induced or solicited any other Respondent to submit a false or'sham Proposal; Respondent$as not solicited or induced any person, firm or corporation 20 refrain from responding; andRespondenthas not sought by collusion or otherwise to obtainfor itself any advantage over any other Respondent or over the CITY. 4. Respondent understands and agrees that the Contract Price is the amount that it needs to furnishand install all of the Work complete and in place. The Schedule ofValues, if required, is provided for the. purpose of Proposal Evaluation and when initiated by the CITY, it shall form the basis for calculating the .pricing of change orders. The Contract Price shall not be adjusted in any way so as to result in a deviation from the Schedule of Values, except to the extent that the CITY changes the scopeof the Work after the Contract Date, As such, the Respondent shall furnish all Tabor, materials, equipment, tools, superintendence and services necessary to provide a complete, in place Project for the Proposal Price af. LUMP SUM BASE "PRICEr dollars and f. Alternates: #I � #S #2 #b #3 #7 #4 #B Afeebreakdown, ifapplicable, for eachtask must be completed in thetable shown above. Failure to complete this information shall render the proposal non- responsive.. ri,a�„a� e r�p�,zor r -zoi3. nir ngnu reserved. 7!(1!13113 page 13 of 77 THIS PROPOSAL IS SUBMITTED TOE Steven Alexander :City Manager City of South Miami 6130 Sunset Drive South Miami, FL 33143 I. If this Proposal is accepted the undersigned Respondent agrees to enter into Contract with the City of South Miami in the form included in this RFP Package, and to perform and furnish all work as specified or indicated in this RFP for the Proposed Price - within the Contract Time and in accordance with the other " terms and conditions of the RFP Package. 2. Respondent accepts all of the terms and conditions of the Advertisement, RFP, Invitation for Proposals and Instructions to Respondents, including without limitation those ,dealing with the .disposition of Proposal Bond /Security. This Proposal will remain subject to acceptance for 90 calendar days after the day of the .Proposal Opening. Respondent agrees to sign and submit the Contract with the :Bonds, Insurance Policy with appropriate endorsements, Insurance Certificate and other documents required by the RFP within ten (10) calendar days after the date of the City's Notice of Award. 1 In submitting this Proposal, Respondent represents that: a. Respondent has examined copies of all the RFP Documents and of the following Addenda, if any " (receipt of all which is hereby acknowledged.) j Addendum No. It Dated: tti j '2113 Addendum No. Dated:�cj /l Addendum No. ,, Dated: f a? / Addendum No. 4 Dated: �� f /, _. Addendum No. ;Dated:. Addendum No. Dated: b. Respondent has familiarized himself with the nature and extent of the Contract Documents; the proposed work site; locality and all local conditions and laws and regulationrthaEin any .manner may affect cost, progress, performanceor furnishingof the Work. 2. Subsurface conditions: If applicable to this RFP, the.Respondent represenu that: "r. Respondent has studied zarefully all reports and drawings; if applicable, of subsurface conditions anddrawingsofphysical conditions ii. Respondent has obtained and careiullyscudied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations explorations, tests and atudies in additiontaortosupplementthosereferredtoin( c) abovewhichpercaintothesubsurface orphysical conditionsat the siteor "otherwisemay affectthecost, progress, performance, or the furnishing oftheWOrk at the ContractPrice, within ttieContract Time and in accordance with the other terms and conditions of the Contract Documents. The Respondent hereby "acknowledges -that "no .additional examinations, investigations, explorations, tests, reports or similar information or data are, or will, he .required by RespondentforanyreasooinconnectionwiththeProposal. � "fhmnas F..Pepe. Z61 T -3613. All rights iaserved. 7/1 1113/13 Page C2 of 72 Proposal Submittal Checklist Form This checklist indicates the formsand documents required to be submitted for this solicitation and to be presented by the deadline set for within the solicitation, Fulfillment of all solicitation requirements listed is mandatory for consideration of response to the solicitation, Additional documents may be required and, if so, they will be identified in an addendum to this RFP.:The response shall include the following items: - 011 X Bid Form X Bid Bond I f NIA Bid Bond Power of Attorney NIA X BIDDER Qualification Statement, -^' - X Non - Collusion Affidavit X Public Entity Crimes and Conflicts of Interest t! X Drug Free Workplace X Acknowledgement of Conformance with OSHA Standards" x List of Proposed Subcontractors and Principal Suppliers X Related Party Transaction Verification Form t✓ X Indemnification and Insurance Documents Csc 4 /,a X CDBG Requirements, ( "Attachment A To Rid Package "'} 'Submit this checklistalong with yaui` proposal indicating the completion and submission of eacfi required forms andlor dotuments. END OF SECTION Page I 1 of 72 @�Thomns F: Pepe, 2011 -213; All rights reserved 7l11713/I3