Loading...
5700-5794 SW 76 TERR PB-82-19-004 % _e 71 kin- 4W. 4,i ItZ' % ------------------- J V J, 40 j J 'N- > N -7. e. J;71 ��12 77r 777� .JF xj�V - - , z-, 1�n ST" 0, 2t 1.11 "J,�-,- [:�v V", 13,f % all 14 CC V0 CrItz,"I U I 7� A I t4, -7, N, "J�21, 74 "k, T,!A!p %164 �D L r_� v N '77 T -s `3 t A 1-1,) :> v % 3 V t e,'­ t,�7­ V "A 't -,INN 17, t k, MATCH- EXISTIN! V, T 0 7­� 4 i 4 L S V,_ N A "A LI t "A6 15 A " , LO CA to 3 PAVEMENT t 7 4- .-J 0. C A 140 7 A q LE a AL i 1%3 r-LUSIRFRG VALVit.- ARC(ND 1A _4 C) e5 C9.I PTI,OV4 'I. TAPPING t -H­F L WHEW-!'�r,, 4 TIA F C SLEEVE (NOT REO. -REQUIRED THRUSt;­'-'BLOCK� 7', N 1Z of TO E ON CONCRETE MAINS WHERE �RANCH RUN EQUALS MAI N SIZE co FLANGE V, SPECIAL-TAP a' MIN. V4 oF Tna fl M '1.6� L PING �o.:� (water) C.I. VALVE OUTLETS ARE EXISTING T14 F zer,,s FT, Atsf V W65r ZE;Fr, �V cr_ BO_X� AND LID (see note) UJ > e cecn om TowN 5H I P 5�� 0 Tff-- 4: 'Q f_1AW C1 E: 4o 6A,;5 r, LY I N 6 A tj 0 t 2 t Id'C.I. R.'StR 'PIPE VARIES) Oro,, ( LENGTH- V.I VJC- IN� tA VA, PAD M COU WT( FLOT ;% e A I N. 7" 4, T7 . ,EXISTIN�G M C - LVE 1. GATE J V,�j. OR - P�0. G -A.3. V,E V. t '3 VE. TAPPING VALVE. r 7 31 6, P, ulREI ii­� TION EQ. A .2v t, 7 F: F1 R PROT I IV"U 41� Ic MNIM AT E A I " E A, + ' 'iTYPIC -AL CON ROTTE.- NECTIO N 7�1 Hydrant ST -C'AT EXIST -A]N TO ING -' M ..... aw, h 4 "'4, A--rf577 spaced a n,a2c- 7771 .7� iiiro Al 0 A N A aza t :, - �­,­ , - C I OR MAIN P 1-i- "- ;­.-��""�r, f ,� � t�- D. 1. 7 C.I'v-Z -71r�, 7� 'i; 7 NOTE MAIN LINE VALVES. % "A VALVE BOX ......1, 0 IN ALL USE No. 3 C �,7 A 1:4 0, t A 'COUNTY DEPT. OF ENVIP%ONM ENTAL TYPICAL GATE �VALVE DADE % k J N� f L i WATER SUH4 Y F T 0`4 LY JRC _3 z" T 16" AND SMALLER RESOU 7 4 % J" r Dat JUN, I — 148 33 5 1983 Se r e ial No. 940 Director '16 2 0"" 9, "a, For-the' Th* MT1 NC n en, e tlo cover s r esign 0 7 10 4 o V 0, A .5 Q_'� '­,� �� Z� .1 ­­ C 0' S'A 9:; 4o 0, t 0 4�I 2� -X 6'V— 7, % % L �4 �nf % 4 J. ,CONCRETE ANCHOR CONCRETE , AT ALL TEES ANCHORS AT 7 ALL 900 SENDS ES_ roject shall be in strict accord- 1. All natc2linls and 1;;bur unler this- Pi MINIMUM COMPR J Author ity 2,500 PSI n ilable and on i DAYS (A 11 Concrete SIVE ,STRENGTH OF irements of' the Miami-Dado Vlater and Sewer MATCH EX. SURFACE AT� 2 8 _ ade Water and Sewer Authority. �_J�,tt;, SCA L C-X',�t 0 11 1 5 v Blocks) % m 0". 7'N A, Al PIPE E 0 01. installed complete with 10" riser TRENCH UNDISTURBED GROUND E MIN 12* ONCRETE ANCH ORS PIP 11 be a AT, ALL 4 5* 22 Ile 0, ih er pipes and, No. 2 valve boxes.. CONCRETE ANCHORS 2" STREET' 'ELL 111/40BENDS 7, 8" CHAMFER AT ALL R 4. All water meter will b _UGS IN TEES, s e installed by the Mia -Dade Water and 8ewer CCW-RETE repaid. T END OF CROSSES,8 A 1,4 Y2" m n ges have been- 1, 6!1 AROLND Auth 2 MAINS, REGARDLESS OF- ALL T­ No.3 C,I. VALVE Box a L 10 :Vrt I& TYPE OF JOINT Fire hydrant requirements (number location) shall be -as required by 5. ye Dade County Fire Departm iate Fire Agency with instal- n 2 3/411-- ,"ance with Aut 2" BRON1E ANGLE 'VALVE A call D, ,.�.�.SA Inspect'on Division to arrange for a per ( CRANE or a qtiv. mit ' f hcri* L PWE ed stLart of con- F P 12 0 J OF FC PIPE Pv.C. PIPE' ( SCHEDULE 8 J onnel will inspect all facilities approved by this HRUST BLOCK BEARINGS ON CONCRETE T C Author; uy. All other requirements of t k 1. RfSER PIPE UNDISTURBED SOIL OF TRENCH WALL IN Vl� _�arjd.ards and reouirements. SQ.FEET AT 100 PSI INTERNAL PRESSURE % 6. 0 C PIPE SIZE DEAD 8. Work p,��rformed under this Project will not be considered as om lete HORIZONTAL BEND END 90- 45- M/2- III /4 until f inal, acceptance of the system by the, Miami-Dade Water an' d, Nz Authority and until the following documents are received ana approved 2- "1 5 n'­ Z 0 by the,,Aiitbority: Ht or 8 4 5 5 1.5 h-I.Do whichever 1211 7 10 6 3 NOTE: Is greater AL 10 1 L DIMENSIONS ARE 16 12 17 2. . Contractor VTaiver a-rid Release of Lien. 3 V CONCR BLO00?,* NET CASTING,NOT PATTERNJ ­6 3. ------------------ (i.e. , Let' er Agr cement) . ctor's Letter 'o 20 12 2" 900 BEND :rce..,ent). NOTES: ' u Ai:- 3 V2 0* "As Built" Y&l ing 'specific locations, depths, 5 ABOVE BEARING A��EAS AFJ� BASED ON AN ALLDWABLE SOIL-BEARING PRESSURE OF, w d Sur 'Gli4EE-'E IF OTHI]R SOIL CONDITIONS -ich have LID.—. /sq.ft. A14D MAY BE VARIED BY TIE. EN %�eyor al on g with two (2) prints of the' "as built" wb :VALVE BOX �MD —Ar. led by a Re-4stered- Surveyor or Ena;Tieor ARL ENCOUNTEREI,� IN _T!U� FIELD. NO. 3 C.1.) 0 V -tract and i_�ndorsi�d by tl-ie Con. or . LAVF PIPE TH1WST CALCULATED. SIZES IARGER THAN 161, MOST I' PLASTIC SHEET TO BE'. USPII B=WFEN PLUGS BOLTS OR HUBS; 'Tt ANCHORS Authority mains to be made 'by Authority CO'NC_---1,h 9. All connections from ex� stin,,, 'LY. The Contractor to excavate at required locations and ARE REQUIRED 014 TAPPING SLE:�%T-_S, F THE B-.-�kNCH,IS EQjAL TO SIZE ,OF RUN. forces OIN U S, NIPP!LE 2 1-iORT CONCRETE SHALL BEE AT LEAST EQUAL .7b THOSE TASuJ_k'TED IN THE TABfE.. i provid.e n,a' erl al wh ECCENTRIC TAPPED CAP st be submitted'to 11-DW&SA, % P R k'D 01S DE L - E ST E, —MAIN ry er permit ORS � \�� AR NOTES J ans. Pi 4 RSERS .1 , I �x - "OWN L AJR REASE AND VALVE 13OX RISERS, �7 AS SCALE POSMON. SHAI-L PLACED AND W-4-wTA wE'D IN VERTICAL, J LAVI 0 DEVELOPMENT C.01RP. MENTS STANDARD REQUIRE 'qb DATE :AV�ST, 7 10,14 2. T H F,—c*AD'TO BE COATED -AFTER INSTALLATION Val`�H f-'-WAT`E R C CYNST R UC 4 ! t afTUMA�C COAT04. D 'I,S T S Y S.T E M T E R -R I B'U T 1 0 N B L 0 W ­ 0 F F J P�n i r 7 -7, ----------- ------------- ——----