Loading...
Marshall Williamson Bid Forms Pages 12-15sm Steven Alexander City Manager City of South Miami 6130 Sunset Drive South Miami, FL 33143 0 Thomas F. Pepe, 2011-2013. All 6_6ts reserved. Page 12 of 72 7/11/13/13 iii, Respondent has correlated the results of all such observations, examinations, investigations, explorations, tests, reports and studies with the terms and conditions of the Contract Documents. iv, Respondent has reviewed and checked all information and data shown or indicated in the RFP Package or in the Contract Documents with respect to existing Underground Facilities at or contiguous to the site and assumes responsibility for the accurate location of all Underground Facilities. No additional examinations, investigations, explorations, tests, reports or similar information or data in respect to any Underground Facilities are, or will be, required by Respondent in order to perform and furnish the Work at the Contract Price, within the Contract Time and in accordance With the other terms and conditions • the Contract Documents. • Respondent has given the City written notice • all conflicts, errors • discrepancies that it has discovered in the Contract Documents and, if any conflicts, errors or discrepancies have been found and notice given, the Respondent represents, by submitting its proposal to the City, that the Respondent has received sufficient notice of the resolution thereof from the City, that such resolution is acceptable to Respondent and that the Respondent waives any claim regarding the conflicts, errors • discrepancies. i M il MOO -1 -1 L-J!Lwm R -I Em I A Im a I itrill Lola I&IS?;j Is A74 a LOL74 M 10*1 KPJ!L=. lot L*jjE3 K;jj!j • 0 Thomas F. Pepe, 2011-2013. All rights reserved. Page 13 of 72 7/11/13/13 5. The ENTIRE WORK shall be completed, in full, within 60 working days from the date stipulated in tj NOTICE TO PROCEED. Failure to complete the entire work during the described time period sh,, result in the assessment of liquidated damages as set forth in the Contract. 6. Communications concerning this Proposal shall be addressed to: 7. The terms used in this Proposal which are defined in the Contract shall have the same meaning as is assigned to them in the Contract Documents, unless specifically defined in this RFP Package. SUBMITTED THIS DAY OF 20X�5 PROPOSAL SUBMITTED BY: 11 ---\ -V -Lr%e- - Company Telephone Number 6R� � Fax Number .41 In a I Wavo it Page 14 of 72 C Thomas F. Pepe, 2011-2013. All rights reserved. 7/11/13/13 Item Description LS Unit Qty Amount I Mobilization I LS 2 Demolition of playground LS i . 3 Playground equipment (2-5 yrs) LS 4 1 Playground equipment (5- 12yrs) LS 5 ] Installation of playground equipment LS M .2- C--), Ck 2- Subtotal 6 Performance Bond LS l 2 'Cr2---S- C--)C 7 OH & Profit (Labor & Office Personnel) LS I 1-t- Total 0 Thomas F. Pepe, 2011 - 2013..11 rights reserved. Page IS of 72 7/11/13/13