Res No 169-16-14724RESOLUTION NO.:169-16-14724
A Resolution foraspecial permit toallowa water main installation for the property
located at 6790 SW 72nd Street.
WHEREAS,Pursuant to Section 17-7 of Code of the Ordinances:
Aftersubgradehasbeenpreparedreadyforthepaving of anystreet,avenueoralley,or
aftertherepavingofanystreet,avenue,oralleynopermitshallbeissuedforany
excavation inoronsuchstreet,avenueoralley within twelve(12)monthsafterthe
completion of thepaving,andinthecase of pavingorrepavinganystreet,avenueor
alley,inthecity,withsheetasphaltoranyotherso-called permanent type of pavement,
nopermitshallbeissuedforanyexcavationinoronthestreet,avenue,oralley,withina
period of five(5)yearsfromandafterthecompletion of thepavingorrepaving,except
forthepurpose of repairingleaksinanywater,steam,gas,drainorsewerorotherpipes
and conduits,and excavations forallnew work inoronthe paved or repaved street,
avenue oralley within thetimesabove mentioned is hereby prohibited,except upon
special permit granted bythecity council.
WHEREAS,H Way Corp wishes to perform work along SW 68th Avenue and SW 72nd
Street;and
WHEREAS,allowing paving activities onaroad under moratorium maybe granted by
resolution of the City Commission;and
WHEREAS,the work being performed byHWayCorp includes the installation of a
water main on SW 68th Avenue and SW 72nd Street;and
WHEREAS,there the new water service linewill benefit many of the residents inthe
area,by improving the water pressure:and
WHEREAS,HWayCorpisrequestingaspecial permit toperformworkontheroad;
and
WHEREAS,approval of thisrequestwillnotbe detrimental orharmfultothe
surrounding area of the community atlarge.
NOW,THEREFORE,BE IT RESOLVED BY THE MAYOR AND CITY
COMMISSION OF THE CITY OF SOUTH MIAMI,FLORIDA THAT:
Section 1:Therecitalssetforthabovehavebeenfoundtobetrueandtheyarehereby
incorporatedbyreferenceas if fullysetforthherein.Therestrictionsareherebychanged
temporarilyforthecurrentconstructionactivities of HWayCorp.Theconstructionactivity
authorizedbythisResolutionmayalsobereducedorrevokedupondetermination of theCity
Managerinhissoleandabsolutediscretionthataviolation of any of the City's ordinanceorthis
Resolutionhasoccurredandhasnotbeenresolvedtohissatisfaction.Thisresolutionmaybe
revokedatanytimeinthesoleandabsolutediscretion of theCityCommission.
Page 1 of2
Res.No.169-16-14724
Special permit application submitted by applicant H Way Corp,for the installation ofa water
main on SW 68 Avenue and SW 72nd Street,is hereby approved subject toall applicable City
ordinances,codes,rulesand regulations and,asa condition to granting the special permit,the
contractor shall sign a guarantee or warranty fora term of four years to repair any bumpy
condition tothe satisfaction of the public worksdirector.
Section2.Severability.Ifanysection clause,sentence,orphraseofthis resolution isfor
any reason held invalid or unconstitutional bya court of competent jurisdiction,the holding shall
notaffectthevalidity of the remaining portions of thisresolution.
Section 3.Effective Date.This resolution shall become effective immediately upon
adoption byvote of theCity Commission.
rthPASSEDANDADOPTEDthis£l day of September,2016.
ATTEST:APPROVED:
OVED AS TO FORM
GALITYAtfD^XECUTION
Page 2 of2
MAYOR
COMMISSION VOTE:4-0
Mayor Stoddard:Absent
Vice Mayor Welsh:Yea
Commissioner Harris:Yea
Commissioner Liebman:Yea
Commissioner Edmond:Yea
South1'Miami
THE CITY OF PLEASANT LIVING
CITY OF SOUTH MIAMI
OFFICE OF THE CITY MANAGER
INTER-OFFICE MEMORANDUM
To:
From:
Date:
The Honorable Mayor&Members of the City Commission
Steven Alexander,City Manager
September 6,2016 hAgendaItemNo.:
Subject:AResolutiongrantingaspecialpermittoallowexcavationforawatermain extension
installationbyHWayCorpfor the propertylocatedat6790SW72ndStreet.
Background:Public WorksreceivedaRight of WayPermitapplicationtoinstallanew water mainas
partof development ofthepropertylocatedat6790SWSunset Drive.Theproposed
water main runs along SW 68th Avenue,and Miami Dade Water&Sewer Points of
connectionisonthe North sideofSW 72nd Street.This improvement will generatecuts
tothe pavement along SW 68th Avenue and SW 72nd Street.The permit work will include
the complete pavment restorationfrom edge toedgeof the pavment to all the
impacted roadways (referto exhibit 1).
Millingandresurfacingwas completed in the beginning of 2015aspart of the Sunset
DriveRoadway Improvements PhaseVproject.Thelimits of resurfacingin this phaseof
the project extended from SW 65th Avenue to SW 69th Avenue,along SW 72nd Street.
The City's Code of Ordinances Sec.17-7placesa moratorium on recently paved roads
foraperiod of fiveyears.The Ordinance states the following:
"After subgrade has been prepared readyfor the paving of any street,avenue oralley,
or after the repavingofany street,avenue,oralleyno permit shallbe issued forany
excavation inoronsuch street,avenue oralley within twelve (12)months after the
completion of the paving,andin the case of pavingor repaving any street,avenue or
alley,in the city,with sheet asphalt orany other so-called permanent type of pavement,
no permit shallbe issued forany excavation inoron the street,avenue,oralley,within
aperiodoffive(5)yearsfromandafter the completion of the pavingorrepaving,
except for the purpose ofrepairingleaksinany water,steam,gas,drainor sewer or
other pipesand conduits,and excavations forall new work inoron the pavedor
repaved street,avenue oralley within the times above mentioned is hereby prohibited,
except uponspecial permit granted by the city council/'
The resolution attached is requesting aspecial permit,as allowed in the Codeof
OrdinancesSec.17-7fortheinstallationof the water main extension within the recently
pavedroad.PublicWorksEngineeringDivisionhas evaluated the proposed
improvements andhas determined that this connection willalso improve the current
water pressure of the system byclosing the system loop.This improvement will benefit
the residents in the surrounding areas.
Amount:Not applicable
Account:Not applicable
Attachments:Resolution
Code of Ordinances Sec.17-7
Exhibit
City of South Miami Code of Ordinances
Chapter 17 -Streets and Sidewalks
Article I -In General
Sec.17-7.-Same—Noticeof street pavingbycity;utility connections prohibited forspecified periods
after paving.
Whenever astreet,avenue oralleyis about tobepaved or repaved,thecity manager orhis
authorized representative,shallnotifythepropertyowners,lessees and tenants onsuch street,avenue or
alleyoftheintentiontopaveorrepavesuchstreet,avenue,oralleys,sothatallwater,steam,gas,drain
or sewer connections can be made priorto the paving or repaving of the same.
After subgrade hasbeenpreparedreadyforthe paving ofanystreet,avenue or alley,orafterthe
repavingofanystreet,avenue,oralleynopermitshallbeissuedforanyexcavationinoron such street,
avenueoralley within twelve (12)monthsafterthe completion ofthe paving,andinthecaseofpavingor
repavinganystreet,avenueor alley,inthe city,with sheetasphaltoranyotherso-calledpermanenttype
of pavement,no permit shall beissuedforany excavation in oronthestreet,avenue,or alley,within a
period of five (5)years from andafterthe completion ofthe paving or repaving,exceptforthepurposeof
repairing leaks in any water,steam,gas,drain orsewerorotherpipesandconduits,andexcavations for
ailnewworkinoronthepavedorrepavedstreet,avenueoralley within thetimesabovementionedis
herebyprohibited,except upon special permit granted bythecitycouncil.
(Ord.6,§4,4-13-26)
Pagel
u
8
*
P
r
o
p
o
s
e
d
8"
w
a
t
e
r
m
a
i
n
%
-
s
s
w
«
b
HO
P
C
T
f
f
i
T
a I
D
0
4
-
4-
^M
S
L
J
+
-
a
—
<D *
-
*
8
-
SU
N
S
E
T
LU
D
L
A
M
EL
E
M
SC
H
O
O
L
S
W
7
4
S
T
-
8
-
7
"
DJ
5 C
O